Chapter 3
Chapter 3
ROOF DECK
SPAN 1-2 SPAN 2
Q(Kpa) (Kpa)
Dead Load due to Slab(S5) 12.06 114.27 --
25.02
Live Load due to Slab(S5) 12.96 --
Dead Load due to Slab(S3) -- 12.06
Live Load due to Slab(S3) -- -- -- 12.96
Dead Load due to Slab(S3) -- --
Live Load due to Slab(S3) -- -- -- --
Dead Load due to Slab (S1)
Live Load due to Slab (S1)
Parapeth wall 3.54
Total 117.81 Total
ROOF DECK
SPAN 1-2 SPAN 2
Q(Kpa) (Kpa)
Dead Load due to Slab(S5) 12.06 --
25.02 81.88
Live Load due to Slab(S5) 12.96 --
Dead Load due to Slab(S3) -- 12.06
Live Load due to Slab(S3) -- -- -- 12.96
Dead Load due to Slab(S3) -- --
Live Load due to Slab(S3) -- -- -- --
Dead Load due to Slab (S1)
Live Load due to Slab (S1)
Parapeth wall 3.54
Total 85.42 Total
Design Load Ca
GRID
ROOF DECK
SPAN A-B SPAN B
Q(Kpa) (Kpa)
Dead Load due to Slab(S1) 12.06 --
25.02 43.73
Live Load due to Slab(S1) 12.96 --
Dead Load due to Slab(S2) -- 12.06
Live Load due to Slab(S2) -- -- -- 12.96
Dead Load due to Slab(S1) -- --
Live Load due to Slab(S1) -- -- -- --
Parapeth wall 3.54
Total 47.27 Total
Design Load Ca
GRID
ROOF DECK
SPAN A-B SPAN B
Q(Kpa) (Kpa)
Dead Load due to Slab(S1) 12.06 --
25.02 87.46
Live Load due to Slab(S1) 12.96 --
Dead Load due to Slab(S2) -- 12.06
Live Load due to Slab(S2) -- -- -- 12.96
Dead Load due to Slab(S1) -- --
Live Load due to Slab(S1) -- -- -- --
Parapeth wall 3.54
Total 91.00 Total
ROOF DECK
SPAN 1-2 SPAN 2
ROOF DECK
Q(Kpa) (Kpa)
Dead Load due to Slab(S5) 12.06 --
25.02 38.09
Live Load due to Slab(S5) 12.96 --
Dead Load due to Slab(S3) -- 12.06
Live Load due to Slab(S3) -- -- -- 12.96
Dead Load due to Slab(S3) -- --
Live Load due to Slab(S3) -- -- -- --
Dead Load due to Slab (S1)
Live Load due to Slab (S1)
Total 38.09 Total
ROOF DECK
SPAN 1-2 SPAN 2
Q(Kpa) (Kpa)
Dead Load due to Slab(S5) 12.06 --
25.02 38.09
Live Load due to Slab(S5) 12.96 --
Dead Load due to Slab(S3) -- 12.06
Live Load due to Slab(S3) -- -- -- 12.96
Dead Load due to Slab(S3) -- --
Live Load due to Slab(S3) -- -- -- --
Dead Load due to Slab (S1)
Live Load due to Slab (S1)
Total 38.09 Total
Design Load Ca
GRID
ROOF DECK
SPAN A-B SPAN B
Q(Kpa) (Kpa)
Dead Load due to Slab(S1) 12.06 --
25.02 43.73
Live Load due to Slab(S1) 12.96 --
Dead Load due to Slab(S2) -- 12.06
Live Load due to Slab(S2) -- -- -- 12.96
Dead Load due to Slab(S1) -- --
Live Load due to Slab(S1) -- -- -- --
Total 43.73 Total
Design Load Ca
ROOF DECK GRID
SPAN A-B SPAN B
Q(Kpa) (Kpa)
Dead Load due to Slab(S1) 12.06 --
25.02 43.73
Live Load due to Slab(S1) 12.96 --
Dead Load due to Slab(S2) -- 12.06
Live Load due to Slab(S2) -- -- -- 12.96
Dead Load due to Slab(S1) -- --
Live Load due to Slab(S1) -- -- -- --
Total 43.73 Total
Design Load Ca
GRID
ROOF DECK
SPAN A-B SPAN B
Q(Kpa) (Kpa)
Dead Load due to Slab(S1) 12.06 --
25.02 43.73
Live Load due to Slab(S1) 12.96 --
Dead Load due to Slab(S2) -- 12.06
Live Load due to Slab(S2) -- -- -- 12.96
Dead Load due to Slab(S1) -- --
Live Load due to Slab(S1) -- -- -- --
Total 43.73 Total
PELIMINAR
BEAM LENGTH(L) LOCATION
DESIGNATION
mm
Load Calculations
GRID 1
SPAN A-B SPAN B-C SPAN C-D
LL DL LL DL LL
0 2.95 0 2.95 0
0 0.24 0 0.24 0
0 0.59 0 0.59 0
0 1.10 0 1.10 0
0 0.96 0 0.96 0
0 3.74 0 3.74 0
0 0 0 0 0
2.4 0 2.4 0 2.4
3.8 0 3.8 0 3.8
0 0.023 0 0.023 0
0 0 0 0 4.8
0 0.07 0 0.07 0
1.9 0 1.9 0 1.9
0 0.38 0 0.38 0
8.10 10.05 8.10 10.05 12.90
Load Calculations
GRID 5
SPAN A-B SPAN B-C SPAN C-D
LL DL LL DL LL
0 2.95 0 2.95 0
0 0.24 0 0.24 0
0 0.59 0 0.59 0
0 1.10 0 1.10 0
0 0.96 0 0.96 0
0 3.74 0 3.74 0
0 0 0 0 0
2.4 0 2.4 0 2.4
3.8 0 3.8 0 3.8
0 0.023 0 0.023 0
0 0 0 0 4.8
0 0.07 0 0.07 0
1.9 0 1.9 0 1.9
0 0.38 0 0.38 0
8.10 10.05 8.10 10.05 12.90
Load Calculations
GRID B
SPAN 1-2 SPAN 2-3 SPAN 3-4 SPAN 4-5
LL DL LL DL LL DL
0 2.95 0 2.95 0 2.95
0 0.24 0 0.24 0 0.24
0 0.59 0 0.59 0 0.59
0 1.10 0 1.10 0 1.1
0 0.96 0 0.96 0 0.96
0 3.74 0 3.74 0 3.74
0 0 0 0 0 0
2.4 0 2.4 0 2.4 0
3.8 0 3.8 0 3.8 0
0 0.023 0 0.023 0 0.023
0 0 0 0 4.8 0
0 0.07 0 0.07 0 0.07
1.9 0 1.9 0 1.9 0
0 0.38 0 0.38 0 0.38
8.10 10.05 8.10 10.05 12.90 10.05
Load Calculations
GRID C
SPAN 1-2 SPAN 2-3 SPAN 3-4 SPAN 4-5
LL DL LL DL LL DL
0 2.95 0 2.95 0 2.95
0 0.24 0 0.24 0 0.24
0 0.59 0 0.59 0 0.59
0 1.10 0 1.10 0 1.1
0 0.96 0 0.96 0 0.96
0 3.74 0 3.74 0 3.74
0 0 0 0 0 0
2.4 0 2.4 0 2.4 0
3.8 0 3.8 0 3.8 0
0 0.023 0 0.023 0 0.023
0 0 0 0 4.8 0
0 0.07 0 0.07 0 0.07
1.9 0 1.9 0 1.9 0
0 0.38 0 0.38 0 0.38
8.10 10.05 8.10 10.05 12.90 10.05
25.02 55.81 --
-- -- --
12.06 32.70 --
-- -- 20.64 72.94 --
12.0636
12.96
Total 55.81 Total 72.94 Total
Load Calculations
GRID 2
SPAN A-B SPAN B-C SPAN C-D
LL DL LL DL LL
0 2.95 0 2.95 0
0 0.24 0 0.24 0
0 0.59 0 0.59 0
0 1.10 0 1.10 0
0 0.96 0 0.96 0
0 3.74 0 3.74 0
0 0 0 0 0
2.4 0 2.4 0 2.4
3.8 0 3.8 0 3.8
0 0.023 0 0.023 0
0 0 0 0 4.8
0 0.07 0 0.07 0
1.9 0 1.9 0 1.9
0 0.38 0 0.38 0
8.10 10.05 8.10 10.05 12.90
Load Calculations
GRID 3
SPAN A-B SPAN B-C SPAN C-D
LL DL LL DL LL
0 2.95 0 2.95 0
0 0.24 0 0.24 0
0 0.59 0 0.59 0
0 1.10 0 1.10 0
0 0.96 0 0.96 0
0 3.74 0 3.74 0
0 0 0 0 0
2.4 0 2.4 0 2.4
3.8 0 3.8 0 3.8
0 0.023 0 0.023 0
0 0 0 0 4.8
0 0.07 0 0.07 0
1.9 0 1.9 0 1.9
0 0.38 0 0.38 0
8.10 10.05 8.10 10.05 12.90
Load Calculations
GRID 4
SPAN A-B SPAN B-C SPAN C-D
LL DL LL DL LL
0 2.95 0 2.95 0
0 0.24 0 0.24 0
0 0.59 0 0.59 0
0 1.10 0 1.10 0
0 0.96 0 0.96 0
0 3.74 0 3.74 0
0 0 0 0 0
2.4 0 2.4 0 2.4
3.8 0 3.8 0 3.8
0 0.023 0 0.023 0
0 0 0 0 4.8
0 0.07 0 0.07 0
1.9 0 1.9 0 1.9
0 0.38 0 0.38 0
8.10 10.05 8.10 10.05 12.90
SPAN 4-5
Q(Kpa) (Kpa)
-- --
-- --
25.0236 43.73
3.54
Total 47.27
SPAN 4-5
LL
0
0
0
0
0
0
0
2.4
3.8
0
0
0
1.9
0
8.10
SPAN 4-5
Q(Kpa) (Kpa)
-- --
-- --
25.0236 43.73
3.54
Total 47.27
SPAN 4-5
LL
0
0
0
0
0
0
0
2.4
3.8
0
0
0
1.9
0
8.10
SPAN 4-5
Q(Kpa) (Kpa)
-- --
-- --
25.0236 43.73
Total 43.73
SPAN 4-5
LL
0
0
0
0
0
0
0
2.4
3.8
0
0
0
1.9
0
8.10
SPAN 4-5
Q(Kpa) (Kpa)
-- --
-- --
25.0236 43.73
25.0236 43.73
Total 43.73
Slab Load Calculations
5TH FLOOR
Slab Weight
Plaster on Tile or Concrete
Floor Topping
Ceramic or quarry tiles
Frame Partitions
200mm thk CHB Exterior wall
100mm thk CHB interior wall, Both face plastered
Office
Schools
Windows, glass, frames and sash
Total
5TH FLOOR
SPAN 1-2
Q(Kpa) (Kpa)
Dead Load due to Slab(S5) 11.95
21.87 33.29
Live Load due to Slab(S5) 9.92
Dead Load due to Slab(S3) --
Live Load due to Slab(S3) -- -- --
Dead Load due to Slab(S3) --
Live Load due to Slab(S3) -- -- --
Dead Load due to Slab (S1)
Live Load due to Slab (S1)
Total 33.29
5TH FLOOR
Slab Weight
Plaster on Tile or Concrete
Floor Topping
Ceramic or quarry tiles
Frame Partitions
200mm thk CHB Exterior wall
100mm thk CHB interior wall, Both face plastered
Office
Schools
Windows, glass, frames and sash
Total
5TH FLOOR
SPAN 1-2
Q(Kpa) (Kpa)
Dead Load due to Slab(S5) 11.95
21.87 33.29
Live Load due to Slab(S5) 9.92
Dead Load due to Slab(S3) --
Live Load due to Slab(S3) -- -- --
Dead Load due to Slab(S3) --
Live Load due to Slab(S3) -- -- --
Dead Load due to Slab (S1)
Live Load due to Slab (S1)
Total 33.29
5TH FLOOR
Slab Weight
Plaster on Tile or Concrete
Floor Topping
Ceramic or quarry tiles
Frame Partitions
200mm thk CHB Exterior wall
100mm thk CHB interior wall, Both face plastered
Office
Schools
Windows, glass, frames and sash
Total
Design Loa
5TH FLOOR
G
5TH FLOOR
SPAN A-B
Q(Kpa) (Kpa)
Dead Load due to Slab(S1) 11.95
21.87 38.22
Live Load due to Slab(S1) 9.92
Dead Load due to Slab(S2) --
Live Load due to Slab(S2) -- -- --
Dead Load due to Slab(S1) --
Live Load due to Slab(S1) -- -- --
Total 38.22
5TH FLOOR
Slab Weight
Plaster on Tile or Concrete
Floor Topping
Ceramic or quarry tiles
Frame Partitions
Design Loa
G
5TH FLOOR
SPAN A-B
Q(Kpa) (Kpa)
Dead Load due to Slab(S1) 11.95
21.87 38.22
Live Load due to Slab(S1) 9.92
Dead Load due to Slab(S2) --
Live Load due to Slab(S2) -- -- --
Dead Load due to Slab(S1) --
Live Load due to Slab(S1) -- -- --
Total 38.22
Slab Load Calculations
5TH FLOOR
Slab Weight
Plaster on Tile or Concrete
Floor Topping
Ceramic or quarry tiles
Frame Partitions
200mm thk CHB Exterior wall
100mm thk Interior wall
Office
Schools
Windows, glass, frames and sash
Total
5TH FLOOR
SPAN 1-2
Q(Kpa) (Kpa)
Dead Load due to Slab(S5) 7.01
16.93 25.77
Live Load due to Slab(S5) 9.92
Dead Load due to Slab(S4) --
Live Load due to Slab(S4) -- -- --
Dead Load due to Slab(S4) --
Live Load due to Slab(S4) -- -- --
Dead Load due to Slab(S4)
Live Load due to Slab(S5)
Total 25.77
5TH FLOOR
Slab Weight
Plaster on Tile or Concrete
Floor Topping
Ceramic or quarry tiles
Frame Partitions
200mm thk CHB Exterior wall
100mm thk Interior wall
Office
Schools
Windows, glass, frames and sash
Total
5TH FLOOR
SPAN 1-2
Q(Kpa) (Kpa)
Dead Load due to Slab(S5) 7.01
16.93 25.77
Live Load due to Slab(S5) 9.92
Dead Load due to Slab(S4) --
Live Load due to Slab(S4) -- -- --
Dead Load due to Slab(S4) --
Live Load due to Slab(S4) -- -- --
Dead Load due to Slab (S2)
Live :pad due to Slab (S2)
Total 25.77
5TH FLOOR
Slab Weight
Plaster on Tile or Concrete
Floor Topping
Ceramic or quarry tiles
Frame Partitions
200mm thk CHB Exterior wall
100mm thk CHB interior wall, Both face plastered
Office
Schools
Windows, glass, frames and sash
Total
Design Loa
G
5TH FLOOR
5TH FLOOR
SPAN A-B
Q(Kpa) (Kpa)
Dead Load due to Slab(S1) 11.95
21.87 38.22
Live Load due to Slab(S1) 9.92
Dead Load due to Slab(S2) --
Live Load due to Slab(S2) -- -- --
Dead Load due to Slab(S1) --
Live Load due to Slab(S1) -- -- --
Total 38.22
5TH FLOOR
Slab Weight
Plaster on Tile or Concrete
Floor Topping
Ceramic or quarry tiles
Frame Partitions
200mm thk CHB Exterior wall
100mm thk CHB interior wall, Both face plastered
Office
Schools
Windows, glass, frames and sash
Total
Design Loa
G
5TH FLOOR
SPAN A-B
Q(Kpa) (Kpa)
Dead Load due to Slab(S4) 11.95
21.87 16.32
Live Load due to Slab(S4) 9.92
Dead Load due to Slab(S4) --
Live Load due to Slab(S4) -- -- --
Dead Load due to Slab(S4) --
Live Load due to Slab(S4) -- -- --
Total 16.32
Slab Weight
Plaster on Tile or Concrete
Floor Topping
Ceramic or quarry tiles
Frame Partitions
200mm thk CHB Exterior wall
100mm thk CHB interior wall, Both face plastered
Office
Schools
Windows, glass, frames and sash
Total
Design Loa
G
5TH FLOOR
SPAN A-B
Q(Kpa) (Kpa)
Dead Load due to Slab(S1) 11.95
21.87 38.22
Live Load due to Slab(S1) 9.92
Dead Load due to Slab(S2) --
Live Load due to Slab(S2) -- -- --
Dead Load due to Slab(S2) --
Live Load due to Slab(S2) -- -- --
Total 38.22
lab Load Calculations
GRID A
SPAN 1-2 SPAN 2-3 SPAN 3-4 SPAN 4-5
DL LL DL LL DL LL DL LL
2.95 0 2.95 0 2.95 0 2.95 0
0.24 0 0.24 0 0.24 0 0.24 0
0.59 0 0.59 0 0.59 0 0.59 0
1.10 0 1.10 0 1.10 0 1.1 0
0.96 0 0.96 0 0.96 0 0.96 0
3.74 0 3.74 0 3.74 0 3.74 0
0 0 0 0 0 0 0 0
0 2.4 0 2.4 0 2.4 0 2.4
0 3.8 0 3.8 0 3.8 0 3.8
0.38 0 0.38 0 0.38 0 0.38 0
DL LL DL LL
2.95 0 2.95 0
0.24 0 0.24 0
0.59 0 0.59 0
1.10 0 1.10 0
0.96 0 0.96 0
3.74 0 3.74 0
0 0 0 0
0 2.4 0 2.4
0 3.8 0 3.8
0.38 0 0.38 0
9.96 6.20 9.96 6.20
Desi
4TH FLOOR
SPAN 1-2 SPAN 2-3
Q(Kpa) (Kpa)
Dead Load due to Slab(S5) 11.95 --
21.87 33.29
Live Load due to Slab(S5) 9.92 --
Dead Load due to Slab(S3) -- 11.95
Live Load due to Slab(S3) -- -- 9.92
Dead Load due to Slab(S3) -- --
Live Load due to Slab(S3) -- -- -- --
Dead Load due to Slab (S1)
Live Load due to Slab (S1)
Desi
4TH FLOOR
SPAN 1-2 SPAN 2-3
Q(Kpa) (Kpa)
Dead Load due to Slab(S5) 11.95 --
21.87 33.29
Live Load due to Slab(S5) 9.92 --
Dead Load due to Slab(S3) -- 11.95
Live Load due to Slab(S3) -- -- -- 9.92
Dead Load due to Slab(S3) -- --
Live Load due to Slab(S3) -- -- -- --
Dead Load due to Slab (S1)
Live Load due to Slab (S1)
Total 33.29 Total
4TH FLOOR
SPAN A-B
DL
Slab Weight 2.95
Plaster on Tile or Concrete 0.24
Floor Topping 0.59
Ceramic or quarry tiles 1.10
Frame Partitions 0.96
200mm thk CHB Exterior wall 3.74
100mm thk CHB interior wall, Both face plastered 0
Office 0
Schools 0
Windows, glass, frames and sash 0.38
Total 9.96
Design Load Calcula
Desi
4TH FLOOR
SPAN 1-2 SPAN 2-3
Q(Kpa) (Kpa)
Dead Load due to Slab(S5) 7.01 --
16.93 #REF!
Live Load due to Slab(S5) 9.92 --
Dead Load due to Slab(S4) -- 7.01
Live Load due to Slab(S4) -- -- -- 9.92
Dead Load due to Slab(S4) -- --
Live Load due to Slab(S4) -- -- -- --
Dead Load due to Slab(S4)
Live Load due to Slab(S5)
Total #REF! Total
Desi
4TH FLOOR
SPAN 1-2 SPAN 2-3
Q(Kpa) (Kpa)
Dead Load due to Slab(S5) 7.01 --
16.93 25.77
Live Load due to Slab(S5) 9.92 --
Dead Load due to Slab(S4) -- 7.01
Live Load due to Slab(S4) -- -- -- 9.92
Dead Load due to Slab(S4) -- --
Live Load due to Slab(S4) -- -- -- --
Dead Load due to Slab (S2)
Live :pad due to Slab (S2)
Total 25.77 Total
4TH FLOOR
4TH FLOOR GRID 2
SPAN A-B SPAN B-C
Q(Kpa) (Kpa)
Dead Load due to Slab(S1) 11.95 --
21.87 38.22
Live Load due to Slab(S1) 9.92 --
Dead Load due to Slab(S2) -- 11.95
Live Load due to Slab(S2) -- -- -- 9.92
Dead Load due to Slab(S1) -- --
Live Load due to Slab(S1) -- -- -- --
Total 38.22 Total
alculations
GRID D
SPAN 1-2 SPAN 2-3 SPAN 3-4 SPAN 4-5
LL DL LL DL LL DL LL
0 2.95 0 2.95 0 2.95 0
0 0.24 0 0.24 0 0.24 0
0 0.59 0 0.59 0 0.59 0
0 1.10 0 1.10 0 1.1 0
0 0.96 0 0.96 0 0.96 0
0 3.74 0 3.74 0 3.74 0
0 0 0 0 0 0 0
2.4 0 2.4 0 2.4 0 2.4
3.8 0 3.8 0 3.8 0 3.8
0 0.38 0 0.38 0 0.38 0
6.20 9.96 6.20 9.96 6.20 9.96 6.20
alculations
GRID 1
-- --
-- --
21.87
#REF!
Total #REF!
alculations
GRID 5
SPAN A-B SPAN B-C SPAN C-D
LL DL LL DL LL
0 2.95 0 2.95 0
0 0.24 0 0.24 0
0 0.59 0 0.59 0
0 1.10 0 1.10 0
0 0.96 0 0.96 0
0 3.74 0 3.74 0
0 0 0 0 0
2.4 0 2.4 0 2.4
3.8 0 3.8 0 3.8
0 0.38 0 0.38 0
6.20 9.96 6.20 9.96 6.20
0 0 0 0 0 0 0
6.20 5.84 6.20 5.84 6.20 5.84 6.20
alculations
GRID C
SPAN 1-2 SPAN 2-3 SPAN 3-4 SPAN 4-5
LL DL LL DL LL DL LL
0 2.95 0 2.95 0 2.95 0
0 0.24 0 0.24 0 0.24 0
0 0.59 0 0.59 0 0.59 0
0 1.10 0 1.10 0 1.1 0
0 0.96 0 0.96 0 0.96 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
2.4 0 2.4 0 2.4 0 2.4
3.8 0 3.8 0 3.8 0 3.8
0 0 0 0 0 0 0
6.20 5.84 6.20 5.84 6.20 5.84 6.20
alculations
GRID 2
SPAN A-B SPAN B-C SPAN C-D
LL DL LL DL LL
0 2.95 0 2.95 0
0 0.24 0 0.24 0
0 0.59 0 0.59 0
0 1.10 0 1.10 0
0 0.96 0 0.96 0
0 3.74 0 3.74 0
0 0 0 0 0
2.4 0 2.4 0 2.4
3.8 0 3.8 0 3.8
0 0.38 0 0.38 0
6.20 9.96 6.20 9.96 6.20
alculations
GRID 3
SPAN A-B SPAN B-C SPAN C-D
LL DL LL DL LL
0 2.95 0 2.95 0
0 0.24 0 0.24 0
0 0.59 0 0.59 0
0 1.10 0 1.10 0
0 0.96 0 0.96 0
0 3.74 0 3.74 0
0 0 0 0 0
2.4 0 2.4 0 2.4
3.8 0 3.8 0 3.8
0 0.38 0 0.38 0
6.20 9.96 6.20 9.96 6.20
Schools 0 3.8
Windows, glass, frames and sash 0.38 0
Total 9.96 6.20
GRID 1
3RD FLOOR SPAN A-B
DL LL
Slab Weight 2.95 0
Plaster on Tile or Concrete 0.24 0
Floor Topping 0.59 0
Ceramic or quarry tiles 1.10 0
Frame Partitions 0.96 0
200mm thk CHB Exterior wall 3.74 0
100mm thk CHB interior wall, Both face plastered 0 0
Office 0 2.4
Schools 0 3.8
Windows, glass, frames and sash 0.38 0
Total 9.96 6.20
Design Load Calculations
3RD FLOOR GRID 1
SPAN A-B SPAN C-D
Q(Kpa) (Kpa) Q(Kpa)
Dead Load due to Slab(S1) 11.95 --
21.87 38.22
Live Load due to Slab(S1) 9.92 -- --
Dead Load due to Slab(S2) -- --
Live Load due to Slab(S2) -- -- -- -- --
Dead Load due to Slab(S1) -- 11.95
21.87
Live Load due to Slab(S1) -- -- -- 9.92
Total 38.22 Total
Schools 0 3.8
Windows, glass, frames and sash 0 0
Total 5.84 6.20
s
GRID D
SPAN 2-3 SPAN 3-4 SPAN 4-5
DL LL DL LL DL LL
2.95 0 2.95 0 2.95 0
0.24 0 0.24 0 0.24 0
0.59 0 0.59 0 0.59 0
1.10 0 1.10 0 1.1 0
0.96 0 0.96 0 0.96 0
3.74 0 3.74 0 3.74 0
0 0 0 0 0 0
0 2.4 0 2.4 0 2.4
0 3.8 0 3.8 0 3.8
0.38 0 0.38 0 0.38 0
9.96 6.20 9.96 6.20 9.96 6.20
GRID 1
SPAN C-D
DL LL
2.95 0
0.24 0
0.59 0
1.10 0
0.96 0
3.74 0
0 0
0 2.4
0 3.8
0.38 0
9.96 6.20
n Load Calculations
GRID 1
SPAN C-D
(Kpa)
--
--
38.22
38.22
s
GRID 5
SPAN B-C SPAN C-D
DL LL DL LL
2.95 0 2.95 0
0.24 0 0.24 0
0.59 0 0.59 0
1.10 0 1.10 0
0.96 0 0.96 0
3.74 0 3.74 0
0 0 0 0
0 2.4 0 2.4
0 3.8 0 3.8
0.38 0 0.38 0
9.96 6.20 9.96 6.20
n Load Calculations
GRID 5
SPAN B-C SPAN C-D
(Kpa) Q(Kpa) (Kpa)
--
-- -- -- --
--
21.63
-- -- --
11.95
21.87
-- 9.92 38.22
21.63 Total 38.22
s
GRID B
SPAN 2-3 SPAN 3-4 SPAN 4-5
DL LL DL LL DL LL
2.95 0 2.95 0 2.95 0
0.24 0 0.24 0 0.24 0
0.59 0 0.59 0 0.59 0
1.10 0 1.10 0 1.1 0
0.96 0 0.96 0 0.96 0
0 0 0 0 0 0
0 0 0 0 0 0
0 2.4 0 2.4 0 2.4
s
GRID C
SPAN 2-3 SPAN 3-4 SPAN 4-5
DL LL DL LL DL LL
2.95 0 2.95 0 2.95 0
0.24 0 0.24 0 0.24 0
0.59 0 0.59 0 0.59 0
1.10 0 1.10 0 1.1 0
0.96 0 0.96 0 0.96 0
0 0 0 0 0 0
0 0 0 0 0 0
0 2.4 0 2.4 0 2.4
0 3.8 0 3.8 0 3.8
0 0 0 0 0 0
5.84 6.20 5.84 6.20 5.84 6.20
s
GRID 2
SPAN B-C SPAN C-D
DL LL DL LL
2.95 0 2.95 0
0.24 0 0.24 0
0.59 0 0.59 0
1.10 0 1.10 0
0.96 0 0.96 0
3.74 0 3.74 0
0 0 0 0
0 2.4 0 2.4
0 3.8 0 3.8
0.38 0 0.38 0
9.96 6.20 9.96 6.20
n Load Calculations
GRID 2
SPAN B-C SPAN C-D
(Kpa) Q(Kpa) (Kpa)
--
-- -- -- --
--
21.63
-- -- --
11.95
21.87
-- 9.92 38.22
21.63 Total 38.22
s
GRID 3
SPAN B-C SPAN C-D
DL LL DL LL
2.95 0 2.95 0
0.24 0 0.24 0
0.59 0 0.59 0
1.10 0 1.10 0
0.96 0 0.96 0
3.74 0 3.74 0
0 0 0 0
0 2.4 0 2.4
0 3.8 0 3.8
0.38 0 0.38 0
9.96 6.20 9.96 6.20
n Load Calculations
GRID 3
SPAN B-C SPAN C-D
(Kpa) Q(Kpa) (Kpa)
--
-- -- -- --
--
16.32
-- -- --
11.95
21.87
-- 9.92 16.32
16.32 Total 16.32
s
GRID 4
SPAN B-C SPAN C-D
DL LL DL LL
2.95 0 2.95 0
0.24 0 0.24 0
0.59 0 0.59 0
1.10 0 1.10 0
0.96 0 0.96 0
3.74 0 3.74 0
0 0 0 0
0 2.4 0 2.4
0 3.8 0 3.8
0.38 0 0.38 0
9.96 6.20 9.96 6.20
n Load Calculations
GRID 4
SPAN B-C SPAN C-D
(Kpa) Q(Kpa) (Kpa)
--
-- -- -- --
--
21.63
-- -- --
11.95
21.87
-- 9.92 21.63
21.63 Total 21.63
Slab Load Calculations
GRID A
2ND FLOOR SPAN 1-2 SPAN 2-3
DL LL DL
Slab Weight 2.95 0 2.95
Plaster on Tile or Concrete 0.24 0 0.24
Floor Topping 0.59 0 0.59
Ceramic or quarry tiles 1.10 0 1.10
Frame Partitions 0.96 0 0.96
200mm thk CHB Exterior wall 3.74 0 3.74
100mm thk CHB interior wall, Both face plastered 0 0 0
Office 0 2.4 0
Suspended metal lath and cement 0.72 0 0.72
Schools 0 3.8 0
Windows, glass, frames and sash 0.38 0 0.38
Total 10.68 6.20 10.68
GRID 1
2ND FLOOR SPAN A-B SPAN C-D
DL LL DL
Slab Weight 2.95 0 2.95
Plaster on Tile or Concrete 0.24 0 0.24
Floor Topping 0.59 0 0.59
Ceramic or quarry tiles 1.10 0 1.10
Frame Partitions 0.96 0 0.96
200mm thk CHB Exterior wall 3.74 0 3.74
100mm thk CHB interior wall, Both face plastered 0 0 0
Office 0 2.4 0
Schools 0 3.8 0
Windows, glass, frames and sash 0.38 0 0.38
Total 9.96 6.20 9.96
GRID D
SPAN 2-3 SPAN 3-4 SPAN 4-5
LL DL LL DL LL
0 2.95 0 2.95 0
0 0.24 0 0.24 0
0 0.59 0 0.59 0
0 1.10 0 1.1 0
0 0.96 0 0.96 0
0 3.74 0 3.74 0
0 0.72 0 0.72 0
2.4 0 2.4 0 2.4
3.8 0 3.8 0 3.8
0 0.38 0 0.38 0
6.20 10.68 6.20 10.68 6.20
GRID 1
SPAN C-D
LL
0
0
0
0
0
0
0
2.4
3.8
0
6.20
ulations
GRID 5
SPAN B-C SPAN C-D
LL DL LL
0 2.95 0
0 0.24 0
0 0.59 0
0 1.10 0
0 0.96 0
0 3.74 0
0 0.72 0
2.4 0 2.4
3.8 0 3.8
0 0.38 0
6.20 10.68 6.20
ulations
SPAN C-D
Q(Kpa) (Kpa)
--
-- -- --
--
-- -- --
12.82
22.74
9.92 39.73
Total 39.73
GRID B
SPAN 2-3 SPAN 3-4 SPAN 4-5
LL DL LL DL LL
0 2.95 0 2.95 0
0 0.24 0 0.24 0
0 0.59 0 0.59 0
0 1.10 0 1.1 0
0 0.96 0 0.96 0
0 0 0 0 0
0 0 0 0 0
2.4 0 2.4 0 2.4
3.8 0 3.8 0 3.8
0 0 0 0 0
6.20 5.84 6.20 5.84 6.20
GRID C
SPAN 2-3 SPAN 3-4 SPAN 4-5
LL DL LL DL
0 2.95 0 2.95 LL
0 0.24 0 0.24 0
0 0.59 0 0.59 0
0 1.10 0 1.1 0
0 0.96 0 0.96 0
0 0 0 0 0
0 0 0 0 0
2.4 0 2.4 0 0
3.8 0 3.8 0 2.4
0 0 0 0 3.8
6.20 5.84 6.20 5.84 0
6.20
GRID 2
SPAN B-C SPAN C-D
LL DL LL
0 2.95 0
0 0.24 0
0 0.59 0
0 1.10 0
0 0.96 0
0 3.74 0
0 0 0
2.4 0 2.4
3.8 0 3.8
0 0.38 0
6.20 9.96 6.20
ulations
SPAN C-D
Q(Kpa) (Kpa)
--
-- --
-- -- --
--
-- -- --
11.95
21.87
9.92 38.22
Total 38.22
GRID 3
SPAN B-C SPAN C-D
LL DL LL
0 2.95 0
0 0.24 0
0 0.59 0
0 1.10 0
0 0.96 0
0 3.74 0
0 0 0
2.4 0 2.4
3.8 0 3.8
0 0.38 0
6.20 9.96 6.20
ulations
SPAN C-D
Q(Kpa) (Kpa)
--
-- -- --
--
-- -- --
11.95
21.87
9.92 16.32
Total 16.32
GRID 4
SPAN B-C SPAN C-D
LL DL LL
0 2.95 0
0 0.24 0
0 0.59 0
0 1.10 0
0 0.96 0
0 3.74 0
0 0 0
2.4 0 2.4
3.8 0 3.8
0 0.38 0
6.20 9.96 6.20
ulations
SPAN C-D
Q(Kpa) (Kpa)
--
-- -- --
--
-- -- --
11.95
21.87
9.92 21.63
Total 21.63
ROOFDECK 5TH
SLAB 1A SLAB 1A
SLAB 1B SLAB 1B
SLAB 1C
SLAB 2A
SLAB 3A SLAB 2A
SLAB 3B SLAB 2B
SLAB 3C SLAB 2C
SLAB 3D
SLAB 4A SLAB 3A
SLAB 4B SLAB 3B
SLAB 3C
SLAB 5A
SLAB 5B
SLAB 4A
SLAB 4B
SLAB 4C
SLAB 5A
SLAB 5B
SLAB 5C