User Acceptance Test Plan
User Acceptance Test Plan
Project Name / #: [ ]
Date: [ ]
Version: [ ]
Project Sponsor: [ ]
Project Manager: [ ]
Business Analyst: [ ]
Project Name User Acceptance Test Plan
Reviewers
Distribution
Name Date
Document Properties
Item Details
Document Title
Author
Creation Date
Last Updated
2
Project Name User Acceptance Test Plan
Table of Contents
1.0 Introduction .......................................................................................................................... 4
1.1 Project Overview .............................................................................................................. 4
1.2 Scope ............................................................................................................................... 4
1.2.1 In Scope ................................................................................................................... 4
1.2.2 Out of Scope ............................................................................................................ 4
1.3 Objective .......................................................................................................................... 4
1.3.1 Primary Objective ..................................................................................................... 4
1.3.2 Secondary Objective ................................................................................................ 4
2.0 UA Test Methodology ........................................................................................................... 4
2.1 Test Phases ..................................................................................................................... 5
3.0 UA Test Environment ........................................................................................................... 5
3.1 UA Test Desktops ............................................................................................................ 5
3.2 UA Test Data.................................................................................................................... 5
4.0 Roles and Responsibilities ................................................................................................... 5
4.1 UAT Team ........................................................................................................................ 6
4.1 Test Partners.................................................................................................................... 6
5.0 UAT Deliverables ................................................................................................................. 6
5.1 UAT Activities ................................................................................................................... 6
5.2 UAT Schedule .................................................................................................................. 6
6.0 UA Test Cases ..................................................................................................................... 7
6.1 UA Test Scripts ................................................................................................................ 8
7.0 UAT Defects ......................................................................................................................... 8
7.1 UAT Defect Tracking ........................................................................................................ 8
7.2 UAT Defect Prioritization .................................................................................................. 8
7.3 UAT Defect Lifecycle........................................................................................................ 8
8.0 Assumptions......................................................................................................................... 9
9.0 Risks .................................................................................................................................... 9
10.0 References ..........................................................................................................................10
11.0 Glossary ..............................................................................................................................10
3
Project Name User Acceptance Test Plan
1.0 Introduction
The purpose of this document is to outline the User Acceptance Testing (UAT) process for the
[Project Name]. Project Sponsors from all participating departments are intended to review this
document. Approval of this document implies that reviewers are confident that following the
execution of the test plan, the resulting system will be considered fully-tested and eligible for
implementation.
UAT is to be completed by the Business Departments (UAT Team) that will be utilizing the software
and/or support departments. The testing is conducted to enable a user to validate that the
software meets the agreed upon acceptance criteria.
1.2 Scope
1.2.1 In Scope
[List testing of functional and use case requirements, non-automated business processes, user
interface, etc. here]
1.3 Objective
1.3.1 Primary Objective
User Acceptance Testing is conducted to ensure that the system satisfies the needs of the
business as specified in the functional requirements and provides confidence in its use.
Modifications to the aforementioned requirements will be captured and tested to the highest level of
quality allowed within the project timeline.
User Acceptance Testing will be conducted primarily by the end users (i.e. Subject Matter Experts).
Users will execute all [Project Name] test scripts referenced in section 6.1. Users may also
perform additional tests not detailed in the plan but remain relevant and within the scope of the
project. UAT progress will be reported based on the percentage executed test cases and other
relevant testing activities.
4
Project Name User Acceptance Test Plan
Users will report issues and defects to the business analysts for documentation and escalation.
These incidents will be described, prioritized, and tracked by using screen captures, verbiage, and
steps necessary for DEVELOPMENT to reproduce the defect. Information on defect prioritization
can be found in section 7.2.
Applicable IP addresses and URLs should be provided to the UAT Team and all workstations
should be configured appropriately for access to the test environment.
Access to test data is a vital component in conducting a comprehensive test of the system. All
UAT participants will require usage of test accounts and other pertinent test data which should be
provided by end user support upon request. Participants not currently utilizing test data must
receive appropriate clearance and/or permissions to perform desired actions in the UAT
environment. All user roles should fully emulate production in the UAT path. Completion of an
online access request may be required in order to create test accounts.
5
Project Name User Acceptance Test Plan
All team members will be presented with an overview of the test process and what their specific
role in UAT will be. The Business Analysts role in the UAT process is to oversee testing by
assigning scripts to SMEs, providing general support, and serving as the primary UAT contact point
throughout the test cycle. The BA will be expected to filter out any duplicate defects found and
escalate high priority issues to the team in a time sensitive manner.
Identify UAT Team Business Analyst lists SMEs that will take part in testing for the
project. The Project Sponsor is often the source of information for the team list. A full
description of team member attributes is detailed in section 4.1.
UAT Plan A strategy-based document defining test methodology and criteria is
distributed to the team.
UAT Plan Team Review Session with business stakeholders to review plan and provide
feedback and sign-off.
UA Test Cases A document that details each specific test case that will be performed
during the UAT process.
6
Project Name User Acceptance Test Plan
Test Data Acquisition Receipt of accounts and test environment data from QA required
to execute test scripts. Note: one full week of lead time is needed to acquire test accounts
from QA.
UA Test Cases A detailed step-by-step breakdown of each individual test case.
UA Test Case Review Approval from business team and/or third parties on completed
scripts.
Desktop Validation Validation of installed applications and configuration necessary for
testing.
UAT Environment Validation Validation of connectivity and expected results in the test
environment for each end user participating in testing.
Test Case Execution Completion of all test scripts by test team.
Defect Tracking Defects will be entered and tracked via spreadsheet by the Business
Analyst and/or Project Manager. Each entry will include detailed information about each
defect.
UAT Touch Point Regularly scheduled meeting to evaluate UAT progress and
outstanding defects.
UAT Sign-Off Formal sign-off indicating the system satisfies the needs of the business
as specified in the functional requirements and provides confidence in its use.
Test cases provide a high-level description of the functionality to be tested. All regression and new
functionality test cases are contained in the Excel spreadsheet UA Test Cases available at:
[insert hyperlink to UAT folder in Project Directory here]. The team plans to leverage relevant QA
test cases for project specific functionality. Each test case based on new functionality will
reference a specific functional requirement.
7
Project Name User Acceptance Test Plan
The UA test scripts are contained within the UAT test case spreadsheet and can be accessed via
hyperlink from each individual test case.
Defects will be entered and tracked via spreadsheet by the Business Analyst during the UAT
process. Each entry will include detailed information about each defect.
8
Project Name User Acceptance Test Plan
8.0 Assumptions
[Identify any assumptions prior to UAT]
The following are key assumptions made by UAT prior to the commencement of the acceptance
test phase:
9.0 Risks
[Identify any risks that could impact UAT]
Below are risks that could potentially impact the UAT process and prevent its successful and timely
completion:
9
Project Name User Acceptance Test Plan
10.0 References
[List sources of information used in the plan (e.g. Functional Requirements, QA Plan, etc.) and
provide hyperlinks]
The following are reference documents which have been leveraged for project specific information
in the design of the UAT plan:
11.0 Glossary
[List terms and definitions applicable to the project here. If terms and definitions are available in
PurplePedia provide a reference or link in the table below]
Term Definition
10