Analysis of 2 - Pile Group - Pc2 MX Design Data: Load Case 100 DL+LL Joint No MZ Grid Mark Column Load
Analysis of 2 - Pile Group - Pc2 MX Design Data: Load Case 100 DL+LL Joint No MZ Grid Mark Column Load
2500
Depth of pile cut off from top of
pedestal dforc 2.00 m Pedestal Size
Depth for overburden pressure (soil) df 1.70 m Dimension in x direction 0.50
Unit Weight of soil gs 18.00 kN/m3 Dimension in z direction 0.50
Overburden Pressure wover 50.00 kN/m2
Weight of Paving Wpav 5.00 kN/m2
Depth of Pile Cap Dpc 1.00 m
No of Piles n 2 Nos.
Area of pedestal Apeach 0.25 m2
Total area of pedestal Ap 0.25 m2 223
Capacity of pile
Vertical Ppv 650 kN
Lateral Pph 65 kN
Pullout Ppp 100 kN
Increment Factor for Wind loads Fincw 1.25 Increment for current load case
Increment Factor for Seismic forces Fincs 1.25 finc = 1.25
Calculations :
Vertical Loads
Weight of Pedestal kN
Area of Pile Cap Apc l*b 3.75 m2
Apcnett = (Apc-Ap) 3.50 m2
Soil Weight Wsoil df *gs * Apcnett 107.10 kN
Overburden Wover wover * Apcnett 175.00 kN
Paving Wt Wpav * Apcnett 17.50 kN
Weight of encasement 6.25 kN
Self Weight of Pile Cap Wswpc Apc * Dpc * 25 93.75 kN
Self weight of pedestal Wp = Ap*(dforc-Dpc) 6.88 kN
Total SW 406.48 kN
Vertical Load Pv SFy + SW 762.62 kN
file:///conversion/tmp/scratch/368927121.xls
PGL/MAP
BHEL-1500MW CCPP,PRAGATI PE-DC-314-611-C007-Part 2
Generator Gas Room-Pile Calculations A-A1.2
CG of load system
ex Mzt / Pv 0.00 m
ez Mxt / Pv 0.00 m
Pile Forces
SHx -2.762 kN
SHy 0.102 kN
Resultant H sqrt( SHx2 + SHz2) 2.764 kN
Lateral Force per Pile H/n 1.38 kN Safe
Permissible Lateral force Finc * Pph 81.25 kN
Check for Pull Out Since all Piles are in Compression,Pull Out Check is Not necessary
file:///conversion/tmp/scratch/368927121.xls
PGL/MAP
BHEL-1500MW CCPP,PRAGATI PE-DC-314-611-C007-Part 2
Generator Gas Room-Pile Calculations A-A1.3
m
m
file:///conversion/tmp/scratch/368927121.xls
PGL/MAP
BHEL-1500MW CCPP,PRAGATI PE-DC-314-611-C007-Part 2
Generator Gas Room-Pile Calculations A-A1.4
v - represents vertical
h - represents hori-
-zontal moment
m - represents column
file:///conversion/tmp/scratch/368927121.xls
PGL/MAP
BHEL-1500MW CCPP,PRAGATI PE-DC-314-611-C007-PART 2
Generator Gas Room-Pile Calculations A-A1.3
Joint 0 Grid A2
Factored Pile Reactions for
SUMMATION OF PILE REACTIONS Punching Shear Check
LOAD SECTION-1 & 4 SECTION-2 & 3 COLUMN
FACTOR P2 P1 LOAD P1 P2
1.5 364.14 363.77 118.20 363.77 364.14
1.5 364.14 464.65 320.07 464.65 465.14
1.5 465.14 573.28 534.22 573.28 570.65
1.5 570.65 273.22 -60.28 273.22 276.21
1.5 276.21 436.12 258.89 436.12 432.49
1.5 432.49 363.77 261.37 363.77 364.14
1.5 364.14 436.12 258.89 436.12 432.49
1.5 432.49 363.77 261.37 363.77 364.14
1.5 364.14 325.28 41.65 325.28 326.08
1.2 260.87 291.01 94.56 291.01 291.31
1.2 291.31 371.72 256.05 371.72 372.11
1.2 372.11 218.58 34.24 218.58 220.97
1.2 220.97 243.89 0.00 243.89 243.89
1.2 243.89 243.89 0.00 243.89 243.89
1.2 243.89 243.89 0.00 243.89 243.89
1.2 243.89 243.89 0.00 243.89 243.89
1.2 243.89 243.89 0.00 243.89 243.89
file:///conversion/tmp/scratch/368927121.xls ]
DESIGN OF 2 PILE GROUP - PG2
SEC 1 SEC 2
JOINT 0
GRID 0
750
P2 P1
1500
750
2500
DATA :
Section 1
Max. factored pile reaction in piles P2 = 364.14 kN (As per cl34.2.4.1 IS456:2000)
Distance of Pile from the face of pedestal = 500 mm Factor for pi
(+ve for pile outside the critical section)
Distance from face of Ped. to edge of PC = 1000 mm
B.M at the face of pedestal = #NAME?
= #NAME? kN.m
Shear force at d/2 from face of pedestal
Critical shear section = #NAME? mm from face of column (As per cl34.2.4.1 IS456:2000)
Factor =
Shear force at critical section = #NAME?
= #NAME? kN
REINFORCEMENT CALCULATIONS:
Bottom Reinforcement :
Mu = #NAME? kN.m
Mu/bd2 = #NAME?
= #NAME? N/mm2
Pt = #NAME? % #NAME?
Ast require = #NAME? mm2
(max. of Pt & 0.12%)
Req. Spaci = #NAME? mm
Provide 20 @ 200 mm C/C , (Both ways) Pt = #NAME?
750
P2 P1
1500
750
2500
DATA :
Section 1
Min. factored pile reaction in piles P2 = 291.31 kN (As per cl34.2.4.1 IS456:2000)
Distance of Pile from the face of pedestal = 500 mm Factor for pi
(+ve for pile outside the critical section)
Distance from face of Ped. to edge of PC = 1000 mm
B.M at the face of pedestal = #NAME?
= #NAME? kN.m
Section 2
Min. factored pile reaction in piles P1 = 291.01 kN (As per cl34.2.4.1 IS456:2000)
Distance of Pile from the face of pedestal = 500 mm Factor =
B.M at the face of pedestal = #NAME?
= #NAME? kN.m
REINFORCEMENT CALCULATIONS:
Top Reinforcement :
Mu = 0.00 kN.m
Mu/bd2 = #NAME?
= #NAME? N/mm2
Pt = #NAME? % #NAME?
Provide minimum reinforcement since there is no negative moment
Ast require = #NAME? mm2
(max. of Pt & 0.12%)
Req. Spaci = #NAME? mm
Provide 20 @ 200 mm C/C , (Both ways) Pt = #NAME?