BHPT Flowing Clt-02

The document summarizes a bottom hole pressure and temperature survey conducted on well CLT-02 from April 14-15, 2016. Pressure and temperature readings were taken in 200m intervals from the surface down to 1753m, where the gauge was left overnight. The following day, a final reading was taken at 1860m, above the perforation interval. Analysis of the data found a bottom hole flowing pressure of 340.30 psia at 1753m and 359.66 psia at the top of perforations.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
84 views

BHPT Flowing Clt-02

The document summarizes a bottom hole pressure and temperature survey conducted on well CLT-02 from April 14-15, 2016. Pressure and temperature readings were taken in 200m intervals from the surface down to 1753m, where the gauge was left overnight. The following day, a final reading was taken at 1860m, above the perforation interval. Analysis of the data found a bottom hole flowing pressure of 340.30 psia at 1753m and 359.66 psia at the top of perforations.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 6

LAPORAN KEGIATAN

BOTTOM HOLE PRESSURE TEMPERATURE SURVEY


CLT-02
Gradient Flowing

ASSET 3 PT PERTAMINA EP SUBANG FIELD

14 APRIL 2016
RUNSHEET BHPT SURVEY
PETROLEUM ENGINEERING SUBANG FIELD
Report Required by : Tubing 2-7/8" 1763.45 Meter Packer 1753.87 Meter
Well No. : CLT-02 GLV Perforasi 2330 - 2333 Meter
Type of Test : Gradient Flowing
Start : 14/04/2016
End : 15/04/2016
On Bottom : 14/04/2016
Off Bottom : 15/04/2016 Date : 14/04/2016 Date : 15/04/2016
Duration : Running In Hole Pull Out Of Hole
Depth Stage Start Time Stop Time Depth Stage Start Time Stop Time
Meter HH:MM:SS HH:MM:SS Meter HH:MM:SS HH:MM:SS
0 16:17:00 16:24:00 1753 16:21:00
Battery Information 200 16:26:00 16:31:00
Gauge S/N Battery S/N Voltage Ah Remaining 400 16:33:00 16:38:00
PPS 25 3.37 600 16:40:00 16:45:00
800 16:47:00 16:52:00
1000 16:54:00 16:59:00
14/04/2016 1200 17:01:00 17:06:00
10.30 - 17.22 - Rig up unit wireline. 1400 17:08:00 17:13:00
- Running sinker 2.25" s.d 1753 m (packer), lancar. 1600 17:15:00 17:20:00
Lakukan pull up test tiap 250 m, beban normal. 1753 17:22:00 0 6:48:00 6:58:00
- RIH EMR ukur gradient flowing tiap 200 m/5 menit s.d 1753 m.
17.22 - 24.00 Gantung EMR di 1753 m.
15/04/2016
00.00 - 06.21 Lanjut gantung EMR di 1753 m.
06.21 - 07.55 - POOH EMR s.d permukaan.
- Rig down unit wireline.
PE Subang Field
Hafandi Riyma P
- Agus Ibnul Hami
- Dwi Aneka
- Kusuma Ekananto
GRADIENT TEKANAN FLOWING
SUMUR : CLT-02

Memory Gauge : PPS-25


Gauge S/N. : 4653
Max. Gauge Pressure : 10000 psi
Max. Gauge Temp : 350 F / 177 C

Depth Pressure Gradient Temp. Gradient


No.
(m) MD (m) TVD (ft) MD (ft) TVD (psia) (psia/ft) (o F) (o F/ft)
1 0 0 0.00 0 67.27 102.64
0.031 0.067
2 200 199.79 656.20 655.511 87.37 146.51
0.040 0.010
3 400 396.91 1312.40 1302.26 113.19 152.92
0.043 0.010
4 600 591.23 1968.60 1939.83 140.88 159.56
0.046 0.027
5 800 785.8 2624.80 2578.21 170.53 176.85
0.054 0.024
6 1000 979 3281.00 3211.48 204.80 192.15
0.055 0.024
7 1200 1171.79 3937.20 3844.64 239.84 207.57
0.055 0.020
8 1400 1364.99 4593.40 4478.53 274.87 220.05
0.060 0.013
9 1600 1558.95 5249.60 5114.91 312.76 228.07
0.057 0.000
10 1753 1707.34 5751.59 5601.78 340.30 228.20
0.057 0.000
11 1860 1811.63 6102.66 5943.96 359.66 228.29

Keterangan :
Packer : 1753.87 mku
UR : 1763 mku
Perforasi : 2330 - 2333; 1860 - 1863 mku
Lapisan : TAF (Z-2170 & Z-1800)

Kedalaman ukur : 1753 mku


Top perfo : 1860 mku
Pwh : 67.27 psia
Pflowing : 340.30 psia dikedalaman pengukuran
: 359.66 psia dipuncak lubang perforasi
Temperatur : 228.20 deg F dikedalaman pengukuran
: 228.29 deg F dipuncak lubang perforasi