19change Directive Field Work Order

This 3 sentence summary provides the key details from the Change Directive document: This Change Directive document authorizes changes to the contract for a construction project, including adjustments to the contract sum and time based on errors, owner requests, or other reasons. It identifies the contractor, project details, basis for the change, and recommendations or approvals from the construction manager, architect/engineer, and owner. Signatures are required from the contractor and owner to concur or accept the changes outlined in the directive.

Uploaded by

Omar Siddiqui
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
249 views

19change Directive Field Work Order

This 3 sentence summary provides the key details from the Change Directive document: This Change Directive document authorizes changes to the contract for a construction project, including adjustments to the contract sum and time based on errors, owner requests, or other reasons. It identifies the contractor, project details, basis for the change, and recommendations or approvals from the construction manager, architect/engineer, and owner. Signatures are required from the contractor and owner to concur or accept the changes outlined in the directive.

Uploaded by

Omar Siddiqui
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

Change Directive (Field Work Order)

State of Ohio Standard Forms and Documents

Contractor Name _______________________ Change Directive No. _______________________


Contact _______________________ Contract No. _______________________
Address _______________________ Project Name _______________________
City, State, Zip _______________________ Project Location _______________________

Basis of Change Directive:


_____ Error /Omission _____ Differing Site Condition Adjustment to Contract Sum (indicate if zero cost)
_____ Owner Request _____ Field Resolution Add: $____________ Deduct: $____________
_____ Value Engineering _____ ________________

Adjustment to Contract Time Cost Basis (check all that apply)


_____ No Change _____ Days Added _____ Days Deducted _____ Time & Material Not to exceed _____ Fixed Price
_____ Allowance (describe below) _____ Unit Price

Your company is authorized and directed to proceed with the following (attach additional sheets if needed):

Justification:

Special Notice: This Change Directive identifies satisfaction of all compensation and time adjustments related to this change in the work.

Construction Manager Recommendation (if applicable) Contractor / CMR Concurrence


Name:__________________________________________ Name: ___________________________________________
_________________________________ __________ _________________________________ __________
Signature Date Signature Date

Architect / Engineer Recommendation Owner Acceptance


Name: __________________________________________________ Name: __________________________________________________
_______________________________________ ___________ _______________________________________ __________
Signature Date Signature Date