Method Statement For Chilled Water Pipes
Method Statement For Chilled Water Pipes
1.1 This "Method Statement" covers the nature and type of work for the installation of Chilled
Water Piping and Accessories in the building and the frequency of which the inspections are
to be carried out.
1.2 This procedure also covers the method of installation and inspection of Chilled Water Piping
with Accessories.
3.0 PLANT
3.1 Following indicative hand tools list shall be used for the installation works.
Drilling Machine
Hammer
Sprit Level
Pipe Wrench
Grooving Machine
Thread Cutting Machine
Pipe work Tools box
4.0 SAFETY
4.1 Only trained persons shall operate the power tools.
4.2 Ensure all concerned personals shall use PPE and all other items as required.
4.3 Ensure adequate lighting is provided in the working area.
4.4 Ensure deep manhole excavations / shaft openings are protected with barricade, tape,
safety nets.
4.5 Refer Risk Assessment record
5.0 METHODS
5.1 All the materials delivered to site shall be inspected and stored properly as per the
manufacturer recommendations.
5.2 Work shall be carried out by the site staff under the strict supervision and guidance of the
concerned Supervisors / Engineers.
5.3 Site Engineer shall check the installations as per the approved inspection test plan.
5.4 Request for inspection shall be prepared by Site Engineer and shall be issued to Consultant
for further inspection.
10 INSPECTION
10.1 A notification of Inspection of installation Chilled Water Piping with all Accessories shall be
submitted one day prior to the Engineer through a inspection request.
10.2 All Inspection stages shall be followed respective to Inspection Test Plan