The document shows cut and fill volumes for earthworks over various stations of a construction project. There was a total cut volume of 36.4 cubic meters and total fill volume of 0 cubic meters, resulting in a net cut of 11 cubic meters. Cut volumes decreased from station 0 to station 247, while fill volumes were applied between stations to gradually reduce the cumulative cut amount. The mass haul diagram visualizes the reducing cut volumes and increasing fill volumes along the length of the project.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
142 views2 pages
Mass Haul Calculator
The document shows cut and fill volumes for earthworks over various stations of a construction project. There was a total cut volume of 36.4 cubic meters and total fill volume of 0 cubic meters, resulting in a net cut of 11 cubic meters. Cut volumes decreased from station 0 to station 247, while fill volumes were applied between stations to gradually reduce the cumulative cut amount. The mass haul diagram visualizes the reducing cut volumes and increasing fill volumes along the length of the project.