The document outlines a schedule for various activities related to a construction project. It includes activities grouped under general, engineering, procurement, and construction sections. The construction section includes activities for three villa projects A, B and C. It provides details of each activity including original duration, remaining duration, start and finish dates.
Download as XLSX, PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
64 views
Excel For Primavera
The document outlines a schedule for various activities related to a construction project. It includes activities grouped under general, engineering, procurement, and construction sections. The construction section includes activities for three villa projects A, B and C. It provides details of each activity including original duration, remaining duration, start and finish dates.