Networks Project 2016 Bill of Quantity OSP Works - : Aerial Cable

This document is a bill of quantity for an aerial cable networks project in an unspecified location. It lists various items needed for the project, including permitting, materials, and civil works. The document provides units and quantities for each item but does not include pricing information. It notes that the total material and service cost, amount subject to negotiation, applicable taxes, and grand total will be provided. The project manager is listed as Yusuf Zamaludin, based in Jakarta.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
34 views

Networks Project 2016 Bill of Quantity OSP Works - : Aerial Cable

This document is a bill of quantity for an aerial cable networks project in an unspecified location. It lists various items needed for the project, including permitting, materials, and civil works. The document provides units and quantities for each item but does not include pricing information. It notes that the total material and service cost, amount subject to negotiation, applicable taxes, and grand total will be provided. The project manager is listed as Yusuf Zamaludin, based in Jakarta.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 4

NETWORKS PROJECT 2016

Bill Of Quantity OSP Works - Aerial Cable

Location :
Customer Name : NA
BOQ

No Description Unit QTY

FTTH
A. Permitting
Permitting (On Area) Ls 1
B. Material dan Service
I.
1 M -
2 M -
3 M -
4 M -
5 M -
6 M -
7 M -
8 M -
9 M -
10 M -
11 M -
12 M -
13 m -
13 m -
-
II. Civil Works -
1 PCS -
2 PCS -
3 PCS -
4 PCS -
5 M -
6 M -
7 M -
8 M -
9 M -
10 M -
Noted : otal Material + Service :
Negotiatian :
PPN 10% :
Grand Total :

2 Yusuf Zamaludin
Project Manager
Jakarta,

Unit Price Total

IDR
-
-
-

-
-
-
-
-
-
-
-
-
-
-
-
-
-

-
-
-
-
-
-
-
-
-
-
aterial + Service :
Negotiatian :
PPN 10% :
Grand Total :