City Planning & Development Coordinator'S Office: (Applicant)

The document outlines the process for applying for and evaluating construction or business applications in a city planning office. It involves: 1) Accepting and initially evaluating applications; 2) Inspecting applications and proposed sites; 3) Final evaluation and assessment of payment if conforming or denial and referral to the zoning board of appeals if non-conforming. The zoning board then reviews non-conforming applications and provides approval or denial.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
106 views2 pages

City Planning & Development Coordinator'S Office: (Applicant)

The document outlines the process for applying for and evaluating construction or business applications in a city planning office. It involves: 1) Accepting and initially evaluating applications; 2) Inspecting applications and proposed sites; 3) Final evaluation and assessment of payment if conforming or denial and referral to the zoning board of appeals if non-conforming. The zoning board then reviews non-conforming applications and provides approval or denial.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

CITY PLANNING & DEVELOPMENT COORDINATORS

OFFICE

(APPLICANT)
Secure application form and
other requirements necessary.

INSPECTION OF APPLICATION
RECEIVING OF APPLICATION INITIAL EVALUATION (BUSINESS & CONSTRUCTION)
(BUSINESS & CONSTRUCTION) (BUSINESS & CONSTRUCTION) Inspect the construction / business activity
Accept the application form and check the Evaluate the construction / business activity applied for. Verify whether the said
attached requirements which shall be passed applied for as to its compliance and conformity construction project is already on- going. As
on to the assigned evaluator for confirmation with the provisions of Zoning Ordinance to business applications, verify the floor area
of documents completeness. (Ordinance 07-027). being utilized whether the same is already
FINAL EVALUATION
(BUSINESS & CONSTRUCTION)
After inspection, the evaluator finalizes the
data / info gathered.

Final evaluation of the application and


assessment of payment.

IF CONFORMING IF NON- CONFORMING

DENIAL / INDORSEMENT OF APPLICATION TO LOCAL ZONING


BOARD OF ADJUSTMENTS AND APPEALS (LZBAA)
If the business/construction is found to be Non-Conforming, a denial letter will be made and
the applicant must submit a letter of reconsideration.

Upon receipt of the motion for reconsideration, a scheduled meeting with the Technical Working
Group will be set for comments and recommendation. Then, a scheduled Local Zoning Board
Meeting will be made for Deliberation / Approval of each application.

PRINTING OF LOCATIONAL 2nd INDORSEMENT OF APPLICATION

CLEARANCE & ORDER OF PAYMENT After the Board Meeting, the application will indorsed to Planning
Office for preparation and signing of Board Resolution

PAYMENT OF LOCATIONAL