Gantt Chart

The document outlines the project timeline for developing a client proposal from November 2016 to March 2017. It involves establishing requirements, designing interfaces and databases, programming the system using PHP and implementing the database. Testing is conducted in March 2017, including module testing, system testing, user acceptance testing and attribute testing. The system is then deployed with ongoing installation, training and maintenance support. Responsibilities are assigned to team members for each task.

Uploaded by

Daniel Johns
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
159 views

Gantt Chart

The document outlines the project timeline for developing a client proposal from November 2016 to March 2017. It involves establishing requirements, designing interfaces and databases, programming the system using PHP and implementing the database. Testing is conducted in March 2017, including module testing, system testing, user acceptance testing and attribute testing. The system is then deployed with ongoing installation, training and maintenance support. Responsibilities are assigned to team members for each task.

Uploaded by

Daniel Johns
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

November 2016 December 2016 January 2017 February 2017 March 2017

Phase Level Activities/Task Responsibility START FINISH 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20


Client Proposal NOV-30-
1 Establish 2016
2 End User Define Client ALL Dec-3- Dec-7-
Requirement Requirement 2016 2016
3 Planning/Brainstorming ALL Dec-8- Dec-12-
2016 2016
4 Interview/Research about KEVIN/REX/PABLO Dec-13- Dec-17-
proposal requirements 2016 2016
5 Checklist proposal ALL Jan-4 Jan-9-
2017 2017
6 Presentation Proposal to ALL Jan-9- Jan-14
the Panelist 2017 2017
7 Submit Requirement ALL Jan-16- JAN-20-
Checklist and Approval 2017 2017
8 Plan on Programming ALL Jan-22- Jan-24-
Language to be used 2017 2017
9 Design on GUI REX Jan-25- Jan-30-
Global Design & of the System 2017 2017
10 Detail Design Submit the GUI design CURA Jan-25- Jan-30-
Implementation To the client 2017 2017
11 Create DFD level 0-2 RONNEL Jan-25- Jan-30-
2017 2017
12 Create ERD RONNEL Jan-25- Jan-30-
2017 2017
13 Create Story Board PABLO/REX Jan-25- Jan-30-
2017 2017
14 Create Use-Case View KEVIN Jan-25- Jan-30-
2017 2017
15 PHP Coding Process ALL Jan-30- March-
2017 27-2017
16 Database Implementation RONNEL/CABAYA Jan-30- March-
2017 27-2017
17 Plan of test approach KEVIN/PABLO March- March-
15-2017 27-2017
18 Testing Conduct Module Testing CURA March- March-
18-2017 27-2017
19 Conduct System CURA March- March-
Testing 18-2017 27-2017
20 Conduct Users PABLO/REX March- March-
Acceptability Test 18-2017 27-2017
21 Conduct Test for System PABLO/REX March- March-
Attributes 18-2017 27-2017
22 Deployment Installation of the System RONNEL Ongoing Ongoing
23 Training of the User PABLO Ongoing Ongoing
24 Maintenance Support Enhancement ALL Ongoing Ongoing