The document provides requirements and procedures for inspecting foundation preparation and steelwork erection for construction projects. It outlines acceptance criteria for tasks like confirming foundation level and location, verifying dimensions of fabricated items, inspecting steel column plumbness and bracing installation, bolting, and field welding. Inspection points are defined along with reference documents such as construction drawings, standards, and specifications. Inspection records are required to be signed off by the subcontractor, contractor, and supervisor to indicate acceptance.

Uploaded by

vignesh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
134 views

Itp Erection

The document provides requirements and procedures for inspecting foundation preparation and steelwork erection for construction projects. It outlines acceptance criteria for tasks like confirming foundation level and location, verifying dimensions of fabricated items, inspecting steel column plumbness and bracing installation, bolting, and field welding. Inspection points are defined along with reference documents such as construction drawings, standards, and specifications. Inspection records are required to be signed off by the subcontractor, contractor, and supervisor to indicate acceptance.

Uploaded by

vignesh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 6

3 Foundation Preparation

ApprovedConstruction
Confirmation
Signed Release Form from Concrete
3.1 acceptance of
casting subcontractor/contractor
foundation

Drawing-(IFC)

ApprovedConstruction

Control foundation level Elevation tolerance EL. 2mm., As per


3.2
pad elevation & location specification
Drawing-(IFC)

Inspection of
4
Fabricated Items

Confirm Dimension
Approved Construction Drawing Issued
4.1 Verification,(Before SUTO-ALL-C08-4-004
for Construction (IFC)AWS D1.1/ D1.1M
Erection)

Visual inspection of
Approved Construction Drawing Issued
4.2 workmanship including SUTO-ALL-C08-4-004
for Construction (IFC)AWS D1.1/ D1.1M
weld quality

5 Steel Works Erection

Confirm column Approved Construction Drawing Issued


5.1 SUTO-ALL-C08-4-004
plumbness for Construction (IFC)
Confirm column Approved Construction Drawing Issued
5.1 SUTO-ALL-C08-4-004
plumbness for Construction (IFC)

Confirm bracings are


Approved Construction Drawing Issued
5.2 properly instaSUT0-All- SUTO-ALL-C08-4-004
for Construction (IFC)
C08-4-004lled

Confirm handrails,
Approved Construction Drawing Issued
5.3 gratings, & stairways are SUTO-ALL-C08-4-004
for Construction (IFC)
correctly installed

6 Bolting

Confirm all nuts, bolts &


Approved Construction Drawing Issued
6.1 washers have been SUTO-ALL-C08-4-004
for Construction (IFC)
fitted.

Confirm erection bolts


have been replaced with Approved Construction Drawing Issued
6.2 SUTO-ALL-C08-4-004
high strength for Construction (IFC)
bolts(where applicable)

Approved Construction Drawing Issued


6.3 Confirm bolt torque SUTO-ALL-C08-4-004
for Construction (IFC)

Field Welding (As per


7
Drawing- Field Points)

ctivity and
Reference Documents
Characteris
(Codes/ Std/ Spec. / Acceptance Criteria Verifying Document
tic to be
Proc.)
Checked

Material Receiving
1
Inspection
- Receiving Inspection of Approved Construction Drawing Issued
SUT1-Z05-Q 00-4-023
Materials for Construction (IFC) & Mill Certificates
1.1 & Factory Production Control
Certificates (FPC), No physical defects,
- Confirm material Safeguards against adverse environment
SiteReceivingInspectiinProcedure
storage condition

Low hydrogen/min. Tensile strength


Receipt inspection of SUT1-Z05-Q 00-4-023- 480N/mm. As per manufacturers
1.2
welding consumables recommendations. Storage-Temp. &
Humidity control environment
Site ReceivingInspection Procedure
QGI-002 Release Note I R R R

ITR-QCI-020- Foundation Pad


I W/R W/R R
Inspection Report

ITR-QCI-0011- Structural Steel


I W R S
Checklist- para. 2 & 4)

ITR-QCI-0011 Structural Steel


I W S S
Checklist- para. 2 & 4)

ITR-QCI-0018 Installation Record For


I W/R W/R S
Structural Steel
ITR-QCI-0018 Installation Record For
I W/R W/R S
Structural Steel

ITR-QCI-011 Structural
I S S S
SteelChecklist(para. 5)

ITR-QCI-011 Structural
I S S S
SteelChecklist(para. 5)

ITR-QCI-011 Structural
I S/W S S
SteelChecklist(para. 3)

ITR-QCI-011 Structural
I S/R S/R S
SteelChecklist(para. 3)

ITR-QCI-0017 Bolt Torque

I W/R W/R R

Inspection record for Structural Steel

Inspection Points

Subcon CONTR. RE/RTO SCC Lab


ITR-QMI-001-Receiving
I W/R W/R S
InspectionReport

ITR-QMI-001- Receiving Inspection


I R S S
Report