Larsen & Toubro Limited Construction Heavy Civil Infrastructure Ic

This document provides a bar bending schedule for the Mega Ahmedabad Metro UG2 Project east-west corridor. It details the rebar requirements for panel P109 of the diaphragm wall at the Kalupur R.C Technical Launching Shaft. The schedule includes 14 items specifying the bar location, spacing, mark, number of bars, length, total length, weight and bending dimensions for rebar sizes #12, #16, #20 and #32.

Uploaded by

Ayush Gupta
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
174 views4 pages

Larsen & Toubro Limited Construction Heavy Civil Infrastructure Ic

This document provides a bar bending schedule for the Mega Ahmedabad Metro UG2 Project east-west corridor. It details the rebar requirements for panel P109 of the diaphragm wall at the Kalupur R.C Technical Launching Shaft. The schedule includes 14 items specifying the bar location, spacing, mark, number of bars, length, total length, weight and bending dimensions for rebar sizes #12, #16, #20 and #32.

Uploaded by

Ayush Gupta
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 4

LARSEN & TOUBRO LIMITED

CONSTRUCTION
HEAVY CIVIL INFRASTRUCTURE IC
FORMAT NO- L&T/MEGA/UG2/F/035
PROJECT TITLE: MEGA AHMEDABAD METRO UG2 PROJECT (EAST-WEST CORRIDOR)

CLIENT: METRO LINK EXPRESS FOR GANDHINAGAR AND AHMEDABAD (MEGA) Co. LIMITED

CONSULTANT: MEGA - GEC (A CONSORTIUM OF SYSTRA-RITES-OCG-AECOM)

CONTRACTOR: LARSEN & TOUBRO LIMITED - CONSTRUCTION (HEAVY CIVIL INFRASTRUCTURE IC)

REV NO.: A REV DATE:22-09-2017


BAR BENDING SCHEDULE
SCHEDULE NO: 5 DATE: LOCATION: (Kalupur R.C Techinical) Launching Shaft
DRAWING NO. LNT-LAS-UG2-LSH-0457 REVISION: A DESCRIPTION OF WORK: DIAPHRAGM WALL, PANEL NO = P109

Cutting
Member / Nos. per Bar Level Total Length Total Weight Bending Shape & Dimensions
SL. No. Spacing Bar Mark No. of Sets Total Nos. Type & Size / Dia Length
Location /Layer Set
Top Bottom (mm) (m) (MT) (mm)
[1] [2] [3] [4] [5] [6] [7] [8] [9] [10] [11] [12] [13] [14]

1 Soil Face 01 150 c/c 1 32 x 1 = 32 #20 50.125 38.125 12000 12000 384.000 0.948 12000

12000
2 Soil Face 01 150 c/c 1 32 x 1 = 32 #20 38.925 26.925 12000 12000 384.000 0.948

2887
3 Soil Face 01 150 c/c 1 32 x 1 = 32 #20 27.725 24.838 2887 2887 92.384 0.228

12000
4 Soil Face 01 150 c/c 3 x 1 = 3 #32 50.125 38.125 12000 12000 36.000 0.227

12000
5 Soil Face 01 150 c/c 3 x 1 = 3 #32 39.405 27.405 12000 12000 36.000 0.227

3847
6 Soil Face 01 150 c/c 3 x 1 = 3 #32 28.685 24.838 3847 3847 11.541 0.073

7150
7 Soil Face 02 150 c/c 2 35 x 1 = 35 #16 45.400 38.25 7150 7150 250.250 0.395

2500
8 Soil Face 02 Bundled 150 c/c 2a 35 x 1 = 35 #12 40.95 38.45 2500 2500 87.500 0.078

Approved by
Prepared by Checked by
Cutting
Member / Nos. per Bar Level Total Length Total Weight Bending Shape & Dimensions
SL. No. Spacing Bar Mark No. of Sets Total Nos. Type & Size / Dia Length
Location /Layer Set
Top Bottom (mm) (m) (MT) (mm)
[1] [2] [3] [4] [5] [6] [7] [8] [9] [10] [11] [12] [13] [14]

12000
9 Excavated Face 01 150 c/c 3 32 x 1 = 32 #20 50.125 38.125 12000 12000 384.000 0.948

12000
10 Excavated Face 01 150 c/c 3 32 x 1 = 32 #20 38.925 26.925 12000 12000 384.000 0.948

2887
11 Excavated Face 01 150 c/c 3 32 x 1 = 32 #20 27.725 24.838 2887 2887 92.384 0.228

12000
12 Excavated Face 01 150 c/c 3 x 1 = 3 #32 50.125 38.125 12000 12000 36.000 0.227

12000
13 Excavated Face 01 150 c/c 3 x 1 = 3 #32 39.405 27.405 12000 12000 36.000 0.227

3847
14 Excavated Face 01 150 c/c 3 x 1 = 3 #32 28.685 24.838 3847 3847 11.541 0.073

5380

12000
15 Excavated Face 02 150 c/c 14 35 x 1 = 35 #32 38.42 26.42 12000 12000 420.000 2.650

5115
Horizontal Biender 200
16 Excavated Face
150 c/c 6a 170 x 1 = 170 #16 50.125 24.838 5451 (5115+200+200)-(4*16) 926.670 1.464 200

5115
Horizontal Biender Soil 200
17 Face
150 c/c 6 170 x 1 = 170 #16 50.125 24.838 5451 (5115+200+200)-(4*16) 926.670 1.464 200

638
18 Stirrups 150 c/c 7 66 x 1 = 66 #10 50.125 40.4 1756 ((2*638)+(2*190))+(20*10)-(10*10) 115.896 0.072

638
19 Stirrups 150 c/c 8 66 x 6 = 396 #10 50.125 40.4 2056 ((2*638)+(2*340))+(20*10)-(10*10) 814.176 0.502

638
Stirrups Around Tremie
20 Pipe
150 c/c 8a 66 x 2 = 132 #10 50.125 40.4 2356 ((2*638)+(2*490))+(20*10)-(10*10) 310.992 0.192

Approved by
Prepared by Checked by
Cutting
Member / Nos. per Bar Level Total Length Total Weight Bending Shape & Dimensions
SL. No. Spacing Bar Mark No. of Sets Total Nos. Type & Size / Dia Length
Location /Layer Set
Top Bottom (mm) (m) (MT) (mm)
[1] [2] [3] [4] [5] [6] [7] [8] [9] [10] [11] [12] [13] [14]

642
21 Stirrups 150 c/c 9 12 x 1 = 12 #12 40.4 38.7 1792 ((2*642)+(2*194))+(20*12)-(10*12) 21.504 0.019

642
22 Stirrups 150 c/c 10 12 x 6 = 72 #12 40.4 38.7 2092 ((2*642)+(2*344))+(20*12)-(10*12) 150.624 0.134

Stirrups Around Tremie 642


23 Pipe
150 c/c 10a 12 x 2 = 24 #12 40.4 38.7 2392 ((2*642)+(2*494))+(20*12)-(10*12) 57.408 0.051

638
24 Stirrups 150 c/c 7 93 x 1 = 93 #10 38.7 24.838 1756 ((2*638)+(2*190))+(20*10)-(10*10) 163.308 0.101

638
25 Stirrups 150 c/c 8 93 x 6 = 558 #10 38.7 24.838 2056 ((2*638)+(2*340))+(20*10)-(10*10) 1147.248 0.708

Stirrups Around Tremie 638


26 Pipe
150 c/c 8a 93 x 2 = 186 #10 38.7 24.838 2356 ((2*638)+(2*490))+(20*10)-(10*10) 438.216 0.270

B 50d
27 Coupler Bar Base Slab 150 c/c 11 35 x 1 = 35 #20 30.128 30.128 1075 50*20+75 37.625 0.093

B 5 50d
28 Coupler Bar Base Slab 150 c/c 12 35 x 1 = 35 #32 29.348 29.348 1675 50*32+75 58.625 0.370

29 Coupler Resting Bars 500 c/c - 4 x 1 = 4 #25 - - 5115 5115 20.460 0.079 5115


590
30 Lifting Eye - 13 3 x 2 = 6 #32 - - 5180 (2*2000)+(2*590) 31.080 0.196 2000
2000

200

970
31 Resting Hooks 1500 c/c - 4 x 2 = 8 #20 50.370 49.62 2140 2140 17.120 0.042

Approved by
Prepared by Checked by
Cutting
Member / Nos. per Bar Level Total Length Total Weight Bending Shape & Dimensions
SL. No. Spacing Bar Mark No. of Sets Total Nos. Type & Size / Dia Length
Location /Layer Set
Top Bottom (mm) (m) (MT) (mm)
[1] [2] [3] [4] [5] [6] [7] [8] [9] [10] [11] [12] [13] [14]

32 Spacer Bar Soil Face 2000 c/c - 4 x 1 = 4 #25 - - 5115 5115 20.460 0.079 5115

Spacer Bar Excavated


33 Face
2000 c/c - 7 x 1 = 7 #32 - - 5115 5115 35.805 0.226 5115

600
807
34 Z Bars 2000 c/c - 39 x 2 = 78 #25 - - 1907 600+600+807-4*(25) 148.746 0.573

600

ABSTRACT of WEIGHTS (MT) -


#8 #10 #12 #16 #20 #25 #32 TOTAL
--- 1.845 0.282 3.323 4.383 0.731 4.496 15.060

Note: M.S round bars conforming to IS:432 are denoted by the symbol ' ' followed by the size in millimetres, and HYSD bars conforming to IS:1786 are denoted by the symbol ' # ' followed by the size in millimetres.

Prepared by Checked by Approved by

Approved by
Prepared by Checked by