0% found this document useful (0 votes)
54 views3 pages

L/s MM MM Diameter (MM) (M/S) Pa MTR Coefficients Pa/m Pa

This document contains calculations of the external static pressure (ESP) for three air handling units (Machines 5B-EU/CU-F4, 3B-EU/CU-F3, and 5B-EU/CU-G1) located at the Al Fayah project in Abu Dhabi. It lists the duct elements, dimensions, air flow rates, velocities, and pressure losses to determine the total static pressure required for each unit. Safety factors are added to the subtotals to calculate the final total pressures of 28.3774 Pa, 37.6578 Pa, and 38.6989 Pa respectively.

Uploaded by

NoorudheenEV
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
54 views3 pages

L/s MM MM Diameter (MM) (M/S) Pa MTR Coefficients Pa/m Pa

This document contains calculations of the external static pressure (ESP) for three air handling units (Machines 5B-EU/CU-F4, 3B-EU/CU-F3, and 5B-EU/CU-G1) located at the Al Fayah project in Abu Dhabi. It lists the duct elements, dimensions, air flow rates, velocities, and pressure losses to determine the total static pressure required for each unit. Safety factors are added to the subtotals to calculate the final total pressures of 28.3774 Pa, 37.6578 Pa, and 38.6989 Pa respectively.

Uploaded by

NoorudheenEV
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 3

EXTERNAL STATIC PRESSURE (ESP) CALCULATION -MACHINE 5B-EU/CU-F4

PROJECT AL FAYA - ABU DHABI DATE:31/5/2017

Air Flow Width Height Equivalent Round Velocity velocity pressure Duct Lengthfitting loss Duct pressure loss Total pressure loss
S.NO Duct Element
L/s mm mm Diameter (mm) (m/s) Pa Mtr coefficients Pa/m Pa
1 Transition from unit 5.5825 0.08 0.4466
2 Duct 342 400 300 378 3.048 5.5825 1.615 0.315 0.5087
3 90 Degree Elbow 5.5825 0.25 1.3956
4 Transition 5.5835 0.08 0.4467
5 Supply Register(manufacturer catalogue) 23.0000
Sub Total 25.7976
Safty factor 10% 2.5798
Total Pressure (Pa) 28.3774
EXTERNAL STATIC PRESSURE (ESP) CALCULATION -MACHINE 3B-EU/CU-F3
PROJECT AL FAYA - ABU DHABI DATE:31/5/2017

Air Flow Width Height Equivalent Round Velocity velocity pressureDuct Lengthfitting loss Duct pressure loss Total pressure loss
S.NO Duct Element
L/s mm mm Diameter (mm) (m/s) Pa Mtr coefficients Pa/m Pa
1 Transition from unit 8.195 0.08 0.6556
2 Duct 342 400 250 343.3 3.695 8.195 1.768 0.508 0.8981
3 Y JOINT 8.195 0.98 8.0311
4 Duct 100 250 200 244 2.1386 2.7433 2.639 0.282 0.7442
5 VCD 2.7433 0.08 0.2195
6 90 Degree Elbow 2.7433 0.25 0.6858
7 Diffuser (manufacturer catalogue) 23.0000

Sub Total 34.2343


Safty factor 10% 3.4234
Total Pressure (Pa) 37.6578
EXTERNAL STATIC PRESSURE (ESP) CALCULATION -MACHINE 5B-EU/CU-G1
PROJECT AL FAYA - ABU DHABI DATE:20/5/2017

Air Flow Width Height Equivalent Round Velocity velocity pressureDuct Lengthfitting loss Duct pressure loss Total pressure loss
S.NO Duct Element
L/s mm mm Diameter (mm) (m/s) Pa Mtr coefficients Pa/m Pa
1 Transition from unit 9.3738 0.08 0.7499
2 Duct 598 550 300 439 3.95 9.3738 1.671 0.425 0.7102
3 Supply Dove tail take off 6.391 0.98 6.2632
4 Duct 302 400 250 343.3 3.268 6.391 1.1 0.404 0.4444
5 VCD 6.391 0.08 0.5113
6 Supply Dove tail take off 1.737 0.98 1.7023
7 Duct 31 200 100 152 1.71 1.737 3.607 0.34 1.2264
8 VCD 1.737 0.08 0.1390
9 90 Degree Elbow 1.737 0.25 0.4343
10 Diffuser (manufacturer catalogue) 23.0000

Sub Total 35.1808


Safty factor 10% 3.5181
Total Pressure (Pa) 38.6989