100% found this document useful (1 vote)
329 views3 pages

IoT Assignment

This document outlines 6 assignments to be completed over 15 weeks. It describes 5 reading assignments requiring a 2-page response summarizing opinions on key papers about smart connected products, the Internet of Things, smart object networking, and smart cities. It also includes a small project proposal and a 6-week project to be completed in groups of 4 students. Assignments are due on Fridays and will be penalized 25% per day for late submissions.

Uploaded by

minichel
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
329 views3 pages

IoT Assignment

This document outlines 6 assignments to be completed over 15 weeks. It describes 5 reading assignments requiring a 2-page response summarizing opinions on key papers about smart connected products, the Internet of Things, smart object networking, and smart cities. It also includes a small project proposal and a 6-week project to be completed in groups of 4 students. Assignments are due on Fridays and will be penalized 25% per day for late submissions.

Uploaded by

minichel
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 3

Assignment-1 (distributed in Week-1) (2 marks)

Read the paper title How smart connected products are transforming competitions.

Paper can be downloaded from:


http://www.tcs.com/SiteCollectionDocuments/Analyst%20Reports/smart-connected-
products-transforming-competition-0115.pdf.

Evaluation: Each student should read the paper and write in two pages his/her opinion only on
the important elements of the paper. This will also ensure that have read the paper.

Submission due: 4:30pm, Friday week -2

NOTE: Please note that the assignment can be submitted on or before the due date of
submission. Late submission will be penalized @ 25% deduction per day.

Assignment-2 (Distributed in week-3) (2 marks)

Read the paper title The Societal impact of the Internet of Things. Paper can be downloaded
from the following website.

Available at: http://www.bcs.org/upload/pdf/societal-impact-report-feb13.pdf.

Evaluation: Each student should read the paper and write in two pages his/her own opinion on
the basis of the important elements/issues discussed in the paper. Writing your own opinion will
ensure that have read the paper.

Submission due on: 4:30pm, Friday week -4

NOTE: Please note that the assignment can be submitted on or before the due date of
submission. Late submission will be penalized @ 25% deduction per day.
Assignment-3 (Distributed in week-5) (2 marks)

Read the Request for Comments RFC 7452, title Architectural considerations in Smart Object
Networking. The paper can downloaded from the following website:

Available at: https://tools.ietf.org/pdf/rfc7452.pdf.

Evaluation: Each student should read the paper and write in two pages his/her opinion only on
the important elements of the paper. This will also ensure that he/she has read the paper.

Submission due on: 4:30pm, Friday week -6

NOTE: Please note that the assignment can be submitted on or before the due date of
submission. Late submission will be penalized @ 25% deduction per day.

Creative Assignment-4 Small Project proposal (Distributed in week-7) (2 marks)

Submit a project proposal in one page. The project proposal should follow a standard template
with the headers as abstract, components used and deliverable.

First evaluation: This evaluation will be done on the basis of clarity and scope of the project
Idea. Project work is group-work. Students can work in a group of 4 students.

Submission due on: 4:30pm, Friday week -7

NOTE: Please note that the assignment can be submitted on or before the due date of
submission. Late submission will be penalized @ 25% deduction per day.
Assignment-5 (Distributed in week-8) (2 marks)

Read the paper title sensing-as-a-service model for smart Cities Supported by Internet of
things. The paper can downloaded from the following website:

Available at: http://users.cecs.anu.edu.au/~charith/files/papers/J002.pdf.

Evaluation: Each student should read the paper and write in two pages his/her opinion only on
the important elements of the paper. This will also ensure that have read the paper.

Submission due on: 4:30pm, Friday week - 9

NOTE: Please note that the assignment can be submitted on or before the due date of
submission. Late submission will be penalized @ 25% deduction per day.

Creative Assignment-6

Project (Marks 10)

Duration: Week 10-15

During week10-15, students will work on the project which was proposed in week-7.

Second project evaluation: Due in Week 12 (5 marks)

Third project evaluation: Due in Week 14 (5 marks)

You might also like