The document outlines the project timeline for developing a client proposal from November 2016 to March 2017. It involves establishing requirements, designing interfaces and databases, programming the system using PHP and implementing the database. Testing is conducted in March 2017, including module testing, system testing, user acceptance testing and attribute testing. The system is then deployed with ongoing installation, training and maintenance support. Responsibilities are assigned to team members for each task.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
100%(1)100% found this document useful (1 vote)
159 views
Gantt Chart
The document outlines the project timeline for developing a client proposal from November 2016 to March 2017. It involves establishing requirements, designing interfaces and databases, programming the system using PHP and implementing the database. Testing is conducted in March 2017, including module testing, system testing, user acceptance testing and attribute testing. The system is then deployed with ongoing installation, training and maintenance support. Responsibilities are assigned to team members for each task.
Client Proposal NOV-30- 1 Establish 2016 2 End User Define Client ALL Dec-3- Dec-7- Requirement Requirement 2016 2016 3 Planning/Brainstorming ALL Dec-8- Dec-12- 2016 2016 4 Interview/Research about KEVIN/REX/PABLO Dec-13- Dec-17- proposal requirements 2016 2016 5 Checklist proposal ALL Jan-4 Jan-9- 2017 2017 6 Presentation Proposal to ALL Jan-9- Jan-14 the Panelist 2017 2017 7 Submit Requirement ALL Jan-16- JAN-20- Checklist and Approval 2017 2017 8 Plan on Programming ALL Jan-22- Jan-24- Language to be used 2017 2017 9 Design on GUI REX Jan-25- Jan-30- Global Design & of the System 2017 2017 10 Detail Design Submit the GUI design CURA Jan-25- Jan-30- Implementation To the client 2017 2017 11 Create DFD level 0-2 RONNEL Jan-25- Jan-30- 2017 2017 12 Create ERD RONNEL Jan-25- Jan-30- 2017 2017 13 Create Story Board PABLO/REX Jan-25- Jan-30- 2017 2017 14 Create Use-Case View KEVIN Jan-25- Jan-30- 2017 2017 15 PHP Coding Process ALL Jan-30- March- 2017 27-2017 16 Database Implementation RONNEL/CABAYA Jan-30- March- 2017 27-2017 17 Plan of test approach KEVIN/PABLO March- March- 15-2017 27-2017 18 Testing Conduct Module Testing CURA March- March- 18-2017 27-2017 19 Conduct System CURA March- March- Testing 18-2017 27-2017 20 Conduct Users PABLO/REX March- March- Acceptability Test 18-2017 27-2017 21 Conduct Test for System PABLO/REX March- March- Attributes 18-2017 27-2017 22 Deployment Installation of the System RONNEL Ongoing Ongoing 23 Training of the User PABLO Ongoing Ongoing 24 Maintenance Support Enhancement ALL Ongoing Ongoing