PT.
Prosys Bangun Persada
LAPORAN KEJADIAN BERBAHAYA File No.
General Engineering & Construction Dangerous Occurrence Report
Doc No. SHES.F.004 Rev. 0 File Rev. Pages 1 / 2
HO Project : TUBAN IV Project No : 091427
Lokasi
Location
:
Tanggal Kejadian Waktu
: :
Date Occured Time
URAIAN KEJADIAN BERBAHAYA / MENDEKATI KECELAKAAN
DESCRIPTION IF NEAR MISS OR DANGEROUS INCIDENT
REKOMENDASI / TINDAKAN PERBAIKAN
RECOMMENDATIONS / CORRECTIVE ACTIONS
KETERLIBATAN PERSONIL / PERALATAN / MATERIAL
PERSONS/ EQUIPMENT / MATERIAL INVOLVED
Dibuat:/Prepared By :: Disetujui/Approved By:
PROJECT SAFETY OFFICER PROJECT MANAGER
Tanggal/ Tanggal/
D D
a a
t t
e e
: :
Diterima Oleh / Received By
CC:
PT. Prosys Bangun Persada
LAPORAN KEJADIAN BERBAHAYA File No.
General Engineering & Construction Dangerous Occurrence Report
Doc No. SHES.F.004 Rev. 0 File Rev. Pages 2 / 2