Project Record Book
Project Record Book
In Charge (Tentative)
3.1 ELECTRICAL ENERGIZATION & CATHODIC PROT. PACKAGES VOLUME 3, BOOK 1.0
3.2 INSTRUMENT LOOP & COMMUNICATION PACKAGES VOLUME 3, BOOK 2.0
3.3 HYDROTEST & PNEUMATIC PACKAGES VOLUME 3, BOOK 3.0
3.4 Potable Water System VOLUME 3, BOOK 4.0
3.5 Fire Fighting System VOLUME 3, BOOK 5.0
3.6 Irrigation Water System VOLUME 3, BOOK 6.0
3.7 Sanitary Sewer System / Storm Drain VOLUME 3, BOOK 7.0
3.8 HVAC Package Units VOLUME 3, BOOK 8.0
3.9 Split System AC Units / Free Standing Unit VOLUME 3, BOOK 9.0
3.10 Medical Equipment & LPG System VOLUME 3, BOOK 10.0
3.11 Swimming Pool System VOLUME 3, BOOK 11.0
3.12 Elevator VOLUME 3, BOOK 12.0 /
3.13 MV Cable and Equipment System (RMU and Transformers) VOLUME 3, BOOK 13.0
3.14 LV Cable and Equipment System VOLUME 3, BOOK 14.0
3.15 Lightning and Grounding System VOLUME 3, BOOK 15.0
3.16 Power (Normal) System (DB, MDB, LV Panel, Disconnect Switches, Capacitor Banks) VOLUME 3, BOOK 16.0
3.17 Power (Emergency) System (Stand-by Power Generator System and UPS) VOLUME 3, BOOK 17.0
3.18 Lighting System (External and Internal) VOLUME 3, BOOK 18.0
3.19 Lighting Control Panels VOLUME 3, BOOK 19.0
3.20 Telecom System VOLUME 3, BOOK 20.0
3.21 Nurse Call System VOLUME 3, BOOK 21.0
3.22 Low Current Public Address VOLUME 3, BOOK 22.0
3.23 Fire Alarm System VOLUME 3, BOOK 23.0
3.24 MATV System VOLUME 3, BOOK 24.0
3.25 CCTV System VOLUME 3, BOOK 25.0
10
OPERATING INSTRUCTIONS & MAINTENANCE FOR PROCESS VOLUME 10
AUTOMATION SYSTEM; (SEE GENERAL)
2017.09.06