This document appears to be a checklist for evaluating vendor bids for adsorbent material. It includes sections for design data on process fluids, adsorbent data like type and bed dimensions, vessel data, quantity required, scope of supply from the vendor, and scope of work. The vendor is to indicate compliance with the listed requirements and provide additional details as requested.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
120 views
TBA - Adsorbent
This document appears to be a checklist for evaluating vendor bids for adsorbent material. It includes sections for design data on process fluids, adsorbent data like type and bed dimensions, vessel data, quantity required, scope of supply from the vendor, and scope of work. The vendor is to indicate compliance with the listed requirements and provide additional details as requested.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 4
PT.
ENCONA INTI INDUSTRI
5.3 TECHNICAL BID ANALYSIS - ADSORBENT
PROJECT : (filled with Project Name) CLIENT : (filled with Client Name) JOB NO : (filled with Project Job No.) DOC NO : (filled with Document Number)
(*) = Vendor to Indicate / Confirm N/R = not required
NO VENDORS UNIT Datasheet [FILL WITH VENDOR NAME]
1 Reference No. - (filled by EII) (*)
2 Date - (filled by EII) (*) 3 Manufacturing Location - (filled by EII) (*) 4 Approved Manufacture List - (filled by EII) (*) 5 DESIGN DATA - PROCESS FLUID VENDOR COMPLIANCE Design Case - (filled by EII) (*) Process Fluid - (filled by EII) (*) Feed Details - Refer to Datasheet (*) Product Details - (Doc. No. )
Operating Pressure psig (filled by EII) (*)
Design Pressure psig (filled by EII) (*) Operating Temperature o F (filled by EII) (*) Design Temperature/ MDMT o F (filled by EII) (*) Inlet Water Content of Gas lb/MMscf (filled by EII) (*) Outlet Water content of gas ppmv (filled by EII) (*) Outlet Water Dew Point o F (filled by EII) (*) Minimum Achievable Turndown % (filled by EII) (*) 6 ADSORBENT DATA Adsorbent Type - (*) (*) [to be developed for each adsorbent type used] Adsorbent Bed Diameter mm (*) (*) Adsorbent Height mm (*) (*) Adsorbent Weight lb (*) (*) Adsorbent Density lb/ft 3 (*) (*) Adsorbent Size in (*) (*) Bed support - (filled by EII) (*) Fixed Bed Support - (filled by EII) (*) PT. ENCONA INTI INDUSTRI
5.3 TECHNICAL BID ANALYSIS - ADSORBENT
PROJECT : (filled with Project Name) CLIENT : (filled with Client Name) JOB NO : (filled with Project Job No.) DOC NO : (filled with Document Number)
(*) = Vendor to Indicate / Confirm N/R = not required
NO VENDORS UNIT Datasheet [FILL WITH VENDOR NAME]
1 Reference No. - (filled by EII) (*)
2 Date - (filled by EII) (*) 3 Manufacturing Location - (filled by EII) (*) Ceramic Ball - (filled by EII) (*) Volume ft 3 (*) (*) Density lb/ft 3 (*) (*) Ingredient - (*) (*) Configuration - (filled by EII) (*) Number of Adsorbent Beds (Online) - (filled by EII) (*) Number of Adsorbent Beds (Regen) - (filled by EII) (*) Number of Adsorbent Beds (Standby) - (filled by EII) (*) Adsorbent Bed Life Time / Replenishment years (filled by EII) (*) Frequency Maximum Pressure Fluctuation to prevent (*) (*) adsorbent lifting ADSORPTION CYCLE Adsorption Times hours/ bed (*) Flow Direction - (*) Maximum Pressure Drop across adsorbent psi (*) REGENERATION CYCLE Regeneration Gas Type - (filled by EII) (*) Regeneration Gas Flowrate lb/hr (*) (*) Heating Mode Flow Direction - (*) (*) Water to be removed during lb/hr (*) (*) desorption/regeneration Regeneration Gas Temperature o F (*) (*) Regeneration Gas Pressure psig (*) (*) PT. ENCONA INTI INDUSTRI
5.3 TECHNICAL BID ANALYSIS - ADSORBENT
PROJECT : (filled with Project Name) CLIENT : (filled with Client Name) JOB NO : (filled with Project Job No.) DOC NO : (filled with Document Number)
(*) = Vendor to Indicate / Confirm N/R = not required
NO VENDORS UNIT Datasheet [FILL WITH VENDOR NAME]
1 Reference No. - (filled by EII) (*)
2 Date - (filled by EII) (*) 3 Manufacturing Location - (filled by EII) (*) Heating up time hours/bed (*) (*) Maximum Pressure Drop across adsorbent psi (*) (*) Cooling Mode Flow Direction - (*) (*) Cooling Temperature o F (*) (*) Cooling down time hours/bed (*) (*) 7 VESSEL DATA Horizontal/Vertical - (filled by EII) (*) Shell Diameter ID ft Vendor to indicate (*) Shell tan to tan Length ft Vendor to indicate (*) 8 QUANTITY Quantity - Vendor to indicate (*) 9 SCOPE OF SUPPLY Equipment proper (To be specified according to - Required (*) data sheet) Process Guarantee [ ]-years service life of adsorbent from start of - Required (*) operations Spare Parts For construction and commissioning - To be separately quoted (*) For 2-years operation and maintenance 10 SCOPE OF WORK Design of molecular sieve bed, include : - Sketch of adsorbent arrangement in - Required (*) Vessel PT. ENCONA INTI INDUSTRI
5.3 TECHNICAL BID ANALYSIS - ADSORBENT
PROJECT : (filled with Project Name) CLIENT : (filled with Client Name) JOB NO : (filled with Project Job No.) DOC NO : (filled with Document Number)
(*) = Vendor to Indicate / Confirm N/R = not required
NO VENDORS UNIT Datasheet [FILL WITH VENDOR NAME]
1 Reference No. - (filled by EII) (*)
2 Date - (filled by EII) (*) 3 Manufacturing Location - (filled by EII) (*) - Heat and Mass Balance, Pressure & - Required (*) Temperature profile during regeneration - Complete review and vetting of TPEC - Required (*) performed design for the system Performance guarantee - Required (*) Seaworthy export packing - Required (*) Export Custom Clearance (if any) - Required (*) Obtaining any export license or other - Required (*) official authorization for exportation Supervising at site for installation - Vendor to quote separately (*) 11 DELIVERY Delivery Schedule week Vendor to indicate (*) FOB Transport - Vendor to indicate (*) 12 TBA Summary Summary - Technical - Past Experience