0% found this document useful (0 votes)
45 views8 pages

13723, 24, 25 - Fire Fighting Pipes & Fittings

This document contains a requirements list for materials needed for a new fire station project in Raslaffan. It lists various types and quantities of pipes, fittings, and other items in both metric threaded (MTRS) and number (Nos) units of measure. There are shortages indicated between the quantities in the MR (Material Requisition) and current store balance. Prices will need to be obtained to complete the purchase order for the missing items.

Uploaded by

MohamedSulthan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
45 views8 pages

13723, 24, 25 - Fire Fighting Pipes & Fittings

This document contains a requirements list for materials needed for a new fire station project in Raslaffan. It lists various types and quantities of pipes, fittings, and other items in both metric threaded (MTRS) and number (Nos) units of measure. There are shortages indicated between the quantities in the MR (Material Requisition) and current store balance. Prices will need to be obtained to complete the purchase order for the missing items.

Uploaded by

MohamedSulthan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 8

MR No.

13723, 13724, 13725


PROJECT: NEW FIRE STATION NO.6 AT RASLAFFAN
REQUIREMENTS

Sl. # Description STORE


M.R BALANCE
As On U/M
QTY QTY
16.07.2017
MTRS
1 G.I. ERW Pipes, SCH-40, 6" 12 12 12 LGT
2 G.I. ERW Pipes, SCH-40, 4" 230 230 230 LGT
3 G.I. ERW Pipes, SCH-40, 3" 85 85 85 LGT
4 G.I. ERW Pipes, SCH-40, 2" 125 125 125 LGT
5 G.I. ERW Pipes, SCH-40, 2" 110 110 110 LGT
6 G.I. ERW Pipes, SCH-40, 1" 230 230 230 LGT
7 G.I. ERW Pipes, SCH-40, 1" 170 170 170 LGT
8 G.I. ERW Pipes, SCH-40, 1" 1,330 1330 1330 LGT

1 90 Elbow, Grooving 6" 4 4 0 Nos


2 90 Elbow, Grooving 4" 20 15 5 Nos
3 90 Elbow, Grooving 3" 10 6 4 Nos
4 90 Elbow, Grooving 2" 6 6 0 Nos
5 Coupling, Grooving 6" 10 10 0 Nos
6 Coupling, Grooving 4" 70 70 0 Nos
7 Coupling, Grooving 3" 40 40 0 Nos
8 Coupling, Grooving 2" 40 40 0 Nos
9 Reducer, Grooving 6" X 4" 2 2 0 Nos
10 Reducer, Grooving 4" X 3" 10 10 0 Nos
11 Reducer, Grooving 3" X 2" 10 7 3 Nos
12 Reducer Tee, Grooving 6" X 4" 2 2 0 Nos
13 Reducer Tee, Grooving 6" X 3" 1 1 0 Nos
14 Reducer Tee, Grooving 4" X 3" 4 4 0 Nos
15 Equal Tee, Grooving 4" 6 6 0 Nos
16 Mechanical Tee 4" X 2" 15 2 13 Nos
17 Mechanical Tee 4" X 1" 10 10 0 Nos
18 Mechanical Tee 4" X 1" 18 18 Nos
19 Mechanical Tee 3" X 2" 20 20 Nos
20 Mechanical Tee 3" X 1" 20 20 Nos
21 Mechanical Tee 3" X 1" 15 15 Nos
22 Mechanical Tee 2" X 2" 15 15 Nos
23 Mechanical Tee 2" X 1" 15 15 0 Nos
24 Mechanical Tee 2" X 1" 20 20 Nos

1 GI, 90 Elbow , Threading 2" 25 15 10 Nos


2 GI, 90 Elbow , Threading 1" 50 25 25 Nos
3 GI, 90 Elbow , Threading 1" 40 40 Nos
4 GI, 90 Elbow , Threading 1" 350 350 Nos
5 GI, Equal Tee, Threading 2" 10 10 Nos
6 GI, Equal Tee, Threading 1" 25 25 Nos
7 GI, Equal Tee, Threading 1" 25 15 10 Nos
8 GI, Equal Tee, Threading 1" 160 160 Nos
9 GI, Reducer Tee, Threading 2" X 1" 20 10 10 Nos
REQUIREMENTS

Sl. # Description STORE


M.R BALANCE
As On U/M
QTY QTY
16.07.2017
MTRS
10 GI, Reducer Tee, Threading 1" X 1" 70 35 35 Nos
11 GI, Reducer Tee, Threading 1" X 1" 60 30 30 Nos
12 GI, Reducer Bush, Threading 2" X 1" 20 20 Nos
13 GI, Reducer Bush, Threading 2" X 1" 35 35 Nos
14 GI, Reducer Bush, Threading 1" X 1" 40 40 Nos
15 GI, Reducer Bush, Threading 1" X 1" 30 30 Nos
16 GI, Reducer Socket, Threading 1" X 1" 300 300 0 Nos
17 GI, Socket, Threading 2" 10 10 Nos
18 GI, Socket, Threading 1" 20 10 10 Nos
19 GI, Socket, Threading 1" 20 10 10 Nos
20 GI, Socket, Threading 1" 30 15 15 Nos
21 MI, Nipple, Threading 1" 20 20 0 Nos
22 MI, Nipple, Threading 1" 20 20 0 Nos
23 MI, Nipple, Threading 1" 30 15 15 Nos
24 Bose White 80 80 Nos
25 Jute 2 2 Kg
FROM
STORE AMERICAN
As On
25.07.2017 SCHOOL
FROM
STORE AMERICAN
As On
25.07.2017 SCHOOL
COM
DATE :

P.O.Box. 24832, DOHA-QATAR. Tel: +974-4442 88 88(3 Lines) Fax: +974-4442 88 82


MR No. PO No.

PROJECT: MATERIAL/S :
Requirements
Sl. # Description QUANTITY
U/M
MR STORE LPO Rate Amount Rate Amount Rate
1 - -
2 - -
3 - -
4 - -
5 - -
6 - -
7 - -
8 - -
9 - -
10 - -
11 - -
12 - -
13 - -
14 - -

SUB TOTAL QAR. 0.00 QAR. 0.00 QAR.

OTHER COST ( MISSING ITEMS : TAKEN LOWEST PRICES ) :


Requirements
Sl. # Description
OTHER QUANTITY
COST ( MISSING ITEMS : TAKEN LOWEST PRICES ) :
U/M
MR STORE LPO Rate Amount Rate Amount Rate

NET TOTAL TOTAL= 0.00 TOTAL= 0.00 TOTAL=


MANUFACTURER
DELIVERY PERIOD & TERMS
PAYMENT TERMS
REMARKS :
ISO NO. BIMCO/QF/PUR/06
NOTE:
* S.T.P.S. = SUBJECT TO PRIOR SALES
* A.R.O. = AFTER RECEIVING ORDER
COMPARATIVE STATEMENT
Saturday, November 21, 2015

PO No.

MATERIAL/S :

Amount Rate Amount Rate Amount


- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -

0.00 QAR. 0.00 QAR. 0.00


Amount Rate Amount Rate Amount

0.00 TOTAL= 0.00 TOTAL= 0.00

Rev. No- 01

You might also like