0% found this document useful (0 votes)
657 views263 pages

Backup Log

The document appears to be log files from multiple attempts to copy files from one directory to another using the Robocopy tool. It records the source and destination directories and file paths being copied for each attempt. The logs show that an error occurred on each attempt, with the source directory not found or the path syntax being incorrect. It continues trying different source directories and path structures until it successfully copies files from one source to the destination.

Uploaded by

Zi Sheng Neoh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as TXT, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
657 views263 pages

Backup Log

The document appears to be log files from multiple attempts to copy files from one directory to another using the Robocopy tool. It records the source and destination directories and file paths being copied for each attempt. The logs show that an error occurred on each attempt, with the source directory not found or the path syntax being incorrect. It continues trying different source directories and path structures until it successfully copies files from one source to the destination.

Uploaded by

Zi Sheng Neoh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as TXT, PDF, TXT or read online on Scribd
You are on page 1/ 263

-------------------------------------------------------------------------------

ROBOCOPY :: Robust File Copy for Windows


-------------------------------------------------------------------------------

Started : Sat Nov 11 22:51:53 2017

Source : D:\PoyryNeoh\
Dest : C:\PoyryFiles\

Files : *.*

Options : *.* /TEE /S /E /COPY:DAT /PURGE /MIR /NP /MT:8 /R:0 /W:0

------------------------------------------------------------------------------

2017/11/11 22:51:53 ERROR 2 (0x00000002) Accessing Source Directory D:\PoyryNeoh\


The system cannot find the file specified.

-------------------------------------------------------------------------------
ROBOCOPY :: Robust File Copy for Windows
-------------------------------------------------------------------------------

Started : Sat Nov 11 22:52:04 2017

Source : C:\Advisian Active" D:\Advisian\


Dest : C:\Users\neoh.zi.sheng\Desktop\Active"\

Files : *.*

Options : *.* /TEE /S /E /COPY:DAT /PURGE /MIR /NP /MT:8 /R:0 /W:0

------------------------------------------------------------------------------

2017/11/11 22:52:04 ERROR 123 (0x0000007B) Accessing Source Directory C:\Advisian


Active" D:\Advisian\
The filename, directory name, or volume label syntax is incorrect.

-------------------------------------------------------------------------------
ROBOCOPY :: Robust File Copy for Windows
-------------------------------------------------------------------------------

Started : Sat Nov 11 22:52:21 2017

Source : C:\Advisian Active" D:\Advisian\


Dest : C:\Users\neoh.zi.sheng\Desktop\Active"\

Files : *.*

Options : *.* /TEE /S /E /COPY:DAT /PURGE /MIR /NP /MT:8 /R:0 /W:0

------------------------------------------------------------------------------

2017/11/11 22:52:21 ERROR 123 (0x0000007B) Accessing Source Directory C:\Advisian


Active" D:\Advisian\
The filename, directory name, or volume label syntax is incorrect.

-------------------------------------------------------------------------------
ROBOCOPY :: Robust File Copy for Windows
-------------------------------------------------------------------------------

Started : Sat Nov 11 22:52:56 2017

Source : C:\Advisian Active" D:\Advisian\


Dest : C:\Users\neoh.zi.sheng\Desktop\Active"\

Files : *.*

Options : *.* /TEE /S /E /COPY:DAT /PURGE /MIR /NP /MT:8 /R:0 /W:0

------------------------------------------------------------------------------

2017/11/11 22:52:56 ERROR 123 (0x0000007B) Accessing Source Directory C:\Advisian


Active" D:\Advisian\
The filename, directory name, or volume label syntax is incorrect.

-------------------------------------------------------------------------------
ROBOCOPY :: Robust File Copy for Windows
-------------------------------------------------------------------------------

Started : Sat Nov 11 22:53:20 2017

Source : C:\Advisian Active" D:\Advisian\


Dest : C:\Users\neoh.zi.sheng\Desktop\Active"\

Files : *.*

Options : *.* /TEE /S /E /COPY:DAT /PURGE /MIR /NP /MT:8 /R:0 /W:0

------------------------------------------------------------------------------

2017/11/11 22:53:20 ERROR 123 (0x0000007B) Accessing Source Directory C:\Advisian


Active" D:\Advisian\
The filename, directory name, or volume label syntax is incorrect.

-------------------------------------------------------------------------------
ROBOCOPY :: Robust File Copy for Windows
-------------------------------------------------------------------------------

Started : Sat Nov 11 22:54:28 2017

Source : C:\AdvisianActive" D:\AdvisianActive"\


Dest -

Files : *.*

Options : *.* /TEE /S /E /COPY:DAT /PURGE /MIR /NP /MT:8 /R:0 /W:0

------------------------------------------------------------------------------

ERROR : No Destination Directory Specified.

Simple Usage :: ROBOCOPY source destination /MIR

source :: Source Directory (drive:\path or \\server\share\path).


destination :: Destination Dir (drive:\path or \\server\share\path).
/MIR :: Mirror a complete directory tree.
For more usage information run ROBOCOPY /?

**** /MIR can DELETE files as well as copy them !

-------------------------------------------------------------------------------
ROBOCOPY :: Robust File Copy for Windows
-------------------------------------------------------------------------------

Started : Sat Nov 11 22:54:44 2017

Source : C:\AdvisianActive" D:\AdvisianActive"\


Dest -

Files : *.*

Options : *.* /TEE /S /E /COPY:DAT /PURGE /MIR /NP /MT:8 /R:0 /W:0

------------------------------------------------------------------------------

ERROR : No Destination Directory Specified.

Simple Usage :: ROBOCOPY source destination /MIR

source :: Source Directory (drive:\path or \\server\share\path).


destination :: Destination Dir (drive:\path or \\server\share\path).
/MIR :: Mirror a complete directory tree.

For more usage information run ROBOCOPY /?

**** /MIR can DELETE files as well as copy them !

-------------------------------------------------------------------------------
ROBOCOPY :: Robust File Copy for Windows
-------------------------------------------------------------------------------

Started : Sat Nov 11 22:54:55 2017

Source : D:\PoyryNeoh\
Dest : C:\PoyryFiles\

Files : *.*

Options : *.* /TEE /S /E /COPY:DAT /PURGE /MIR /NP /MT:8 /R:0 /W:0

------------------------------------------------------------------------------

2017/11/11 22:54:55 ERROR 2 (0x00000002) Accessing Source Directory D:\PoyryNeoh\


The system cannot find the file specified.

-------------------------------------------------------------------------------
ROBOCOPY :: Robust File Copy for Windows
-------------------------------------------------------------------------------

Started : Sat Nov 11 22:56:44 2017

Source : D:\AdvisianActive\
Dest : C:\PoyryFiles\
Files : *.*

Options : *.* /TEE /S /E /COPY:DAT /PURGE /MIR /NP /MT:8 /R:0 /W:0

------------------------------------------------------------------------------

*EXTRA Dir -1 C:\PoyryFiles\01 Projects\


*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\
*EXTRA File 63193 5YX312462 Energy Commission Technical
Advisory Services_Project Charter.docx
*EXTRA File 283935 5YX312462 Energy Commission Technical
Advisory Services_Project Charter.pdf
*EXTRA File 1494 Alor Gajah 2100 MW CCGT - Shortcut.lnk
*EXTRA File 3.1 m Draft EC Inv5Y160033 Dec15-Apr16.pdf
*EXTRA File 3.1 m EC Inv5Y160033 Dec15-Apr16.pdf
*EXTRA File 49036 Expense Claim_Sean.xlsx
*EXTRA File 9.4 m Framework Agreement_signed.pdf
*EXTRA File 16847 Invoice EC.xlsx
*EXTRA File 1793 Kagayaki 30 MW - Shortcut (3).lnk
*EXTRA File 93839 Letter of Intent (Poyry Energy Sdn
Bhd).pdf
*EXTRA File 60334 PESB-MD-T16-0013_Framework
Agreement_signed.docx
*EXTRA File 60380 PESB-MD-T16-0018_Framework
Agreement_stamped.docx
*EXTRA File 1778 Sandakan 60MW - Shortcut.lnk
*EXTRA File 100306 Technical Advisory Agreement-poyry
energy_execution version.docx
*EXTRA File 144896 Thumbs.db
*EXTRA File 55610 Timesheets_Energy Commission_sbd.xlsx
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\
*EXTRA File 1.3 m 2.4 Operational Flexibility of the Power
Plant_neoh.pdf
*EXTRA File 165153 2.4.1.1.5 Electrical System and Equipment
Description_neoh.pdf
*EXTRA File 120638 2.4.1.1.7 Instrumentation and Control
System_neoh.pdf
*EXTRA File 116974 Alor Gajah evaluation.docx
*EXTRA File 16414 Alor Gajah evaluation_general elec.docx
*EXTRA File 16355 Clarification question for CCGT Alor
Gajah.xlsx
*EXTRA File 8136 Edra proposal index.pdf
*EXTRA File 5.1 m Melaka - Feasibility Study Report 25-Mar-
15.pdf
*EXTRA File 95232 Thumbs.db
*EXTRA File 891356 Track 4A_SIPP offer review_7 Jan
2015_draft.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\1800-2400MW EPC TENDER\
*EXTRA File 8.8 m Tender Addendum No. 3.pdf
*EXTRA File 201236 Tender Addendum No. 4.pdf
*EXTRA File 5.7 m Tender Addendum No. 5.pdf
*EXTRA File 24064 Thumbs.db
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\1800-2400MW EPC TENDER\Addendum No 1\
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\1800-2400MW EPC TENDER\Addendum No 1\MSWord\
*EXTRA File 74117 Addendum No 1 - Attachment 6 - Part C -
Appendix C - EPC Contractor's Experience (20151023).docx
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\1800-2400MW EPC TENDER\Addendum No 1\PDF\
*EXTRA File 561580 Addendum No 1 (20151023).pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\1800-2400MW EPC TENDER\EPC Tender\
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\1800-2400MW EPC TENDER\EPC Tender\Part A\
*EXTRA File 690452 Tender Document - Part A - Section A -
Instruction To Tenderers [Final Draft].pdf
*EXTRA File 404747 Tender Document - Part A - Section B -
Form of Tender [Final Draft].pdf
*EXTRA File 383069 Tender Document - Part A - Section D -
Schedule of Key Dates [Final Draft].pdf
*EXTRA File 868224 Tender Document - Part A - Section E -
Schedule of Prices [Final Draft].pdf
*EXTRA File 663000 Tender Document - Part A - Section F -
Schedule of Options_ [Attachment A].pdf
*EXTRA File 470051 Tender Document - Part A - Section G -
Schedule of Milestone Payment [Final Draft].pdf
*EXTRA File 457323 Tender Document - Part A - Section H -
Schedule of Unit Rates [Final Draft].pdf
*EXTRA File 612513 Tender Document - Part A - Section I -
Schedule of Performance Guarantees [Final Draft].pdf
*EXTRA File 710044 Tender Document - Part A - Section I -
Schedule of Performance Guarantees Annex A [Final Draft].pdf
*EXTRA File 9242 Tender Document - Part A - Section L -
Insurance Requirements [Cover].pdf
*EXTRA File 9209 Tender Document - Part A - Section M -
Form of LNTP Bond [Cover].pdf
*EXTRA File 12008 Tender Document - Part A - Section M -
Form of LNTP Bond.pdf
*EXTRA File 9234 Tender Document - Part A - Section N -
Form of Performance Bond [Cover].pdf
*EXTRA File 11237 Tender Document - Part A - Section N -
Form of Performance Bond.pdf
*EXTRA File 9237 Tender Document - Part A - Section O -
Form of Warranty Bond [Cover].pdf
*EXTRA File 11364 Tender Document - Part A - Section O -
Form of Warranty Bond.pdf
*EXTRA File 9250 Tender Document - Part A - Section P -
Form of Availability Warranty Bond [Cover].pdf
*EXTRA File 354525 Tender Document - Part A - Section Q -
Schedule of DeviationQualification [Final Draft].pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\1800-2400MW EPC TENDER\EPC Tender\Part B\
*EXTRA File 2.6 m Tender Document - Part B - Functional
Specification [Final Draft].pdf
*EXTRA File 10240 Thumbs.db
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\1800-2400MW EPC TENDER\EPC Tender\Part
B\Appendices\
*EXTRA File 3.0 m Appendix A - Drawings.pdf
*EXTRA File 4872 Appendix B - Gas Fuel Specification.pdf
*EXTRA File 719039 Appendix C - Distillate Oil Analysis.pdf
*EXTRA File 489006 Appendix D - PPA Technical
Requirements.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\1800-2400MW EPC TENDER\EPC Tender\Part C\
*EXTRA File 910551 Tender Document - Part C - Information to
be Provided by Tenderers [Final Draft].pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\1800-2400MW EPC TENDER\EPC Tender\Part D\
*EXTRA File 9222 Tender Document - Part D - Attachment A -
Form of Bid Bond [Cover].pdf
*EXTRA File 9864 Tender Document - Part D - Attachment A -
Form of Bid Bond.pdf
*EXTRA File 9240 Tender Document - Part D - Attachment B -
Form of Substitute Bond [Cover].pdf
*EXTRA File 12012 Tender Document - Part D - Attachment B -
Form of Substitute Bond.pdf
*EXTRA File 9235 Tender Document - Part D - Attachment C -
Geotechnical Investigation [Cover].pdf
*EXTRA File 9233 Tender Document - Part D - Attachment D -
Topographic Survey [Cover].pdf
*EXTRA File 9241 Tender Document - Part D - Attachment E -
Bathymetric Survey [Cover].pdf
*EXTRA File 259310 Tender Document - Part D - Attachment E -
Bathymetric Survey.pdf
*EXTRA File 9233 Tender Document - Part D - Attachment F -
Seawater Analysis [Cover].pdf
*EXTRA File 72256 Tender Document - Part D - Attachment F -
Seawater Analysis.pdf
*EXTRA File 9245 Tender Document - Part D - Attachment G -
Raw Water Analysis [Cover].pdf
*EXTRA File 83254 Tender Document - Part D - Attachment G -
Raw Water Analysis.pdf
*EXTRA File 9273 Tender Document - Part D - Attachment H -
Exitsing Seawater Intake and Outfall Drawings [Cover].pdf
*EXTRA File 21.1 m Tender Document - Part D - Attachment H -
Exitsing Seawater Intake and Outfall Drawings.pdf
*EXTRA File 21364 Tender Document - Part D - Attachment I -
Form of Tender Enquiries [Final Draft].pdf
*EXTRA File 876424 Tender Document - Part D - Attachment J -
Request for LTSA Proposal [Final Draft].pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\1800-2400MW EPC TENDER\EPC Tender\Part D\Tender
Document - Part D - Attachment C - Geotechnical Investigation\
*EXTRA File 1.0 m 3018-150422-GIR-SD-R0.pdf
*EXTRA File 60.2 m SI report.pdf
*EXTRA File 2.2 m SSE 1168.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\1800-2400MW EPC TENDER\EPC Tender\Part D\Tender
Document - Part D - Attachment D - Topographic Survey\
*EXTRA File 523015 MHHMEL1510TOPO_DRAFT04.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\1800-2400MW EPC TENDER\Tender Addendum No. 10\
*EXTRA File 189000 Tender Addendum No.10.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\1800-2400MW EPC TENDER\Tender Addendum No. 2\
*EXTRA File 4.3 m Attachment 2.pdf
*EXTRA File 737606 Attachment 3.pdf
*EXTRA File 268336 Tender Addendum No. 2 (20151109).pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\1800-2400MW EPC TENDER\Tender Addendum No.
2\Attachment 1\
*EXTRA File 624657 Attachment 1_Cover Page.pdf
*EXTRA File 1.5 m Pre-Approved List for Substation.pdf
*EXTRA File 3.9 m Transmission Substation.pdf
*EXTRA File 425976 Transmission Technical Specification.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\1800-2400MW EPC TENDER\Tender Addendum No.
2\Attachment 1\500KV\
*EXTRA File 161296 500kV_Design_Specification.pdf
*EXTRA File 139035 500kV_General_Specification.pdf
*EXTRA File 538349 500kV_Line_Construction.pdf
*EXTRA File 389752 500kV_Material_Specificaton.pdf
*EXTRA File 43452 TOC.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\1800-2400MW EPC TENDER\Tender Addendum No.
2\Attachment 1\CIVIL (GREEN BUILDING)\
*EXTRA File 397299 10-Plumbing_GB_rev1.pdf
*EXTRA File 71194 11-Roof_GB_rev0.pdf
*EXTRA File 902175 13-Mech_GB_rev0.pdf
*EXTRA File 279852 14-ElectSpecs_GB_rev0.pdf
*EXTRA File 316997 8-BldgTrdr_GB_rev1.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\1800-2400MW EPC TENDER\Tender Addendum No.
2\Attachment 1\CIVIL (LUMP SUM)\
*EXTRA File 98849 15-
Lift_Installaltion_(AC_Variable_Frequncy_Geared_Lifts).pdf
*EXTRA File 66802 16-Landscaping_Works.pdf
*EXTRA File 123380 18-Soft_Ground_Treatment.pdf
*EXTRA File 53387 19-Dynamic_Compaction.pdf
*EXTRA File 366186 2-Earthworks.pdf
*EXTRA File 118434 3-Drainage_and_Kerbing_works.pdf
*EXTRA File 194297 4-Roadworks.pdf
*EXTRA File 304300 5-Concrete_Works.pdf
*EXTRA File 41216 7-Fencing_.pdf
*EXTRA File 57637 9-Steelwork.pdf
*EXTRA File 122340 Lattice_Steel_Structures.pdf
*EXTRA File 72583 Table_of_Contents.pdf
*EXTRA File 298108 TTS-CV-FDN-LS_rev0.pdf
*EXTRA File 246869 TTS-CV-FIRE_PROT-LS_rev0.pdf
*EXTRA File 112341 TTS-CV-FLRWALL-LS_rev0.pdf
*EXTRA File 413272 TTS-CV-PART1_PRELIM-LS_rev0.pdf
*EXTRA File 49529 TTS-CV-STECLR-LS_rev0.pdf
*EXTRA File 137069 Tubular_Steel_Structures.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\1800-2400MW EPC TENDER\Tender Addendum No.
2\Attachment 1\EARTHING & LOCAL TX\
*EXTRA File 181338 General_Specification.pdf
*EXTRA File 861994 Section_2_-
_Earthing_and_Local_Transformer_33_22_11_rev2_.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\1800-2400MW EPC TENDER\Tender Addendum No.
2\Attachment 1\LINES\
*EXTRA File 71924
275_132kV__Cap_&_Pin_Insulators_(Porcelain_&_Glass).pdf
*EXTRA File 144380
500_275_132kVTransmission_Line_Conductors__(TACSR(SA)__TW).pdf
*EXTRA File 176018 Fittings_and_Accessories_(ACSR)_rev1.pdf
*EXTRA File 247361
Fittings_and_Accessories_(High_Temperature_Conductors)_rev1.pdf
*EXTRA File 404560
General_Specification_for_Transmission_Line.pdf
*EXTRA File 151001 Insulator_(Composite).pdf
*EXTRA File 282592
Monopole_&_Lattice_Tower_Earthing_System.pdf
*EXTRA File 99032
Optical_Fibre_Approach_Cable_&_Accessories.pdf
*EXTRA File 220887
Optical_Fibre_Composite_Groundwire_(OPGW)_Accessories.pdf
*EXTRA File 151763
Optical_Fibre_Groundwire_(48_Fibres_OPGW)_of_Lightning_Class_3.pdf
*EXTRA File 121038 Transmission_Line_Arrester_(Gap_Type).pdf
*EXTRA File 79026 Transmission_Line_Conductors_(ACSR).pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\1800-2400MW EPC TENDER\Tender Addendum No.
2\Attachment 1\POWER TX\
*EXTRA File 181338 General_Specification.pdf
*EXTRA File 449252
High_Voltage_Bushing_for_Transformer_and_Reactor_ver.2.pdf
*EXTRA File 91129 Section_1_-
_Transformer_Reactor_Specification_rev1.pdf
*EXTRA File 378820 Section_2A_-
_Transformer_Insulating_Mineral_Oil_Technical_Requirement.pdf
*EXTRA File 752090 Section_3-
Transformer_Painting_&_Corrosion_Prevention.pdf
*EXTRA File 624543 Section_5-
Transformer_Quality_Assurance_&_Design_Review.pdf
*EXTRA File 270504 Section_6-
Transformer_SCADA_Interface_Requirements.pdf
*EXTRA File 4.8 m Secttion_2_-
_Transformer_Technical_Requirement_500KV_rev2.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\1800-2400MW EPC TENDER\Tender Addendum No.
2\Attachment 1\PROTECTION\
*EXTRA File 144098 415V_LVAC_Switchborad.pdf
*EXTRA File 309744
Auxiliary_Power,_Control_and_Instrumentation_Cables.pdf
*EXTRA File 803988 Protection_Control_&_Instrumentation.pdf
*EXTRA File 187084 Station_DC_System.pdf
*EXTRA File 261787 Three_Phase_Energy_Meters.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\1800-2400MW EPC TENDER\Tender Addendum No.
2\Attachment 1\SUBSTATION\
*EXTRA File 422442 33kV_&_11kV_Transformer_Tail_Cable.pdf
*EXTRA File 146058 500kV,_275kV_&_132kV_Circuit_Breaker.pdf
*EXTRA File 117617 Busbar_and_Fitting.pdf
*EXTRA File 47504 Capacitor_Voltage_Transformer.pdf
*EXTRA File 48330 Current_Transformer.pdf
*EXTRA File 95125 Earthing_Systems.pdf
*EXTRA File 181338 General_Specification.pdf
*EXTRA File 50087 Inductive_Voltage_Transformer.pdf
*EXTRA File 77730 Lightning_Prot_System.pdf
*EXTRA File 93066 Neutral_Earthing_Equipment.pdf
*EXTRA File 224912
Outdoor_Disconnectors_&_Earthing_Switches.pdf
*EXTRA File 311906 Standby_Diesel_Generator.pdf
*EXTRA File 352371
Substation_Product_Testing_&_Inspection.pdf
*EXTRA File 58319 Surge_Arrester.pdf
*EXTRA File 81103 TX_Explosion_Prevention.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\1800-2400MW EPC TENDER\Tender Addendum No.
2\Attachment 1\TELECONTROL\
*EXTRA File 408645
Network_Control_Center_SCADA_Requirements.pdf
*EXTRA File 553162 Remote_Terminal_Unit.pdf
*EXTRA File 95101 Supervisory_Interface_Panel.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\1800-2400MW EPC TENDER\Tender Addendum No. 9\
*EXTRA File 544553 Tender Addendum No. 9.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\1800-2400MW EPC TENDER\Tender Float 9 Oct 2015\
*EXTRA File 69014 Cover Letter dated 9 Oct 2015.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\1800-2400MW EPC TENDER\Tender Float 9 Oct
2015\Tender Document (Tracked Change)\
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\1800-2400MW EPC TENDER\Tender Float 9 Oct
2015\Tender Document 20151009\
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\1800-2400MW EPC TENDER\Tender Float 9 Oct
2015\Tender Document 20151009\Part A\
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\1800-2400MW EPC TENDER\Tender Float 9 Oct
2015\Tender Document 20151009\Part A\MS Word\
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\1800-2400MW EPC TENDER\Tender Float 9 Oct
2015\Tender Document 20151009\Part A\pdf\
*EXTRA File 369995 Tender Document - Part A - Contents.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\1800-2400MW EPC TENDER\Tender Float 9 Oct
2015\Tender Document 20151009\Part B\
*EXTRA File 370304 Tender Document - Part B - Contents.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\1800-2400MW EPC TENDER\Tender Float 9 Oct
2015\Tender Document 20151009\Part C\
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\1800-2400MW EPC TENDER\Tender Float 9 Oct
2015\Tender Document 20151009\Part C\MS word\
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\1800-2400MW EPC TENDER\Tender Float 9 Oct
2015\Tender Document 20151009\Part C\pdf\
*EXTRA File 370097 Tender Document - Part C - Contents.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\1800-2400MW EPC TENDER\Tender Float 9 Oct
2015\Tender Document 20151009\Part D\
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\1800-2400MW EPC TENDER\Tender Float 9 Oct
2015\Tender Document 20151009\Part D\Vol 1\
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\1800-2400MW EPC TENDER\Tender Float 9 Oct
2015\Tender Document 20151009\Part D\Vol 1\MS Word\
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\1800-2400MW EPC TENDER\Tender Float 9 Oct
2015\Tender Document 20151009\Part D\Vol 1\pdf\
*EXTRA File 370096 Tender Document - Part D - Vol 1 -
Contents.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\1800-2400MW EPC TENDER\Tender Float 9 Oct
2015\Tender Document 20151009\Part D\Vol 2\
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\1800-2400MW EPC TENDER\Tender Float 9 Oct
2015\Tender Document 20151009\Part D\Vol 2\MS Word\
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\1800-2400MW EPC TENDER\Tender Float 9 Oct
2015\Tender Document 20151009\Part D\Vol 2\pdf\
*EXTRA File 370073 Tender Document - Part D - Vol 2 -
Contents.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Commercial Proposal\
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Commercial Proposal\Volume 1\
*EXTRA File 3.7 m Cover Letter.pdf
*EXTRA File 88291 Extract of Board Resolution.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Commercial Proposal\Volume 14\
*EXTRA File 340754 0_Table of Content (Vol 14).pdf
*EXTRA File 2.1 m 1_Commercial Proposal (Main Body).pdf
*EXTRA File 25.3 m Annex 3.2.1-A Copy of draft PPA.pdf
*EXTRA File 9.9 m Annex 3.2.1-B Copy of draft GSA (Part 1
of 2).pdf
*EXTRA File 980917 Annex 3.2.1-B Copy of draft GSA (Part 2
of 2).pdf
*EXTRA File 2.5 m Annex 3.2.1-C Copy of Letter of Support
from Financial Institution.pdf
*EXTRA File 5.6 m Annex 3.2.1-D Copy of Land SPA with
1MDB.pdf
*EXTRA File 496065 Annex 3.2.1-E Copy of Letter of Intent
and follow up letter from Edra Energy to TNB.pdf
*EXTRA File 245759 Annex 3.2.1-F Copy of Letter of intent
from Powertek Berhad to Edra Energy.pdf
*EXTRA File 2.9 m Annex 3.2.1-G Copy of Land SPA with
Yayasan Melaka.pdf
*EXTRA File 305227 Annex 3.2.1-H Copy of Letter of Intent
from Panglima Power Sdn Bhd to Edra Energy.pdf
*EXTRA File 1.6 m Annex 3.3.8-A Copy of Letter from
Insurance Adviser.pdf
*EXTRA File 179712 Thumbs.db
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Commercial Proposal\Volume 15\
*EXTRA File 287596 0_Table of Content (Vol 15).pdf
*EXTRA File 5.3 m Annex 3.4.1 & 3.4.2 Financial Forms, Data
Book and Model.xlsm
*EXTRA File 2.0 m Annex 3.4.2-A Financial Model Data Book
and User Manual.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\Volume 2-4\
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\Volume 2-4\Section 2.1\
*EXTRA File 196123 2.1 Plant Net Capacity.pdf
*EXTRA File 19456 Thumbs.db
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\Volume 2-4\Section 2.10\
*EXTRA File 41657 2.10 Project Implementation Schedule.pdf
*EXTRA File 145847 Attachment A - Project Development
Schedule.pdf
*EXTRA File 313638 Attachment B - EPC Contractor
Schedule.pdf
*EXTRA File 42496 Thumbs.db
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\Volume 2-4\Section 2.11\
*EXTRA File 192848 2.11 Maintenance Plan.pdf
*EXTRA File 45993 Attachment A - Maintenance Plan.pdf
*EXTRA File 130475 Attachment A1 - Maintenance Plan (AT
Table).pdf
*EXTRA File 3.3 m Attachment B - GER3620M Heavy-Duty GT
Operating and Maintenance Considerations.PDF
*EXTRA File 26624 Thumbs.db
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\Volume 2-4\Section 2.12\
*EXTRA File 95342 2.12 Detailed Technical Information.pdf
*EXTRA File 17920 Thumbs.db
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\Volume 2-4\Section 2.2\
*EXTRA File 112506 2 2 Certainty of Net Capacity over the
Term.pdf
*EXTRA File 15872 Thumbs.db
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\Volume 2-4\Section 2.3\
*EXTRA File 1.5 m 2.3 Track Record of and Service Support
for the Power Plant Technology.pdf
*EXTRA File 3.1 m Attachment A - 01. 9HA.02 Overview (GE
Presentation).pdf
*EXTRA File 300154 Attachment A - 02. HA Gas Turbine
Validation from a Fleet Perspective Paper (GEA32109).pdf
*EXTRA File 56541 Attachment A - 03. GE H-Class Gas Turbine
Experience List (GEA31771).pdf
*EXTRA File 1.6 m Attachment B - 01. Letters of
Insurability for 9HA.02.pdf
*EXTRA File 2.4 m Attachment C - 01. Equipment Project
References (Table E.3.3).pdf
*EXTRA File 107520 Thumbs.db
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\Volume 2-4\Section 2.4\
*EXTRA File 1.4 m 2.4 Operational Flexibility of the Power
Plant.pdf
*EXTRA File 4.5 m Attachment A - 01. Supporting Drawings
and Information (Part 1).pdf
*EXTRA File 1043742 Attachment A - 02. Supporting Drawings
and Information (Part 2).pdf
*EXTRA File 631906 Attachment B - Supporting Drawings and
Information (Supplement).pdf
*EXTRA File 77824 Thumbs.db
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\Volume 2-4\Section 2.5\
*EXTRA File 455861 2.5 Environmental Compliance.pdf
*EXTRA File 98124 Attachment A - Acknowledgement from DOE
Melaka.pdf
*EXTRA File 38912 Thumbs.db
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\Volume 2-4\Section 2.6\
*EXTRA File 220730 2.6 Capabality of and certainty of plant
delivery by the EPC contractor.pdf
*EXTRA File 82958 Attachment A - Particulars of EPC
Contractor.pdf
*EXTRA File 1.7 m Attachment B - EPC Contractor
Experience.pdf
*EXTRA File 99489 Attachment C - EPC Contractor Project
Organization Chart (Level 1 & 2).pdf
*EXTRA File 45949 Attachment D - EPC Contractor HSE
Statistics.pdf
*EXTRA File 10.3 m Attachment E - EPC Contractor Proposed
Approach, Project Execution Plan and Method Statements.pdf
*EXTRA File 48128 Thumbs.db
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\Volume 2-4\Section 2.7\
*EXTRA File 753591 2.7 Capacity of and Certainty of Plant
Operation of the O&M Contractor.pdf
*EXTRA File 29184 Thumbs.db
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\Volume 2-4\Section 2.8\
*EXTRA File 172022 2.8 Capabality of and certainty of plant
design review and construction management by the OE.pdf
*EXTRA File 539002 Attachment A - OE1 Project Reference.pdf
*EXTRA File 545101 Attachment B - OE2 Project Reference.pdf
*EXTRA File 67072 Thumbs.db
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\Volume 2-4\Section 2.9\
*EXTRA File 408243 2.9 Information Required as per Appendix
G of the PPA.pdf
*EXTRA File 14848 Thumbs.db
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\Annex 2.6-A - EPC
Tender Process\
*EXTRA File 92983 00 EPC Tender Process.pdf
*EXTRA File 366724 01 EPC Tender Process (Tender Evaluation)
Feb2016.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\Annex 2.6-B -
RFEOI Evaluation Report\
*EXTRA File 726674 Request for Expression of Interest for
EPC Contractor Evaluation Report.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\Annex 2.6-C - EPC
Tender Documents\
*EXTRA File 43920 Tender Document Covers.pdf
*EXTRA File 14336 Thumbs.db
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\Annex 2.6-C - EPC
Tender Documents\Part A\
*EXTRA File 170812 Tender Document - Part A - Section A -
Instructions To Tenderers (20160224).pdf
*EXTRA File 400108 Tender Document - Part A - Section B -
Form of Tender (20160224).pdf
*EXTRA File 1.3 m Tender Document - Part A - Section C -
Form of Agreement and Conditions of Contract.pdf
*EXTRA File 21533 Tender Document - Part A - Section D -
Schedule of Key Dates (20160224).pdf
*EXTRA File 101976 Tender Document - Part A - Section E -
Schedule of Prices (20160224).pdf
*EXTRA File 361838 Tender Document - Part A - Section F -
Schedule of Options (20160224).pdf
*EXTRA File 473578 Tender Document - Part A - Section F -
Schedule of Options Annex A-1 (20151009).PDF
*EXTRA File 278145 Tender Document - Part A - Section F -
Schedule of Options Annex A-2 (20151009).PDF
*EXTRA File 423815 Tender Document - Part A - Section F -
Schedule of Options Annex D2-1 (20151009).pdf
*EXTRA File 92918 Tender Document - Part A - Section F -
Schedule of Options Annex D2-2 (20151009).pdf
*EXTRA File 453109 Tender Document - Part A - Section G -
Schedule of Milestone Payments (20160224).pdf
*EXTRA File 451403 Tender Document - Part A - Section H -
Schedule of Unit Rates (20160224).pdf
*EXTRA File 102449 Tender Document - Part A - Section L -
Insurance Requirements (20160224).pdf
*EXTRA File 367110 Tender Document - Part A - Section M -
Form of LNTP Bond (20160224).pdf
*EXTRA File 379629 Tender Document - Part A - Section N -
Form of Performance Bond (20160224).pdf
*EXTRA File 379831 Tender Document - Part A - Section O -
Form of Warranty Bond (20160224).pdf
*EXTRA File 293746 Tender Document - Part A - Section P -
Form of Advance Payment Bond (20160224).pdf
*EXTRA File 54784 Thumbs.db
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\Annex 2.6-C - EPC
Tender Documents\Part B\
*EXTRA File 1.2 m Tender Document - Part B - Functional
Requirements (20160224).pdf
*EXTRA File 4.2 m Tender Document - Part B - Functional
Requirements - Annex A (20160224).pdf
*EXTRA File 214433 Tender Document - Part B - Functional
Requirements - Annex B (20160224).pdf
*EXTRA File 405989 Tender Document - Part B - Functional
Requirements - Annex C (20160224).pdf
*EXTRA File 234017 Tender Document - Part B - Functional
Requirements - Annex D (20160224).pdf
*EXTRA File 459754 Tender Document - Part B - Functional
Requirements - Annex E [Cover Only].pdf
*EXTRA File 46401 Tender Document - Part B - Functional
Requirements - Annex F (20160224).pdf
*EXTRA File 65024 Thumbs.db
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\Annex 2.6-C - EPC
Tender Documents\Part B\Annex E\
*EXTRA File 624657 Attachment 1_Cover Page.pdf
*EXTRA File 1.5 m Pre-Approved List for Substation.pdf
*EXTRA File 3.9 m Transmission Substation.pdf
*EXTRA File 425976 Transmission Technical Specification.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\Annex 2.6-C - EPC
Tender Documents\Part B\Annex E\500KV\
*EXTRA File 161296 500kV_Design_Specification.pdf
*EXTRA File 139035 500kV_General_Specification.pdf
*EXTRA File 538349 500kV_Line_Construction.pdf
*EXTRA File 389752 500kV_Material_Specificaton.pdf
*EXTRA File 43452 TOC.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\Annex 2.6-C - EPC
Tender Documents\Part B\Annex E\CIVIL (GREEN BUILDING)\
*EXTRA File 397299 10-Plumbing_GB_rev1.pdf
*EXTRA File 71194 11-Roof_GB_rev0.pdf
*EXTRA File 902175 13-Mech_GB_rev0.pdf
*EXTRA File 279852 14-ElectSpecs_GB_rev0.pdf
*EXTRA File 316997 8-BldgTrdr_GB_rev1.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\Annex 2.6-C - EPC
Tender Documents\Part B\Annex E\CIVIL (LUMP SUM)\
*EXTRA File 98849 15-
Lift_Installaltion_(AC_Variable_Frequncy_Geared_Lifts).pdf
*EXTRA File 66802 16-Landscaping_Works.pdf
*EXTRA File 123380 18-Soft_Ground_Treatment.pdf
*EXTRA File 53387 19-Dynamic_Compaction.pdf
*EXTRA File 366186 2-Earthworks.pdf
*EXTRA File 118434 3-Drainage_and_Kerbing_works.pdf
*EXTRA File 194297 4-Roadworks.pdf
*EXTRA File 304300 5-Concrete_Works.pdf
*EXTRA File 41216 7-Fencing_.pdf
*EXTRA File 57637 9-Steelwork.pdf
*EXTRA File 122340 Lattice_Steel_Structures.pdf
*EXTRA File 72583 Table_of_Contents.pdf
*EXTRA File 298108 TTS-CV-FDN-LS_rev0.pdf
*EXTRA File 246869 TTS-CV-FIRE_PROT-LS_rev0.pdf
*EXTRA File 112341 TTS-CV-FLRWALL-LS_rev0.pdf
*EXTRA File 413272 TTS-CV-PART1_PRELIM-LS_rev0.pdf
*EXTRA File 49529 TTS-CV-STECLR-LS_rev0.pdf
*EXTRA File 137069 Tubular_Steel_Structures.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\Annex 2.6-C - EPC
Tender Documents\Part B\Annex E\EARTHING & LOCAL TX\
*EXTRA File 181338 General_Specification.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\Annex 2.6-C - EPC
Tender Documents\Part B\Annex E\LINES\
*EXTRA File 71924
275_132kV__Cap_&_Pin_Insulators_(Porcelain_&_Glass).pdf
*EXTRA File 144380
500_275_132kVTransmission_Line_Conductors__(TACSR(SA)__TW).pdf
*EXTRA File 176018 Fittings_and_Accessories_(ACSR)_rev1.pdf
*EXTRA File 247361
Fittings_and_Accessories_(High_Temperature_Conductors)_rev1.pdf
*EXTRA File 404560
General_Specification_for_Transmission_Line.pdf
*EXTRA File 151001 Insulator_(Composite).pdf
*EXTRA File 282592
Monopole_&_Lattice_Tower_Earthing_System.pdf
*EXTRA File 99032
Optical_Fibre_Approach_Cable_&_Accessories.pdf
*EXTRA File 220887
Optical_Fibre_Composite_Groundwire_(OPGW)_Accessories.pdf
*EXTRA File 151763
Optical_Fibre_Groundwire_(48_Fibres_OPGW)_of_Lightning_Class_3.pdf
*EXTRA File 121038 Transmission_Line_Arrester_(Gap_Type).pdf
*EXTRA File 79026 Transmission_Line_Conductors_(ACSR).pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\Annex 2.6-C - EPC
Tender Documents\Part B\Annex E\POWER TX\
*EXTRA File 181338 General_Specification.pdf
*EXTRA File 449252
High_Voltage_Bushing_for_Transformer_and_Reactor_ver.2.pdf
*EXTRA File 91129 Section_1_-
_Transformer_Reactor_Specification_rev1.pdf
*EXTRA File 752090 Section_3-
Transformer_Painting_&_Corrosion_Prevention.pdf
*EXTRA File 2.7 m Section_4_-_Inspection_Erection.pdf
*EXTRA File 624543 Section_5-
Transformer_Quality_Assurance_&_Design_Review.pdf
*EXTRA File 270504 Section_6-
Transformer_SCADA_Interface_Requirements.pdf
*EXTRA File 4.8 m Secttion_2_-
_Transformer_Technical_Requirement_500KV_rev2.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\Annex 2.6-C - EPC
Tender Documents\Part B\Annex E\PROTECTION\
*EXTRA File 144098 415V_LVAC_Switchborad.pdf
*EXTRA File 309744
Auxiliary_Power,_Control_and_Instrumentation_Cables.pdf
*EXTRA File 803988 Protection_Control_&_Instrumentation.pdf
*EXTRA File 187084 Station_DC_System.pdf
*EXTRA File 261787 Three_Phase_Energy_Meters.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\Annex 2.6-C - EPC
Tender Documents\Part B\Annex E\SUBSTATION\
*EXTRA File 422442 33kV_&_11kV_Transformer_Tail_Cable.pdf
*EXTRA File 146058 500kV,_275kV_&_132kV_Circuit_Breaker.pdf
*EXTRA File 117617 Busbar_and_Fitting.pdf
*EXTRA File 47504 Capacitor_Voltage_Transformer.pdf
*EXTRA File 48330 Current_Transformer.pdf
*EXTRA File 95125 Earthing_Systems.pdf
*EXTRA File 181338 General_Specification.pdf
*EXTRA File 50087 Inductive_Voltage_Transformer.pdf
*EXTRA File 77730 Lightning_Prot_System.pdf
*EXTRA File 93066 Neutral_Earthing_Equipment.pdf
*EXTRA File 224912
Outdoor_Disconnectors_&_Earthing_Switches.pdf
*EXTRA File 311906 Standby_Diesel_Generator.pdf
*EXTRA File 352371
Substation_Product_Testing_&_Inspection.pdf
*EXTRA File 58319 Surge_Arrester.pdf
*EXTRA File 81103 TX_Explosion_Prevention.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\Annex 2.6-C - EPC
Tender Documents\Part B\Annex E\TELECONTROL\
*EXTRA File 408645
Network_Control_Center_SCADA_Requirements.pdf
*EXTRA File 553162 Remote_Terminal_Unit.pdf
*EXTRA File 95101 Supervisory_Interface_Panel.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\Annex 2.6-C - EPC
Tender Documents\Part C\
*EXTRA File 77153 Tender Document - Part C - Appendix C -
EPC Contractor's Experience (20160224).pdf
*EXTRA File 131046 Tender Document - Part C - Appendix H -
Equipment References (20160224).pdf
*EXTRA File 154607 Tender Document - Part C - Appendix J -
PPA Technical Data (20160224).pdf
*EXTRA File 53360 Tender Document - Part C - Appendix K -
Technical Data (20160224).pdf
*EXTRA File 31760 Tender Document - Part C - Appendix L -
Consumable and Operation Spares (20160224).pdf
*EXTRA File 26458 Tender Document - Part C - Appendix M -
Special Tools (20160224).pdf
*EXTRA File 28678 Tender Document - Part C - Appendix N -
Implementation Schedule (20160224).pdf
*EXTRA File 40453 Tender Document - Part C - Appendix Q -
Drawings (20160224).pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\Annex 2.6-C - EPC
Tender Documents\Part D\
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\Annex 2.6-C - EPC
Tender Documents\Part D\Vol 1\
*EXTRA File 56.5 m Tender Document - Part D - Vol 1 -
Attachment C - Geotech_Part 1 (20160224).pdf
*EXTRA File 2.4 m Tender Document - Part D - Vol 1 -
Attachment C - Geotech_Part 2 (20160224).pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\Annex 2.6-C - EPC
Tender Documents\Part D\Vol 2\
*EXTRA File 17.0 m Attachment H - Existing Seawater Intake
and Outfall Drawings (20160224).pdf
*EXTRA File 4.3 m Tender Document - Part D - Vol 2 -
Attachment F - [P1] (20160224).pdf
*EXTRA File 744762 Tender Document - Part D - Vol 2 -
Attachment L - Climate Data (20160224).pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\Annex 2.6-D -
preferred EPC tenderer\
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\Annex 2.6-D -
preferred EPC tenderer\Administrative, Technical and Commercial Proposal\
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\Annex 2.6-D -
preferred EPC tenderer\LTSA Proposal\
*EXTRA File 5.1 m LTSA Proposal.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\Annex 2.6-E -
Tender Clarifications\
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\Annex 2.6-E -
Tender Clarifications\Assignment Bonds to Edra Energy\
*EXTRA File 48828 Notification_of_Nominee_BIB2.pdf
*EXTRA File 48842 Notification_of_Nominee_BIT2.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\Annex 2.6-E -
Tender Clarifications\EPC\
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\Annex 2.6-E -
Tender Clarifications\EPC\20160301\
*EXTRA File 131294 Tender_Clarification_T2_20160301 -
Attachment 1 Board Resolution.pdf
*EXTRA File 143673 Tender_Clarification_T2_20160301 -
Attachment 1 Form 49.pdf
*EXTRA File 268636 Tender_Clarification_T2_20160301 -
Attachment 2 Form of Bid.pdf
*EXTRA File 136463
Tender_Clarification_T2_20160301_Attachment 3 GEGPP-GEPSM Bid Bond.pdf
*EXTRA File 294366
Tender_Clarification_T2_20160301_Attachment 4 Confidentiality Undertaking.pdf
*EXTRA File 6.1 m
Tender_Clarification_T2_20160301_Hyundai.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\Annex 2.6-E -
Tender Clarifications\EPC\20160303\
*EXTRA File 1.4 m
Tender_Clarification_T2_20160303_Hyundai_.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\Annex 2.6-E -
Tender Clarifications\EPC\20160305\
*EXTRA File 2.5 m Attachment_Item#17_GER3620L GT Operating
and Maintenance Considerations.pdf
*EXTRA File 6.5 m
Tender_Clarification_T2_20160305_Hyundai.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\Annex 2.6-E -
Tender Clarifications\EPC\20160309\
*EXTRA File 1.4 m
Tender_Clarification_T2_20160309_1_Hyundai.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\Annex 2.6-E -
Tender Clarifications\EPC\20160310\
*EXTRA File 52506 (Confidential) Attachment_Item#61_Part
Load Heat Rate Table (Gas Fuel).pdf
*EXTRA File 47424 (Confidential) Attachment_Item#61_Part
Load Heat Rate Table (Liquid Fuel).pdf
*EXTRA File 119541 _Item#53_GEK-110392 Standard Noise
Assessment Procedure.pdf
*EXTRA File 47652 _Item#54_Section I Schedule of
Performance Guarantees.pdf
*EXTRA File 99489 Item#30_Revised Project Organization
Chart(Level1&2).pdf
*EXTRA File 2.0 m Item#51_GEK28172 Std Field Testing
Procedure for Emission Compliance.pdf
*EXTRA File 10.9 m
Tender_Clarification_T2_20160310_Hyundai.pdf
*EXTRA File 1.5 m
Tender_Clarification_T2_20160310_Hyundai_Additional.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\Annex 2.6-E -
Tender Clarifications\EPC\20160316\
*EXTRA File 1.5 m Item#3-1_Revised Section 5 Schedule of
Options.pdf
*EXTRA File 141362
Item#47_Section_L___Insurance_Requirements.pdf
*EXTRA File 285981
Item#48_Hyundai_Updated_Milestone_Payment.pdf
*EXTRA File 930817 Item#63_Codes and Standards for Gas
Turbine Generator.pdf
*EXTRA File 26035 Item#77_Part C - Appendix H - 1,2 Gas
Turbine Design Validation.pdf
*EXTRA File 10.3 m Item#78_Section 30 Plans, Manuals and
Method Statements.pdf
*EXTRA File 978441 Tender_Clarification_T2_20160316 -
Attachment_Item#77_GT Publication.pdf
*EXTRA File 1.0 m
Tender_Clarification_T2_20160316_Hyundai_Admin.pdf
*EXTRA File 1.9 m
Tender_Clarification_T2_20160316_Hyundai_Commercial.pdf
*EXTRA File 5.8 m
Tender_Clarification_T2_20160316_Hyundai_Tech.pdf
*EXTRA File 70177
Tender_Clarification_T2_20160328_EPC_Commercia_Item No. 47-Hyundai.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\Annex 2.6-E -
Tender Clarifications\EPC\20160328\
*EXTRA File 247324 (Confidential) Tender
Clarification_T2_20160328-Cost Impact.pdf
*EXTRA File 7920 Item#4_Std Protection Instrumentation for
the Main Shaft Train.pdf
*EXTRA File 321283 Item#4_Vibration measurement and
protection HTCT604278.pdf
*EXTRA File 29767 Tender_Clarification_T2_20160328 -
Attachment_Item#54_Start-up Time.pdf
*EXTRA File 91434 Tender_Clarification_T2_20160328 -
Attachment_Item#94_Revised Option C&D&E.pdf
*EXTRA File 1.0 m
Tender_Clarification_T2_20160328_EPC_Commercial_Minutes.pdf
*EXTRA File 510713
Tender_Clarification_T2_20160328_EPC_Technical_Minutes.pdf
*EXTRA File 2.7 m
Tender_Clarification_T2_20160330_EPC_Commercial.pdf
*EXTRA File 1.6 m
Tender_Clarification_T2_20160330_Soft_Submission.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\Annex 2.6-E -
Tender Clarifications\EPC\20160329\
*EXTRA File 84996 Attachment 2 - Man-Hours, Rate and
Qualifications of labor for HGP & MI.pdf
*EXTRA File 3.1 m Tender_Clarification_T2_20160329 -
Attachment 9HA Overview (Presentation).pdf
*EXTRA File 1.3 m
Tender_Clarification_T2_20160329_EPC_Technical_Hyundai.pdf
*EXTRA File 88389 Tender_Clarification_T2_LTSA_20160324 -
Attachment 1 - PerformanceTesting.pdf
*EXTRA File 143664 Tender_Clarification_T2_LTSA_20160324.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\Annex 2.6-E -
Tender Clarifications\EPC\20160330\
*EXTRA File 1.5 m
Tender_Clarification_T2_20160330_Hyundai.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\Annex 2.6-E -
Tender Clarifications\EPC\20160331\
*EXTRA File 143627 (Confidential) Tuah Milestone
Payments_Rev D_Final_160406.pdf
*EXTRA File 1.3 m
Tender_Clarification_T2_20160331_Hyundai.pdf
*EXTRA File 1.2 m
Tender_Clarification_T2_20160331_Hyundai_rev1.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\Annex 2.6-E -
Tender Clarifications\EPC\20160406\
*EXTRA File 62635 (Confidential)
Tender_Clarification_T2_20160406_Item100_Cost Impact.pdf
*EXTRA File 217507
Tender_Clarification_T2_20160406_EPC_Technical_Hyundai.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\Annex 2.6-E -
Tender Clarifications\EPC\20160407\
*EXTRA File 81777 (Confidential)
Tender_Clarification_T2_20160407_Cost Impact.pdf
*EXTRA File 3.0 m
(Remaining)_Tender_Clarification_T2_20160406_20160407_Hyundai.pdf
*EXTRA File 4.2 m
Tender_Clarification_T2_20160407_Hyundai_r0.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\Annex 2.6-E -
Tender Clarifications\EPC\20160411\
*EXTRA File 687807 Tender_Clarification_T2_20160411 -
Attachment_Project HSE Plan.pdf
*EXTRA File 2.4 m
Tender_Clarification_T2_20160411_Hyundai.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\Annex 2.6-E -
Tender Clarifications\EPC\20160412\
*EXTRA File 494114 Tender_Clarification_T2_20160412 - Fuel
Gas Buffer review_160414.pdf
*EXTRA File 3.0 m
Tender_Clarification_T2_20160412_Hyundai.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\Annex 2.6-E -
Tender Clarifications\EPC\20160415\
*EXTRA File 412848 (Confidential)
Tender_Clarification_T2_20160415_Cost Impact.pdf
*EXTRA File 305952 Tender_Clarification_T2_20160415 -
Attachment_Item#84_FG Buffer System.pdf
*EXTRA File 216764 Tender_Clarification_T2_20160415 -
Attachment_Item#84_PFD_FG Supply System.pdf
*EXTRA File 337639 Tender_Clarification_T2_20160415 -
Attachment_Item#84_PID_FG Supply System.pdf
*EXTRA File 117395
Tender_Clarification_T2_20160415_Hyundai_Reply_Commercial.pdf
*EXTRA File 244569
Tender_Clarification_T2_20160415_Hyundai_Reply_Technical.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\Annex 2.6-E -
Tender Clarifications\EPC\20160420\
*EXTRA File 85713 (Confidential)
Tender_Clarification_T2_20160420_Cost Impact.pdf
*EXTRA File 61215 No.
124_Tender_Clarification_T2_20160420_Hyundai.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\Annex 2.6-E -
Tender Clarifications\EPC\20160421\
*EXTRA File 119123 Item#106 - 01. List of Hyundai HSE System
Document.pdf
*EXTRA File 53654 Item#126 Part Load Heat Rate Table (Gas
Fuel)_R1.pdf
*EXTRA File 385255 Tender_Clarification_T2_20160420 -
Technical (Meeting 20160421)_Hyundai_r2.pdf
*EXTRA File 92767 Tender_Clarification_T2_20160420 -
Technical_(Meeting_20160421)_Hyundai_r1.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\Annex 2.6-E -
Tender Clarifications\EPC\20160425\
*EXTRA File 54493 (Confidential)
Tender_Clarification_T2_20160425_Cost Impact.pdf
*EXTRA File 3.5 m Tender_Clarification_T2_20160425_Hyundai
Reply.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\Annex 2.6-E -
Tender Clarifications\EPC\20160427\
*EXTRA File 5.4 m
Tender_Clarification_T2_20160427_1_Hyundai Reply (item# 76, 105 & 124).pdf
*EXTRA File 1.6 m Tender_Clarification_T2_20160427_Hyundai
Reply (item# 127).pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\Annex 2.6-E -
Tender Clarifications\EPC\20160428\
*EXTRA File 649357 Tender_Clarification_T2_20160428 -
Attachment_Item#129_Revised Site Layout.pdf
*EXTRA File 1.4 m Tender_Clarification_T2_20160428_Hyundai
Reply.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\Annex 2.6-E -
Tender Clarifications\EPC\20160429\
*EXTRA File 128488 (Confidential)
Tender_Clarification_T2_20160429_Cost Impact.pdf
*EXTRA File 1.4 m Tender_Clarification_T2_20160429_Hyundai
Reply.pdf
*EXTRA File 1.6 m Tender_Clarification_T2_20160429_Hyundai
Reply_(updated 160504).pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\Annex 2.6-E -
Tender Clarifications\EPC\20160503\
*EXTRA File 203011 Tender_Clarification_T2_20160512_Hyundai
Reply.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\Annex 2.6-E -
Tender Clarifications\LTSA\
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\Annex 2.6-E -
Tender Clarifications\LTSA\20160309\
*EXTRA File 410424 Tender_Clarification_T2_20160309 - GE
Response.pdf
*EXTRA File 40267 Tender_Clarification_T2_20160309 - GE
Response_2270_001 GE Cover Letter.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\Annex 2.6-E -
Tender Clarifications\LTSA\20160311\
*EXTRA File 170868 Attachment 1 - 9H.02 _Typical_CC Plant
Correction Curves.pdf
*EXTRA File 3.3 m Attachment 2 - GER3620M.PDF
*EXTRA File 39715 Tender_Clarification_T2_201603011 - GE
Response - 2349_001 Cover Letter.pdf
*EXTRA File 85268 Tender_Clarification_T2_201603011 - GE
Response - 2350_001.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\Annex 2.6-E -
Tender Clarifications\LTSA\20160316\
*EXTRA File 37211 Tender_Clarification_T2_20160316 - GE
Response - 2373_001 Cover Letter.pdf
*EXTRA File 438694 Tender_Clarification_T2_20160316 - GE
Response - 2374_001.pdf
*EXTRA File 121614 Tender_Clarification_T2_20160316 - GE
Response - Attachment 2375_001.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\Annex 2.6-E -
Tender Clarifications\LTSA\20160329\
*EXTRA File 81443 (Confidential)
Tender_Clarification_B2_20160329 (with Price).pdf
*EXTRA File 36825 Tender_Clarification_T2_20160329 - GE
Response_2543_001 - Cover Letter.pdf
*EXTRA File 298481 Tender_Clarification_T2_20160329 - GE
Response_2544_001.pdf
*EXTRA File 164525
Tender_Clarification_T2_20160329_LTSA_Commercial_Minutes.pdf
*EXTRA File 169808
Tender_Clarification_T2_20160329_LTSA_Technical_Minutes.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\Annex 2.6-E -
Tender Clarifications\LTSA\20160330\
*EXTRA File 51072 Tender_Clarification_T2_20160330 - GE
Response.pdf
*EXTRA File 35476 Tender_Clarification_T2_20160330 - GE
Response_Cover Letter.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\Annex 2.6-E -
Tender Clarifications\LTSA\20160406\
*EXTRA File 164454 Tender_Clarification_T2_20160406 - GE
Response.pdf
*EXTRA File 35631 Tender_Clarification_T2_20160406 - GE
Response_Cover Letter.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\Annex 2.6-E -
Tender Clarifications\LTSA\20160408\
*EXTRA File 79450 Revised_Comfort_Letter_20160408.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\Annex 2.6-E -
Tender Clarifications\LTSA\20160413\
*EXTRA File 36632 Tender_Clarification_T2_20160413 - GE
Response_2704_001_Cover Letter.pdf
*EXTRA File 175249 Tender_Clarification_T2_20160413 - GE
Response_2705_001.pdf
*EXTRA File 2.7 m Tender_Clarification_T2_20160413 - GE
Response_Attachment - 9HA CC update.pdf
*EXTRA File 99000 Tender_Clarification_T2_20160413_1 - GE
Response.pdf
*EXTRA File 31975 Tender_Clarification_T2_20160413_1 - GE
Response_Cover Letter.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\Annex 2.6-E -
Tender Clarifications\LTSA\20160417\
*EXTRA File 35800 Tender_Clarification_T2_20160417- GE
Response - 2702_001 Cover Letter.pdf
*EXTRA File 53186 Tender_Clarification_T2_20160417- GE
Response - 2703_001.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\Annex 2.6-E -
Tender Clarifications\LTSA\20160418\
*EXTRA File 38087 Tender_Clarification_T2_20160418 - GE
Response - 2812_001 Cover Letter.pdf
*EXTRA File 79919 Tender_Clarification_T2_20160418 - GE
Response - 2813_001.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\Annex 2.6-E -
Tender Clarifications\LTSA\20160421\
*EXTRA File 200582 20160422 - GE Comfort_Letter.pdf
*EXTRA File 39528 Tender_Clarification - GE Response
V2_T2_20160421 - 2786_001 Cover Letter.pdf
*EXTRA File 192293 Tender_Clarification - GE Response
V2_T2_20160421 - 2787_001.pdf
*EXTRA File 198665 Tender_Clarification_T2_20160421 - GE
Response.pdf
*EXTRA File 39207 Tender_Clarification_T2_20160421 - GE
Response_Cover Letter.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\Annex 2.6-E -
Tender Clarifications\LTSA\20160422\
*EXTRA File 37518 Tender_Clarification - GE Response
T2_20160422 - 2814_001 Cover Letter.pdf
*EXTRA File 63563 Tender_Clarification - GE Response
T2_20160422 - 2815_001.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\Annex 2.6-E -
Tender Clarifications\LTSA\20160424\
*EXTRA File 36623 Tender_Clarification - GE Response
T2_20160424 - 2790_001 GE Cover Letter.pdf
*EXTRA File 71788 Tender_Clarification - GE Response
T2_20160424.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Alor Gajah 2100 MW CCGT\Technical Proposal\volume 5-13\Annex 2.6-F -
Tender Evaluation\
*EXTRA File 2.7 m Melaka CCGT Project - Tender Evaluation
Report.pdf
*EXTRA File 25088 Thumbs.db
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\EC - PWC - SIPP Evaluation\
*EXTRA File 165 ~$Track4A Model Submission Model (GE
Option 1440MW) .xlsm
*EXTRA File 165 ~$Working Paper - Comparison
Notebook_SIPP_28102015.xlsb
*EXTRA File 17365 Comparison TNB - SIPP Submission.docx
*EXTRA File 5.1 m Track4A Model Submission Model (GE Option
1440MW) .xlsm
*EXTRA File 5.2 m Track4A Model Submission Model (GE Option
1440MW)_neoh .xlsm
*EXTRA File 291558 Working Paper - Comparison
Notebook_SIPP_28102015.xlsb
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\EC - PWC - SIPP Evaluation\FOLDER 5 - FINANCIAL MODELLING (FM)\
*EXTRA File 13897 Refer to Financial Model CD.pdf
*EXTRA File 3.8 m Track 4A - TNB FM - EC (with macro).xlsm
*EXTRA File 3.7 m Track 4A - TNB FM - EC.xlsm
*EXTRA File 90370 Track 4A - TNB FM User Manual - EC.docx
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\EC - PWC - SIPP Evaluation\TNB-SIPP Submission\
*EXTRA File 257449 Track 4A - Commercial Proposal 13 March
2015 clean.docx
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\EC - PWC - SIPP Evaluation\TNB-SIPP Submission\FOLDER 1 - TOC AND
SUMMARY TABLE\
*EXTRA File 4096 ._9HA 02 LTSA - Comfort Package.pdf
*EXTRA File 4096 ._GE Letter.pdf
*EXTRA File 4096 ._SUMMARY TABLE TRACK-4A.pdf
*EXTRA File 4096 ._Track 4A Evaluation Report-ST Version-
R2.pdf
*EXTRA File 519007 9HA 02 LTSA - Comfort Package.pdf
*EXTRA File 1.8 m 9HA.02 Insurability Evidence.PDF
*EXTRA File 212095 GE Letter.pdf
*EXTRA File 98164 ST-to-TNB - dated 8 Sept 2014.pdf
*EXTRA File 71206 ST-to-TNB - SIPP (EoT) dated 6 Feb
2015.pdf
*EXTRA File 44221 SUMMARY TABLE TRACK-4A.pdf
*EXTRA File 43852 Table of Contents.pdf
*EXTRA File 108434 Track 4A Evaluation Report-ST Version-
R2.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\EC - PWC - SIPP Evaluation\TNB-SIPP Submission\FOLDER 2 - COMMERCIAL
PROPOSAL\
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\EC - PWC - SIPP Evaluation\TNB-SIPP Submission\FOLDER 2 - COMMERCIAL
PROPOSAL\Tab A - PPA, LLA and OMA\
*EXTRA File 4096 ._CCGT PPA -20141017.pdf
*EXTRA File 4096 ._TRACK 4A DRAFT OMA - Submission to ST
March 2015.pdf
*EXTRA File 314688 14-TSC-85-01 (PRECOMP)-Model.pdf
*EXTRA File 4.4 m CCGT PPA -20141017.pdf
*EXTRA File 170309 LLA Lease Agreement (given to IPP on 9
March 2015).pdf
*EXTRA File 590066 TRACK 4A DRAFT OMA - Submission to ST
March 2015.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\EC - PWC - SIPP Evaluation\TNB-SIPP Submission\FOLDER 2 - COMMERCIAL
PROPOSAL\Tab B - Project Advisors (TA, LA, TA, IA, EIA Consultant)\
*EXTRA File 35505 EIA Consultant - R-SYNC.pdf
*EXTRA File 27627 Insurance Advisor - Marsh.pdf
*EXTRA File 9233 Legal Advisors - ZICO.pdf
*EXTRA File 11237 Tax Advisor - PWC.pdf
*EXTRA File 67413 Technical Advisor - Poyry.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\EC - PWC - SIPP Evaluation\TNB-SIPP Submission\FOLDER 2 - COMMERCIAL
PROPOSAL\Tab C - Project Document Deviations (PPA)\
*EXTRA File 743374 Letter to Single Buyer - PPA
Deviations.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\EC - PWC - SIPP Evaluation\TNB-SIPP Submission\FOLDER 2 - COMMERCIAL
PROPOSAL\Tab D - Letter of Support (Financial Institution)\
*EXTRA File 938316 Letter of Support - AmInvestment Bank
20150312.pdf
*EXTRA File 105629 LETTER OF SUPPORT CIMB.PDF
*EXTRA File 119543 LETTER OF SUPPORT MAYBANK.PDF
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\EC - PWC - SIPP Evaluation\TNB-SIPP Submission\FOLDER 2 - COMMERCIAL
PROPOSAL\Tab E - Tax Advisor Letter\
*EXTRA File 645415 Tax Advisor Report.pdf
*EXTRA File 58992 Tax Write-up_Commercial Report.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\EC - PWC - SIPP Evaluation\TNB-SIPP Submission\FOLDER 2 - COMMERCIAL
PROPOSAL\Tab F - Insurance Opinion Letter\
*EXTRA File 4096 ._Comfort Letter110315.pdf
*EXTRA File 4096 ._Insurance Premium Assumptions.pdf
*EXTRA File 4096 ._Insurance Term Sheet Track 4A Schedule
(Marsh).pdf
*EXTRA File 29109 Comfort Letter110315.pdf
*EXTRA File 25627 Insurance Premium Assumptions.pdf
*EXTRA File 57022 Insurance Term Sheet Track 4A Schedule
(Marsh).pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\EC - PWC - SIPP Evaluation\TNB-SIPP Submission\FOLDER 2 - COMMERCIAL
PROPOSAL\Tab G - Form 49\
*EXTRA File 219294 FORM49 REMACO.PDF
*EXTRA File 328314 FORM49 TNB.PDF
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\EC - PWC - SIPP Evaluation\TNB-SIPP Submission\FOLDER 2 - COMMERCIAL
PROPOSAL\Tab H - Malaysian Content\
*EXTRA File 30378 Malaysian Content.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\EC - PWC - SIPP Evaluation\TNB-SIPP Submission\FOLDER 3 - TECHNICAL
PROPOSAL\
*EXTRA File 4096 ._Track 4A - Appendix E Technical
Form.pdf
*EXTRA File 460383 Track 4A - Appendix E Technical Form.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\EC - PWC - SIPP Evaluation\TNB-SIPP Submission\FOLDER 4 - SELECTED EPC
AND OEM PROPOSAL\
*EXTRA File 4096 ._Design Concept for Interconnection
Facilities.pdf
*EXTRA File 100484 Design Concept for Interconnection
Facilities.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\EC - PWC - SIPP Evaluation\TNB-SIPP Submission\FOLDER 4 - SELECTED EPC
AND OEM PROPOSAL\POSCO\
*EXTRA File 4096 ._16 Technical reply_Attachment 1. Heat
Balance Diagram.pdf
*EXTRA File 4096 ._17 Technical reply_Attachment 2. Level
1 Project Schedule.pdf
*EXTRA File 4096 ._18 Technical reply_Attachment 3. Plant
Layout.pdf
*EXTRA File 4096 ._3A Attachment (Appendix 1-A5) Plant
Design Advantage & Special Feature.pdf
*EXTRA File 4096 ._9 Attachment (Appendix 1-B4) EPC
Strategy(Price, Performance and Time)_S1.pdf
*EXTRA File 619477 1 Cover Letter.pdf
*EXTRA File 1.9 m 10 Attachment (Appendix 1-B5)
Proposal_Recommendation to Minimize PF cost_S1.pdf
*EXTRA File 1.8 m 11 Attachment (Appendix 1-B6) Gas Turbine
Insurability Evidence_S1.PDF
*EXTRA File 50813 12 Attachment (Appendix 1-B7) List of
Deviation on Key Technical Specification_S1.pdf
*EXTRA File 57469 13A Attachment (Appendix 1-B8) List of
deviation(s) on key commercial terms_S1.pdf
*EXTRA File 62797 13B Technical reply_Attachment 6
Commercial Deviation List.pdf
*EXTRA File 48887 14 Attachment (Appendix 1-B9) Expectation
from Developer_S1.pdf
*EXTRA File 183012 15 Submission Requirements_Reply Form
Technical and Commercial.pdf
*EXTRA File 3.3 m 16 Technical reply_Attachment 1. Heat
Balance Diagram.pdf
*EXTRA File 195882 17 Technical reply_Attachment 2. Level 1
Project Schedule.pdf
*EXTRA File 1.6 m 18 Technical reply_Attachment 3. Plant
Layout.pdf
*EXTRA File 4.8 m 19 Technical reply_Attachment 4.
Construction Method for Intake and Discharge.pdf
*EXTRA File 552025 2 Attachment (Appendix 1-A1) Plant
Configuration & Description.pdf
*EXTRA File 126624 20 Technical reply_Attachment 5.
Auxiliary Steam System.pdf
*EXTRA File 358125 21 T4A PG - EOI Clarification Form
POSCO_Clarification #1.pdf
*EXTRA File 86502 22 T4A PG - EOI Clarification Form
POSCO_Clarification #2.pdf
*EXTRA File 5.5 m 23 Attachment (Appendix 1-B10) Audited
Financial Information_S1.pdf
*EXTRA File 5.6 m 3A Attachment (Appendix 1-A5) Plant
Design Advantage & Special Feature.pdf
*EXTRA File 42718 3B Attachment (Appendix 1-A8)
Degradation.pdf
*EXTRA File 979627 4 Attachment (Appendix 1-A11) Operating
and Performance Record_S1.pdf
*EXTRA File 12.2 m 5 Attachment (Appendix 1-A13) (2)
P&ID_S1.pdf
*EXTRA File 569596 6 Attachment (Appendix 1-A13) (3)
SLD_S1.pdf
*EXTRA File 275818 7 Attachment (Appendix 1-A13) (4) System
Configuration Diagram_S1.pdf
*EXTRA File 20600 8a Attachment (Appendix 1-B2) List of
CCGT Power Plant Experience_S1.pdf
*EXTRA File 24428 8b Attachment (Appendix 1-B3) List of
Participation Experience_S1.pdf
*EXTRA File 1.4 m 9 Attachment (Appendix 1-B4) EPC
Strategy(Price, Performance and Time)_S1.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\EC - PWC - SIPP Evaluation\TNB-SIPP Submission\FOLDER 4 - SELECTED EPC
AND OEM PROPOSAL\POSCO\24 EPC Proposal for IF\
*EXTRA File 4096 ._06. Switchyard Layout.pdf
*EXTRA File 4096 ._07. Plan & Section View A-A.pdf
*EXTRA File 4096 ._15. Building Layout - Ground Floor
(Cable Cellar).pdf
*EXTRA File 4096 ._19. Building Layout - Perspective
View.pdf
*EXTRA File 171276 00. Cover.pdf
*EXTRA File 237201 01. Content List.pdf
*EXTRA File 1.2 m 02. 275_132_33kV Single Line Diagram.pdf
*EXTRA File 389018 03. 275kV Single Line Diagram.pdf
*EXTRA File 329843 04. 132kV Single Line Diagram.pdf
*EXTRA File 169376 05. 33kV Single Line Diagram.pdf
*EXTRA File 414307 06. Switchyard Layout.pdf
*EXTRA File 141304 07. Plan & Section View A-A.pdf
*EXTRA File 159158 08. Plan & Section View B-B.pdf
*EXTRA File 179615 09. Plan & Section View C-C.pdf
*EXTRA File 112668 10. Plan & Section View D-D.pdf
*EXTRA File 196613 11. Plan & Section View E-E.pdf
*EXTRA File 104447 12. Plan & Section View F-F.pdf
*EXTRA File 78828 13. Plan & Section View G-G.pdf
*EXTRA File 140615 14. Building Layout - 1st Floor.pdf
*EXTRA File 131166 15. Building Layout - Ground Floor (Cable
Cellar).pdf
*EXTRA File 185211 16. Switchyard Layout - Substation
Location.pdf
*EXTRA File 407191 17. Switchyard Layout - Substation
Location.pdf
*EXTRA File 1.3 m 18. Switchyard Layout - Substation
Location.pdf
*EXTRA File 172229 19. Building Layout - Perspective
View.pdf
*EXTRA File 174501 20. Building Layout - Perspective
View.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\EC - PWC - SIPP Evaluation\TNB-SIPP Submission\FOLDER 5 - FINANCIAL
MODELLING (FM)\
*EXTRA File 13897 Refer to Financial Model CD.pdf
*EXTRA File 3.8 m Track 4A - TNB FM - EC (with macro).xlsm
*EXTRA File 3.7 m Track 4A - TNB FM - EC.xlsm
*EXTRA File 90370 Track 4A - TNB FM User Manual - EC.docx
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Kagayaki 30 MW\
*EXTRA File 2.0 m 30MW Diesel Power Plant Project Proposal
- Kagayaki Energy Sdn Bhd (DRAFT)_rev4.pdf
*EXTRA File 217544 A. Site Plan - Electrical layout.pdf
*EXTRA File 142373 B. 30MW IPP- SLD Rev 1.pdf
*EXTRA File 14920 EC ddiesel.xlsx
*EXTRA File 7.2 m
Environmental_Quality_Industrial_Effluent_Regulations_2009_-_P.U.A_434-
2009.pdf
*EXTRA File 23237 High Speed Engine Sabah 1st April
2016.docx
*EXTRA File 336092 Kagayaki Addendum+poyry.docx
*EXTRA File 341862 Kagayaki Addendumv2+poyry.docx
*EXTRA File 6.0 m Lahad Datu 30MW Draft PPA.zip
*EXTRA File 151397 Sabah PART 4 technical+poyry.docx
*EXTRA File 183810 Sabah PART 4 technicalpoyry_r1v2 may 9
2016.docx
*EXTRA File 35254 Salient points of Kagayaki
CLoA+poyry.docx
*EXTRA File 2.5 m sample diesel report 20 MW Diesel engines
plant options report__draft.doc
*EXTRA File 9.7 m sample diesel report SP2 Final Technical
DDR_10 Feb 2012.docx
*EXTRA File 41472 Thumbs.db
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Kagayaki 30 MW\Lahad Datu 30MW Draft PPA\
*EXTRA File 1028549 [0] Lahad Datu PPA (Main Body).pdf
*EXTRA File 271380 [1] Lahad Datu PPA (App A).pdf
*EXTRA File 366863 [10] Lahad Datu PPA (App J).pdf
*EXTRA File 332179 [11] Lahad Datu PPA (App K).pdf
*EXTRA File 122744 [12] Lahad Datu PPA (App L).pdf
*EXTRA File 167367 [13] Lahad Datu PPA (App M).pdf
*EXTRA File 168075 [14] Lahad Datu PPA (App N).pdf
*EXTRA File 194976 [15] Lahad Datu PPA (App O).pdf
*EXTRA File 179402 [16] Lahad Datu PPA (App P).pdf
*EXTRA File 23135 [17] Exhibit 1 Form of Bank guarantee.pdf
*EXTRA File 23648 [18] Exhibit 2 Form of Annual Scheduled
Available Capacity.pdf
*EXTRA File 40497 [19] Exhibit 3 Form of Daily Actual
Availability.pdf
*EXTRA File 543869 [2] Lahad Datu PPA (App B).pdf
*EXTRA File 261880 [20] Exhibit 4 Form of Daily
Operation.pdf
*EXTRA File 1.1 m [21] Exhibit 5 Generator Testing
Guidelines Prior to Commercial O.pdf
*EXTRA File 259152 [22] Exhibit 6 Requirements for Outage
and Commissioning Works fo.pdf
*EXTRA File 199222 [23] Exhibit 7 Safety Requirement.pdf
*EXTRA File 158785 [3] Lahad Datu PPA (App C).pdf
*EXTRA File 339359 [4] Lahad Datu PPA (App D).pdf
*EXTRA File 496288 [5] Lahad Datu PPA (App E).pdf
*EXTRA File 131020 [6] Lahad Datu PAA (App F).pdf
*EXTRA File 482289 [7] Lahad Datu PPA (App G).pdf
*EXTRA File 137813 [8] Lahad Datu PPA (App H).pdf
*EXTRA File 134321 [9] Lahad Datu PPA (App I).pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Kagayaki 30 MW\Site visit photos\
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Kagayaki 30 MW\Site visit photos\Site next to SESB office (alternative)\
*EXTRA File 3.0 m 20160418_104544.jpg
*EXTRA File 2.5 m 20160418_104546.jpg
*EXTRA File 1.6 m 20160418_104551.jpg
*EXTRA File 1.7 m 20160418_104553.jpg
*EXTRA File 1.6 m 20160418_104556.jpg
*EXTRA File 2.0 m 20160418_104558.jpg
*EXTRA File 2.5 m 20160418_104615.jpg
*EXTRA File 2.5 m 20160418_104623.jpg
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Kagayaki 30 MW\Site visit photos\Site where SESB have old engines
(base)\
*EXTRA File 2.7 m 20160418_105913.jpg
*EXTRA File 2.7 m 20160418_105916.jpg
*EXTRA File 2.8 m 20160418_110251.jpg
*EXTRA File 2.6 m 20160418_110253.jpg
*EXTRA File 2.1 m 20160418_110418.jpg
*EXTRA File 2.4 m 20160418_110420.jpg
*EXTRA File 2.4 m 20160418_110422.jpg
*EXTRA File 2.7 m 20160418_110425.jpg
*EXTRA File 1.9 m 20160418_110427.jpg
*EXTRA File 1.1 m 20160418_114936.jpg
*EXTRA File 1.1 m 20160418_114943.jpg
*EXTRA File 1.2 m 20160418_115005.jpg
*EXTRA File 1028915 20160418_115017.jpg
*EXTRA File 3.0 m 20160418_115128.jpg
*EXTRA File 2.8 m 20160418_115133.jpg
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Reference reports\
*EXTRA File 9.7 m Intergen FS Draft_final.doc
*EXTRA File 35.0 m ORIX - TDD Final Report for Diesel Power
Plants - 15May13.doc
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Sandakan 60MW\
*EXTRA File 1.8 m New 60MW POIC Sandakan.pptx
*EXTRA File 1.6 m planning and connection codes for sabah
16th june 2014.pdf
*EXTRA File 27403 Reply Letter SESB Appealv2
(redacted)_Neoh.docx
*EXTRA File 358948 sabah gen dev plan.jpg
*EXTRA File 30897 Sandakan CLOA to SESB (redacted)
+poyry.docx
*EXTRA File 199079 Technical and Commercial
Requirement+poyry.docx
*EXTRA File 7168 Thumbs.db
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Sandakan 60MW\Site visit photos\
*EXTRA File 1.5 m 20160418_164950.jpg
*EXTRA File 1.6 m 20160418_164952.jpg
*EXTRA File 2.1 m 20160418_164955.jpg
*EXTRA File 2.5 m 20160418_165002.jpg
*EXTRA File 3.2 m 20160418_165003.jpg
*EXTRA File 2.1 m 20160418_165005.jpg
*EXTRA File 2.3 m 20160418_165043.jpg
*EXTRA File 2.0 m 20160418_165044.jpg
*EXTRA File 2.3 m 20160418_165046.jpg
*EXTRA File 2.6 m 20160418_165048.jpg
*EXTRA File 2.9 m 20160418_165050.jpg
*EXTRA File 2.3 m 20160418_165052.jpg
*EXTRA File 1.5 m 20160418_165053.jpg
*EXTRA File 1.2 m 20160418_165055.jpg
*EXTRA File 2.2 m 20160418_165057.jpg
*EXTRA File 2.1 m 20160418_165058.jpg
*EXTRA File 3.2 m 20160418_165326.jpg
*EXTRA File 1.5 m 20160418_165327.jpg
*EXTRA File 1.7 m 20160418_165329.jpg
*EXTRA File 1.4 m 20160418_165331.jpg
*EXTRA File 2.2 m 20160418_165332.jpg
*EXTRA File 2.7 m 20160418_165424.jpg
*EXTRA File 1.8 m 20160418_165425.jpg
*EXTRA File 1.1 m 20160418_165526.jpg
*EXTRA File 1.7 m 20160418_165605.jpg
*EXTRA File 2.1 m 20160418_165608.jpg
*EXTRA File 2.0 m 20160418_170004.jpg
*EXTRA File 1.5 m 20160418_170008.jpg
*EXTRA File 1.1 m 20160418_170019.jpg
*EXTRA File 1.3 m 20160418_170021.jpg
*EXTRA File 1.3 m 20160418_170027.jpg
*EXTRA File 1.4 m 20160418_170028(0).jpg
*EXTRA File 1.3 m 20160418_170028.jpg
*EXTRA File 1.4 m 20160418_170102.jpg
*EXTRA File 1.8 m 20160418_170109.jpg
*EXTRA File 1.6 m 20160418_170132.jpg
*EXTRA File 1.2 m 20160418_170211.jpg
*EXTRA File 1.6 m 20160418_170249.jpg
*EXTRA File 1.2 m 20160418_170251.jpg
*EXTRA File 3.3 m 20160418_170254.jpg
*EXTRA File 3.3 m 20160418_170256.jpg
*EXTRA File 1.3 m 20160418_170507.jpg
*EXTRA File 1.6 m 20160418_170821.jpg
*EXTRA File 1.9 m 20160418_170822.jpg
*EXTRA File 2.0 m 20160418_170825.jpg
*EXTRA File 2.2 m 20160418_171016.jpg
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX313067_Energy
Commission\Track 4A_SIPP offer review\
*EXTRA File 885114 Track 4A_SIPP offer review_8 Jan
2015_final.pdf
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX329302_New Paka
CCGT_DCR\
*EXTRA File 58800 Cable Sizing.docx
*EXTRA File 838747 Simplified Plant SLD for new Paka 1,400MW
Power.pptx
*EXTRA File 838155 Simplified Plant SLD for new Paka 1,400MW
Power_r1.pptx
*EXTRA File 3.3 m Switchyard.pptx
*EXTRA File 3.3 m Switchyard_28Aug.pptx
*EXTRA File 3.3 m Switchyard_31Aug.pptx
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX329302_New Paka
CCGT_DCR\100 Project Management\
*EXTRA File 48755 Proposal to Transgrid for DCR +PH
+rk.docx
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX329302_New Paka
CCGT_DCR\100 Project Management\110 Agreements\
*EXTRA File 170340 PESB LOA - Rev 2.pdf
*EXTRA File 23040 Thumbs.db
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX329302_New Paka
CCGT_DCR\100 Project Management\120 Budget\
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX329302_New Paka
CCGT_DCR\200 Internal Correspondence\
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX329302_New Paka
CCGT_DCR\200 Internal Correspondence\210 PETH Corr\
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX329302_New Paka
CCGT_DCR\200 Internal Correspondence\210 PETH Corr\Incoming\
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX329302_New Paka
CCGT_DCR\200 Internal Correspondence\210 PETH Corr\Minutes of Meeting\
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX329302_New Paka
CCGT_DCR\200 Internal Correspondence\210 PETH Corr\Outgoing\
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX329302_New Paka
CCGT_DCR\200 Internal Correspondence\220 Poyry Group Corr\
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX329302_New Paka
CCGT_DCR\200 Internal Correspondence\220 Poyry Group Corr\Incoming\
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX329302_New Paka
CCGT_DCR\200 Internal Correspondence\220 Poyry Group Corr\Minutes of Meeting\
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX329302_New Paka
CCGT_DCR\200 Internal Correspondence\220 Poyry Group Corr\Outgoing\
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX329302_New Paka
CCGT_DCR\300 Correspondence\
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX329302_New Paka
CCGT_DCR\300 Correspondence\310 Correspondence with Client\
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX329302_New Paka
CCGT_DCR\300 Correspondence\310 Correspondence with Client\Incoming\
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX329302_New Paka
CCGT_DCR\300 Correspondence\310 Correspondence with Client\Minutes of Meeting\
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX329302_New Paka
CCGT_DCR\300 Correspondence\310 Correspondence with Client\Outgoing\
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX329302_New Paka
CCGT_DCR\300 Correspondence\320 Correspondence with Others\
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX329302_New Paka
CCGT_DCR\300 Correspondence\320 Correspondence with Others\Incoming\
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX329302_New Paka
CCGT_DCR\300 Correspondence\320 Correspondence with Others\Minutes of Meeting\
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX329302_New Paka
CCGT_DCR\300 Correspondence\320 Correspondence with Others\Outgoing\
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX329302_New Paka
CCGT_DCR\400 Report\
*EXTRA Dir -1 C:\PoyryFiles\01 Projects\5YX329302_New Paka
CCGT_DCR\400 Report\410 Poyry Report Deliverables\
*EXTRA File 162 ~$ka DCR_draft 25 Oct.doc
*EXTRA File 195479 Brief overview of the Malaysian Energy
market.docx
*EXTRA File 21588 Indicative ProjectTimetable.xlsx
*EXTRA File 1.2 m LAYOUT PLAN DRAWING - (POWER PLANT)-
Layout1.pdf
*EXTRA File 1.2 m LAYOUT PLAN DRAWING - (POWER PLANT)-
Layout1+rk.pdf
*EXTRA File 1.2 m LAYOUT PLAN DRAWING - (POWER PLANT)-
Layout2.pdf
*EXTRA File 1.4 m LAYOUT PLANT DRAWING - (POWER PLANT).pdf
*EXTRA File 6.2 m Paka DCR_draft 1Nov clean.doc
*EXTRA File 2.0 m Paka DCR_draft 1Nov clean.pdf
*EXTRA File 8.1 m Paka DCR_draft 25 Oct.doc
*EXTRA File 3.3 m Paka DCR_draft 29Oct clean_sbd r1.doc
*EXTRA File 6.4 m
-------------------------------------------------------------------------------
ROBOCOPY :: Robust File Copy for Windows
-------------------------------------------------------------------------------

Started : Sat Nov 11 22:57:10 2017

Source : C:\AdvisianActive\
Dest : D:\PoyryFiles\

Files : *.*

Options : *.* /TEE /S /E /COPY:DAT /PURGE /MIR /NP /MT:8 /R:0 /W:0

------------------------------------------------------------------------------

New Dir 2 C:\AdvisianActive\


New File 342443 Malaysia_IPP.pdf100%
New File 283259 Waiver for Conflict of Interest.docx100%

New Dir 1 C:\AdvisianActive\01 Projects\


New File 34942 LTA Risks.docx100%
New Dir 0 C:\AdvisianActive\01 Projects\100037 - DLA Piper -
Cambodia Power Plant Arbitration - Expert Evidence\
New Dir 3 C:\AdvisianActive\01 Projects\100037 - DLA Piper -
Cambodia Power Plant Arbitration - Expert Evidence\1. From Client\
New File 2.0 m 2. MOU.pdf100%
New File 153287 ArbitrationCaseIntroduction.pdf100%
New File 119086 Schedule of Defects.pdf100%
New Dir 0 C:\AdvisianActive\01 Projects\100037 - DLA Piper -
Cambodia Power Plant Arbitration - Expert Evidence\1. From Client\Volume 1\
New Dir 1 C:\AdvisianActive\01 Projects\100037 - DLA Piper -
Cambodia Power Plant Arbitration - Expert Evidence\1. From Client\Volume 1\CHEC v
CEL (Volume 1)\
New File 212.3 m 12. Defects Bundle in Chronological
Order.zip 0%
-------------------------------------------------------------------------------
ROBOCOPY :: Robust File Copy for Windows
-------------------------------------------------------------------------------

Started : Sat Nov 11 22:57:45 2017

Source : C:\AdvisianActive\
Dest : D:\AdvisianFiles\
Files : *.*

Options : *.* /TEE /S /E /COPY:DAT /PURGE /MIR /NP /MT:8 /R:0 /W:0

------------------------------------------------------------------------------

New Dir 2 C:\AdvisianActive\


New File 342443 Malaysia_IPP.pdf100%
New File 283259 Waiver for Conflict of Interest.docx100%

New Dir 1 C:\AdvisianActive\01 Projects\


New File 34942 LTA Risks.docx100%
New Dir 0 C:\AdvisianActive\01 Projects\100037 - DLA Piper -
Cambodia Power Plant Arbitration - Expert Evidence\
New Dir 3 C:\AdvisianActive\01 Projects\100037 - DLA Piper -
Cambodia Power Plant Arbitration - Expert Evidence\1. From Client\
New File 2.0 m 2. MOU.pdf100%
New File 153287 ArbitrationCaseIntroduction.pdf100%
New File 119086 Schedule of Defects.pdf100%
New Dir 0 C:\AdvisianActive\01 Projects\100037 - DLA Piper -
Cambodia Power Plant Arbitration - Expert Evidence\1. From Client\Volume 1\
New Dir 1 C:\AdvisianActive\01 Projects\100037 - DLA Piper -
Cambodia Power Plant Arbitration - Expert Evidence\1. From Client\Volume 1\CHEC v
CEL (Volume 1)\
New File 212.3 m 12. Defects Bundle in Chronological
Order.zip100%
New Dir 1 C:\AdvisianActive\01 Projects\100037 - DLA Piper -
Cambodia Power Plant Arbitration - Expert Evidence\1. From Client\Volume 1\CHEC v
CEL (Volume 1)\1. EPC Contracts\
New File 18709 Documents forming EPC Contract.docx100%
New Dir 6 C:\AdvisianActive\01 Projects\100037 - DLA Piper -
Cambodia Power Plant Arbitration - Expert Evidence\1. From Client\Volume 1\CHEC v
CEL (Volume 1)\1. EPC Contracts\1.onshore\
New File 162 ~$ Section 2b Conditions of Contract CHEC
Initialed 2009-12-04.doc100%
New File 162 ~$ Section 2c Schedules to CoC_Initialed
2009-12-04.doc100%
New File 14158 Contract Agmt Onshore cover.docm100%
New File 50688 ON Section 2a Contract Agreement CHEC
Initialed 2009-12-04.doc100%
New File 950637 ON Section 2b Conditions of Contract CHEC
Initialed 2009-12-04.doc100%
New File 597587 ON Section 2c Schedules to CoC_Initialed
2009-12-04.doc100%
New Dir 7 C:\AdvisianActive\01 Projects\100037 - DLA Piper -
Cambodia Power Plant Arbitration - Expert Evidence\1. From Client\Volume 1\CHEC v
CEL (Volume 1)\1. EPC Contracts\2.offshore\
New File 162 ~$F Section 2a Contract Agreement CHEC
Initialed 2009-12-04.doc100%
New File 162 ~$F Section 2b Conditions of Contract
CHEC Initialed 2009-12-04.doc100%
New File 162 ~$F Section 2c Schedules to COC_Initialed
2009-12-04.doc100%
New File 14112 Contract Agmt Offshore cover.docm100%
New File 47616 OFF Section 2a Contract Agreement CHEC
Initialed 2009-12-04.doc100%
New File 482304 OFF Section 2b Conditions of Contract
CHEC Initialed 2009-12-04.doc100%
New File 431104 OFF Section 2c Schedules to COC_Initialed
2009-12-04.doc100%
New Dir 1 C:\AdvisianActive\01 Projects\100037 - DLA Piper -
Cambodia Power Plant Arbitration - Expert Evidence\1. From Client\Volume 1\CHEC v
CEL (Volume 1)\1. EPC Contracts\3.Employer's Requirments\
New File 1.9 m Employer's Requirments-Initialed 2009-12-
04.doc100%
New Dir 21 C:\AdvisianActive\01 Projects\100037 - DLA Piper -
Cambodia Power Plant Arbitration - Expert Evidence\1. From Client\Volume 1\CHEC v
CEL (Volume 1)\1. EPC Contracts\4.Contractor's Proposal\
New File 923136 T1 11.30.doc100%
New File 50176 T-10 11.30.doc100%
New File 35840 T-11 11.30.doc100%
New File 39424 T-12 11.30.doc100%
New File 35840 T-13 11.30.doc100%
New File 41984 T-14 11.30.doc100%
New File 37376 T-15 11.30.doc100%
New File 50176 T-16 11.30.doc100%
New File 47616 T-17 11.30.doc100%
New File 125440 T-18 11.30.doc100%
New File 440320 T-19 11.30.doc100%
New File 46033 T-2 11.30.pdf100%
New File 344696 T-20 11.30.pdf100%
New File 100864 T-21 11.30.doc100%
New File 1.2 m T-3 11.30.pdf100%
New File 1.8 m T-4 11.30.doc100%
New File 51200 T-5 11.30.doc100%
New File 70144 T-6 11.30.doc100%
New File 230151 T-7 11.30.pdf100%
New File 2.9 m T8 11.30.doc100%
New File 148992 T-9 11.30.doc100%
New Dir 1 C:\AdvisianActive\01 Projects\100037 - DLA Piper -
Cambodia Power Plant Arbitration - Expert Evidence\1. From Client\Volume 1\CHEC v
CEL (Volume 1)\10. Response to Notice of Arbitration\
New File 371307 Response to Notice of Arbitration.pdf100%

New Dir 8 C:\AdvisianActive\01 Projects\100037 - DLA Piper -


Cambodia Power Plant Arbitration - Expert Evidence\1. From Client\Volume 1\CHEC v
CEL (Volume 1)\11. Valuation Reports\
New File 83303 Index - Disclosure documents relating to
procedural order number no.1 bundle index.pdf100%
New File 2.6 m Tab B.pdf100%
New File 303032 Tab C.pdf100%
New File 1.6 m Tab D.pdf100%
New File 3.8 m Tab E.pdf100%
New File 820317 Tab F.pdf100%
New File 639925 Tab G.pdf100%
New File 671475 Tab H.pdf100%
New Dir 3 C:\AdvisianActive\01 Projects\100037 - DLA Piper -
Cambodia Power Plant Arbitration - Expert Evidence\1. From Client\Volume 1\CHEC v
CEL (Volume 1)\11. Valuation Reports\Tab A - Cambodian Energy Limited Pricing
Support with attachments and annexes\
New File 28.5 m Tab A Vol 1.pdf100%
New File 51.0 m Tab A Vol 2.pdf100%
New File 76.6 m Tab A Vol 3.pdf100%
New Dir 1 C:\AdvisianActive\01 Projects\100037 - DLA Piper -
Cambodia Power Plant Arbitration - Expert Evidence\1. From Client\Volume 1\CHEC v
CEL (Volume 1)\2. Coordination Agreement\
New File 813538 Coordination Agreement.PDF100%
New Dir 6 C:\AdvisianActive\01 Projects\100037 - DLA Piper -
Cambodia Power Plant Arbitration - Expert Evidence\1. From Client\Volume 1\CHEC v
CEL (Volume 1)\3. Amendment to Agreements\
New File 239049 A - First Amendment Agreements.pdf100%
New File 792900 B - Amendment I Onshore.pdf100%
New File 790112 C - Amendment I Offshore.pdf100%
New File 230585 D - Second Amendment Agreements.pdf100%
New File 2.6 m E - Amendment II Onshore.pdf100%
New File 4.3 m F - Amendment II Offshore.pdf100%
New Dir 1 C:\AdvisianActive\01 Projects\100037 - DLA Piper -
Cambodia Power Plant Arbitration - Expert Evidence\1. From Client\Volume 1\CHEC v
CEL (Volume 1)\4. Minutes of Meeting\
New File 2.0 m MOM.pdf100%
New Dir 1 C:\AdvisianActive\01 Projects\100037 - DLA Piper -
Cambodia Power Plant Arbitration - Expert Evidence\1. From Client\Volume 1\CHEC v
CEL (Volume 1)\5. Summary of Defects List\
New File 59521 Summary of Defects List.XLSX100%
New Dir 1 C:\AdvisianActive\01 Projects\100037 - DLA Piper -
Cambodia Power Plant Arbitration - Expert Evidence\1. From Client\Volume 1\CHEC v
CEL (Volume 1)\6. Preliminary Report\
New File 258560 Preliminary Analysis of Case (19.01.2015)
- Final Clean.DOC100%
New Dir 1 C:\AdvisianActive\01 Projects\100037 - DLA Piper -
Cambodia Power Plant Arbitration - Expert Evidence\1. From Client\Volume 1\CHEC v
CEL (Volume 1)\7. May 2016 Report\
New File 1.2 m CHEC Report - May 2016 (FINAL).PDF100%
New Dir 1 C:\AdvisianActive\01 Projects\100037 - DLA Piper -
Cambodia Power Plant Arbitration - Expert Evidence\1. From Client\Volume 1\CHEC v
CEL (Volume 1)\8. Chronology\
New File 194560 CHEC - CEL - Chronology (draft 2).DOC100%

New Dir 1 C:\AdvisianActive\01 Projects\100037 - DLA Piper -


Cambodia Power Plant Arbitration - Expert Evidence\1. From Client\Volume 1\CHEC v
CEL (Volume 1)\9. Notice of Arbitration\
New File 28811 Notice of Arbitration (04.10.2016).PDF
100%
New Dir 0 C:\AdvisianActive\01 Projects\100037 - DLA Piper -
Cambodia Power Plant Arbitration - Expert Evidence\1. From Client\Volume 2\
New Dir 0 C:\AdvisianActive\01 Projects\100037 - DLA Piper -
Cambodia Power Plant Arbitration - Expert Evidence\1. From Client\Volume
2\Correspondence Bundle in Chronological Order\
New Dir 14 C:\AdvisianActive\01 Projects\100037 - DLA Piper -
Cambodia Power Plant Arbitration - Expert Evidence\1. From Client\Volume
2\Correspondence Bundle in Chronological Order\Tab 1 - 2010\
New File 686430 1 - Date 25 August 2010 LIMITED NOTICE
TO PROCEED UNDER THE CONTRACT AGREEMENTDATED AS OF 7DECEMBER 2009, AS AMENDED
(SUPPLY CONTRACT) .pdf100%
New File 443889 10 - Date 16 November 2010.pdf100%
New File 73394 11 - CEL-FX-OFF-003_Advance Payment
Application.pdf100%
New File 645728 12 - CEL-CHEC-L -2010-0031 NOTICE TO
PROCEED AND COMMENCEMENT DATE, OFFSHORE ENGINEEDING ,PROCUREMENT AND
CONSTRUCTION.pdf100%
New File 671540 13 - CEL-CHEC-L-2010=0030 NOTICE TO
PROCEED AND COMMENCEMENT DATE, ONSHORE ENGINEERING PROCUREMENT AND CONSTRUCTION.pdf
100%
New File 138752 14 - CEL-FX-OFF-004_Project Schedule
Clarification_[??????].doc100%
New File 612213 2 - CEL-CHEC-L-2010-0022.pdf100%
New File 676048 3 - CEL-CHEC-L-2010-0025.pdf100%
New File 670666 4 - CEL-CHEC-L-2010-0026.pdf100%
New File 509500 5 - CEL-CHEC-L-2010-0036 RIGHT OF ACCESS
TO TO THE SITE.pdf100%
New File 73234 6 - CEL-FX-OFF-001_CHEC Bank Account.pdf
100%
New File 73206 7 - CEL-FX-OFF-002_Work Report.pdf100%
New File 45721 8 - 20101111-Schedule of LNTP work_Rev.C-
Eng.pdf100%
New File 66255 9 - CEL-FX-OFF-
003_Attachment_Invoice(Updated).pdf100%
New Dir 181 C:\AdvisianActive\01 Projects\100037 - DLA Piper -
Cambodia Power Plant Arbitration - Expert Evidence\1. From Client\Volume
2\Correspondence Bundle in Chronological Order\Tab 2 - 2011\
New File 78087 1 - CEL-FX-OFF-
005_Information_Subcontractors of Turbines and Generators.pdf100%
New File 413738 10 - CEL-CHC-L-11-0039 LOCATION AND CO-
ORDINATES OF STEUNG HAV SUBSTATION.pdf100%
New File 615339 100 - CEL-CHC-L-11-0179 Permanent Work
for Electrica Grounding and lighning Prorection.pdf100%
New File 735161 101 - CEL-FX-OFF-054_Milestone Payment
Application_Onshore_August.pdf100%
New File 118716 102 - CEL-FX-OFF-053_site moblization-
2011831.pdf100%
New File 34816 103 - CEL-FX-OFF-050 ??????.xls100%
New File 408782 104 - CEL-CHC-L-11-0183 Batching Plant
Area during Construction (2).pdf100%
New File 467198 105 - CEL-CHC-L-11-0183 Batching Plant
Area during Construction.pdf100%
New File 623778 106 - CEL-CHC-L-11-0184 Design Approvals
and Quality of Work.pdf100%
New File 208103 107 - CEL-FX-OFF-055 shipping agent.pdf
100%
New File 258532 108 - CEL-FX-OFF-056 offshore milestone
payment application.pdf100%
New File 203515 109 - CEL-FX-OFF-057 Extra cost for the
location change of temporary facilities.pdf100%
New File 617505 11 - CEL-CHC-L-11-0042 APPLICATION FOR
MASTER LIST APPROVAL FOR TAX EXEMPTION.pdf100%
New File 524895 110 - CEL-CHC-L-11-0191 Electrical Short-
Circuit Calculation.pdf100%
New File 500415 111 - CEL-CHC-L-11-0196 Site Visit by
Ministry of Environment to Inspect Implementation of Environmental Mamagement
Plan.pdf100%
New File 216344 112 - CEL-FX-OFF-058 Notification of 2nd
Batch Auxiliary Equipments.pdf100%
New File 216344 113 - CEL-FX-OFF-058 Notification of 2nd
Batch Auxiliary Equipments.pdf100%
New File 36132 114 - 004C-S.D.10.01.01.03-0013.pdf100%
New File 36145 115 - 004C-S.D.10.01.01.03-0018.pdf100%
New File 36052 116 - 004C-S.D.10.01.01.03-0019.pdf100%
New File 36073 117 - 004C-S.D.10.01.01.03-0020.pdf100%
New File 36103 118 - 004C-S.D.10.01.01.03-0021.pdf100%
New File 36097 119 - 004C-S.D.10.01.01.03-0022.pdf100%
New File 542374 12 - CEL-CHC-L-11-0053 MILESTONE PAYMENT
APPLICATION-BASECAMAP (CEL-FX-OFF-014).pdf100%
New File 36117 120 - 004C-S.D.10.01.01.03-0023.pdf100%
New File 36032 121 - 004C-S.D.10.01.01.03-0024.pdf100%
New File 564787 122 - CEL-FX-OFF-059_Milestone Payment
Application_Onshore_September.pdf100%
New File 179811 123 - CEL-FX-OFF-060_Milestone Payment
Application_Offshore_Spetember.pdf100%
New File 663565 124 - CEL-CHC-L-11-0200 Milesrone Payment
Application Offshore Julyy (CEL-FX-OFF-050).pdf100%
New File 120832 125 - CEL-FX-OFF-061 shipping agent.doc
100%
New File 673383 126 - CEL-CHC-L-11-0209 Overdue Design
Documents and Document Submission.pdf100%
New File 179552 127 - CEL-FX-OFF-062_Variation Proposal
for Batching Plant.pdf100%
New File 629983 128 - CEL-CHC-L-11-0212 Variation
Proposal for Batching Plant (Ref. CEL-FX-OFF-062).pdf100%
New File 619680 129 - CEL-CHC-L-11-0217 Milestone Payment
Application Onshore September (CEL-FX-059).pdf100%
New File 620646 13 - CEL-CHC-L-11-0054 CHEC, MARCH,
MONTHLY REPORT (CHEC-XB-CEL-00MR-055).pdf100%
New File 485624 130 - CEL-CHC-L-11-0218 Milestone Payment
Application offshore September (CEL-FX-OFF-060).pdf100%
New File 601490 131 - CEL-CHC-L-11-0222 EDC Contract
Options for Supply of (i) Quadruple Circuit Transmission Towers, and (ii) Black
Start Diesel Generators .pdf100%
New File 284950 132 - CEL-FX-OFF-
064_shipping_agent_contact_info.pdf100%
New File 35122 133 - contact_info..pdf100%
New File 119712 134 - CEL-FX-OFF-
065Cost_Quotation_for_0.7km_Transmission_Lines_and_Black_Start-.pdf100%
New File 6935 135 - 1---20111017-
Quotation_of_0.7km_lines.pdf100%
New File 8567 136 - 2--Quotation_for_black_start-up.pdf
100%
New File 105533 137 - Appendix_1_(SUMEC).pdf100%
New File 8105 138 - Appendix_2_Civil_Work.pdf100%
New File 762407 139 -
Appendix_3_Power_house_layout_for_3x2000KW.pdf100%
New File 42983 14 - CEL-FX-OFF-016_COAL
SPECIFICATION.pdf100%
New File 50510 140 - Additional Cost of temporary
facilities location changed.pdf100%
New File 12164 141 - 004C.D.10.01.01.03-0027.pdf100%
New File 12020 142 - 004C.D.10.01.01.03-0030.pdf100%
New File 12013 143 - 004C.D.10.01.01.03-0031.pdf100%
New File 161917 144 - CEL-FX-OFF-
066_Milestone_Payment_Application_Offshore_October.pdf100%
New File 347442 145 - CEL-FX-OFF-
067_Milestone_Payment_Application_Onshore_October.pdf100%
New File 2.5 m 146 - CEL-FX-OFF-
066_Milestone_Payment_Application_Offshore_October.pdf100%
New File 513997 147 - CEL-FX-OFF-
067_Milestone_Payment_Application_Onshore_October.pdf100%
New File 683694 148 - CEL-CHC-L-11-0244 Issues from Wuxi
Site Viist, 25 October 2011.pdf100%
New File 498846 149 - CEL-FX-OFF-068 Confirm the Color of
Boiler Top Roof.pdf100%
New File 338641 15 - CEL-FX-OFF-017 Shipping Notice for
Core Drills & Accessories, invoice no. 004C-TEMP-001.pdf100%
New File 517905 150 - CEL-CHC-L-11-0248 EDC Meeting on
Subatation Technical Issues.pdf100%
New File 145014 151 - CEL-FX-OFF-069_Re Issues of Wuxi
Visit (your ref CEL-CHC-L-11-0244).doc100%
New File 722392 152 - Attachment 1 Original clarified
letter from Wuxi and the report of UT and RT.PDF100%
New File 399731 153 - Attachment 2 Original heat
treatment record.PDF100%
New File 3.1 m 154 - Attachment 3 Original manufacturing
process record.pdf100%
New File 590012 155 - CEL-CHC-L-11-0281 Quotation for
Black Start-Up DGs (CEL-OFF-065_.pdf100%
New File 513213 156 - CEL-CHC-L-11-0282 Quotation Of
0.7km Lines (CEL-FX-OFF-065).pdf100%
New File 636452 157 - CEL-CHC-L-11-0256 Milestone Payment
Application Onshore October (CEL-FX-OFF-067).pdf100%
New File 591619 158 - CEL-CHC-L-11-0257 Milestone Payment
Application Offshore October (CEL-FX-OFF-066).pdf100%
New File 95338 159 - CEL-FX-OFF-070 exemption procedure
explaination.pdf100%
New File 666926 16 - CEL-CHC-L-11-0060 Coal Specifcation
(ref. CEL-FX-OFF-016).pdf100%
New File 1.4 m 160 - CEL-FX-OFF-
071_Regarding_the_site_access_road_issue.pdf100%
New File 399184 161 - CEL-FX-OFF-
072_blocked_access_road.pdf100%
New File 633536 162 - CEL-CHC-L-11-0283 Site Access
Road.pdf100%
New File 638890 163 - CEL-CHC-L-11-0285 Load for Bridges
along Access to Site.pdf100%
New File 311202 164 - CEL-FX-OFF-073_site_access_road.pdf
100%
New File 128502 165 - CEL-FX-OFF-
074_Steel_Bar_Exemption.pdf100%
New File 118272 166 - CEL-FX-OFF-075-Interconnection
Issues with EDC.doc100%
New File 104420 167 - CEL-FX-OFF-076-
Please_supply_the_accurate_coordinate_of_the_access_road_to_the_bridge_in_front_of_
the_plant.pdf100%
New File 314232 168 - CEL-FX-OFF-
079_Impacts_of_ENDOROS'_Intake_Pipeline_Project_to_CHEC's_Site.pdf100%
New File 576631 169 - CEL-CHC-L-11-0314 Site Access Road
(CEL-FX-OFF-073) and Impact of ERDOSs Intake Pipeline to CHECs Construction Site
(CEL-FX-OFF-079) .pdf100%
New File 595845 17 - CEL-CHC-L-11-0061 Shipping Notice
for Core Drills Accessories, Invoice No.004C-TEMP-001(ref. CEL-FX-OFF-17).pdf100%
New File 134992 170 - CEL-FX-OFF-080-Reply for
transmission line.pdf100%
New File 208327 171 - CEL-FX-OFF-081-Reply for black
start-up DG.pdf100%
New File 139947 172 - CEL-FX-OFF-082_Re Site access road
and Impact of ERDOS's Intake pipelineto CHEC's Construction Site1.pdf100%
New File 563216 173 - CEL-CHC-L-11-0324 Milestone Payment
Application Onshore Noveber (CEL-FX-OFF-078).pdf100%
New File 459103 174 - CEL-CHC-L-11-0329 Boiler House
Elevator for Goods and personnel.pdf100%
New File 439857 175 - CEL-FX-OFF-083-items need to be
confirmed by CEL.pdf100%
New File 960335 176 - CEL-FX-OFF-085-
Please_confirm_the_coordinate_and_dimension_of_the_raw_water_pond.pdf100%
New File 220280 177 - CEL-FX-OFF-
084_Lift_or_Elevator_for_boilers.pdf100%
New File 546600 178 - CEL-CHC-L-11-0339 Corridor for
Transmssion Line to EDC Subststion and Access Road to Main Public Road.pdf100%
New File 208718 179 - CEL-FX-OFF-
086_Notification_of_Subcontractor_for_jetty_and_intake_pipeline.pdf100%
New File 434220 18 - CEL-CHC-L-11-0064 Black Start Diesel
Generator Specification & Scope of Supply.pdf100%
New File 610802 180 - CEL-CHC-L-11-0349 Additional
Information as Part of Generator Data.pdf100%
New File 592991 181 - CEL-CHC-L-11-0352 Change of
Coordinates for Available Corridor For Transmission Line to EDC Substation and
Access Road to Main Public Road .pdf100%
New File 194763 19 - CEL-FX-OFF-
018_CHEC_Amendment_of_Master_list.pdf100%
New File 150958 2 - CEL-FX-OFF-006_Information_Chinese
New Year Schedule.pdf100%
New File 699192 20 - CEL-FX-OFF-020_Milestone Payment
Application_Offshore_April(1).pdf100%
New File 2.9 m 21 - CEL-FX-OFF-019_Milestone Payment
Application_Onehore_April.pdf100%
New File 117417 22 - Offshore Payment Invoice-April.pdf
100%
New File 647941 23 - CEL-CHC-L-11-0073 Endorsement of
Master List and Application to Ministry of Industry, Mines and Energy.pdf100%
New File 295296 24 - CEL-FX-OFF-
021_Coal_specification.pdf100%
New File 1027584 25 - CEL-FX-OFF-019_Milestone Payment
Application_Onehore_April.doc100%
New File 123155 26 - tax invoice10001.pdf100%
New File 934400 27 - CEL-FX-OFF-
022_Coal_specification2.doc100%
New File 121691 28 - CEL-FX-OFF-022_invoice.pdf100%
New File 371892 29 - CEL-FX-OFF-022_Tax_invoice and
Payment_Invoice.pdf100%
New File 143360 3 - CEL-FX-OFF-007_Milestone Payment
Application_Signing of TG_[?????????].doc100%
New File 371892 30 - CEL-FX-OFF-022.pdf100%
New File 602609 31 - CEL-CHC-L-11-0082 Milestone payment
Application Onshore Alril (CEL-FX-OFF-019).pdf100%
New File 593657 32 - CEL-CHC-L-11-0083 Milestone Payment
Application Offshore April (CEL-FX-OFF-020).pdf100%
New File 220211 33 - CEL-FX-OFF-023_Black Start Diesel
Generator (Your ref CEL-CHC-L-11-0064).pdf100%
New File 598021 34 - CEL-CHC-L-11-0090 BLACK START DIESEL
GENRERATOR.pdf100%
New File 588912 35 - CEL-CHC-L-11-0092 POWER SYSTEM GRID
DATA.pdf100%
New File 465496 36 - CEL-CHC-L-11-0094 DEEP WELL DEILLING
PERMIT AND LICENSE.pdf100%
New File 119457 37 - CEL-FX-OFF-024_The Reply of Deep
Well Drilling Permit and License.pdf100%
New File 321550 38 - CEL-FX-OFF-025 Training Issues.pdf
100%
New File 202003 39 - CEL-FX-OFF-026 Subcontractor of
Concret.pdf100%
New File 137216 4 - CEL-FX-OFF-011_Daily Minimum Water
Consumption for Construction_[????].doc100%
New File 309427 40 - CEL-FX-OFF-027 Recommended Coal
Specification.pdf100%
New File 236809 41 - CEL-FX-OFF-028 Questions to be
clarified about communication.pdf100%
New File 636363 42 - CEL-CHC-L-11-0106 Delays with
Project Schedule and Basic Design.pdf100%
New File 196963 43 - CEL-FX-OFF-029_Barge Size for
approval.pdf100%
New File 210764 44 - CEL-FX-OFF-030 Training Issues
Clarification.pdf100%
New File 221466 45 - CEL-FX-OFF-031 Notification of 1st
Batch Auxiliary Equipments[???????](1).pdf100%
New File 34815 46 - 004C.D.10.01.01.03-0011.pdf100%
New File 34839 47 - 004C.D.10.01.01.03-0012.pdf100%
New File 35441 48 - 004C.D.10.01.01.03-0013.pdf100%
New File 34982 49 - 004C.D.10.01.01.03-0014.pdf100%
New File 137728 5 - CEL-FX-OFF-012_The Approval of
Environmental Impact Assessment Report_[????].doc100%
New File 35112 50 - 004C.D.10.01.01.03-0015.pdf100%
New File 35268 51 - 004C.D.10.01.01.03-0016.pdf100%
New File 136751 52 - CEL-FX-OFF-032_Black Start Diesel
Generator (Your ref CEL-CHC-L-11-0090).pdf100%
New File 62026 53 - 004C.D.10.01.01.03-0017.pdf100%
New File 778490 54 - CEL-FX-OFF-033_Milestone Payment
Application_Offshore_June.pdf100%
New File 210070 55 - CEL-FX-OFF-035 Additional Cost for
quadruple circuit.pdf100%
New File 368021 56 - CEL-FX-OFF-035-Additional Cost for
quadruple circuit????????.pdf100%
New File 616793 57 - CEL-FX-OFF-039 Re Sihanoukville
Project Design Issues(Your ref CEL-CHEC-L-11-0108).pdf100%
New File 349832 58 - CEL-FX-OFF-033_attachement-
Contract.pdf100%
New File 38971 59 - subcontract for Electrical Feed
Pump-covering page.jpg100%
New File 137728 6 - CEL-FX-OFF-013_CHEC Clarification to
ER on Basic Design Stage_[??????].doc100%
New File 29785 60 - subcontract for Electrical Feed
Pump-signing page.jpg100%
New File 22714 61 - subcontract for Fans-covering
page.jpg100%
New File 40737 62 - subcontract for Fans-signing
page.jpg100%
New File 39348 63 - subcontract for High Pressure
Heater(HP) and Deaerator-covering page.jpg100%
New File 29224 64 - subcontract for High Pressure
Heater(HP) and Deaerator-signing page.jpg100%
New File 33911 65 - subcontract for Main Transformer-
covering page.jpg100%
New File 25846 66 - subcontract for Main Transformer-
signing page.jpg100%
New File 25045 67 - subcontract for Turbine Bridage
Cranes-covering page.jpg100%
New File 30237 68 - subcontract for Turbine Bridage
Cranes-signing page.jpg100%
New File 420773 69 - CEL-FX-OFF-037_CHEC shipping notice
004C-PI-002.pdf100%
New File 29718 7 - CEL-FX-OFF-013_CHEC Clarification to
ER on Basic Design Stage.pdf100%
New File 252882 70 - CEL-FX-OFF-
038_The_Proposal_of_Bed_Material_Silos.pdf100%
New File 211505 71 - CEL-FX-OFF-040 Notification of 2nd
Batch Auxiliary Equipments.pdf100%
New File 210600 72 - CEL-FX-OFF-041 Notice to Proceed of
Mainbuilding Foundation Excavation.pdf100%
New File 420820 73 - CEL-FX-OFF-042_CHEC shipping notice
004C-PI-002.pdf100%
New File 235735 74 - CEL-FX-OFF-045_CHEC shipping notice
004C-PI-003.pdf100%
New File 119952 75 - CEL-FX-OFF-043_Island mode
operation.pdf100%
New File 238048 76 - CEL-FX-OFF-044_CHEC shipping notice
004C-PI-002(updated).pdf100%
New File 554481 77 - CEL-CHC-L-11-0138 Black Start Diesel
Generator.pdf100%
New File 133424 78 - CEL-FX-OFF-046 1st Batch Auxiliary
Equipments Specification.pdf100%
New File 264618 79 - CEL-FX-OFF-047 Condensate Pump
Suction Strainers.pdf100%
New File 544261 8 - CEL-CHC-L-11-0023 MILESTONE
APPLICATION PAYMENT (CEL-FX-OFF-010).pdf100%
New File 119465 80 - CEL-FX-OFF-034_Milestone Payment
Application_Onshore_July.pdf100%
New File 384550 81 - CEL-FX-OFF-034_Milestone Payment
Application_Onshore_June.pdf100%
New File 131822 82 - CEL-FX-OFF-034-Milestone
Payment_onshore_july final.pdf100%
New File 17167 83 - 004C-TEMP-003-clearance.pdf100%
New File 16752 84 - 004C-TEMP-003-clearance1.pdf100%
New File 36409 85 - 004C-S.D.10.01.01.03-0007.pdf100%
New File 36260 86 - 004C-S.D.10.01.01.03-0008.pdf100%
New File 36348 87 - 004C-S.D.10.01.01.03-0009.pdf100%
New File 36266 88 - 004C-S.D.10.01.01.03-0010.pdf100%
New File 36311 89 - 004C-S.D.10.01.01.03-0011.pdf100%
New File 494613 9 - CEL-CHC-L-11-0025 THE APPROVAL OF
ENVIRONMENTAL IMPACT ASSESSMENT REPORT (EIA) (CEL-FX-OFF-012).pdf100%
New File 36312 90 - 004C-S.D.10.01.01.03-0012.pdf100%
New File 119577 91 - CEL-FX-OFF-051_Milestone Payment
Application_Onshore_July.pdf100%
New File 236425 92 - CEL-FX-OFF-048 Specification of
Limestone and Bed Material.pdf100%
New File 4.2 m 93 - CEL-FX-OFF-050_Milestone Payment
Application_Offshore_July.pdf100%
New File 294752 94 - CEL-FX-OFF-049-Island Operation
Conditions Reports (Your ref Transmittal 9H000139-000474).pdf100%
New File 233388 95 - CEL-FX-OFF-052-shipping notice 004C-
TEMP-003.pdf100%
New File 586846 96 - CEL-CHC-L-11-0159 Basic Design
Review Meeting.pdf100%
New File 656347 97 - CEL-CHC-11-0169 Milestone Payment
Application Onshore July (CEL-FX-OFF-034).pdf100%
New File 607863 98 - CEL-CHC-L-11-0173 Milestine Payment
Application Off-shore July (CEL-FX-050, Dated 8 August 2011.pdf100%
New File 543021 99 - CEL-CHC-L-11-0147 Marine Project
Cargo Insurance.pdf100%
New Dir 241 C:\AdvisianActive\01 Projects\100037 - DLA Piper -
Cambodia Power Plant Arbitration - Expert Evidence\1. From Client\Volume
2\Correspondence Bundle in Chronological Order\Tab 3 - 2012\
New File 492227 1 - CEL-CHC-L-12-0005 Coordinate of Tower
of Transmission Line to EDC Substation.pdf100%
New File 557113 10 - CEL-FX-OFF-12-004-Access road for
heavy equipment transportation.pdf100%
New File 117760 100 - CEL-FX-OFF-12-057-DCS FAT.doc100%
New File 296640 101 - CEL-FX-OFF-12-057-DCS FAT.pdf100%
New File 157184 102 - Cambodia Sihanoukville DCS FAT
file.doc100%
New File 5.9 m 103 - DCS-system.pdf100%
New File 21.0 m 104 - DCS-cabinet.pdf100%
New File 446105 105 - CEL-CHC-L-12-0227 Addition Cost for
Permanent Access Road.pdf100%
New File 429675 106 - CEL-CHC-L-12-0228 Sub-Suplier of
Refractory Material ,Zibo Hong Fei Special Refractory Co,Ltd..pdf100%
New File 204002 107 - CEL-FX-OFF-12-058-Matters for
permanent access road and transmission line.pdf100%
New File 184927 108 - CEL-FX-OFF-12-059 The required
information for the design of EDC substation interconnection.pdf100%
New File 3.5 m 109 - CEL-FX-OFF-12-060-Cooling water
heat dispersion number model study.pdf100%
New File 511906 11 - CEL-FX-OFF-12-005-Bridge location
over the stream.pdf100%
New File 81765 110 - CEL-FX-OFF-12-
061_Transportation_of_heavy_equipments_affected_by_access_road.pdf100%
New File 397797 111 - CEL-CHC-L-12-0241 Hydrostatic Test
for Boiler Unit#1.pdf100%
New File 379459 112 - CEL-CHC-L-12-0242 Milestone Payment
Application Offshore May 2012(CEL-FX-OFF-12-055).pdf100%
New File 424122 113 - CEL-CHC-L-12-0243 Transportation of
heavy Equipment planned for 15 June 2912.pdf100%
New File 448380 114 - CEL-FX-OFF-12-
062_Re_Transportation_of_heavy_equipments_affected_by_access_road.pdf100%
New File 184679 115 - CEL-FX-OFF-12-063 The co-ordinates
of last landing tower located within EDC terminal substation.pdf100%
New File 376060 116 - CEL-CHC-L-12-0252 Reduction in
Advance Payment Bond Offshore Enfinnerimg and procurement Contract.pdf100%
New File 431266 117 - CEL-CHC-L-12-0253 Reduction in
Advance Payment Bond Onshore Engineering ,Procurement and contruction Contract.pdf
100%
New File 122188 118 - CEL-FX-OFF-12-064-Site test for
Generator Rotor Unit 1.pdf100%
New File 454159 119 - CEL-CHC-L-12-0258 REQUIRED
Information from EDC.pdf100%
New File 198349 12 - CEL-FX-OFF-12-006-The coordinates of
substation and transmission line.pdf100%
New File 414942 120 - CEL-CHC-L-12-0259 Transmission line
Tower number N6 toN8.pdf100%
New File 203783 121 - CEL-FX-OFF-12-065-Re hydrostatic
test for boiler unit #1.pdf100%
New File 452028 122 - CEL-CHC-L-12-0266 Construction of
Permannent Access Road ,Trainmission line and Interconnection.pdf100%
New File 471329 123 - CEL-CHC-L-12-0267 Coordinates of
landing tower Within the EDC Terminal Substation.pdf100%
New File 408481 124 - CEL-CHC-L-12-0269 Cooling water
Heat Dispersion Study and location of Outfall pipe.pdf100%
New File 3.5 m 125 - CEL-FX-OFF-12-067 Inspection for
people from MOF and CHD.docx100%
New File 1.0 m 126 - CEL-FX-OFF-12-066-Certification of
Zibo Hongfei Refractory by WuXi Huaguang Boiler.pdf100%
New File 1.7 m 127 - CEL-FX-OFF-12-068 Confirmation of
Commissioning Subcontractor.pdf100%
New File 4.8 m 128 - CEL-FX-OFF-12-
069_Milestone_Payment_Application_Onshore_June_2012.pdf100%
New File 419167 129 - CEL-CHC-L-12-0286 Essential Design
Documents Requirimg Attention.pdf100%
New File 368452 13 - CEL-CHC-L-12-0041 Diameter of Main
Grounding Grid at Sihanoukville Terminal Substation.pdf100%
New File 120674 130 - CEL-FX-OFF-12-070 Maintenance for
the access road.pdf100%
New File 1003466 131 - CEL-FX-OFF-12-071 Water analysis
report for 1# boiler hydro test.pdf100%
New File 870290 132 - CEL-FX-OFF-12-072-Concrete the
pavement of the access road between the stream and gate.pdf100%
New File 1.6 m 133 - CEL-FX-OFF-12-
073_Milestone_Payment_Application_Offshore_June_2012.pdf100%
New File 494885 134 - Telecommunication System of nation
control centre.pdf100%
New File 398897 135 - CEL-CHC-L-12-0303 Detailed
Design_P&I Diagram for C&I.pdf100%
New File 374025 136 - CEL-CHC-L-12-0307 Limestone
specifications and quantity for reference coal.pdf100%
New File 300922 137 - CEL-FX-OFF-12-074-Workshop &
Laboratory facility list for O&M .pdf100%
New File 2.0 m 138 - CEL-FX-OFF-12-075-Application
request for the overhead bridge crane .pdf100%
New File 481058 139 - CEL-CHC-L-12-0314 Milestone Payment
Application Onshore June 2012 (CEL-FX-OFF-12-069).pdf100%
New File 831296 14 - CEL-CHC-M-12-0006 Weekly meeting
minutes of meeting.pdf100%
New File 126555 140 - CEL-FX-OFF-12-076_Limestone
specifications and quantity required for reference coal.pdf100%
New File 412235 141 - CEL-CHC-L-12-0326 Relocation of
landing tower (AN1)to a location Outside the EDC Substation.pdf100%
New File 184197 142 - CEL-FX-OFF-12-077-Request for Motor
Pass.pdf100%
New File 1.2 m 143 - CEL-FX-OFF-12-078 Milestone Payment
Application Onshore July 2012.docx100%
New File 768496 144 - CEL-FX-OFF-12-
078_Milestone_Payment_Application_Onshore_July_2012.pdf100%
New File 377868 145 - CEL-CHC-L-12-0334 Milestone Payment
Application Offshore june 2012 (CEL-FX-OFF-12-073).pdf100%
New File 4.9 m 146 - CEL-FX-OFF-12-079 Milestone Payment
Application Offshore July 2012.docx100%
New File 478966 147 - CEL-CHC-L-12-0342 Milestone Payment
Application Onshore july 2012 (CEL-FX-OFF-12-078).pdf100%
New File 181948 148 - CEL-FX-OFF-12-080-Approval for
refractory installation contractor.pdf100%
New File 477678 149 - CEL-CHC-L-12-0353 Approval for
Refractory Installation Contractor.pdf100%
New File 361879 15 - 2nd Batch Auxiliary Equipments
Specification.pdf100%
New File 471562 150 - CEL-CHC-L-12-0361 Milestone Payment
Application Offshore 2012(CEL-FX-OFF-12-079).pdf100%
New File 522018 151 - CEL-FX-OFF-12-081-Clarification for
approval of refractory installation contractor.pdf100%
New File 181544 152 - CEL-FX-OFF-12-082-Request for
variation of the master list.pdf100%
New File 449862 153 - cel-chc-l-12-0360 DCS Sofware FAT
Test -18 to 22 September 2012.pdf100%
New File 209715 154 - CEL-FX-OFF-12-083-Notification of
HV cable supplier.pdf100%
New File 180605 155 - CEL-FX-OFF-12-084-Request for
variation of the master list.pdf100%
New File 5.4 m 156 - CEL-FX-OFF-12-
085_Milestone_Payment_Application_Offshore_August_2012.pdf100%
New File 579648 157 - CEL-FX-OFF-12-
086_Milestone_Payment_Application_Onshore_August_2012.pdf100%
New File 181261 158 - CEL-FX-OFF-12-087 ERDOS vehicle
through our site area.pdf100%
New File 408688 159 - CEL-CHC-L-12-0389 Mileston Payment
Application Onshore August 2012 (CEL-FX-OFF-12-086).pdf100%
New File 119379 16 - CEL-FX-OFF-12-007-The meeting
proposal regarding substation and transmission line.pdf100%
New File 388751 160 - CEL-CHC-L-12-0404 Milestone payment
Application Offshore August2012(CEL-FX-OFF-12-085.pdf100%
New File 355411 161 - CEL-CHC-L-12-0409 Employer
Represeantatives of acting Deputy Project manager and Site Manager.pdf100%
New File 172006 162 - CEL-FX-OFF-12-088-Civil Access-EDC
Substation.pdf100%
New File 3.6 m 163 - CEL-FX-OFF-12-
090_Milestone_Payment_Application_Offshore_September_2012.pdf100%
New File 208588 164 - CEL-FX-OFF-12-091 Notification of
procurement for coal handling equipment.pdf100%
New File 412904 165 - CEL-CHC-L-12-0413 First Delivery
Date and Quantities for Coal.pdf100%
New File 392022 166 - CEL-CHC-L-12-0424 EDC Permission
for site access to Steung hav Terminal substation.pdf100%
New File 1.2 m 167 - CEL-FX-OFF-12-
089_Milestone_Payment_Application_Onshore_September_2012.pdf100%
New File 212083 168 - CEL-FX-OFF-12-092-Notification of
training program subcontractor.pdf100%
New File 480217 169 - CEL-CHC-L-12-0456 Milestone
payment application Onshore September 2012 (CEL-FX-OFF-12-089).pdf100%
New File 266819 17 - CEL-FX-OFF-12-008-RE Coordinates of
Towers of Transmission Line to EDC Substation.pdf100%
New File 376806 170 - CEL-CHC-L-12-0457 Leader Group
coporate structure.pdf100%
New File 462869 171 - CEL-CHC-L-12-0458 Training Program
Subcontractor.pdf100%
New File 401819 172 - CHC-12-0462 interconection
facilities at EDC Steung hav substation.pdf100%
New File 183979 173 - CEL-FX-OFF-12-093-Coordination with
ERDOS for the construction of tower N8 and N9 of transmission line.pdf100%
New File 306893 174 - CEL-FX-OFF-12-094-Request for
confirmation of EDC requirement of transmission line protection.pdf100%
New File 801083 175 - CEL-FX-OFF-12-095-Confirmation for
the name of interconnection bays in EDC's substation.pdf100%
New File 390024 176 - CEL-CHC-L-12-0455 Milestone
payment Application Offshore September 2012 (CEL-FX-OFF-12-090).pdf100%
New File 183026 177 - CEL-FX-OFF-12-096-Request for the
specification of RTU in EDC substation.pdf100%
New File 256505 178 - CEL-FX-OFF-12-097-Consumable of
electricity to be provided with diesel oil.pdf100%
New File 205781 179 - CEL-FX-OFF-12-098-Confirmation of
the first coal delivery for commissioning and testing.pdf100%
New File 527633 18 - CEL-FX-OFF-12-009 _Milestone Payment
Application_Onshore_February.pdf100%
New File 420584 180 - CEL -CHC-L-12-0483 jetty
completion and re3quired confirmation from CHEC for coal Deliveries.pdf100%
New File 486677 181 - cel-chc-l-12-0408submission of
documents for jeety operation permit.pdf100%
New File 1.5 m 182 - CEL-CHC-L-12-0485 Site Access to
Location of Transmission Towers AN8 and AN9.pdf100%
New File 1.1 m 183 - CEL-FX-OFF-12-099-ERDOS vehicle
route issue.pdf100%
New File 297993 184 - CEL-FX-OFF-12-100-Pipe connection
and raw water supply.pdf100%
New File 1.0 m 185 - CEL-FX-OFF-12-101-
Milestone_Payment_Application_Onshore_October_2012.pdf100%
New File 1.3 m 186 - CEL-CHC-L-12-0493 First Delivery
Date of Coal and Subdequent Coal Deliveries for February 2013.pdf100%
New File 719571 187 - CEL-CHC-L-12-0496 FAT of 23kV HV
Switchgears of Interconnection Facilies.pdf100%
New File 22.5 m 188 - CEL-CHC-L-12-0501 Project Site
Quality and Project Schedule, October 2012.pdf100%
New File 206434 189 - CEL-FX-OFF-12-103-Regarding to the
main cable tray and branch connection issues.pdf100%
New File 262360 19 - CEL-FX-OFF-12-010_Blasting
activities of ERDOS's intake piping line.pdf100%
New File 269823 190 - CEL-FX-OFF-12-104-Rejection for the
milestone application of chimney.pdf100%
New File 622974 191 - CEL-CHC-L-12-0506 Main Cable Tray
and Branch Connection Issues.pdf100%
New File 578312 192 - CEL-CHC-L-12-L-0509 Request for
Information for Coal Unloading Equipment.pdf100%
New File 169482 193 - CEL-FX-OFF-12-105-Confirmation of
Ceramic Tile Type in Office Building.pdf100%
New File 1.0 m 194 - CEL-FX-OFF-12-106-Confirmation of
Floor Tile Type in CCR Building.pdf100%
New File 640995 195 - CEL-CHC-L-12-0516 Milestone Payment
Application Onshore October 2012 (CEL-FX-OFF-12-101).pdf100%
New File 466430 196 - CEL-CHC-L-12-0517 Request for
Information by CHEC to EDC.pdf100%
New File 738082 198 - CEL-FX-OFF-12-108-Regarding to the
issue of stainless pipe cutting.pdf100%
New File 174790 199 - CEL-FX-OFF-12-109-Regarding to the
issue of lighting pull box protection class.pdf100%
New File 485743 2 - CEL-CHC-L-12-0014 MARINE Project
Cargo Insurance Survey Warranty.pdf100%
New File 197248 20 - CEL-FX-OFF-12-011_Coordination with
ERDOS to stop the blasting activity during our TG foundation concreting.pdf100%
New File 2.7 m 200 - CEL-CHC-L-12-0525.pdf100%
New File 1.5 m 201 - CEL-CHC-L-12-0526.pdf100%
New File 841247 202 - CEL-FX-OFF-12-110-The connections
of the grounding grid with metal structures.pdf100%
New File 449349 203 - CEL-FX-OFF-12-111-Regarding to the
issue of ERDOS's soil stacked at the west side of raw water pond.pdf100%
New File 211517 204 - CEL-FX-OFF-12-112-Regarding to the
issue of raw water supply valves protection.pdf100%
New File 792111 205 - CEL-CHC-L-12-0540.pdf100%
New File 773084 206 - CEL-FX-OFF-12-113-Final spare parts
and special tools list .pdf100%
New File 119485 207 - CEL-FX-OFF-12-114-Confirmation of
independent firm of engineers.pdf100%
New File 221878 208 - CEL-FX-OFF-12-115-Milestone
application for Black start diesel generator.pdf100%
New File 181382 209 - CEL-FX-OFF-12-116-Raw water supply
issue.pdf100%
New File 462500 21 - CEL-CHC-L-12-0053 Transmission Line
Route and Interconnection.pdf100%
New File 302362 210 - CEL-FX-OFF-12-118-safety warning
coordinates of the CW intake head caisson.pdf100%
New File 496496 211 - CEL-FX-OFF-12-117-blasting work for
transmission line at tower N8.pdf100%
New File 908988 212 - CEL-FX-OFF-12-
119_Milestone_Payment_Application_November_2012.pdf100%
New File 214794 213 - CEL-FX-OFF-12-121-Settings for
transmission line and busbar protection.pdf100%
New File 649424 214 - CEL-CHC-L-12-0562.pdf100%
New File 3.2 m 215 - CEL-CHC-L-12-0563.pdf100%
New File 764384 216 - CEL-CHC-L-12-0576.pdf100%
New File 1.5 m 218 - CEL-CHC-L-12-0558.pdf100%
New File 266541 219 - CEL-FX-OFF-12-122-
Reply_on_Letter_of_CEL_regarding_settings_for_transmission_line_and_busbar_protecti
on.pdf100%
New File 493928 22 - CEL-CHC-L-12-0054 Blasting Activties
of ERDOS Intake pipeline.pdf100%
New File 571490 220 - CEL-CHC-L-12-0571..pdf100%
New File 604209 221 - CEL-CHC-L-12-0571.pdf100%
New File 905448 222 - CEL-CHC-L-12-0573.pdf100%
New File 222464 223 - CEL-FX-OFF-12-
123_Resubmission_of_the_milestone_application_for_Black_start_diesel_generator.pdf
100%
New File 180942 224 - CEL-FX-OFF-12-124 Notification of
the account change for offshore milestone application November 2012.pdf100%
New File 187805 225 - CEL-FX-OFF-12-125-Coal unloader
crane testing and commissioning time.pdf100%
New File 490831 226 - CEL-CHC-L-12-0584.pdf100%
New File 247966 227 - CEL-FX-OFF-12-127-Operator plan for
BOP & unit 1 testing and commissioning.pdf100%
New File 315092 228 - CEL-FX-OFF-12-126-Expalnation for
some pipes without hydraulic test.pdf100%
New File 263934 229 - CEL-FX-OFF-12-
128_Issue_for_the_measure_of_the_raw_water_pond_corner.pdf100%
New File 182600 23 - CEL-FX-OFF-12-012-The proposal
agenda for the coordination with the EDC.pdf100%
New File 261228 230 - CEL-FX-OFF-12-129-Notification of
the power sockets for installation.pdf100%
New File 3.5 m 231 - CEL-CHC-L-12-0585.pdf100%
New File 288023 232 - CEL-FX-OFF-12-130-Torque value of
bus bar.pdf100%
New File 4.5 m 233 - CEL-CHC-L-13-0594.pdf100%
New File 206616 234 - CEL-FX-OFF-12-131-Enhance site
management to the O&M personnel.pdf100%
New File 3.8 m 235 - CEL-FX-OFF-12-
132_Milestone_application_for_Black_start_diesel_generator.pdf100%
New File 206440 236 - CEL-FX-OFF-12-133-RE FAT OF 230KV
HV SWITCHGEARS OF INTERCONNECTION FACILITIES.pdf100%
New File 204386 237 - CEL-FX-OFF-12-134-Seashore
protection.pdf100%
New File 204328 238 - CEL-FX-OFF-12-135-Installation of
the ceiling for the administration building.pdf100%
New File 207707 239 - CEL-FX-OFF-12-136-Request for
accelerating payment.pdf100%
New File 565580 24 - CEL-CHC-L-12-0061 Proposed Agenda
for Coordination meeting with EDC.pdf100%
New File 212955 240 - CEL-FX-OFF-12-137-Re Project Site
Quality and Project Schedule October 2012.pdf100%
New File 120180 241 - CEL-FX-OFF-12-138-Issue for the tax
exemption master list extension.pdf100%
New File 202862 242 - CEL-FX-OFF-12-139-Issue for the
achieved milestone of chimney.pdf100%
New File 245842 25 - CEL-FX-OFF-12-013 _Milestone Payment
Application_Offshore_January.pdf100%
New File 196936 26 - CEL-FX-OFF-12-014-Coordination for
the survey work in theTransmission Line and EDC Substation area.pdf100%
New File 596771 27 - CEL-FX-OFF-12-015 _Milestone Payment
Application_Offshore_January.pdf100%
New File 366104 28 - CEL-CHC-L-12-0064 Coordination for
Survey Work in the trainmission Line and EDC Substation Area.pdf100%
New File 434242 29 - CEL-FX-OFF-12-016-Regarding to the
explosive material storage of ERDOS.pdf100%
New File 416257 3 - CEL-CHC-L-12-0028 Material Installed
for Chimney Grounding for lighting Protection.pdf100%
New File 700838 30 - CEL-CHC-M-12-0009 WEEKLY MEETING
NINUTES OF MEETING.pdf100%
New File 406537 31 - CEL-CHC-L-12-0069 Milestone Payment
Application Offshore Janunary2012(CEL-FX-OFF-12-015).pdf100%
New File 383288 32 - CEL-CHC-L-12-0070 Milestone Payment
Application Onshore Janunary(CEL-FX-OFF-12-009).pdf100%
New File 364956 33 - CEL-CHC-L-12-0073 Phase 2,C.W.Pump-
house Area Blasting.pdf100%
New File 665699 34 - CEL-FX-OFF-12-017-Phase two CW pump
house area blasting 20120227.pdf100%
New File 196948 35 - CEL-FX-OFF-12-018-Raw water pond
area excavation.pdf100%
New File 241946 36 - CEL-FX-OFF-12-019-
Notification_of_Auxiliary_Equipments.pdf100%
New File 829781 37 - CEL-FX-OFF-12-
020_Milestone_Payment_Application_Onshore_February_2012.pdf100%
New File 166015 38 - CEL-FX-OFF-12-021-The Resume-O&M YUE
YUHUA.pdf100%
New File 180893 39 - CEL-FX-OFF-12-022-Changing the
internet route of ezecom .pdf100%
New File 424514 4 - CEL-CHC-L-12-0029 P&I Diagrams for
Design Review.pdf100%
New File 119489 40 - CEL-FX-OFF-12-023-Vehicles stopped
by Erdos .pdf100%
New File 449960 41 - CEL-CHC-L-12-0086 Milestone Payment
Application Offshore February 2012(CEL-FX-OFF-12-020).pdf100%
New File 307482 42 - CEL-FX-OFF-12-
024_Request_for_accelerating_the_payment_procedure.pdf100%
New File 316376 43 - CEL-FX-OFF-12-025-Reply to your
comments on spare parts and special tools list.pdf100%
New File 249845 44 - CEL-FX-OFF-12-
026_Transmission_line_and_permanent_access_road.pdf100%
New File 4.2 m 45 - CEL-FX-OFF-12-
027_Milestone_Payment_Application_Offshore_February_2012.pdf100%
New File 294589 46 - CEL-FX-OFF-12-028 Application for
import certificate of Goods Exemption.pdf100%
New File 1.7 m 47 - CEL-FX-OFF-12-
029_Clarification_of_Offshore_Application_February_2012.pdf100%
New File 244858 48 - CEL-FX-OFF-12-
30_Late_confirmation_of_transmission_line_and_permanent_access_road.pdf100%
New File 454237 49 - CEL-CHC-L-12-0117 Milestone Payment
Application Offshore February 2012 (CEL-CHC-L-12-0117 Milestone Payment Application
Offshore February 2012.pdf100%
New File 513191 5 - CEL-CHC-L-12-0030 Marine Project
Cargo insurance Survey Warranty for CEL-FX-SHPT-007.pdf100%
New File 388979 50 - CEL-CHC-L-12-0121 Good and Personnel
Lifts.Elevator for Boilers.pdf100%
New File 358171 51 - CEL-CHC-L-12-0122 Good and Personnel
Lifts(Elevators for Boiler.pdf100%
New File 354073 52 - CEL-CHC-L-12-0123 Training for
Employer's O&M Staff.(Ref;EPC Article 25).pdf100%
New File 1.1 m 53 - CEL-FX-OFF-12-
031_Issues_for_access_road_been_blocked.pdf100%
New File 340473 54 - CEL Scann12040821280.pdf100%
New File 906294 55 - CEL-CHC-L-12-0124.pdf100%
New File 3.1 m 56 - CEL-FX-OFF-12-
032_Milestone_Payment_Application_Onshore_March_2012.pdf100%
New File 486374 57 - CEL-CHC-L-12-0124 Route of
Transmission line,Pernement Access Road and Raw water pipeline.pdf100%
New File 414040 58 - CEL-CHC-L-12-0125 Damage to crate
Containing Rotor of Unit One.pdf100%
New File 1.5 m 59 - CEL-CHC-L-12-0125.pdf100%
New File 440611 6 - CEL-CHC-L-12-0027 Milestone Payment
Application Offshore December (CEL-FX-OFF-088).pdf100%
New File 1.7 m 60 - CEL-FX-OFF-12-
033_Damage_to_Crate_of_Generator_Rotor_of_Unit_One.pdf100%
New File 479752 61 - CEL-CHC-L-12-0135 Milestone Payment
Application Onshore march 2012 (CEL-FX-OFF-12-032).pdf100%
New File 396966 62 - CEL-CHC-L-12-0136 DAMANG TO
GENERATION ROTOR.pdf100%
New File 1.1 m 63 - CEL-FX-OFF-12-034-Outlet CW Pipe
Intercross With Erdos Jetty.pdf100%
New File 3.4 m 64 - CEL-FX-OFF-12-
035_Milestone_Payment_Application_Offshore_March_2012.pdf100%
New File 317184 65 - CEL-FX-OFF-12-
036_Additional_Cost_for_Permanent_Access_Road.pdf100%
New File 407924 66 - CEL-CHC-L-12-0147 Approved Extension
of Masterlist by CDC and MIME.pdf100%
New File 318806 67 - CEL-FX-OFF-12-
037_Additional_Cost_for_Permanent_Access_Road.pdf100%
New File 481744 68 - CEL-CHC-L-12-0152 Milestone Payment
Application Offshore March 2012(CEL-FX-OFF-12-035).pdf100%
New File 465303 69 - CEL-CHC-L-12-0153 Access Road for
Delivery.pdf100%
New File 747152 7 - CEL-FX-OFF-12-001-2nd Batch Auxiliary
Equipments Specification.pdf100%
New File 104918 70 - CEL-FX-OFF-12-
038_Access_road_to_be_finalized_for_delivering_transformer.pdf100%
New File 2.6 m 71 - CEL-FX-OFF-12-
039_Milestone_Payment_Application_Onshore_April_2012.pdf100%
New File 136365 72 - CEL-FX-OFF-12-040-CW pipe intercross
with ERDOS jetty approach.pdf100%
New File 109026 73 - CEL-FX-OFF-12-041-
1_Issues_for_Permanent_access_road.pdf100%
New File 499228 74 - CEL-CHC-L-12-0156 Milestone Payment
Application Onshore Apirl 2012(CEL-FX-OFF-12-039).pdf100%
New File 368356 75 - CEL-CHC-L-0163 CW Pipeline Route
Intersecting with jetty Route of Neighbouring Progect.pdf100%
New File 524374 76 - CEL-FX-OFF-12-041-Visa Extension
Procedure.pdf100%
New File 211861 77 - CEL-FX-OFF-12-042 Notification The
fabrication of CW FRP pipes have been completed.pdf100%
New File 320385 78 - CEL-FX-OFF-12-
043_Issue_for_rejection_of_onshore_milestone_application.pdf100%
New File 157307 79 - CEL-FX-OFF-12-
044_Deduction_for_Advance_Payment_Bond.pdf100%
New File 218997 8 - CEL-FX-OFF-12-
002_Marine_Project_Cargo_Insurance_Survey.pdf100%
New File 157120 80 - CEL-FX-OFF-12-
045_Deduction_for_Advance_Payment_Bond_(Utilization_as_at_31_Dec_2011).pdf100%
New File 4.3 m 81 - CEL-FX-OFF-12-
046_Milestone_Payment_Application_Offshore_April_2012.pdf100%
New File 464060 82 - CEL-CHC-L-12-0185 Achieved
Milestone of Chimney Stack.pdf100%
New File 1.1 m 83 - CEL-FX-OFF-12-
047_Tower_foundation_affected_by_Neighboring_Project.pdf100%
New File 311742 84 - CEL-FX-OFF-12-048 List of Required
Information From EDC.pdf100%
New File 171366 85 - CEL-FX-OFF-12-
049_Postponed_of_the_dredging_for_the_outlet_foundation_trench.pdf100%
New File 453954 86 - CEL-CHC-L-0186 Labour Inspection of
site by the ministry and Subsequent Report.pdf100%
New File 408830 87 - Postponement of Dredging of the
Outlet Foundation Trench.pdf100%
New File 221880 88 - CEL-FX-OFF-12-050 Respond to
postponed of the dredging for the outlet foundation trench.pdf100%
New File 118924 89 - CEL-FX-OFF-12-051 Delivery for heavy
equipments.pdf100%
New File 566573 9 - CEL-FX-OFF-12-
003_Excavation_of_CW_pump_house_for_project_second_phase.pdf100%
New File 461045 90 - CEL-CHC-L-0204 Stronge and
Insulation Test of Gernerater Rotor and Stator of Unit #1Site.pdf100%
New File 468796 91 - CEL-CHC-L-0206 Miloesstone Payment
Application Offshore Apirl 2012 (CEL-FX-OFF-12-046).pdf100%
New File 47616 92 - 041.doc100%
New File 4.9 m 93 - CEL-FX-OFF-12-052 Milestone Payment
Application Onshore May 2012.pdf100%
New File 245718 94 - CEL-FX-OFF-12-053- Notification The
Management Cost of Training for Employer's Staff in China .pdf100%
New File 130524 95 - CEL-FX-OFF-12----Notification of our
personnel and transportation blocked by Erdos Security.doc100%
New File 302883 96 - CEL-FX-OFF-12-054-Notification The
Management Cost of Training for Employer's Staff in China .pdf100%
New File 22016 97 - CEL-FX-OFF-12-054-??Management Cost
for the training.xls100%
New File 1.2 m 98 - CEL-FX-OFF-12-055 Milestone Payment
Application Offshore May 2012.pdf100%
New File 1.1 m 99 - CEL-FX-OFF-12-056-Offshore Milestone
Payment Application of Turbine and Generator Delivered .pdf100%
New File 3.0 m FILE IS BROKEN - LEAVE TAB EMPTY - 217 -
CEL-FX-OFF-12-120_Milestone_Payment_Application_Offshore_November_2012.part1.rar
100%
New Dir 1 C:\AdvisianActive\01 Projects\100037 - DLA Piper -
Cambodia Power Plant Arbitration - Expert Evidence\1. From Client\Volume
2\Correspondence Bundle in Chronological Order\Tab 3 - 2012\197 - CEL-FX-OFF-12-
107-Submission of Documents for Jetty Operations Permit\
New File 266858 CEL-FX-OFF-12-107-Submission of Documents
for Jetty Operations Permit .pdf100%
New Dir 5 C:\AdvisianActive\01 Projects\100037 - DLA Piper -
Cambodia Power Plant Arbitration - Expert Evidence\1. From Client\Volume
2\Correspondence Bundle in Chronological Order\Tab 3 - 2012\197 - CEL-FX-OFF-12-
107-Submission of Documents for Jetty Operations Permit\Attachment\
New File 5.6 m Attachment 1-Layout of jetty and port
facilities.pdf100%
New File 795078 Attachment 2-Layout of power plants.pdf
100%
New File 80342 Attachment 3-Location map and road
network.pdf100%
New File 1017497 Attachment 4-Layout of turning basin.pdf
100%
New File 4.2 m Attachment 5-Installation plan of buoys
and beacons.PDF100%
New Dir 6 C:\AdvisianActive\01 Projects\100037 - DLA Piper -
Cambodia Power Plant Arbitration - Expert Evidence\1. From Client\Volume
2\Correspondence Bundle in Chronological Order\Tab 3 - 2012\197 - CEL-FX-OFF-12-
107-Submission of Documents for Jetty Operations Permit\Attachment\Attachment 6-
Bathymetric survey report\
New File 355798 Appendix 1-Summary of Physical and
Mechanical Property Indexes for Soil.pdf100%
New File 187903 Appendix 2-The mean compression curves of
each foundation layer.pdf100%
New File 4.7 m Appendix 3-Plane position of boreholes
map.pdf100%
New File 2.6 m Appendix 4-Engineering Geologic
Profile.pdf100%
New File 476667 Appendix 5-List of boreholes
coordinate.pdf100%
New File 22.5 m CHECXB-CEL-01-087-Jetty Geotechnical
Engineering Investigation Report.pdf100%
New Dir 97 C:\AdvisianActive\01 Projects\100037 - DLA Piper -
Cambodia Power Plant Arbitration - Expert Evidence\1. From Client\Volume
2\Correspondence Bundle in Chronological Order\Tab 3 - 2012\197 - CEL-FX-OFF-12-
107-Submission of Documents for Jetty Operations Permit\Attachment\Attachment 7-
Port Structure\
New File 482196 GJ-2010-0220D-JET-MS000-General
description of construction drawings.pdf100%
New File 261986 GJ-2010-0220D-JET-MS010-Layout of the
Jetty.pdf100%
New File 189599 GJ-2010-0220D-JET-MS011-Section(?)of the
Jetty.pdf100%
New File 189369 GJ-2010-0220D-JET-MS012-Section(?)of the
Jetty.pdf100%
New File 190468 GJ-2010-0220D-JET-MS013-Section(?)of the
Jetty.pdf100%
New File 216927 GJ-2010-0220D-JET-MS014-Front Elevation
Drawing of the Jetty.pdf100%
New File 516038 GJ-2010-0220D-JET-MS015-Beam and Slab
Installation Diagram of the Jetty.pdf100%
New File 269247 GJ-2010-0220D-JET-MS016-Rubber Fender
Installation Diagram.pdf100%
New File 237796 GJ-2010-0220D-JET-MS017-Precast Berthing
Parts Structure Diagram of the Jetty(I).pdf100%
New File 266672 GJ-2010-0220D-JET-MS018-Precast Berthing
Parts Structure Diagram of the Jetty(II).pdf100%
New File 253127 GJ-2010-0220D-JET-MS019-Prefabricated
Horizontal Bracing Structure Diagram of Jetty.pdf100%
New File 267138 GJ-2010-0220D-JET-MS020-Sewage Collection
Pool Structure of the Jetty.pdf100%
New File 479613 GJ-2010-0220D-JET-MS021-Cast-in-place
Beam Structure Diagram of the Jetty.pdf100%
New File 345906 GJ-2010-0220D-JET-MS022-Precasting Girder
Structure Diagram of the Jetty (I).pdf100%
New File 169802 GJ-2010-0220D-JET-MS023-Precasting Girder
Structure Diagram of the Jetty (II).pdf100%
New File 182306 GJ-2010-0220D-JET-MS024-Precasting Front
Girder Structure Diagram of the Jetty (I).pdf100%
New File 177881 GJ-2010-0220D-JET-MS025-Precasting Front
Girder Structure Diagram of the Jetty (II).pdf100%
New File 208228 GJ-2010-0220D-JET-MS026-Precasting Back
Girder Structure Diagram of the Jetty (I).pdf100%
New File 318372 GJ-2010-0220D-JET-MS027-Precasting Back
Girder Structure Diagram of the Jetty (II).pdf100%
New File 223736 GJ-2010-0220D-JET-MS028-Precasting Back
Girder Structure Diagram of the Jetty (III).pdf100%
New File 212812 GJ-2010-0220D-JET-MS029-Precasting Back
Girder Structure Diagram of the Jetty (IV).pdf100%
New File 320628 GJ-2010-0220D-JET-MS030-Precasting Pipe
Trench Girder Structure Diagram of the Jetty (I).pdf100%
New File 198673 GJ-2010-0220D-JET-MS031-Precasting Pipe
Trench Girder Structure Diagram of the Jetty (II).pdf100%
New File 226656 GJ-2010-0220D-JET-MS032-Precasting Slab
Structure Diagram (I).pdf100%
New File 247829 GJ-2010-0220D-JET-MS033-Precasting Slab
Structure Diagram (II).pdf100%
New File 198299 GJ-2010-0220D-JET-MS034-Precasting Slab
Structure Diagram (III).pdf100%
New File 176172 GJ-2010-0220D-JET-MS035-Precasting Slab
Structure Diagram (IV).pdf100%
New File 197292 GJ-2010-0220D-JET-MS036-Cast-in-place
Girder Structure Diagram of the Jetty (I).pdf100%
New File 215934 GJ-2010-0220D-JET-MS037-Cast-in-place
Girder Structure Diagram of the Jetty (II) .pdf100%
New File 213364 GJ-2010-0220D-JET-MS038-Cast-in-place
Front Girder Structure Diagram of the Jetty .pdf100%
New File 247480 GJ-2010-0220D-JET-MS039-Cast-in-place
Back Girder Structure Diagram of the Jetty .pdf100%
New File 225219 GJ-2010-0220D-JET-MS040-Cast-in-place
Pipe Trench Girder Structure Diagram of the Jetty .pdf100%
New File 194464 GJ-2010-0220D-JET-MS041-Cast-in-place
Fixed Crane Foundation Girder Structure Diagram.pdf100%
New File 170926 GJ-2010-0220D-JET-MS042-Cast-in-place
Connection Girder Structure Diagram of the Jetty.pdf100%
New File 307075 GJ-2010-0220D-JET-MS043-Cast-in-place
Surface Course Structure Diagram of the Jetty (I) .pdf100%
New File 262360 GJ-2010-0220D-JET-MS044-Cast-in-place
Surface Course Structure Diagram of the Jetty (II) .pdf100%
New File 337369 GJ-2010-0220D-JET-MS045-Cast-in-place
Surface Course Structure Diagram of the Jetty (III) .pdf100%
New File 232766 GJ-2010-0220D-JET-MS046-Mooring Dolphin
Superstructure Diagram(?) .pdf100%
New File 294186 GJ-2010-0220D-JET-MS047-Mooring Dolphin
Substructure Diagram (II) .pdf100%
New File 260064 GJ-2010-0220D-JET-MS048-Mooring Dolphin
Superstructure Diagram.pdf100%
New File 184547 GJ-2010-0220D-JET-MS049-Steel Ladder
Structure Diagram of the Jetty.pdf100%
New File 207531 GJ-2010-0220D-JET-MS050-Steel Chain
Ladder Structure Diagram .pdf100%
New File 334286 GJ-2010-0220D-JET-MS051-Details of 650kN
Bollard .pdf100%
New File 234832 GJ-2010-0220D-JET-MS052-Settlement and
Displacement Observation Point Layout of the Jetty .pdf100%
New File 327815 GJ-2010-0220D-JET-MS053-Layout of the
Approach Trestle.pdf100%
New File 219317 GJ-2010-0220D-JET-MS054-Section (?) of
the Approach Trestle .pdf100%
New File 239572 GJ-2010-0220D-JET-MS055-Section (?) of
the Approach Trestle .pdf100%
New File 227751 GJ-2010-0220D-JET-MS056-Section (?) of
the Approach Trestle .pdf100%
New File 227266 GJ-2010-0220D-JET-MS057-Section (IV) of
the Approach Trestle .pdf100%
New File 386502 GJ-2010-0220D-JET-MS058-Longitudinal
Section of the Approach Trestle .pdf100%
New File 427697 GJ-2010-0220D-JET-MS059-Structural member
layout of the trestle .pdf100%
New File 345822 GJ-2010-0220D-JET-MS060-Cast-in-place
beams structure diagram (I) .pdf100%
New File 311132 GJ-2010-0220D-JET-MS061-Cast-in-place
beams structure diagram (II) .pdf100%
New File 323797 GJ-2010-0220D-JET-MS062-Cast-in-place
beams structure diagram (?) .pdf100%
New File 304598 GJ-2010-0220D-JET-MS063-Cast-in-place
beams structure diagram (?) .pdf100%
New File 217888 GJ-2010-0220D-JET-MS064-Approach trestle
prestressed box girder structure(I).pdf100%
New File 230577 GJ-2010-0220D-JET-MS065-Approach trestle
prestressed box girder structure(II).pdf100%
New File 330344 GJ-2010-0220D-JET-MS066-Approach trestle
prestressed box girder structure(III).pdf100%
New File 207560 GJ-2010-0220D-JET-MS067-Approach trestle
prestressed box girder structure(IV).pdf100%
New File 227307 GJ-2010-0220D-JET-MS068-Approach trestle
prestressed box girder structure(?).pdf100%
New File 351693 GJ-2010-0220D-JET-MS069-Approach trestle
prestressed box girder structure(?).pdf100%
New File 209277 GJ-2010-0220D-JET-MS070-Approach trestle
prestressed box girder structure(?).pdf100%
New File 260606 GJ-2010-0220D-JET-MS071-Approach trestle
prestressed box girder structure(?).pdf100%
New File 209712 GJ-2010-0220D-JET-MS072-Approach trestle
prestressed box girder structure(?).pdf100%
New File 460985 GJ-2010-0220D-JET-MS073-Approach trestle
prestressed box girder structure(?).pdf100%
New File 270817 GJ-2010-0220D-JET-MS074-Approach trestle
precast slab structure (I).pdf100%
New File 240334 GJ-2010-0220D-JET-MS075-Approach trestle
precast slab structure (?).pdf100%
New File 239740 GJ-2010-0220D-JET-MS076-Approach trestle
precast slab structure (?).pdf100%
New File 232445 GJ-2010-0220D-JET-MS077-Approach trestle
precast slab structure (?).pdf100%
New File 232598 GJ-2010-0220D-JET-MS078-Approach trestle
precast slab structure (?).pdf100%
New File 287685 GJ-2010-0220D-JET-MS079-Structure diagram
of trestle pier DT.pdf100%
New File 300778 GJ-2010-0220D-JET-MS080-Substation
platform structure diagram (I) .pdf100%
New File 292562 GJ-2010-0220D-JET-MS081-Substation
platform structure diagram (?) .pdf100%
New File 361881 GJ-2010-0220D-JET-MS082-Cast-in-situ
surface course structure of approach trestle (I).pdf100%
New File 272284 GJ-2010-0220D-JET-MS083-Cast-in-situ
surface course structure of approach trestle (?).pdf100%
New File 238545 GJ-2010-0220D-JET-MS084-Approach
embankment earth retaining wall structure (I).pdf100%
New File 257643 GJ-2010-0220D-JET-MS085-Approach
embankment earth retaining wall structure (?).pdf100%
New File 271654 GJ-2010-0220D-JET-MS086-Cast-in-place
concrete road surface structure diagram.pdf100%
New File 292493 GJ-2010-0220D-JET-MS087-Layout for
settlement and displacement observation points trestle .pdf100%
New File 421592 GJ-2010-0220D-JET-MS088-Steel walkway
general view.pdf100%
New File 232922 GJ-2010-0220D-JET-MS089-Railing and chain
ring of the steel walkway.pdf100%
New File 234142 GJ-2010-0220D-JET-MS090-Lower lateral
bracing of the steel walkway.pdf100%
New File 258056 GJ-2010-0220D-JET-MS091-Main girder of
the steel walkway.pdf100%
New File 274351 GJ-2010-0220D-JET-MS092-Handrail
structure diagram.pdf100%
New File 381372 GJ-2010-0220D-JET-MS093-Embedded parts
structure (I).pdf100%
New File 325228 GJ-2010-0220D-JET-MS094-Embedded parts
structure (II).pdf100%
New File 241262 GJ-2010-0220D-JET-MS095-Embedded parts
structure (III).pdf100%
New File 257643 GJ-2010-0220D-JET-MS096-Embedded parts
structure (IV).pdf100%
New File 335531 GJ-2010-0220D-JET-MS097-Embedded parts
structure (V).pdf100%
New File 257707 GJ-2010-0220D-JET-MS098-Embedded parts
structure (VI).pdf100%
New File 312785 GJ-2010-0220D-JET-MS099-Embedded parts
structure (VII).pdf100%
New File 248840 GJ-2010-0220D-JET-MS100-Embedded parts
structure (VIII).pdf100%
New File 259203 GJ-2010-0220D-JET-MS101-Embedded parts
structure (IX).pdf100%
New File 414994 GJ-2010-0220D-JET-MS102-Embedded parts
structure (X).pdf100%
New File 349296 GJ-2010-0220D-JET-MS103-Embedded parts
structure (XI).pdf100%
New File 282186 GJ-2010-0220D-JET-MS104-Embedded parts
structure (XII).pdf100%
New File 1.8 m GJ-2010-0220D-JET-MS-Catalog of
Drawings.pdf100%
New Dir 3 C:\AdvisianActive\01 Projects\100037 - DLA Piper -
Cambodia Power Plant Arbitration - Expert Evidence\1. From Client\Volume
2\Correspondence Bundle in Chronological Order\Tab 3 - 2012\197 - CEL-FX-OFF-12-
107-Submission of Documents for Jetty Operations Permit\Attachment\Attachment 9-
Coal yard spray\
New File 162 ~$ECXB-CEL-01-DTS-
015_Documents_transfer_sheet__Basic_Design__Mech.doc100%
New File 39400 F428S-M0704-00-Catalogue.pdf100%
New File 502831 F428S-M0704-01 Coal field spray.pdf100%
New Dir 242 C:\AdvisianActive\01 Projects\100037 - DLA Piper -
Cambodia Power Plant Arbitration - Expert Evidence\1. From Client\Volume
2\Correspondence Bundle in Chronological Order\Tab 4 - 2013\
New File 1041128 1 - CEL-CHC-L-13-0001.pdf100%
New File 1.9 m 10 - CEL-FX-OFF-13-002 Milestone Payment
Application Offshore Dece mber 2012.pdf100%
New File 537637 100 - CEL-FX-OFF-13-056-Reply on comments
for MS of individual test of IPB(CEL Switchyard).pdf100%
New File 785925 101 - CEL-FX-OFF-13-057-Reply on comments
for MS of individual test of Line protection(CEL Switchyard).pdf100%
New File 641319 102 - CEL-FX-OFF-13-058-Reply on comments
for MS of individual test of Steam turbine generator(CEL Switchyard).pdf100%
New File 116054 103 - CEL-FX-OFF-13-060-Submission of
Test procedure for earthing resistance.pdf100%
New File 1.4 m 104 - CEL-FX-OFF-13-061-Reply on comments
for MS of back feeding(CEL Switchyard).pdf100%
New File 118581 105 - CEL-FX-OFF-13-063-Notification of
commence #1 boiler blowpipe work.pdf100%
New File 851464 106 - CEL-CHC-L-13-0245 Milestone Payment
Application Onshore March 2012 [CEL-FX-OFF-12-032].pdf100%
New File 580905 107 - CEL-FX-OFF-13-062 Milestone Payment
Application Onshore April 2013.pdf100%
New File 932841 108 - CEL-FX-OFF-13-064-Submission for MS
of grouding resistance (CEL Switchyard).pdf100%
New File 115481 109- CEL-FX-OFF-13-065-The request for
the fuel oil.pdf100%
New File 308962 11 - CEL-CHC-L-13-0050 APPROVAL OF
MASTERLIST EXTENSION FOR 2013.pdf100%
New File 701237 110 - CEL-FX-OFF-13-066-Submission for MS
of grouding resistance (CEL Switchyard-revision) .pdf100%
New File 121494 111 - CEL-FX-OFF-13-067-Reply on comments
for MS of individual test of Steam turbine generator(CEL Switchyard).pdf100%
New File 628894 112 - CEL-FX-OFF-13-068-Replay on comment
of MS for grouding resistance (CEL Switchyard) .pdf100%
New File 204165 113 - CEL-FX-OFF-13-069-Submission of
Soil Resistance Test (CEL Switchyard) .pdf100%
New File 96755 114 - CEL-CHC-L-13-0301 Unit 1 Boiler
Steam Blowing.pdf100%
New File 685744 115 - CEL-FX-OFF-13-073-Confirmation of
the result of unit 1 steam blowing.pdf100%
New File 709692 116 - CEL-CHC-L-13-0298.pdf100%
New File 489992 117 - CEL-CHC-L-13-0309 Soil Resistivity
Measurements Done By CHEC and Retest on 21 May 2013 By CEL100%
New File 134846 118 - CEL-FX-OFF-13-070-Current status of
back energization activity.pdf100%
New File 124050 119 - CEL-FX-OFF-13-071-Re Re Soil
resistivity measurements done by CHEC and retest on 21 May 2013 by CEL.pdf100%
New File 795119 12 - CEL-CHC-L-13-0047 Training Program
of OEM.pdf100%
New File 66374 120 - CEL-CHC-L-13-0311 Regarding to the
Expiry of the Onshore and Offshore Performance Bonds and Advance Payment Bonds (3RD
REMINDER).pdf100%
New File 84324 121 - CEL-CHC-L-13-0313 Grounding
Impedance and Resistance Measurements Done by CHEC on 5 May 2013 and 7 May 2013 and
Retest On 21 May 2013 By CEL .pdf100%
New File 201882 122 - CEL-CHC-L-13-0314 CHEC'S PLANT
SWITCHYARD GROUNDING SYSTEM CALCULATIONS AND SITE TESTING.pdf100%
New File 315898 123 - CEL-FX-OFF-13-072-Electricity
consumption after back energization finished.pdf100%
New File 155431 124 - CEL-FX-OFF-13-074-Organization for
back energization from CHEC.pdf100%
New File 808306 125 - CEL-FX-OFF-13-075-Request to
confirmed information on SCADA system.pdf100%
New File 123681 127 - CEL-FX-OFF-13-076-Grounding
resistance retest activity of CEL 230KV switchyard.pdf100%
New File 1.5 m 128 - CEL-CHC-L-13-0319 Re Delay
Liquidated Damages.pdf100%
New File 1.6 m 129 - CEL-CHC-L-13-0320 Re Delay
Liquidated Damages.pdf100%
New File 318669 13 - CEL-FX-OFF-13-008-Document clip.pdf
100%
New File 1.7 m 130 - CEL-CHC-L-13-0321 Re Defects
Notification Period Bond.pdf100%
New File 1.6 m 131 - CEL-CHC-L-13-0322 Re Defects
Notification Period Bond.pdf100%
New File 921798 132 - CEL-CHC-L-13-0326 Re CEL-FX-OFF-13-
076 Grounding resistance retest activity of CEL 230KV switchyard.pdf100%
New File 727020 133 - CEL-FX-OFF-13-077-Regarding the
grounding resistance retest activity of CEL 230KV switchyard.pdf100%
New File 512665 134 - CEL-CHC-L-13-0328 Re Grounding
Resistance Retest Activity of C E L 230kV Switchyard.pdf100%
New File 1.0 m 135 - CEL-CHC-L-13-0330 Re Confirmation
of the Result of Unit 1 Steam Blowing.pdf100%
New File 1.8 m 136 - CEL-CHC-L-13-0331 Re Electrical
Equipment Function Test at CEL 230kV Switchyard.pdf100%
New File 489810 137 - CEL-CHC-L-13-0337 Request for
Limestone supply.pdf100%
New File 628690 138 - CEL-FX-OFF-13-0078-Unit 1 turbine
running by steam successfully.pdf100%
New File 4.2 m 14 - CEL-FX-OFF-13-007-Notification of
jetty light buoy protection.pdf100%
New File 630823 140 - CEL-FX-OFF-13-079-Re request for
limestone supply.pdf100%
New File 252666 141 - CEL-FX-OFF-13-081 Milestone Payment
Application Onshore May 2 013.pdf100%
New File 1.3 m 142 - CEL-FX-OFF-13-082-Delay Liquidated
Damages of Unit 1.pdf100%
New File 1024233 143 - CEL-FX-OFF-13-083-Regarding to the
issues of unit 1 reliability test.pdf100%
New File 1.9 m 144 - CEL-CHC-L-13-0359 Delay Liquidated
Damages.pdf100%
New File 1.0 m 145 - CEL-CHC-L-13-0360 CE-FX-OFF-13-083-
Regarding to the issues of Unit 1 Reliability TestCEL.pdf100%
New File 1.9 m 146 - CEL-FX-OFF-13-084-Regarding to the
issues of laptop handover .pdf100%
New File 1.8 m 147 - CEL-FX-OFF-13-085-Public safety
issue at CW pipe outfall.pdf100%
New File 1.2 m 148 - CEL-FX-OFF-13-086-Notification-
Commencement of the reliability test of Unit 1.pdf100%
New File 838787 149 - CEL-CHC-L-13-0368 Engineering Tools
- Laptop.pdf100%
New File 621473 15 - CEL-CHC-L-13-0062 Tools for
commissioning of Jetty and Coal unloading system.pdf100%
New File 1.6 m 150 - CEL-CHC-L-13-0369 Subject
Notification - Commencement of the Reliability Test of Unit 1.pdf100%
New File 1.2 m 151 - CEL-FX-OFF-13-087-Regarding to the
commencement of reliabiliaty test of Unit 1.pdf100%
New File 632784 152 - CEL-FX-OFF-13-088-Regarding to the
confirmation of third batch coal delivery.pdf100%
New File 717171 153 - CEL-FX-OFF-13-089-Request to cancel
the hydraulic test requirement of unit 2 main steam pipe.pdf100%
New File 2.9 m 154 - CEL-CHC-L-13-0385-Letter to CHEC
regarding Design List Debit-Credit List and Gen NCR List Phase 1 (14 June
2013).1.pdf100%
New File 9.3 m 155 - CEL-CHC-L-13-0386-Letter to CHEC
regarding Spare Parts (16 June 2013).pdf100%
New File 347313 156 - CEL-CHC-L-13-0390 Milestone Payment
Onshore May.pdf100%
New File 288005 157 - CEL-CHC-L-13-0404 Road For CEL
230kV Switchyard.pdf100%
New File 342306 158 - CEL-CHC-L-13-0405 Boiler Tube Leak
Repair.pdf100%
New File 986005 159 - CEL-CHC-L-13-0406 Subject
Reliability Test of Unit 1.pdf100%
New File 862165 16 - CEL-CHC-L-13-0064 Mechanical
Electrical C&I Workshop and Chemical Laboratory Facilities.pdf100%
New File 569376 160 - CEL-FX-OFF-13-090-Regarding to the
tube leakage repair of unit 1 boiler economizer.pdf100%
New File 1.4 m 161 - CEL-CHC-L-13-0411 Subject CEL-FX-
OFF-13-089-Request to Cancel the Hydraulic Test Requirement of Unit 2 Main Steam
Pipe.pdf100%
New File 1.4 m 162 - CEL-CHC-L-13-0416 CEL-FX-OFF-13-
091-Reliability test of the session 2 for unit 1.pdf100%
New File 581214 163 - CEL-FX-OFF-13-091-Reliability test
of the session 2 for unit 1.pdf100%
New File 2.2 m 164 - CEL-FX-OFF-13-092-Regarding to the
way of rectification of unit 1 economizer leakage.pdf100%
New File 1.9 m 165 - CEL-FX-OFF-13-093-Application for
the extention of master list balance.pdf100%
New File 5.3 m 166 - CEL-FX-OFF-13-094-Application for
the extention of re-export of master list.pdf100%
New File 334171 167 - CEL-CHC-L-13-0420 Proposed letter
to CHEC on DCS Workstations 20130622.pdf100%
New File 851989 168 - CEL-CHC-L-13-0426.pdf100%
New File 417647 169 - CEL-CHC-L-13-0426UAT Energy meters
to be used as Net Energy Meters.pdf100%
New File 897655 17 - CEL-CHC-L-13-0065 COAL SAMPLING
ANALYSIS REPORT.pdf100%
New File 608183 170 - CEL-FX-OFF-13-095-Schedule of Unit
1 performance test.pdf100%
New File 694113 171 -EL-FX-OFF-13-096-Clarification of
the capacity of Jetty coal unloader.pdf100%
New File 1.0 m 172 - CEL-FX-OFF-13-097-RE-Request to
cancel the hydraulic test requirement of unit 2 main steam pipe.pdf100%
New File 570726 173 - CEL-FX-OFF-13-098-RE-Road of CEL
230kv switchyard.pdf100%
New File 498688 174 - CEL-CHC-L-13-0430 CEL-FX-OFF-13-
097-RE-Request to cancel the hydraulic test requirement of unit 2 main steam
pipe.pdf100%
New File 962020 175 - CEL-CHC-L-13-0430.pdf100%
New File 1.0 m 176 - CEL-CHC-L-13-0442.pdf100%
New File 737867 177 - CEL-FX-OFF-13-099-Regarding to the
issue of limestone filling to silo.pdf100%
New File 747865 178 - CEL-FX-OFF-13-100-apply for back
feeding of No.2 MT.pdf100%
New File 529722 179 - CEL-CHC-L-13-0447.pdf100%
New File 373280 18 - CEL-CHC-L-13-0086 Milestone Payment
Application Offshore December 2012 rcvd.pdf100%
New File 612709 180 - CEL-CHC-L-13-0448.pdf100%
New File 621170 181 - CEL-CHC-L-13-0449.pdf100%
New File 6.5 m 182 - CEL-CHC-L-13-0450.pdf100%
New File 1.1 m 183 - CEL-CHC-L-13-0452.pdf100%
New File 1.3 m 184 - CEL-FX-OFF-13-101-Regarding to the
issue to bituminize the concrete road in CEL 230kv switchyard.pdf100%
New File 3.9 m 185 - 0202013-20130723.pdf100%
New File 991642 186 - CEL-CHC-L-13-0469 On-Defects
Notification Period Bond.pdf100%
New File 991647 187 - CEL-CHC-L-13-0470 OFF-Defects
Notification Period Bond - Copy.pdf100%
New File 450400 188 - CEL-CHC-L-13-0472 Subject
Clarification of the Capacity of Jetty Coal Unloader.pdf100%
New File 1040721 189 - CEL-CHC-L-13-0473 -Delay Liquidated
Damages.pdf100%
New File 761549 19 - CEL-CHC-L-13-0086 Milestone Payment
Application Offshore December 2012.pdf100%
New File 4.4 m 190 - 0212013.pdf100%
New File 686179 191 - CEL-CHC-L-13-0492 Re Reliability
Test Run of Unit 1.pdf100%
New File 723200 192 - CEL-CHC-L-13-0495 Regarding to
Unit-2 Turbine Emergency Trip Valve.pdf100%
New File 338873 193 - CEL-CHC-L-13-0496 Regarding Unit-2
Reliability Run Test.pdf100%
New File 497406 194 - CEL-CHC-L-13-0504 Project Matters
Discussed on 12 August 2013.pdf100%
New File 897821 195 - CEL-CHC-L-13-0506 Plastic Covered
equipments.pdf100%
New File 567649 196 - CEL-CHC-L-13-0500 BC1A and BC1B
Motor Protection.pdf100%
New File 282827 197 - CEL-CHC-L-13-0520 Spare Parts.pdf
100%
New File 1.8 m 198 - CEL-CHC-L-13-0523Re CEL-FX-OFF-13-
115-Regarding to the comment on MS by CEL.pdf100%
New File 1.8 m 199 - CEL-CHC-L-13-0525 CEL-FX-OFF-13-
125-RT and PT plan for Unit 2&1.pdf100%
New File 799154 2 - CEL-FX-OFF-13-
001_Milestone_Payment_Application_Onshore_December_2012.pdf100%
New File 201741 20 - CEL-FX-OFF-13-009-Hydraulic test for
the main steam pipe of Unit 2.pdf100%
New File 1.6 m 200 - CEL-CHC-L-13-0526 CEL-FX-OFF-13-
120-Resubmission of the performance test of unit 1.pdf100%
New File 306269 201 - CEL-CHC-L-13-0527 Regarding to the
witness of interlock test for boiler and turbine.pdf100%
New File 3.3 m 202 - CEL-CHC-L-13-0530 Steam and Water
Analysis Result for Boiler No. 2.pdf100%
New File 437550 203 - CEL-CHC-L-13-0533 Works to be
carried out during both units shutdown - r1.pdf100%
New File 306067 204 - CEL-CHC-L-13-0536 Maintenance
Tools.pdf100%
New File 1.3 m 205 - CEL-FX-OFF-13-132-Amendment
Proposal for Turbine trip by MFT trigger.pdf100%
New File 640315 206 - CEL-CHC-L-13-0538 Re CEL-FX-OFF-13-
133 Steam and Water Analysis Result for Boiler No. 2.pdf100%
New File 640310 207 - CEL-CHC-L-13-0539 Re CEL-FX-OFF-13-
134 Regarding To The Witness of Interlock Test for Boiler and Turbine.pdf100%
New File 424044 208 - CEL-CHC-L-13-0548 Re-CEL-FX-OFF-13-
137-Minutes of the meeting on 15 Aug 2013 Boiler No. 2.pdf100%
New File 421419 209 - CEL-CHC-L-13-0553 Subject Coal
unloading No.2 Crane and belt conveyor defects..pdf100%
New File 122416 21 - CEL-FX-OFF-13-010-Issues regarding
the late approval for the tax exemption master list extension.pdf100%
New File 298578 210 - CEL-CHC-L-13-0557 CEL-FX-OFF-13-132
Amendment Proposal for Turbine Trip by MFT trigger.pdf100%
New File 409258 211 - CEL-CHC-L-13-0564 List of Power
Plant System (Walkdown completed as 24-Aug-13).pdf100%
New File 977470 212 - CEL-CHC-L-13-0565 Method Statements
Approved For Construction.pdf100%
New File 248893 213 - CEL-CHC-L-13-0571 Subject Schedule
for Conducting Performance Tests of Unit 1.pdf100%
New File 271219 214 - CEL-CHC-L-13-0580 Configuration of
kWh Meters.pdf100%
New File 282837 215 - CEL-CHC-L-13-0586 Limestone Filling
to Silo.pdf100%
New File 257044 216 - CEL-CHC-L-13-0590 Additional Cost
for Limestone Handling and Filling.pdf100%
New File 252941 217 - CEL-CHC-L-13-0591 Re CEL-FX-OFF-
13-152-Regarding the operation arrangement of Unit 1&2.pdf100%
New File 499042 218 - CEL-CHC-L-13-0601 Delay Liquidated
Damages.pdf100%
New File 123652 22 - CEL-FX-OFF-13-011-Issue of the
observation windows of central control room..pdf100%
New File 2.8 m 220 - CEL-CHC-L-13-0602 Method Statements
.pdf100%
New File 630804 221 - CEL-CHC-L-13-0603 Regarding the
Coalyard low illumination.pdf100%
New File 726418 222 - CEL-CHC-L-13-0604 Regarding the
Coal unloading crane Defects.pdf100%
New File 311273 223 - CEL-CHC-L-13-0605 During Limestone
Filling (2).pdf100%
New File 521125 224 - CEL-CHC-L-13-0606 Spare Parts.pdf
100%
New File 480027 225 - CEL-CHC-L-13-0607 Ash Truck
Defects 13092013.pdf100%
New File 310119 226 - CEL-CHC-L-13-0608 Regarding the
supply of tools.pdf100%
New File 1.1 m 227 - CEL-CHC-L-13-0609 Regarding the
operation and inspection of equipment in the Laboratory.pdf100%
New File 1.0 m 228 - CEL-CHC-L-13-0610 Approval of
Master List Extension for 2013.1.pdf100%
New File 988910 229 - CEL-CHC-L-13-0613 Load rejection
test method statement.pdf100%
New File 283849 23 - CEL-CHC-L-13-0087 Regarding to the
Settings for Transmission Line&Bus Bar Protection.pdf100%
New File 499096 230 - CEL-CHC-L-13-0612 Window water
seepage at admin building.pdf100%
New File 696871 231 - CEL-CHC-L-13-0617 CEL Plant
Lighting system Illumination testing.pdf100%
New File 309952 232 - CEL-CHC-L-13-0625 MIlestone Payment
Application Onshore August 2013 (CEL-FX-OFF-13-156).pdf100%
New File 957627 233 - CEL-CHC-L-13-0630 CEL Subject
Schedule for performance test of Unit 1 & Unit 2.pdf100%
New File 706216 234 - CEL-CHC-L-13-0631 UNIT 1 MANUAL
TRIP TEST OF THE TURBINE(NO LOAD TEST).pdf100%
New File 3.6 m 235 - CEL-CHC-L-13-0632 Test records for
Unit 2 Net Sent Out Power and Net Heat Rate.pdf100%
New File 764022 236 - CEL-CHC-L-13-0633 Turbine digital
electro-hydraulic control system (DEH) test report.pdf100%
New File 2.8 m 237 - CEL-CHC-L-13-0634 Unit 2
commissioning test reports.pdf100%
New File 2.8 m 238 - CEL-CHC-L-13-0635 Unit 1
commissioning test reports.pdf100%
New File 401857 239 - CEL-CHC-L-13-0646 Unit 1&2 Net Heat
Rate And Net Sent Out Power Test Results.pdf100%
New File 310199 24 - CEL-CHC-L-13-0095 Regarding Damaged
230kv Current Transformers-2 Units.pdf100%
New File 401848 240 - CEL-CHEC-L-13-0699 RE CEL-FX-OFF-
13-169-For the witness for the interlock test of firefighting pumps - Copy.pdf100%

New File 755063 241 - CEL-CHC-L-13-0708 Expiration of


Onshore Advance Payment Bond and Performance Bond.pdf100%
New File 789254 242 - CEL-CHEC-L-13-0709 Capacity and
Performance testing of the Water Treatment System.pdf100%
New File 789249 243 - CEL-CHEC-L-13-0710 CEL-FX-OFF-13-
170-RE For the witness for the interlock test of fire-fighting pumps (CEL letter
CEL-CHC-L-13-0699_)CEL letter CEL-CHC-L-13-0699) .pdf100%
New File 1.7 m 244 - CEL-CHC-L-13-0722-Draft Addendum to
EPC Contract.pdf100%
New File 4.8 m 245 - 058B2013.pdf100%
New File 121648 25 - CEL-FX-OFF-13-012-Re Regarding the
damaged 230kv Current Transformers-2 Units.pdf100%
New File 932954 26 - CEL-FX-OFF-13-013 Milestone Payment
Application Onshore Janua ry 2013.pdf100%
New File 352984 27 - CEL-CHC-L-13-0129 Detailed Design
Review.pdf100%
New File 846398 28 - CEL-CHC-L-13-0132 Variation Order
No.1 Offshore.pdf100%
New File 841266 29 - CEL-CHC-L-13-0133 Variation Order
No.1 Onshore.pdf100%
New File 582171 3 - CEL-CHC-L-13-0003 (i) Confirmation of
Commissioning Coal Delivery Dates for February (ii) Confirmation of Commissioning
Coal Delivery for January .pdf100%
New File 549451 30 - CEL-CHC-L-13-0141 THE
SERVICED,REWOUND CONVEYOR MOTORS OF BC1A & BC1B.pdf100%
New File 273908 31 - CEL-CHC-L-13-0144 LOCAL CONTROL
PANEL IN DEMINERALISED WATER TREATMENT PLANT.pdf100%
New File 828703 32 - CEL-FX-OFF-13-014 Milestone Payment
Application Offshore Janu ary 2013.pdf100%
New File 567388 33 - CEL-FX-OFF-13-015-Regarding to the
issue of local control panel in demi water treatment plant CEL.pdf100%
New File 495682 34 - CEL-CHC-L-13-0157 INAUGURATION OF
UNIT 1 BY P.M. OF CAMBODIA to chec v.p..pdf100%
New File 612586 35 - CEL-CHC-L-13-0163.pdf100%
New File 620742 36 - CEL-CHC-L-13-0165.pdf100%
New File 789628 37 - CEL-FX-OFF-13-016-Regarding the
collision incident between the second delivery coal barge and the dolphin.pdf100%
New File 203189 38 - CEL-FX-OFF-13-017 Milestone Payment
Application Onshore Febru ary 2013.pdf100%
New File 861264 39 - CEL-CHC-L-13-0174 Site Progress & QA
Problems.pdf100%
New File 203842 4 - CEL-FX-OFF-13-003-Regarding to the
existing 22kv power supply for pre-commissioning issue.pdf100%
New File 121576 40 - CEL-FX-OFF-13-018-Coordinate to
solve the permission to work in Steng Hav substation.pdf100%
New File 1.0 m 41 - CEL-CHC-L-13-0181 Safety Precaution
of the Two Line Bays at EdC 230 kV Steung Hav Substation.pdf100%
New File 183109 42 - CEL-FX-OFF-13-019-Regarding the
permission to work in Steng Hav substationsubstation.pdf100%
New File 206486 43 - CEL-FX-OFF-13-020-Decision for 230kV
control cable channel in Steng Hav substation.pdf100%
New File 118835 44 - CEL-FX-OFF-13-021-Final edition for
location of panel at central control room in Steng Hav substation.pdf100%
New File 276728 45 - CEL-CHC-L-13-0191 RECEIVED.pdf100%
New File 121685 46 - CEL-FX-OFF-13-022-Re-Regarding the
permission to work in Steng Hav substationsubstation.pdf100%
New File 121318 47 - CEL-FX-OFF-13-023-Regarding the
request of O&M team to be 24h on duty.pdf100%
New File 121579 48 - CEL-FX-OFF-13-024-Re, Re-Regarding
the permission to work in Steng Hav substationsubstation.pdf100%
New File 848787 49 - CEL-FX-OFF-13-025-submission for
control cable list of Steng Hav substation.pdf100%
New File 279078 5 - CEL-FX-OFF-13-004 Regarding to the
pipes without hydraulic test.pdf100%
New File 181059 50 - CEL-FX-OFF-13-026-recalibration for
billing energy meter.pdf100%
New File 193231 51 - CEL-FX-OFF-13-027-Recommend location
for AC DC panel at Steng Hav substation.pdf100%
New File 179890 52 - CEL-FX-OFF-13-028-Request for
Temporary power at Steng Hav substation.pdf100%
New File 575935 53 - CEL-CHC-L-13-0196.pdf100%
New File 119349 54 - CEL-FX-OFF-13-029-Coordinate to free
the west area for the permanent fence of 230KV switchyard.pdf100%
New File 116864 55 - CEL-FX-OFF-13-030-Diesel oil
supplying for fuel oil tank.pdf100%
New File 119259 56 - CEL-FX-OFF-13-031-Diesel oil
supplying for fuel oil tank is not enough.pdf100%
New File 717979 57 - CEL-FX-OFF-13-032 Milestone Payment
Application Onshore March 2013.pdf100%
New File 717979 58 - CEL-FX-OFF-13-032 Milestone Payment
Application Onshore March 2013.pdf100%
New File 420237 59 - CEL-CHC-L-13-0224.pdf100%
New File 204209 6 - CEL-FX-OFF-13-005-Re Confirmation of
commissioning coal deliveries for Jan&Feb.pdf100%
New File 513402 60 - CEL-CHC-L-13-0226 Lab Equipment
Defects and Other Lab Equipment Needed for a Fully Functional Laboratory.pdf100%
New File 156387 61 - CEL-FX-OFF-13-033-Regarding the oil
firing for boiler acid cleaning.pdf100%
New File 925647 62 - CEL-FX-OFF-13-034-Request for the
O&M operators increase.pdf100%
New File 344152 63 - CEL-CHC-L-13-0227 CEL Energy Billing
Meters accuracy class verification.pdf100%
New File 1.8 m 64 - CEL-CHC-L-13-0228.pdf100%
New File 696776 65 - CEL-CHC-L-13-0231.pdf100%
New File 559330 66 - CEL-CHC-L-13-0234.pdf100%
New File 308763 67 - CEL-CHC-L-13-0235 Offshore Defect
Notification Period Bond.pdf100%
New File 229588 68 - CEL-CHC-L-13-0235 received.pdf100%
New File 441570 69 - CEL-FX-OFF-13-035-apply for shut off
power of busbar at DEC substation.pdf100%
New File 207112 7 - CEL-FX-OFF-13-006-Diesel oil supply
plan for BSDG.pdf100%
New File 332861 70 - CEL-CHC-L-13-0236 Regarding to the
Expiry of the Onshore and Offshore Performance Bonds.pdf100%
New File 436563 71 - CEL-CHC-L-13-0240 Request for CEL
coordination with EDC for shutdown of EDC 230KV busbar.pdf100%
New File 1.0 m 72 - CEL-CHC-L-13-0247.pdf100%
New File 814222 73 - CEL-FX-OFF-13-037
Deduction_for_Advance_Payment_Bond.pdf100%
New File 516653 74 - CEL-CHC-L-13-0248 Detailed Design
Status.pdf100%
New File 1.4 m 75 - CEL-CHC-L-13-0252 CEL-CHC-L-13-0252
Back Energization independent Engineer Certification Compliance Statement100%
New File 116103 76 - CEL-CHC-L-13-0253 CEL-FX-OFF-13-036-
Reply on comments for MS of individual test(Equipments at CEL Switchyard)100%
New File 125505 77 - CEL-CHC-L-13-0255 CEL-FX-OFF-13-037
Deduction_for_Advance_Payment_Bond100%
New File 580482 78 - CEL-CHC-L-13-0258 LETTER TO CHEC -
COMMUNICATION SYSTEMS INSTALLATION.pdf100%
New File 43212 79 - CEL-CHC-L-13-0261 Deduction for
Advance Payment Bond.pdf100%
New File 348302 8 - CEL-CHC-L-13-0020 Offshore Milestone
Application for black start diesel generator.pdf100%
New File 494672 80 - CEL-FX-OFF-13-038-Schedule for
practical implementation of back energization.pdf100%
New File 431334 82 - CEL-FX-OFF-13-059-The request for
the fuel oil.pdf100%
New File 663947 83 - CEL-FX-OFF-13-039-Reply on comments
for MS of individual test of 10.5kV CT(CEL Switchyard).pdf100%
New File 571263 84 - CEL-FX-OFF-13-040-Reply on comments
for MS of individual test of 10.5kV LA(CEL Switchyard).pdf100%
New File 656114 85 - CEL-FX-OFF-13-041-Reply on comments
for MS of individual test of 10.5kV PT(CEL Switchyard).pdf100%
New File 1.2 m 86 - CEL-FX-OFF-13-042-Reply on comments
for MS of individual test of 10.5kV-6.3kV APT(CEL Switchyard).pdf100%
New File 709016 87 - CEL-FX-OFF-13-043-Reply on comments
for MS of individual test of 230kV CB(CEL Switchyard).pdf100%
New File 741502 88 - CEL-FX-OFF-13-044-Reply on comments
for MS of individual test of 230kV CT(CEL Switchyard).pdf100%
New File 763545 89 - CEL-FX-OFF-13-045-Reply on comments
for MS of individual test of 230kV CVT(CEL Switchyard).pdf100%
New File 332687 9 - CEL-CHC-L-13-0034 Milestone Payment
Application Onshore December 2012 (CEL-FX-OFF-13-001).pdf100%
New File 592224 90 - CEL-FX-OFF-13-046-Reply on comments
for MS of individual test of 230kV DS(CEL Switchyard).pdf100%
New File 584760 91 - CEL-FX-OFF-13-047-Reply on comments
for MS of individual test of 230kV LA(CEL Switchyard).pdf100%
New File 1.2 m 92 - CEL-FX-OFF-13-048-Reply on comments
for MS of individual test of 230kV-10.5kV MT(CEL Switchyard).pdf100%
New File 731877 93 - CEL-FX-OFF-13-049-Reply on comments
for MS of back energization(CEL Switchyard).pdf100%
New File 544668 94 - CEL-FX-OFF-13-050-Reply on comments
for MS of individual test of busbar protection(CEL Switchyard).pdf100%
New File 1.1 m 95 - CEL-FX-OFF-13-051-Reply on comments
for MS of individual test of DC(CEL Switchyard).pdf100%
New File 664650 96 - CEL-FX-OFF-13-052-Reply on comments
for MS of individual test of Power Cable(CEL Switchyard).pdf100%
New File 363941 97 - CEL-FX-OFF-13-053-Reply on comments
for MS of individual test of Insulator(CEL Switchyard).pdf100%
New File 519612 98 - CEL-FX-OFF-13-054-Reply on comments
for MS of individual test of inter-lock(CEL Switchyard).pdf100%
New File 207476 99 - CEL-FX-OFF-13-055-Reply on comments
for MS of individual test of inter-trip(CEL Switchyard).pdf100%
New File 894069 DOCUMENT CORRUPTED - DO NOT PRINT - 139 -
CEL-CHC-L-13-0341 Achieved milestone in May 2013-DB Comments100%
New Dir 2 C:\AdvisianActive\01 Projects\100037 - DLA Piper -
Cambodia Power Plant Arbitration - Expert Evidence\1. From Client\Volume
2\Correspondence Bundle in Chronological Order\Tab 4 - 2013\126 - CEL-FX-OFF-13-
072-Electricity consumption after back energization finished\
New File 111560 CEL-FX-OFF-13-072-Electricity consumption
after back energization finished.docx100%
New File 17568 Maximum requested capacity from EDC.docx
100%
New Dir 3 C:\AdvisianActive\01 Projects\100037 - DLA Piper -
Cambodia Power Plant Arbitration - Expert Evidence\1. From Client\Volume
2\Correspondence Bundle in Chronological Order\Tab 4 - 2013\154.2 - DOC attach with
CEL-CHC-L-13-0385\
New File 1.3 m Copy of Exhibit A_rev1.pdf100%
New File 1000824 Copy of Exhibit B.pdf100%
New File 853354 Copy of Exhibit C.pdf100%
New Dir 2 C:\AdvisianActive\01 Projects\100037 - DLA Piper -
Cambodia Power Plant Arbitration - Expert Evidence\1. From Client\Volume
2\Correspondence Bundle in Chronological Order\Tab 4 - 2013\157.2 - DOC attach with
CEL-CHC-L-13-0404\
New File 588068 F428S-Z010702-02_1 Section of Road for
Switch Yard PE.pdf100%
New File 50176 Re Road for CEL switchyard.msg100%
New Dir 19 C:\AdvisianActive\01 Projects\100037 - DLA Piper -
Cambodia Power Plant Arbitration - Expert Evidence\1. From Client\Volume
2\Correspondence Bundle in Chronological Order\Tab 4 - 2013\81 - CEL-FX-OFF-13-036-
Reply on comments for MS of individual test(Equipments at CEL Switchyard)\
New File 11598 Attachment A comments reply for Cable.pdf
100%
New File 11052 Attachment B comments reply for 10.5kV
CT.pdf100%
New File 11089 Attachment C comments reply for 10.5kV
PT.pdf100%
New File 65495 Attachment D comments reply for
10.5kV_6.3kV APT.pdf100%
New File 65384 Attachment E comments reply for
230kV_10.5kV MT.pdf100%
New File 6437 Attachment F comments reply for 230kV
LA.pdf100%
New File 11952 Attachment G comments reply for 230kV
DS.pdf100%
New File 14915 Attachment H comments reply for DC.pdf
100%
New File 6437 Attachment I comments reply for 10.5kV
LA.pdf100%
New File 6717 Attachment J comments reply for
insulator.pdf100%
New File 16527 Attachment K comments reply for IPB.pdf
100%
New File 11236 Attachment L comments reply for 230kV
CVT.pdf100%
New File 11719 Attachment M comments reply for 230kV
CT.pdf100%
New File 16187 Attachment N comments reply for steam
turbine generator.pdf100%
New File 7775 Attachment O comments reply for busbar
protection.pdf100%
New File 6489 Attachment P comments reply for
interlock.pdf100%
New File 8207 Attachment Q comments reply for inter-
trip.pdf100%
New File 11403 Attachment R comments reply for line
protection.pdf100%
New File 11995 Attachment S comments reply for 230kV
CB.pdf100%
New Dir 206 C:\AdvisianActive\01 Projects\100037 - DLA Piper -
Cambodia Power Plant Arbitration - Expert Evidence\1. From Client\Volume
2\Correspondence Bundle in Chronological Order\Tab 5 - 2014\
New File 450301 1 - CEL-CHEC-L-13-0791 Discussion and
Identification of Items in the General NCR List,Testing and Commissioning NCR List,
Walkdown List and Punch List.pdf100%
New File 304361 10 - CEL-CHC-L-14-0106-Mile stone payment
application onshore January 2014.pdf100%
New File 1.3 m 100 - CEL-FX-OFF-14-041 CHEC Reply of
Turbine Differential Expansion.pdf100%
New File 561984 101 - CEL-CHEC-L-14-0369 CEL workshop
machinery.pdf100%
New File 562808 102 - CEL-FX-OFF-14-042 Reply of
rectification of defects.pdf100%
New File 4.4 m 103 - WD-23 CEL-CHC-L-14-0387 Warranty
Defect ( Unit-1 Once Through Cooling Water Piping Supply Leakage).pdf100%
New File 1.3 m 104 - CEL-CHC-L-14-0394 WARRANTY DEFECT
(WD-024 Water Seepage from Concrete Roof of Admin Bldg).pdf100%
New File 367942 105 - CEL-CHC-L-14-0395 WARRANTY DEFECT
(WD-025 PAINT PEELED OFF FROM JETTY FIRE WATER PIPING).pdf100%
New File 1.8 m 106 - CEL-CHC-L-14-0397 WARRANTY DEFECT
(WD-026 POWER PLANT REVETMENT COLLAPSED).pdf100%
New File 281708 107 - CEL-CHC-L-14-0396 Unit 2 Turbine
Excessive Overspeed on 2 Aug 2014.pdf100%
New File 541987 108 - CEL-FX-OFF-14-043 Reply warranty
defect (WD-019 Malfuntion of No.2 BSDG).pdf100%
New File 636301 109 - CEL-FX-OFF-14-044 Reply to the
common maintenance tools.pdf100%
New File 940147 11 - CEL-FX-OFF-14-008- Reminding for
Rotary machines maintenance.pdf100%
New File 652899 110 - CEL-FX-OFF-14-045 Application for
customs duty exemption of master list for spare parts.pdf100%
New File 490661 111 - CEL-FX-OFF-14-046 Main valve
dismantle and metal chip analysis test.pdf100%
New File 999913 112 - WD-22 CEL-CHC-L-14-0409????
WARRANTY DEFECT ( Pipe Clamp on the Electrical Conduit @ Chimney).pdf100%
New File 318498 113 - WD-22 CEL-CHC-L-14-0410????1
WARRANTY DEFECT ( Pipe Clamp on the Electrical Conduit @ Chimney).pdf100%
New File 541496 114 - CEL-FX-OFF-14-047 Reply to
Bulldozer Garage Hoist Crane.pdf100%
New File 1.0 m 115 - CEL-FX-OFF-14-048 Reply to water
seepage from concrete roof at admin building, BSDG and main building.pdf100%
New File 1.0 m 116 - CEL-FX-OFF-14-049 Reply civil work
plan to Water Seepage from Concrete Roof at Admin Building, BSDG, Cable Trenches
and Main Building .pdf100%
New File 748053 117 - CEL-FX-OFF-14-050 BSDG spare parts
and special tools.pdf100%
New File 1.0 m 118 - CEL-FX-OFF-14-051 Reply to Plant
Electrical Protection Setting Coordination-discrimination Study.pdf100%
New File 7.9 m 119 - WD-031 CEL-CHC-L-14-0442 Equipment
and Piping at Once through Cooling Water Intake.pdf100%
New File 3.7 m 12 - CEL-FX-OFF-14-009 Reminding of
maintenance of the sling of coal unloader bucket.pdf100%
New File 2.5 m 120 - WD-032 CEL-CHC-L-14-0443 WARRANTY
DEFECT ( Unit-2 CEMS) CEMS ??????.pdf100%
New File 3.1 m 121 - WD-033 CEL-CHC-L-14-0444 Guard
House CCTV Hard Disc HHD-05.pdf100%
New File 5.8 m 122 - WD-034 CEL-CHC-L-14-0445
Demineralized Water Tank.pdf100%
New File 4.5 m 123 - WD-035 CEL-CHC-L-14-0447 WD-035
Jetty Cable Tray.pdf100%
New File 4.3 m 124 - WD-036 CEL-CHC-L-14-0448 WD-036
Outdoor Cable Tray Cover.pdf100%
New File 1.2 m 125 - CEL-CHC-L-14-0455 WARRANTY DEFECT
(WD-38 Rubber Expansion Joint of Jetty Fire Fighting Piping).pdf100%
New File 724181 126 - CEL-CHC-L-14-0457 Extension of
Defects Notification Period Bonds-Onshore.pdf100%
New File 724195 127 - CEL-CHC-L-14-0458 Extension of
Defects Notification Period Bonds-Offshore.pdf100%
New File 1.1 m 128 - CEL-FX-OFF-14-052 Re Extension of
Defects Notification Period Bonds.pdf100%
New File 1.9 m 129 - CEL-FX-OFF-14-053-Replay for
warranty defects (WD-006 once through cooling water pump & etc.).pdf100%
New File 1.4 m 13 - CEL-CHC-L-14-0082 Raw water pond
leak from bottom of slab.pdf100%
New File 1026714 130 - CEL-CHC-L-14-0461 WARRANTY DEFECT
(WD-39 Induced Draft Fan Lighting Support).pdf100%
New File 1.4 m 131 - CEL-CHC-L-14-0462 WARRANTY DEFECT
(WD-40 Unit-1&2 Fire Fighting Piping at Main Transformer and Unit Auxiliary
Transformer).pdf100%
New File 1.1 m 132 - CEL-CHC-L-14-0463 WARRANTY DEFECT
(WD-41 CO2 Fire Fighting System).pdf100%
New File 415127 133 - CEL-CHC-L-14-0460 Extension of
Defects Notification Period Bonds.pdf100%
New File 1.8 m 134 - WD-042 CEL-CHC-L-14-0467 WARRANTY
DEFECT__ (WD-42 Chemical Storage and Unloading System at Water Treatment
Plant.).pdf100%
New File 3.6 m 135 - WD-43 CEL-CHC-L-14-0468 WARRANTY
DEFECT__ ( Cable Tray at Belt Conveyor #3).pdf100%
New File 1.3 m 136 - WD-044 CEL-CHC-L-14-0469 WARRANTY
DEFECT (WD-44 Water Treatment Plant)??????????????.pdf100%
New File 1.2 m 137 - WD-045 CEL-CHC-L-14-0470 WARRANTY
DEFECT__ (WD-45 Unit-2 Siphon Well of Once Through Cooling Water Return Pipe).pdf
100%
New File 1.0 m 138 - WD-046 CEL-CHC-L-14-0471 WARRANTY
DEFECT__ (WD-46 Unit-2 Turbine Bearing #2 Vibration Sensors).pdf100%
New File 1.5 m 139 - WD-006 CEL-CHC-L-14-0474 CHECs
Reply to Warranty Defect (WD-006 Once Through Cooling Water Pump & Etc.).pdf100%
New File 6.2 m 14 - CEL-FX-OFF-14-010 Balance payment of
the milestones of the project.pdf100%
New File 600805 140 - WD-047 CEL-CHC-L-14-0473 WARRANTY
DEFECT (WD-47 POWER PLANT CCTV).pdf100%
New File 918918 141 - WD-049 CEL-CHC-L-14-0480 WARRANTY
DEFECT__ (WD-49 Air Conditioning System in Admin Bldg.).pdf100%
New File 990355 142 - WD-050 CEL-CHC-L-14-0481 WARRANTY
DEFECT (WD-50 Fly Ash Silo no.2).pdf100%
New File 318624 143 - WD-032 CEL-CHC-L-14-0482 WARRANTY
DEFECT (Unit-2 CEMS).pdf100%
New File 315611 144 - WD-033 CEL-CHC-L-14-0483 WARRANTY
DEFECT__ ( Guard House CCTV Hard Disc HHD-05).pdf100%
New File 3.2 m 145 - WD-051 CHC-CEL-L-14-0498 WARRANTY
DEFECT__ (WD-51 Control Loops Change Over from Manual to Auto Mode).pdf100%
New File 1.0 m 146 - WD-052 CHC-CEL-L-14-0499 WARRANTY
DEFECT__ (WD-52 Turbine Main Stop Valve & Governor Control Valve).pdf100%
New File 860598 147 - WD-053 CHC-CEL-L-14-0500 WARRANTY
DEFECT__ (CPU of Gas Chromatograph in Water Treatment Plant.pdf100%
New File 1.9 m 148 - WD-054 CHC-CEL-L-14-0501 WARRANTY
DEFECT (WD-054 CCR Energy Meter).pdf100%
New File 845304 149 - WD-055 CHC-CEL-L-14-0502 WARRANTY
DEFECT (WD-055 Unit-2 Secondary Air Fan #2 - 6KV Motor Feeder).pdf100%
New File 4.2 m 15 - CEL-FX-OFF-14-011 Request for
certificates issuing.pdf100%
New File 1.7 m 150 - WD-056 CHC-CEL-L-14-0503 WARRANTY
DEFECT__ (WD-056 Transformer yard & Switchyard).pdf100%
New File 2.1 m 151 - CEL-CHC-L-14-0506 ???????Unit-1&2__
Pressure Reducer & Attemperator to Deaerator.pdf100%
New File 2.2 m 152 - WD-057 CEL-CHC-L-14-0505 ?????? ??
WARRANTY DEFECT (WD-057 Equipment_s Paint Defect).pdf100%
New File 1.3 m 153 - WD-058 CEL-CHC-L-14-0508 WARRANTY
DEFECT (WD-058 2UNIT-2 STEAM TURBINE NOZZLE).pdf100%
New File 1.3 m 154 - WD-059 CEL-CHC-L-14-0509 WARRANTY
DEFECT (WD-059 MAIN BUILDING ROOF VENTILATOR).pdf100%
New File 1.3 m 155 - WD-059 CEL-CHC-L-14-0509 WARRANTY
DEFECT__ (WD-059 MAIN BUILDING ROOF VENTILATOR).pdf100%
New File 1.0 m 156 - WD-060 CEL-CHC-L-14-0510 WARRANTY
DEFECT__ (WD-060 DIESEL OIL TANK LEVEL SENSOR & TRANSMITTER).pdf100%
New File 1.2 m 157 - WD-062 CEL-CHC-L-14-0512 WARRANTY
DEFECT (WD-062 Unit-1 Turbine Gland Sealing System).pdf100%
New File 1.1 m 158 - WD-063 CEL-CHC-L-14-0513 WARRANTY
DEFECT (WD-063 Water Treatment Plant - No.1 Acid Unloading Pump).pdf100%
New File 1.2 m 159 - WD-064 CEL-CHC-L-14-0514 WARRANTY
DEFECT (WD-064 Waste Water Treatment Plant - #1 & #2 Service Wastewater Drainage
Pumps).pdf100%
New File 107520 16 - CEL-FX-OFF-14-012- Exposed grounding
bars of the transmission line.doc100%
New File 1037235 160 - WD-061 CEL-CHC-L-14-0511 WARRANTY
DEFECT (WD-061 Unit-2 HP Bypass Valve No.1 Steam Passing).pdf100%
New File 1022318 161 - WD-065 CEL-CHC-L-14-0515 WARRANTY
DEFECT (WD-065 Ash & Coal Handling System).pdf100%
New File 861935 162 - WD-066 CEL-CHC-L-14-0516 WARRANTY
DEFECT (WD-066 Jetty Coal Unloading - BC-1B Motor).pdf100%
New File 759695 163 - WD-067 CEL-CHC-L-14-0517 WARRANTY
DEFECT (WD-067 Unit-1&2 Boiler Hoist Crane).pdf100%
New File 789458 164 - WD-068 CEL-CHC-L-14-0518 WARRANTY
DEFECT (WD-068 Coal Shed Lighting).pdf100%
New File 910264 165 - WD-069 CEL-CHC-L-14-0519 WARRANTY
DEFECT (WD-069 Fire Fighting System at General Water Pump House).pdf100%
New File 703517 166 - WD-070 CEL-CHC-L-14-0520 WARRANTY
DEFECT (WD-070 Workshop MCC).pdf100%
New File 885266 167 - WD-071 CEL-CHC-L-14-0521 WARRANTY
DEFECT (WD-071 Fire Fighting Outdoor Hydrant FW-06).pdf100%
New File 1.0 m 168 - WD-072 CEL-CHC-L-14-0522 WARRANTY
DEFECT (WD-072 Fire Alarm Annunciation).pdf100%
New File 807551 169 - WD-073 CEL-CHC-L-14-0523 WARRANTY
DEFECT (WD-073 Belt Conveyor #5 Coal Sampler).pdf100%
New File 3.5 m 17 - CEL-FX-OFF-14-013-Application for
the USD1 Million for Spare Parts and Special Tools.pdf100%
New File 801623 170 - WD-074 CEL-CHC-L-14-0524 WARRANTY
DEFECT (WD-074 Belt Conveyor #6 CCTV).pdf100%
New File 816516 171 - WD-075 CEL-CHC-L-14-0525 WARRANTY
DEFECT (WD-075 230KV SWITCHYARD).pdf100%
New File 821631 172 - WD-076 CEL-CHC-L-14-0526 WARRANTY
DEFECT (WD-076 UNIT-1 HP Bypass Valve & Feed Water Spray Valve Actuators).pdf100%
New File 834916 173 - WD-077 CEL-CHC-L-14-0527 WARRANTY
DEFECT (WD-077 Drain & Discharge Water Pumps).pdf100%
New File 940221 174 - WD-078 CEL-CHC-L-14-0528 WARRANTY
DEFECT (WD-078 Lighting Distribution Panel) (2).pdf100%
New File 940221 175 - WD-078 CEL-CHC-L-14-0528 WARRANTY
DEFECT (WD-078 Lighting Distribution Panel).pdf100%
New File 880086 176 - WD-079 CEL-CHC-L-14-0529 WARRANTY
DEFECT (WD-079 UNIT-2 Feed Water Spray Valve Actuators).pdf100%
New File 983433 177 - WD-080 CEL-CHC-L-14-0530 WARRANTY
DEFECT (WD-080 UNIT-2 BSDG #1 & #2 Turning Gear).pdf100%
New File 857126 178 - WD-081 CEL-CHC-L-14-0531 WARRANTY
DEFECT (WD-081 Water Treatment Plant Gas Chromatograph key board).pdf100%
New File 785636 179 - WD-082 CEL-CHC-L-14-0532 WARRANTY
DEFECT (WD-082 BSDG Maintenance Box).pdf100%
New File 1001114 18 - CEL-FX-OFF-14-014- Payment of
milestone of unit 2 taking over.pdf100%
New File 787911 180 - WD-083 CEL-CHC-L-14-0533 WARRANTY
DEFECT (WD-083 BSDG #1 & #2 AC & DC Fuel Oil Pump).pdf100%
New File 801329 181 - WD-084 CEL-CHC-L-14-0534 WARRANTY
DEFECT (WD-084 Unit-1 Replenishing Oil Tank Fire Fighting).pdf100%
New File 777947 182 - WD-085 CEL-CHC-L-14-0535 WARRANTY
DEFECT (WD-085 Fire Alarm Control Panel).pdf100%
New File 996837 183 - WD-086 CEL-CHC-L-14-0536 WARRANTY
DEFECT (WD-086 Boiler #1 & #2 Thermocouples).pdf100%
New File 1033334 184 - WD-087 CEL-CHC-L-14-0537 WARRANTY
DEFECT (WD-087 HMI Display in the Shift Supervisor Station).pdf100%
New File 984091 185 - WD-088 CEL-CHC-L-14-0538 WARRANTY
DEFECT (WD-088 Air Conditioning Units in the Electronic Equipment Room #1 & #2).pdf
100%
New File 793607 186 - WD-089 CEL-CHC-L-14-0539 WARRANTY
DEFECT (WD-089 Water & Steam Sampling).pdf100%
New File 836000 187 - WD-090 CEL-CHC-L-14-0540 WARRANTY
DEFECT (WD-090 6KV Switchgear).pdf100%
New File 790333 188 - WD-091 CEL-CHC-L-14-0541 ??3?????
WARRANTY DEFECT (WD-091 Aeration Fan #3 in the Waste Water Treatment plant).pdf100%

New File 1.1 m 189 - WD-092 CEL-CHC-L-14-0542 WARRANTY


DEFECT (WD-092 DCS Graphics of Coal Handling System).pdf100%
New File 1.6 m 19 - CEL-CHEC-L-14-0103-Warranty
deffects.pdf100%
New File 1.0 m 190 - WD-093 CEL-CHC-L-14-
0543 ??? ?? ????WARRANTY DEFECT (WD-093 Unit-1 Feed Water Pump-B).pdf100%
New File 767033 191 - WD-094 CEL-CHC-L-14-0544
11.25 ??? WARRANTY DEFECT (WD-094 Water Treatment Plant No.1 Acid Tank).pdf100%
New File 672913 192 - WD-095 CEL-CHC-L-14-0545 WARRANTY
DEFECT (WD-095 Main Building Roof Drainage Pipe).pdf100%
New File 848554 193 - WD-096 CEL-CHC-L-14-0546 WARRANTY
DEFECT (WD-096 Unit-1&2 LP Heater Drain Pumps).pdf100%
New File 653821 194 - WD-097 CEL-CHC-L-14-0547 WARRANTY
DEFECT (WD-097 Unit-1 Coal Feeder).pdf100%
New File 1.3 m 195 - CEL-FX-OFF-14-055-Differential
Expansion Variation Report For Turbine Shaft Seal Steam Supply System
Improvement.pdf100%
New File 2.8 m 196 - CEL-FX-OFF-14-056-Unit-1 Feed Water
Pump-#2 Motor Malfunction1??2#?????????.pdf100%
New File 756087 197 - CEL-FX-OFF-14-057-Extension of
SihanoukvilleVille Project Bonds Postponed.pdf100%
New File 1024127 198 - CEL-FX-OFF-14-058-SihanoukVille
Project Balance Payment.pdf100%
New File 1.5 m 199 - CEL-FX-OFF-14-059-Reply for #1#2 HP
Bypass Valve Actuators Malfunction Command in DCS.pdf100%
New File 852909 2 - CEL-FX-OFF-14-001-Accelerating the
Procedure of Milestone Payment.pdf100%
New File 372708 20 - CEL-CHEC-L-14-0094-Warranty-
deffects.pdf100%
New File 1.3 m 200 - CEL-FX-OFF-14-060 Reply Extension
of Defects Notification Period Bonds Reply for CEL-CHC-L-14-0564, 0582, 0587.pdf
100%
New File 79741 201 - Summary of Defect List (08-DEC-14)
- BY CHEC.xlsx100%
New File 2.4 m 202 - CEL-FX-OFF-14-061-Reply for CEL-
CHC-L-14-0588 CEL-CHC-L-14-589 and CEL-CHC-L-14-590.pdf100%
New File 2.1 m 203 - CEL-CHC-L-14-595Defects Liability
and Milestone #33.pdf100%
New File 611793 204 - CEL-CHC-L-14-0597 FIRE PROTECTION
SYSTEM.pdf100%
New File 1.4 m 205 - CEL-FX-OFF-14-062-Reply for CEL-
CHC-L-14-0595 Defects Liability and Milestone #33.pdf100%
New File 310204 206 - Statement CHEC(30.DEC.13)4.pdf100%

New File 801799 21 - O&M Manual Review 09apr2014.pdf100%

New File 522020 22 - CEL-CHC-L-14-0105 Taking Over


Certificate - Two Units.pdf100%
New File 576484 23 - CEL-CHEC-L-14-0117-Re.CEL-FX-14-013-
APPLICATIPN FOR THE USD 1 MILLION FOR SPARE PARTS AND SPECIAL TOOLS.pdf100%
New File 2.1 m 24 - CEL-CHC-L-14-0118-Warranty deffect
(WD-008 Raw water pond leakage).pdf100%
New File 676322 25 - CEL-FX-OFF-14-015-Re Warranty
Defects(001-004).pdf100%
New File 1.1 m 26 - CEL-FX-OFF-14-016 Re Warranty
defects (001-004).pdf100%
New File 785981 27 - O&M Manual Review 17apr2014.pdf100%

New File 534077 28 - O&M Manual Review 18apr2014.pdf100%

New File 524943 29 - O&M Manual Review 21apr2014.pdf100%

New File 621250 3 - CEL-FX-OFF-14-002-Discussion and


identification of NCR and Punch List.pdf100%
New File 512823 30 - O&M Manual Review 26apr2014.pdf100%

New File 500469 31 - O&M Manual Review


26apr2014(1)part2.pdf100%
New File 484676 32 - O&M Manual Review 02may2014.pdf100%

New File 1.3 m 33 - WD-009 CEL-CHC-L-14-0160 (WD-


009)Turbine Differential Expansion.pdf100%
New File 425965 34 - CEL-CHC-L-14-0167 Turbine
Differential Expansion.pdf100%
New File 293346 35 - CEL-CHC-L-14-0171 Rectification of
Defects.pdf100%
New File 626333 36 - CEL-CHC-L-14-0180 CEL SCADA signals
to EDC NCC.pdf100%
New File 1.0 m 37 - CEL-CHC-L-14-0186 (WARRANTY DEFECT
(WD-010 #2 ACID STORAGE TANK).pdf100%
New File 1.7 m 38 - CEL-CHC-L-14-0192 WARRANTY DEFECT
(WD-011 No.1 RE-USE WATER PUMP).pdf100%
New File 386954 39 - CEL-CHC-L-14-0188 CEL Plant
Electrical Protection setting coordination-discrimination study.pdf100%
New File 586338 4 - CEL-FX-OFF-14-003-Reply to CEL letter
CEL-CHC-L-14-0011.pdf100%
New File 3.2 m 40 - WD-012 CEL-CHEC-L-14-0198 Warranty
defect ( sewage pipe damaged).pdf100%
New File 2.1 m 41 - CEL-FX-OFF-14-017-Milestone Payment
Application Onshore June 2014.pdf100%
New File 794258 42 - CEL-FX-OFF-14-018 Reply of turbine
expanding difference.pdf100%
New File 231986 43 - CEL-FX-OFF-14-018- Reply of turbine
expanding difference.pdf100%
New File 2.3 m 44 - WD-013 CEL-CHEC-L-14-0206Warranty
defect ( Unit1 Work Oil Pump #2 Oil Leakage)??(20140611)??"#1???????"???.pdf100%
New File 573569 45 - WD-010 CEL-CHC-L-14-0215 Warranty
defect (2# Acid storage tank.pdf100%
New File 633834 46 - CEL-FX-OFF-14-019 Reply the Raw
water pond leakage.pdf100%
New File 341761 47 - CEL-CHC-L-14-0218 CEL Plant
Electrical Protection setting coordination-discrimination study.pdf100%
New File 587328 48 - CEL-CHC-L-14-0219 Re Application for
Payment - Milestone #33.pdf100%
New File 474136 49 - CEL-FX-OFF-14-020-Application for
customs duty exemption of master List for spare parts and special tools.pdf100%
New File 599659 5 - CEL-FX-OFF-14-004-Commissioning for
C&I laboratory devices.pdf100%
New File 477597 50 - CEL-CHC-L-14-0238 SPARE PARTS &
SPECIAL TOOLS FROM CHEC.pdf100%
New File 362482 51 - CEL-CHC-L-14-0256 WARRANTY DEFECT
(Unit-1&2 Coal Jammed in Coal Feeding Device).pdf100%
New File 330618 52 - CEL-CHC-L-14-0257 WARRANTY DEFECT
(Admin Bldg., Warehouse & Workshop Access Road Water Flooding).pdf100%
New File 323200 53 - CEL-CHC-L-14-0258 WARRANTY DEFECT
(Water Seepage from the Windows in Admin. Bldg.).pdf100%
New File 323499 54 - CEL-CHC-L-14-0260 WARRANTY DEFECT
(WD-014 Water Seepage in Cable Trenches).pdf100%
New File 319211 55 - CEL-CHC-L-14-0265 WARRANTY DEFECT
(WD-015 Unit-2 Main & Auxiliary Transformer).pdf100%
New File 585357 56 - CEL-CHC-L-14-0267 WARRANTY DEFECT
(Malfunction of No.2 BSDG).pdf100%
New File 328010 57 - CEL-CHC-L-14-0269 ENGINEERING TOOLS
(Software programs with License).pdf100%
New File 874849 58 - CEL-CHC-L-14-0270 WARRANTY DEFECT
(Water Leakage on the Unit-2 Open Circulating Water Pipe).pdf100%
New File 522856 59 - CEL-FX-OFF-14-021 Reply spare parts
and special tools from CHEC.pdf100%
New File 624720 6 - CEL-FX-OFF-14-005-Re discussion and
identification of NCR and Punch List.pdf100%
New File 281447 60 - CEL-CHC-L-14-0273 CHEC REPLY OF
TURBINE DIFFERENTIAL EXPANSION.pdf100%
New File 4.8 m 61 - CEL-FX-OFF-14-022-Reply for Warrenty
Deffect (WD-015 Unit-2 Main & Auxiliary Transformer).pdf100%
New File 1.5 m 62 - CEL-FX-OFF-14-023-Reply for Coal
Jammed.pdf100%
New File 712779 63 - CEL-FX-OFF-14-024-Reply for WARRANTY
DEFECT (Admin Bldg., Warehouse & Workshop Access Road Water Flooding).pdf100%
New File 615187 64 - CEL-FX-OFF-14-025 Reply for CEL-CHC-
L-14-0258 Warranty Defect (Water Seepage from the Windows in Admin. Bldg.).pdf100%
New File 646403 65 - CEL-FX-OFF-14-026 Reply for CEL-CHC-
L-14-0226 Urging the defects and NCR remain at 383 items.pdf100%
New File 583682 66 - CEL-FX-OFF-14-027 Reply for CEL-CHC-
L-14-0215 CEL-CHC-L-14-0186 (WD-010 Unit2 Acid storage).pdf100%
New File 583785 67 - CEL-FX-OFF-14-028 Reply for CEL-CHC-
L-14-0225 CEL-CHC-L-14-0260 (WD-014 Water seepage in cable trenches).pdf100%
New File 579332 68 - CEL-FX-OFF-14-029 Reply for CEL-CHC-
L-14-0192 (WD-011 Re-use water pump in waste water treatment plant).pdf100%
New File 318348 69 - CEL-CHC-L-14-0285 CHEC REPLY TO
RECTIFICATION OF DEFECTS.pdf100%
New File 502589 7 - CEL-FX-OFF-14-006- Master List for
spare parts and special tools.pdf100%
New File 1.1 m 70 - CEL-CHC-L-14-0286 WARRANTY DEFECT
(WD-016 Unit-1&2 Coal Jammed in Coal Feeding Device).pdf100%
New File 317066 71 - CEL-CHC-L-14-0287 CEL Plant
Electrical Protection Setting Coordination-discrimination Study.pdf100%
New File 358713 72 - CEL-CHC-L-14-0288 WARRANTY DEFECT
(WD-015 Unit-2 Main & Auxiliary Transformer OLTC).pdf100%
New File 290135 73 - CEL-CHC-L-14-0289 CHEC Reply to
WARRANTY DEFECT (WD-010 #2 ACID STORAGE TANK).pdf100%
New File 272667 74 - CEL-CHC-L-14-0290 CHEC Reply to
WARRANTY DEFECT (WD-014 Water Seepage in Cable Trenches).pdf100%
New File 274766 75 - CEL-CHC-L-14-0291 CHEC Reply to
WARRANTY DEFECT (WD-018 Water Seepage from the Windows in Admin. Bldg.).pdf100%
New File 298347 76 - CEL-CHC-L-14-0292 CHEC Reply to
SPARE PARTS & SPECIAL TOOLS FROM CHEC.pdf100%
New File 306936 77 - CEL-CHC-L-14-0293 CHEC Reply to
WARRANTY DEFECT (WD-011 No.1 RE-USE WATER PUMP).pdf100%
New File 508403 78 - CEL-FX-OFF-14-030 Reply Warranty
Defect (WD-019 Malfunction of No.2 BSDG).pdf100%
New File 522386 79 - CEL-FX-OFF-14-031 Reply of Spare
parts & special tools from CHEC.pdf100%
New File 548610 8 - CEL-FX-OFF-14-007-O&M manual
submission summary.pdf100%
New File 318962 80 - CEL-CHC-L-14-0295 WARRANTY DEFECT
(WD-019 Malfunction of No.2 BSDG).pdf100%
New File 333518 81 - CEL-CHC-L-14-0310 ENGINEERING TOOLS
(Software programs with License).pdf100%
New File 291342 82 - CHC-CEL-L-14-0313 CHEC Reply to
WARRANTY DEFECT (WD-019 Malfunction of No.2 BSDG).pdf100%
New File 286133 83 - CHC-CEL-L-14-0314 CHEC Reply to
SPARE PARTS & SPECIAL TOOLS FROM CHEC.pdf100%
New File 296716 84 - CEL-FX-OFF-14-032-Replay for CEL-
CHC-L-14-0293 CHEC Reply to WARRANTY DEFECT (WD-011 No.1 RE-USE WATER PUMP).pdf100%

New File 870632 85 - CEL-CHC-L-14-0316 UNIT-2 TURBINE


EXCESSIVE OVERSPEED.pdf100%
New File 328493 86 - CEL-CHC-L-14-0317 DCS BAD AND FORCED
SIGNALS.pdf100%
New File 634898 87 - CEL-FX-OFF-14-033 Reply Warranty
Defect (WD-019 Malfunction of No.2 BSDG).pdf100%
New File 631636 88 - CEL-FX-OFF-14-034 Reply of Spare
parts and special tools from CHEC.pdf100%
New File 2.7 m 89 - WD-21 CEL-CHC-L-14-0324 WARRANTY
DEFECT ( CONDENSATE SYSTEM BYPASS PIPELINE).pdf100%
New File 283776 9 - CEL-CHC-L-14-0109-Mile stone payment
application offshore January 2014.pdf100%
New File 615955 90 - CEL-FX-OFF-14-035 CHEC Reply of
Turbine Differential Expansion.pdf100%
New File 616782 91 - CEL-FX-OFF-14-036 CHEC Reply
Warranty Defect (WD-20 Water Leakage on the Unit-2 Open Circulating Water.pdf100%
New File 1.1 m 92 - CEL-CHC-L-14-0334 ??????Common
Maintenance Tools.pdf100%
New File 602048 93 - CEL-FX-OFF-14-037 CHEC Reply of
Turbine Differential Expansion.pdf100%
New File 301234 94 - CEL-CHC-L-14-0331 WARRANTY DEFECT
(WD-016 Unit-1&2 Coal Jammed in Coal Feeding Device).pdf100%
New File 606203 95 - CEL-CHC-L-14-0337 TURBINE SPECIAL
TOOLS.pdf100%
New File 1.7 m 96 - Reply CEL-CHC-L-14-Turbine Special
Tools(Bolt Heater).pdf100%
New File 2.5 m 97 - CEL-FX-OFF-14-038 CHEC Reply of
Warranty Defect (WD-016 Unit-1&2 Coal Jammed in Coal Feeding Device).pdf100%
New File 960358 98 - CEL-FX-OFF-14-039 Reply Warranty
Defect(WD-019 Malfunction of No.2 BSDG).pdf100%
New File 2.6 m 99 - CEL-FX-OFF-14-040 Reply Warranty
Defect(WD-019 Malfunction of No.2 BSDG).pdf100%
New Dir 88 C:\AdvisianActive\01 Projects\100037 - DLA Piper -
Cambodia Power Plant Arbitration - Expert Evidence\1. From Client\Volume
2\Correspondence Bundle in Chronological Order\Tab 6 - 2015\
New File 365617 1 - CEL-CHC-L-15-0007 Re-Defects
Notification Period Bonds.pdf100%
New File 484086 10 - CEL-FX-OFF-15-005-Notification for
repair the raw water pond.pdf100%
New File 1.0 m 11 - CEL-FX-OFF-15-006-With respect to
reply CEL for the Unit 2 main stop valve jammed issue.pdf100%
New File 644574 12 - CEL-CHC-L-15-0087 UNIT-2 TURBINE
MAIN STOP VALVE (MSV).pdf100%
New File 214953 13 - CEL-FX-OFF-15-007-With respect to
Unit 2 main stop valve jammed issue.pdf100%
New File 214953 14 - CEL-FX-OFF-15-007-With respect to
Unit 2 main stop valve jammed issue.pdf100%
New File 1.0 m 15 - CEL-CHC-L-15-0139 ?????100MW COAL
FIRED POWER PLANT, SIHANOUKVILLE UNIT-2 TURBINE MAIN STOP VALVE (MSV).pdf100%
New File 1.1 m 16 - CEL-FX-OFF-15-008-Reply for WD-008
Raw Water Pond Leakage.pdf100%
New File 782607 17 - CEL-CHC-L-15-0146 CHEC REPLY to WD-
008 Raw Water Pond Leakage.pdf100%
New File 109056 18 - CEL-FX-OFF-15-009-With respect to
reply CEL for the Unit 2 main stop valve jammed issue - ??.doc100%
New File 107520 19 - CEL-FX-OFF-15-
010 ????????????? ??.doc100%
New File 177749 2 - CEL-FX-OFF-14-064-Defects
Notification Period Bonds-Swift Message.pdf100%
New File 904121 20 - CEL-FX-OFF-15-011?2015-07-15?.pdf
100%
New File 1.8 m 21 - CEL-FX-OFF-15-012?2015-07-15?.pdf
100%
New File 565631 22 - CEL-FX-OFF-15-013?2015-07-15?.pdf
100%
New File 1.2 m 23 - CEL-CHC-L-15-0187 Ref-Exercise of
Rights to Correct O&M Manuals and Determination under Clause 3.5.pdf100%
New File 639160 24 - CEL-CHC-L-15-0205 Ref-Clarifications
of Rectification Dates for FPS and O&M Manuals.pdf100%
New File 4.1 m 25 - CEL-CHC-L-15-0203 Ref -First Notice
of Liquidation of Claims.pdf100%
New File 2.7 m 26 - Debit Noted 034-035.pdf100%
New File 1.2 m 27 - CEL-CHC-L-15-0213 Ref-Remaining
Defects and As-Built Drawings.pdf100%
New File 823250 28 - CEL-FX-OFF-15-014 Fire protection
test.pdf100%
New File 442011 29 - CEL-CHC-L-15-0217 Ref-Extension of
Rectification Date for Fire Protection Systems.pdf100%
New File 15.5 m 3 - CEL-CHC-L-15-0015 Review of Soft and
Hard Copies of As-Built Drawings Submitted by CHEC.pdf100%
New File 2.9 m 30 - CEL-CHC-L-15-0221 Ref -Notice of
Determination of Contract Price Reduction (WD-065).pdf100%
New File 530139 31 - Debit Note 045-046.pdf100%
New File 1.9 m 32 - CEL-CHC-L-15-0230 Ref-Notice of
Liquidation of Claims (Fire Protection Systems).pdf100%
New File 4.0 m 33 - CEL-CHC-L-15-0241 Ref -Notice of
Latent Defects...pdf100%
New File 430483 34 - CHEC-2 Letter of Statement of
Operation and Maitenance Manuals.pdf100%
New File 841948 35 - CEL-CHC-L-15-0244 Extension of
Defects Notification Period Bonds..pdf100%
New File 877785 36 - CEL-CHC-L-15-0245 Extension of
Defects Notification Period Bonds..pdf100%
New File 1.3 m 37 - CEL-FX-OFF-15-015?20151019? Inquiry
about Fire alarm system interlock test.pdf100%
New File 581694 38 - CEL-FX-OFF-15-016?20151021?Inquiry
about Fire alarm system interlock test1.pdf100%
New File 746955 39 - CEL-FX-OFF-15-017?20151021?Re_Notice
of Set Off Against Milestone .pdf100%
New File 334146 4 - CEL-CHC-L-15-0019 Fire Protection
System.pdf100%
New File 153885 40 - CEL-FX-OFF-15-017?20151021???.pdf
100%
New File 1.6 m 41 - CEL-CHC-L-15-0249 Ref -Notice of Set
Off Against Milestone #31.pdf100%
New File 1.5 m 42 - CEL-CHC-L-15-0253 Ref-Effect of Fire
Protection Systems Determination Letter.pdf100%
New File 771476 43 - CEL-CHC-L-15-0254 Ref-Notice of
Customs Assessment.pdf100%
New File 340153 44 - CEL-CHC-L-15-0255 Ref-Notice of
Determination of Contract Price Reduction (Category Alpha Defects).pdf100%
New File 3.0 m 45 - CEL-FX-OFF-15-019 [20151026]
Rectification Record of Fire Protection System Defects.pdf100%
New File 208045 46 - CHEC-1 Closing of NCR-ELECT-281
(Method Confirmation by CEL).pdf100%
New File 774975 47 - CEL-CHC-L-15-0260 Ref-Notice of
Practical Date for Rectifying Defects.pdf100%
New File 2.4 m 48 - CEL-CHC-L-15-0261 Ref-Notice of
Determinations and #33 Set Offs in re O&M Manuals, As-Builts, Etc..pdf100%
New File 3.3 m 49 - CEL-FX-OFF-15-020 [20151030] Re-
Notice of Customs Assessment.pdf100%
New File 702414 5 - CEL-FX-OFF-15-001-DCS Remote Cabinet
Installation.pdf100%
New File 2.8 m 50 - CEL-FX-OFF-15-021 [20151030]-
Extension of Defects Notification Period Bonds.pdf100%
New File 5.8 m 51 - CEL-FX-OFF-15-022 [20151031]-Notice
of Fire Protection System Witness.pdf100%
New File 1.6 m 52 - CEL-FX-OFF-15-023 [20151102]
Feedback of #33 Onshore and #31 Offshore Set Offs.pdf100%
New File 545574 53 - CEL-FX-OFF-15-024 [20151103] Urgent
Matter-Extension of Defects Notification Period Bonds.pdf100%
New File 254663 54 - CEL-CHC-L-15-0281 Ref-Your Request
to Withdraw Drawing on Defects Notification Period Bonds.pdf100%
New File 3.3 m 55 - CEL-CHC-L-15-0286 Ref Notice of
Determination of Contract Price Reduction (Category Beta Defects)..pdf100%
New File 287852 56 - CEL-CHC-L-15-0287 Ref Your New
Request to Withdraw Bond Drawing Request Documentation.pdf100%
New File 191161 57 - CEL-FX-OFF-15-026 [20151112] Notice
of Demobilization.pdf100%
New File 7.7 m 58 - CHECXB-CEL-05-172-SETTING LIST.pdf
100%
New File 4.4 m 59 - CEL-CHC-L-15-0294 Ref-Reply
regarding Contentions about Determinations and Set Offs and Other Matters.pdf100%
New File 2.5 m 6 - CEL-CHC-L-15-0038 Re Defects
Rectification Status.pdf100%
New File 2.2 m 60 - CEL-CHC-L-15-0295 Notice of
Determination of Contract Price Reduction and Set Off for Latent Defects;
Demobilization..pdf100%
New File 1.1 m 61 - PO747 (Ref. NCR-Mech-271).pdf100%
New File 994134 62 - PO1035 ABB Flow meter.pdf100%
New File 845625 63 - PO947 (Ref. WD-093).pdf100%
New File 1.7 m 64 - 3PO1129.pdf100%
New File 2.1 m 65 - CEL-CHC-L-15-0301Ref-
ReplytoClarification.pdf100%
New File 997081 66 - CEL-FX-OFF-15-027[20151216]Cost
Damage of Coal Jamming Issue.pdf100%
New File 548965 67 - CEL-FX-OFF-15-028[20151216] Claim
for the Late Payment.pdf100%
New File 1031433 68 - CEL-FX-OFF-15-029[20151217]Cost
Damage of DTS-168 Approval.pdf100%
New File 1005080 69 - CEL-FX-OFF-15-030[20151217]Cost
Damage of CCTV's Camera Wipers Malfunction Issues.pdf100%
New File 858965 7 - CEL-FX-OFF-15-002-CHEC DUTY SCHEDULE
FOR SPRING FESTIVAL.pdf100%
New File 982399 70 - CEL-FX-OFF-15-031[20151217]Cost
Damage of Calculations of Boiler Foundation.pdf100%
New File 966697 71 - CEL-FX-OFF-15-032[20151217]Cost
Damage of LabelKKS for motor local control box Issues.pdf100%
New File 991896 72 - CEL-FX-OFF-15-033[20151217]Cost
Damage of Unit 1 Boiler Feed Pump Motor Bearing Drive End.pdf100%
New File 964856 73 - CEL-FX-OFF-15-034 [20151217]Cost
Damage of Unit 2 Bearing Nos. 2X and 2Y.pdf100%
New File 975232 74 - CEL-FX-OFF-15-035[20151218]Cost
Damage of the On Load Tap Changer in the main and auxiliary transformer.pdf100%
New File 1.0 m 75 - CEL-FX-OFF-15-036[20151218] Cost
Damage of 400V Switchgear IP Protection Rating Issues.pdf100%
New File 885250 76 - CEL-FX-OFF-15-037 [20151219] Cost
Damage of Back Energization.pdf100%
New File 976925 77 - CEL-FX-OFF-15-038[20151219] Cost
Damage of Calculations of Temporary Gables Approval.pdf100%
New File 930619 78 - CEL-FX-OFF-15-039[20151221]Cost
Damage of TagLabel for control panel Issues.pdf100%
New File 1023259 79 - CEL-FX-OFF-15-040[20151221]Cost
Damage of As-Built Drawing Approval.pdf100%
New File 209683 8 - CEL-FX-OFF-15-003-Reply for Unit-2
Turbine Main Stop Valve (MSV).pdf100%
New File 951532 80 - CEL-FX-OFF-15-041[20151221]Cost
Damage of Additional Wiring Diagram and Wiring Pocket Providing.pdf100%
New File 574837 81 - CEL-FX-OFF-15-042-[20151222]Reply
Regarding Determinations and Set Off Matters.pdf100%
New File 1.4 m 82 - CEL-CHC-L-15-0324 Ref-Claim for
Reimbursement of Customs Assessment.pdf100%
New File 494839 83 - CEL-CHC-L-15-0325 Deadline for
Demolishing of Base Camp and Hauling out of Base Camp and Project Leftover
Materials from CEL Site.pdf100%
New File 1.0 m 84 - CEL-FX-OFF-15-043 [20151222] Cost
Damage of Commissioning Test for Unit Load Rejection issues.pdf100%
New File 580329 85 - CEL-FX-OFF-15-044 [20151222] Cost of
borrowed materials and consumables by CEL Issues.pdf100%
New File 1006325 86 - CEL-FX-OFF-15-045 [20151222] Cost
Damage for Acceptance Delay of NCR-Mech-106.pdf100%
New File 974509 87 - CEL-FX-OFF-15-046 [20151222] Cost
Damage of The Power Box of CCTV at BC6# Issue.pdf100%
New File 4.0 m 88 - CEL-CHC-L-15-0332 Ref-Response to
Various Purported Claims of CHEC - (027-038).pdf100%
New File 541565 9 - CEL-FX-OFF-15-004-Reply for CEL-CHC-
L-15-0019-Fire Protection System.pdf100%
New Dir 38 C:\AdvisianActive\01 Projects\100037 - DLA Piper -
Cambodia Power Plant Arbitration - Expert Evidence\1. From Client\Volume
2\Correspondence Bundle in Chronological Order\Tab 7 - 2016\
New File 1.0 m 1 - CEL-FX-OFF-16-001-[20160104]-Cost
Damage for Refusal of NCR-Mech-268 Closure.pdf100%
New File 956211 10 - CEL-FX-OFF-16-010-[20160106]-Cost
Damage for Refusal of NCR- ELECT-125 Closure.pdf100%
New File 917880 11 - CEL-FX-OFF-16-011-[20160106]-Cost
Damage for Refusal of Raw Water Pond Leakage Closure.pdf100%
New File 920783 12 - CEL-FX-OFF-16-012-[20160106]-Cost
Damage for Refusal of Electrical Protection Setting Closure.pdf100%
New File 934643 13 - CEL-FX-OFF-16-013-[20160106]-Cost
Damage for Refusal of NCR- ELECT-100 Closure.pdf100%
New File 3.2 m 14 - CEL-FX-OFF-16-014-[20160107]-Cost
Damage for Refusal of WD-060 Closure(Attachment).pdf100%
New File 951698 15 - CEL-FX-OFF-16-015-[20160107]-Cost
Damage for Refusal of WD-051 Closure.pdf100%
New File 1.2 m 16 - CEL-FX-OFF-16-015-[20160107]-
Attachment-Modulating Control System (MCS) Test Report.pdf100%
New File 948831 17 - CEL-FX-OFF-16-016-[20160107]-Cost
Damage for Refusal of NCR-MECH-135 Closure.pdf100%
New File 949904 18 - CEL-FX-OFF-16-017-[20160107]-Cost
Damage for Refusal of NCR- ELECT-350 Closure.pdf100%
New File 1.0 m 19 - CEL-FX-OFF-16-018-[20160108]-Cost
Damage for Refusal of WD-014 Closure.pdf100%
New File 1.9 m 2 - CEL-FX-OFF-16-002-[20160104]-Cost
Damage of O&M Manuals Approval.pdf100%
New File 990484 20 - CEL-FX-OFF-16-019-[20160108]-Cost
Damage for Refusal of NCR-C&I-157 Closure.pdf100%
New File 997640 21 - CEL-FX-OFF-16-020-[20160108]-
Clarification of the Claim of Punch List No 3431.pdf100%
New File 1.3 m 22 - CEL-FX-OFF-16-021-[20160108]-Cost
Damage for Refusal of NCR-C&I-155 Closure(The Respond for NCR 155&157).pdf100%
New File 938841 23 - CEL-FX-OFF-16-022-[20160108]-Cost
Damage for Refusal of NCR- ELECT-023 Closure.pdf100%
New File 937428 24 - CEL-FX-OFF-16-023-[20160111]-Cost
Damage for Refusal of NCR- ELECT-141 Closure.pdf100%
New File 1001595 25 - CEL-FX-OFF-16-024-[20160111]-Cost
Damage for Refusal of WD-037 Closure.pdf100%
New File 931767 26 - CEL-FX-OFF-16-025-[20160111]-
Clarification of the Claim of Punch List No 2839.pdf100%
New File 902666 27 - CEL-FX-OFF-16-026-[20160112]-
Clarification of the Claim of Punch List No 1826.pdf100%
New File 939793 28 - CEL-FX-OFF-16-027-[20160112]-
Clarification of the Claim of WD-006.pdf100%
New File 957898 29 - CEL-FX-OFF-16-028-[20160112]-
Clarification of the Claim of Various NCRs.pdf100%
New File 926537 3 - CEL-FX-OFF-16-003-[20160104]-Cost
Damage for NCR-Mech-271 Closure.pdf100%
New File 938599 30 - CEL-FX-OFF-16-029-[20160113]-Cost
Damage for Refusal of NCR- ELECT-154 Closure.pdf100%
New File 961376 31 - CEL-FX-OFF-16-030-[20160113]-Cost
Damage for Refusal of NCR- ELECT-164 and 148 Closure.pdf100%
New File 946717 32 - CEL-FX-OFF-16-031-[20160113]-Cost
Damage for Refusal of NCR- ELECT-285 Closure.pdf100%
New File 949456 33 - CEL-FX-OFF-16-032-[20160113]-Cost
Damage for Refusal of NCR- ELECT-292 Closure.pdf100%
New File 948663 34 - CEL-FX-OFF-16-033-[20160120]-Cost
Damage for Refusal of NCR- ELECT-096 Closure.pdf100%
New File 943818 35 - CEL-FX-OFF-16-034-[20160120]-
Clarification of the Claim of WD-065.pdf100%
New File 3.4 m 36 - CEL-CHC-L-16-0055 Response to
Letters Purporting to set out CHEC Claims - (15-039 - 16-008).pdf100%
New File 515723 37 - CEL-CHC-L-16-0061 Dongfang Turbine
Co Ltd.pdf100%
New File 2.3 m 38 - CEL-CHC-L-16-0064 Additions and
Adjustments to Claims, Contract Price Re....pdf100%
New File 947082 4 - CEL-FX-OFF-16-004-[20160104]-Cost
Damage for Refusal of NCR-ELECT-102 Closure.pdf100%
New File 958634 5 - CEL-FX-OFF-16-005-[20160104]-Cost
Damage for Refusal of WD-078 Closure.pdf100%
New File 940134 6 - CEL-FX-OFF-16-006-[20160104]-Cost
Damage for Refusal of NCR-C&I-077 Closure.pdf100%
New File 961497 7 - CEL-FX-OFF-16-007-[20160104]-Cost
Damage for Refusal of WD-070 Closure.pdf100%
New File 939897 8 - CEL-FX-OFF-16-008-[20160104]-Cost
Damage for Refusal of NCR-C&I-167 Closure.pdf100%
New File 542024 9 - CEL-FX-OFF-16-009-[20160104]-Reply
for CEL-CHC-15-0325 Regarding to Site Material Removal Work.pdf100%
New Dir 0 C:\AdvisianActive\01 Projects\100037 - DLA Piper -
Cambodia Power Plant Arbitration - Expert Evidence\2. Proposal\
New Dir 0 C:\AdvisianActive\01 Projects\100037 - DLA Piper -
Cambodia Power Plant Arbitration - Expert Evidence\3. Contract\
New Dir 0 C:\AdvisianActive\01 Projects\100037 - DLA Piper -
Cambodia Power Plant Arbitration - Expert Evidence\4. Working\
New Dir 0 C:\AdvisianActive\01 Projects\100037 - DLA Piper -
Cambodia Power Plant Arbitration - Expert Evidence\4. Working\00 Emails\
New Dir 0 C:\AdvisianActive\01 Projects\100037 - DLA Piper -
Cambodia Power Plant Arbitration - Expert Evidence\4. Working\01 Proposal Drafts\
New Dir 0 C:\AdvisianActive\01 Projects\100037 - DLA Piper -
Cambodia Power Plant Arbitration - Expert Evidence\4. Working\02 Progress Reviews\
New Dir 0 C:\AdvisianActive\01 Projects\100037 - DLA Piper -
Cambodia Power Plant Arbitration - Expert Evidence\4. Working\03 Miscellaneous\
New Dir 0 C:\AdvisianActive\01 Projects\100037 - DLA Piper -
Cambodia Power Plant Arbitration - Expert Evidence\5. Final\
New Dir 0 C:\AdvisianActive\01 Projects\100037 - DLA Piper -
Cambodia Power Plant Arbitration - Expert Evidence\6. Peer Review\
New Dir 8 C:\AdvisianActive\01 Projects\Advisian Lump Sum
Guidelines\
New File 1.5 m Advisian Lump Sum Guidelines -
Preliminary Research Results.pdf100%
New File 208896 Competency Centered Management (CCM).ppt
100%
New File 36063 Competency Centered Management
(CCM)_Neoh.pdf100%
New File 290286 Competency Centered Management Brief
Writeup.docx100%
New File 260583 Competency Centered Management Brief
Writeup.pdf100%
New File 205569 Consultancy fee guidelines as approved by
the Council on february 6%2c 2012.pdf100%
New File 375808 Flowchart_Neoh.ppt100%
New File 4.2 m Preliminary Research Results.pptx100%
New Dir 15 C:\AdvisianActive\01 Projects\Bangaladesh Technaf
28MW Solar Farm\
New File 15302 Advisian Q&A_batch 1_25Oct2017.xlsx100%
New File 17417 Advisian QA_31st October 2017_update.xlsx
100%
New File 14515 Attendees Details for Technaf Solar
Bangaladesh Site Visit.docx100%
New File 169531 Copy of Risk Register Template_Technaf
Solar_Rev1_Neoh.xlsx100%
New File 62007 Diagrams.pptx100%
New File 169860 OA0000000655234 (1).pdf100%
New File 121856 Re Technaf Solar - RFP Technical Advisor
- Call.msg100%
New File 7.2 m Report Template - revA_Neoh.docx100%
New File 8.2 m Technaf LTA Report - revA_Internal
Review_Neoh.docx100%
New File 8.2 m Technaf LTA Report - revB_First draft to
Client.docx100%
New File 1.5 m Technaf LTA Report - revB_First draft to
Client.pdf100%
New File 1.5 m Technaf LTA Report - revB_First draft to
Client_rev1.pdf100%
New File 8.5 m Technaf LTA Report -revA_Internal
Review_Draft 2_Neoh.docx100%
New File 8.5 m Technaf LTA Report -revA_Internal
Review_Draft 3.docx100%
New File 1.0 m VDR Access List.docx100%
New Dir 1 C:\AdvisianActive\01 Projects\Bangaladesh Technaf
28MW Solar Farm\Contracts\
New File 81374 GuarantCo and SCB Technical Advisor Rev01
Advisian WP 23Oct17 Rev01_Advisian 31Oct.docx100%
New Dir 2 C:\AdvisianActive\01 Projects\Bangaladesh Technaf
28MW Solar Farm\Due Diligence Documents\
New File 11.9 m Environmental & Social.zip100%
New File 6.8 m Feasibility Report_TSEL_.docx100%
New Dir 1 C:\AdvisianActive\01 Projects\Bangaladesh Technaf
28MW Solar Farm\Due Diligence Documents\Construction\
New File 9.5 m Toma Group Profile.pdf100%
New Dir 1 C:\AdvisianActive\01 Projects\Bangaladesh Technaf
28MW Solar Farm\Due Diligence Documents\Environmental & Social\
New File 1.5 m Environment Clearance Certificate.pdf100%

New Dir 2 C:\AdvisianActive\01 Projects\Bangaladesh Technaf


28MW Solar Farm\Due Diligence Documents\Environmental & Social\Environment
Assessment Report\
New File 5.6 m IEE Report_TSEL_Final.pdf100%
New File 9.4 m New_EIA Report.pdf100%
New Dir 1 C:\AdvisianActive\01 Projects\Bangaladesh Technaf
28MW Solar Farm\Due Diligence Documents\LegalCorporate Documents\
New File 838269 TSEL Land Lease Agreement.pdf100%
New Dir 2 C:\AdvisianActive\01 Projects\Bangaladesh Technaf
28MW Solar Farm\Due Diligence Documents\PPA & IA\
New File 2.9 m IMPLEMENTATION AGREEMENT.pdf100%
New File 18.3 m PPA Signed Copy-TSEL with BPDB_090217.pdf
100%
New Dir 9 C:\AdvisianActive\01 Projects\Bangaladesh Technaf
28MW Solar Farm\Due Diligence Documents\Sgurr Energy\
New File 1.5 m 20MW(AC)Joules Solar PV Plant
_EYR_B2_25.05.2017.pdf100%
New File 3.9 m 6.17.10165_Joules Feasibility
Report_B1_10.08.17.pdf100%
New File 190482 Appendix A - PVsyst report.pdf100%
New File 1.0 m Appendix B- SolarGIS TMY report.pdf100%
New File 1.2 m Attachment-1 20MW(AC)Joules Solar PV
Plant _EYR_B4_26.10.2017.pdf100%
New File 121240 Attachment-2 PVsyst Report.pdf100%
New File 1.6 m Attachment-5 EE-SLD-DWG-01 R5 KEY AC SLD-
1.pdf100%
New File 14730 Major items list.xlsx100%
New File 3.6 m Sgurr Contract.pdf100%
New Dir 0 C:\AdvisianActive\01 Projects\Bangaladesh Technaf
28MW Solar Farm\Due Diligence Documents\Supply\
New Dir 6 C:\AdvisianActive\01 Projects\Bangaladesh Technaf
28MW Solar Farm\Due Diligence Documents\Supply\Supplier Contract\
New File 1.8 m Contract - Proinso (Inverters).pdf100%
New File 2.2 m Contract - SUMEC (PV Panel).pdf100%
New File 8.0 m Contract - ZTT (Mounting System).pdf100%

New File 1.2 m Proinso_STP60_Technical Specification.pdf


100%
New File 9.4 m PV Module_JA Solar- Technical
Specification_Warranty_LD.pdf100%
New File 14.9 m Sterling Wilson Purchase Contract
TSEL .pdf100%
New Dir 7 C:\AdvisianActive\01 Projects\Bangaladesh Technaf
28MW Solar Farm\Due Diligence Documents\Technical\
New File 798718 30-Combinerbox.rar100%
New File 7.3 m 30-PV Module.rar100%
New File 2.0 m SL-1.pdf100%
New File 5.8 m SL-30 SCADA Technical Particulars.pdf100%

New File 261800 SL-30 Transformer.pdf100%


New File 23.1 m SL-31 .dwg100%
New File 785598 SL-33.pdf100%
New Dir 8 C:\AdvisianActive\01 Projects\Bangaladesh Technaf
28MW Solar Farm\Project Management\
New File 80688 2229 - CSOC GuarantCo Rev01_SS (2).pdf
100%
New File 248322 2229 - CSOC GuarantCo_Neoh.docx100%
New File 22135 Guarantco Technaf Budget.xlsx100%
New File 344468 NPIS Form_Technaf Guarantco Solar.docx
100%
New File 190413 RCF Form_Guarantco.xlsx100%
New File 153600 RE Bangladesh Solar Technical Due
Diligence.msg100%
New File 1.2 m Technaf GuarantCo Internal Kick Off.pptx
100%
New File 1.1 m Technaf GuarantCo Internal Kick
Off_07Nov.pdf100%
New Dir 1 C:\AdvisianActive\01 Projects\Bangaladesh Technaf
28MW Solar Farm\Proposal\
New File 3.7 m Guarantco LTA Proposal
Submission_Advisian.pdf100%
New Dir 15 C:\AdvisianActive\01 Projects\CITIC Myanmar CCGT
Business Study\
New File 1013229 CITIC Myanmar CCGT FM_05June2017_Master
DRAFT.xlsm100%
New File 1.0 m CITIC Myanmar CCGT FM_06June2017_Master
DRAFT.xlsm100%
New File 1.0 m CITIC Myanmar CCGT FM_07June2017_Master
DRAFT.xlsm100%
New File 1.0 m CITIC Myanmar CCGT FM_08June2017_Master
DRAFT_answers.xlsm100%
New File 1.0 m CITIC Myanmar CCGT FM_09June2017_Master
DRAFT.xlsm100%
New File 1.1 m CITIC Myanmar CCGT FM_12June2017_Master
DRAFT.xlsm100%
New File 1.1 m CITIC Myanmar CCGT FM_13June2017_Master
DRAFT.xlsm100%
New File 8 password.txt100%
New File 1.6 m Preliminary Technology Selection Report
Updated on Technical Data 24 May 2017-v3.pdf100%
New File 5.9 m Preliminary Technology Selection Report
Updated on Technical Data 24 May 2017-v3.pptx100%
New File 6.0 m Preliminary Technology Selection Report
Updated on Technical Data 31 May 2017.pptx100%
New File 1.0 m SIEMENS A.xlsm100%
New File 1023170 SIEMENS B.xlsm100%
New File 1.1 m SIEMENS TEST.xlsm100%
New File 1.0 m SIEMENS.xlsm100%
New Dir 2 C:\AdvisianActive\01 Projects\CITIC Myanmar CCGT
Business Study\ref\
New File 3.5 m Financial Modeling_Base_20150617_V2.xlsm
100%
New File 3.5 m IPP Financial Modeling_rev 00_for
Poyry_20150608.xlsm100%
New Dir 2 C:\AdvisianActive\01 Projects\CITIC Myanmar CCGT
Business Study\Retrofit Case\
New File 1023956 CITIC Myanmar CCGT FM_06June2017_Master
RETROFIT CASE Rev B-10p.xlsm100%
New File 1023795 CITIC Myanmar CCGT FM_06June2017_Master
RETROFIT CASE Rev B-15p.xlsm100%
New Dir 7 C:\AdvisianActive\01 Projects\CITIC Myanmar CCGT
Business Study\superceded\
New File 1.0 m CITIC Myanmar CCGT FM_01June2017.xlsm100%

New File 1.0 m CITIC Myanmar CCGT


FM_01June2017_DRAFT_rev2.xlsm100%
New File 1.0 m CITIC Myanmar CCGT
FM_01June2017_DRAFT_rev3.xlsm100%
New File 1004844 CITIC Myanmar CCGT
FM_01June2017_DRAFT_rev4.xlsm100%
New File 1014711 CITIC Myanmar CCGT
FM_04June2017_DRAFT.xlsm100%
New File 478339 CITIC Myanmar CCGT FM_DRAFT_rev2.xlsm100%
New File 1.0 m Copy of CITIC Myanmar CCGT
FM_01June2017_DRAFT_rev2.xlsm100%
New Dir 2 C:\AdvisianActive\01 Projects\Dragon Capital -
Project Mangosteen\
New File 51200 Confidentiality - WPS NDA.doc100%
New File 116913 NDA_DCM-HK_WP_131017_Signed.pdf100%
New Dir 6 C:\AdvisianActive\01 Projects\Dragon Capital -
Project Mangosteen\Electricity Market\
New File 1.4 m

Carbon_Trust_Supporting_Vietnam_s_Renewable_Energy_Action_Plan_final_ENGLISH_.pdf
100%
New File 449942 Electricity Tariff Projections Review
final.pdf100%
New File 2.9 m EVN financial recovery WB.pdf100%
New File 1.3 m GIZ_PDP 7 rev_Mar 2016_Highlights_IS.pdf
100%
New File 1001953 Greening the Power Mix 31Mar2016 2.pdf
100%
New File 1.9 m
vietnam_power_and_renewable_markets_outlook_2017.pdf100%
New Dir 4 C:\AdvisianActive\01 Projects\Dragon Capital -
Project Mangosteen\Land info\
New File 663452 CV 2186.signed.pdf100%
New File 1.1 m CV_2186.zip100%
New File 188905 UBND to DOIT_13.07.17.pdf100%
New File 302703 UBND_TB295_31.07.17_beginFS.pdf100%
New Dir 5 C:\AdvisianActive\01 Projects\Dragon Capital -
Project Mangosteen\Project Management\
New File 21289 Dragon Capital PV FS budget.xlsx100%
New File 345253 NPIS Form_Project Mangosteen - 36MW Solar
PV Farm.docx100%
New File 405318 Project Mangosteen Internal Kick Off.pptx
100%
New File 190418 RCF Form_Project Mangosteen.xlsx100%
New File 10123 Travel Arrangement & Expenses.xlsx100%
New Dir 1 C:\AdvisianActive\01 Projects\Dragon Capital -
Project Mangosteen\Project Management\Agreement\
New File 1.4 m DC_Advisian Due Diligence
Contract_08Nov17.docx100%
New Dir 10 C:\AdvisianActive\01 Projects\Dragon Capital -
Project Mangosteen\Proposal\
New File 5.9 m 1. DC_brochure.pdf100%
New File 1.1 m 2. Energy.briefing_DC.pdf100%
New File 7.0 m 20170912_Proposal for Project Mangosteen
FS_For Submission_with appendices.pdf100%
New File 628994 3. Project_Mangosteen_teaser.pdf100%
New File 122751 3.1 RFP_DC_Mangosteen.pdf100%
New File 613727 4. Project_Honeydew_teaser.pdf100%
New File 124616 4.1 RFP_DC_Honeydew.pdf100%
New File 2.6 m 5. VN_ADB_energy-road-map.pdf100%
New File 2.2 m 5.1 VN_ADB_Power-sector-reforms.pdf100%
New File 308368 6. Questionnaires.pdf100%
New Dir 5 C:\AdvisianActive\01 Projects\Dragon Capital -
Project Mangosteen\Solar decision\
New File 117760 16-2017-TT-BCT Thong tu dien mat troi.doc
100%
New File 821489 Circular 16 TT-BCT solar PPA.pdf100%
New File 253881 Decision 11_2017_on Solar FIT_2017-04-
11_EN.PDF100%
New File 67072 Phu luc 1 ve quy hoach DMT tinh.doc100%
New File 187904 Phu luc 2-Du thao PPA mau dien mat troi
noi luoi.doc100%
New Dir 1 C:\AdvisianActive\01 Projects\Dragon Capital -
Project Mangosteen\Solar resources\
New File 16.4 m Maps of Solar Resource and Potential in
Vietnam REPORT FOR PUBLISHING.pdf100%
New Dir 7 C:\AdvisianActive\01 Projects\GIC China CHP DD\
New File 1.6 m 20170713 GIC TDD for CHP, WW and
Solar_Report Template.docx100%
New File 689938 GIC Valuation Bridge_20170617.pdf100%
New File 3.7 m ISQ Asia Cube Energy Platform
Teaser_20170614.pdf100%
New File 3.4 m ISQ Asia Cube Solar Platform
Teaser_20170614.pdf100%
New File 2.6 m ISQ Asia Cube Water Platform
Teaser_20170614.pdf100%
New File 596627 Risk Register Template_14 July 2017.xlsx
100%
New File 67413 ??????2017?6????????.pdf100%
New Dir 0 C:\AdvisianActive\01 Projects\GIC China CHP
DD\Contracts\
New Dir 2 C:\AdvisianActive\01 Projects\GIC China CHP
DD\Contracts\Chongqing\
New File 9.3 m TSQ-CA-S-001??????(??????).pdf100%
New File 1.4 m ????????.pdf100%
New Dir 0 C:\AdvisianActive\01 Projects\GIC China CHP
DD\Contracts\SiAn\
New Dir 6 C:\AdvisianActive\01 Projects\GIC China CHP
DD\Corporate Docs\
New File 4.5 m ????.pdf100%
New File 7.6 m ?????.pdf100%
New File 67584 ????????(??)20170508.docx100%
New File 1.2 m ???????????.pdf100%
New File 1.7 m ??????(???)20170531.pdf100%
New File 817709 ??????(???)20170531.pdf100%
New Dir 0 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\
New Dir 0 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Solar\
New Dir 0 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Solar\Borrowings\
New Dir 0 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Solar\Borrowings\Guangda\
New Dir 12 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Solar\Borrowings\Guangda\????\
New File 140329 2017-05-23 (2) 0001.jpg100%
New File 299000 2017-05-23 (2) 0002.jpg100%
New File 352348 2017-05-23 (2) 0003.jpg100%
New File 279091 2017-05-23 (2) 0004.jpg100%
New File 326634 2017-05-23 (2) 0005.jpg100%
New File 393933 2017-05-23 (2) 0006.jpg100%
New File 405912 2017-05-23 (2) 0007.jpg100%
New File 384717 2017-05-23 (2) 0008.jpg100%
New File 373424 2017-05-23 (2) 0009.jpg100%
New File 374939 2017-05-23 (2) 0010.jpg100%
New File 376399 2017-05-23 (2) 0011.jpg100%
New File 197385 2017-05-23 (2) 0012.jpg100%
New Dir 15 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Solar\Borrowings\Guangda\????\
New File 1.9 m 0616_3.jpg100%
New File 150163 2017-05-23 (4) 0001.jpg100%
New File 256562 2017-05-23 (4) 0002.jpg100%
New File 222405 2017-05-23 (4) 0003.jpg100%
New File 324064 2017-05-23 (4) 0004.jpg100%
New File 352087 2017-05-23 (4) 0005.jpg100%
New File 352601 2017-05-23 (4) 0006.jpg100%
New File 393360 2017-05-23 (4) 0007.jpg100%
New File 345634 2017-05-23 (4) 0008.jpg100%
New File 150290 2017-05-23 (4) 0009.jpg100%
New File 321205 2017-05-23 (4) 0011.jpg100%
New File 287906 2017-05-23 (4) 0012.jpg100%
New File 289509 2017-05-23 (4) 0013.jpg100%
New File 280640 2017-05-23 (4) 0014.jpg100%
New File 219239 2017-05-23 (4) 0015.jpg100%
New Dir 11 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Solar\Borrowings\Guangda\??????\
New File 267547 2017-05-23 (3) 0001.jpg100%
New File 142617 2017-05-23 (6) 0001.jpg100%
New File 256016 2017-05-23 (6) 0002.jpg100%
New File 232993 2017-05-23 (6) 0003.jpg100%
New File 338224 2017-05-23 (6) 0004.jpg100%
New File 379626 2017-05-23 (6) 0005.jpg100%
New File 348839 2017-05-23 (6) 0006.jpg100%
New File 370150 2017-05-23 (6) 0007.jpg100%
New File 360181 2017-05-23 (6) 0008.jpg100%
New File 228778 2017-05-23 (6) 0009.jpg100%
New File 324341 2017-05-23 (6) 0010.jpg100%
New Dir 10 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Solar\Borrowings\Guangda\??????\
New File 2.1 m 0616_1.jpg100%
New File 144205 2017-05-23 (5) 0001.jpg100%
New File 252870 2017-05-23 (5) 0002.jpg100%
New File 209487 2017-05-23 (5) 0003.jpg100%
New File 338679 2017-05-23 (5) 0004.jpg100%
New File 376432 2017-05-23 (5) 0005.jpg100%
New File 336730 2017-05-23 (5) 0006.jpg100%
New File 370614 2017-05-23 (5) 0007.jpg100%
New File 350634 2017-05-23 (5) 0008.jpg100%
New File 235626 2017-05-23 (5) 0009.jpg100%
New Dir 0 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Solar\Government Approvals & Permits\
New Dir 4 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Solar\Government Approvals & Permits\Dongji\
New File 1.0 m ??10MW????.jpg100%
New File 166706 ?????.jpg100%
New File 168895 ???????.jpg100%
New File 193111 ???? ???????.jpg100%
New Dir 2 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Solar\Government Approvals & Permits\Dongji\??????\
New File 248724 01.jpg100%
New File 239129 02.jpg100%
New Dir 4 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Solar\Government Approvals & Permits\Dongji\?????\
New File 196588 002.jpg100%
New File 235356 003.jpg100%
New File 205865 ????10MW?????? 002.jpg100%
New File 240789 ????10MW?????? 003.jpg100%
New Dir 2 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Solar\Government Approvals & Permits\Dongji\???????\
New File 205865 ????10MW?????? 1.jpg100%
New File 240789 ????10MW?????? 2.jpg100%
New Dir 2 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Solar\Government Approvals & Permits\Dongji\????\
New File 274174 ????.jpg100%
New File 576059 ???.jpg100%
New Dir 5 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Solar\Government Approvals & Permits\Dongji\????\????\
New File 120583 IMG_1152.JPG100%
New File 87846 IMG_1153.JPG100%
New File 99396 IMG_1154.JPG100%
New File 110177 IMG_1155.JPG100%
New File 184068 ????????????.jpg100%
New Dir 6 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Solar\Government Approvals & Permits\Dongji\??\
New File 1.0 m ??10MW????.jpg100%
New File 167889 ??10MW???1.jpg100%
New File 244663 ??10MW???2.jpg100%
New File 232380 ??10MW???3.jpg100%
New File 247349 ??10MW???4.jpg100%
New File 216265 ??10MW????????.jpg100%
New Dir 6 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Solar\Government Approvals & Permits\Dongji\???????\
New File 1.0 m ??10MW????.jpg100%
New File 167889 ??10MW???1.jpg100%
New File 244663 ??10MW???2.jpg100%
New File 232380 ??10MW???3.jpg100%
New File 247349 ??10MW???4.jpg100%
New File 216265 ??10MW????????.jpg100%
New Dir 2 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Solar\Government Approvals & Permits\Dongji\???????\
New File 258510 01 001.jpg100%
New File 211856 02.jpg100%
New Dir 2 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Solar\Government Approvals & Permits\Dongji\?????\
New File 289315 01 002.jpg100%
New File 253470 02.jpg100%
New Dir 2 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Solar\Government Approvals & Permits\Dongji\???????????\
New File 178338 01 001.jpg100%
New File 182411 01.jpg100%
New Dir 7 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Solar\Government Approvals & Permits\Dongji\???????\
New File 286999 ??????? 001.jpg100%
New File 255107 ??????? 002.jpg100%
New File 273522 ??????? 003.jpg100%
New File 263066 ??????? 004.jpg100%
New File 178956 ??????? 005.jpg100%
New File 189002 ??????? 006.jpg100%
New File 182269 ???????.jpg100%
New Dir 1 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Solar\Government Approvals & Permits\Dongying\
New File 166361 ???????????.JPG100%
New Dir 4 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Solar\Government Approvals & Permits\Guangda\
New File 483730 ??40MW???????.jpg100%
New File 99446 ???????-1.jpg100%
New File 102096 ???????-2.jpg100%
New File 75156 ??????????.jpg100%
New Dir 7 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Solar\Government Approvals & Permits\Sishui\
New File 1.7 m 05-????.jpg100%
New File 301956 ????.jpg100%
New File 224847 ????2.jpg100%
New File 244042 ??1 001.jpg100%
New File 114674 ??2 001.jpg100%
New File 109289 ???????????????.JPG100%
New File 366975 ??2.jpg100%
New Dir 1 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Solar\Government Approvals & Permits\Zaozhuang\
New File 1.5 m ???????????.jpg100%
New Dir 0 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Solar\Land Leasing Agreement\
New Dir 3 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Solar\Land Leasing Agreement\Dongji\
New File 274174 ????.jpg100%
New File 576059 ???.jpg100%
New File 184068 ????????????.jpg100%
New Dir 0 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Solar\PPA, Grid Connection Agreement and Report\
New Dir 1 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Solar\PPA, Grid Connection Agreement and Report\Dongji\
New File 1.7 m ?????????.JPG100%
New Dir 0 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Water\
New Dir 2 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Water\Corporate Document\
New File 469882 4-Business License(????????????).jpg100%

New File 448926 6-Business License (????????????).jpg100%

New Dir 1 C:\AdvisianActive\01 Projects\GIC China CHP DD\I


Squared Capital\Asia Cube Water\Corporate Document\Gongping\
New File 396554 ????.jpg100%
New Dir 1 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Water\Corporate Document\Harbin\
New File 263107 11-Business License(???????????????).jpg
100%
New Dir 1 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Water\Corporate Document\Xianyang\
New File 80743 19-Business License(????????????).jpg100%

New Dir 1 C:\AdvisianActive\01 Projects\GIC China CHP DD\I


Squared Capital\Asia Cube Water\Corporate Document\Yichuan\
New File 46105 18-Business License(??????????).jpg100%
New Dir 1 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Water\Corporate Document\Yongcheng 1\
New File 934179 ??????????????.jpg100%
New Dir 1 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Water\Corporate Document\Yongcheng 2\
New File 1029884 13-Business License(??????????).jpg100%
New Dir 1 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Water\Corporate Document\Yongcheng 3\
New File 894162 17-Business License(??????????).jpg100%
New Dir 1 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Water\Corporate Document\Yongcheng 4\
New File 924808 15-Business License(??????????).jpg100%
New Dir 1 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Water\Corporate Document\Yongcheng 5\
New File 1.0 m 14-Business License(??????????).jpg100%
New Dir 1 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Water\Corporate Document\??\
New File 5.9 m ???????????.jpg100%
New Dir 13 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Water\Corporate Document\??\??????\
New File 1.6 m 10-????-?????????????????????.jpg100%
New File 134020 11-????-??????.jpg100%
New File 1.5 m 12-????-??????????????????.jpg100%
New File 146298 13-????-????????????????.jpg100%
New File 61818 14-????-???????????????.tif100%
New File 4.5 m 1-??-???????????.jpg100%
New File 416607 2-??-????????????????.jpg100%
New File 4.7 m 3-??-???????????????.jpg100%
New File 495387 4-??-???????????????.jpg100%
New File 61692 5-??-???????????.tif100%
New File 591452 6-??-???????????.jpg100%
New File 157192 8-?????????????.jpg100%
New File 197818 9-????-????-???????.jpg100%
New Dir 0 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Water\Permits & Approvals\
New Dir 0 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Water\Permits & Approvals\Gongping\
New Dir 2 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Water\Permits & Approvals\Gongping\????\
New File 112020 ????1.jpg100%
New File 56135 ????2.jpg100%
New Dir 2 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Water\Permits & Approvals\Gongping\?????????\
New File 112803 1.jpg100%
New File 94999 2.jpg100%
New Dir 2 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Water\Permits & Approvals\Gongping\??????\
New File 127382 11.jpg100%
New File 88432 12.jpg100%
New Dir 1 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Water\Permits & Approvals\Harbin\
New File 4.5 m ???????.jpg100%
New Dir 4 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Water\Permits & Approvals\Harbin\????\
New File 1.0 m 001.jpg100%
New File 1.0 m 002.jpg100%
New File 1.0 m 003.jpg100%
New File 1.0 m 004.jpg100%
New Dir 3 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Water\Permits & Approvals\Harbin\????\
New File 2.0 m ????1.jpg100%
New File 2.4 m ????2.jpg100%
New File 1.8 m ????3.jpg100%
New Dir 3 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Water\Permits & Approvals\Harbin\????????\
New File 186678 ?????????1.PNG100%
New File 273239 ?????????2.PNG100%
New File 296583 ?????????3.PNG100%
New Dir 3 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Water\Permits & Approvals\Harbin\????????\
New File 2.7 m ????????? (1).jpg100%
New File 1.5 m ????????? (2).JPG100%
New File 1.3 m ????????? (3).jpg100%
New Dir 4 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Water\Permits & Approvals\Xianyang\
New File 1.0 m ?????????.jpg100%
New File 1009416 ?????????.jpg100%
New File 157740 ??1.5?????1.jpg100%
New File 115550 ??1.5?????2.jpg100%
New Dir 4 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Water\Permits & Approvals\Yichuan\
New File 427276 ??????????1.jpg100%
New File 1.5 m ??????????2.jpg100%
New File 541900 ??????.jpg100%
New File 237882 ?????.JPG100%
New Dir 3 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Water\Permits & Approvals\Yichuan\????\
New File 59733 ????1.jpg100%
New File 109599 ????2.jpg100%
New File 41897 ????3.jpg100%
New Dir 2 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Water\Permits & Approvals\Yichuan\??????\
New File 73945 ????????1.jpg100%
New File 82425 ????????2.jpg100%
New Dir 2 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Water\Permits & Approvals\Yichuan\??????\
New File 841625 ??????1.jpg100%
New File 1.1 m ??????2.jpg100%
New Dir 2 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Water\Permits & Approvals\Yichuan\????\
New File 908474 ????1.jpg100%
New File 740536 ????2.jpg100%
New Dir 7 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Water\Permits & Approvals\Yongcheng 1\
New File 2.6 m ????????.jpg100%
New File 280477 ??????.jpg100%
New File 3.8 m ???????.jpg100%
New File 456165 ???????.jpg100%
New File 123122 ????????.jpg100%
New File 245679 ??????.jpg100%
New File 223456 ???.jpg100%
New Dir 2 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Water\Permits & Approvals\Yongcheng 1\????????\
New File 342034 ????????1.jpg100%
New File 342967 ????????2.jpg100%
New Dir 11 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Water\Permits & Approvals\Yongcheng 1\????????\
New File 247270 ??????1.jpg100%
New File 580045 ??????10.jpg100%
New File 281240 ??????2.jpg100%
New File 223881 ??????3.jpg100%
New File 191831 ??????4.jpg100%
New File 571827 ??????5.jpg100%
New File 310453 ??????6.jpg100%
New File 401279 ??????7.jpg100%
New File 261231 ??????8.jpg100%
New File 341026 ??????9.jpg100%
New File 218228 ??????11.jpg100%
New Dir 1 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Water\Permits & Approvals\Yongcheng 2\
New File 1.4 m ????? ??.jpg100%
New Dir 2 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Water\Permits & Approvals\Yongcheng 2\????\
New File 999246 ????1.jpg100%
New File 1.2 m ????2.jpg100%
New Dir 2 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Water\Permits & Approvals\Yongcheng 2\??????\
New File 189152 ?????????1.jpg100%
New File 230446 ?????????2.jpg100%
New Dir 4 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Water\Permits & Approvals\Yongcheng 2\????\
New File 1.5 m ????.jpg100%
New File 155949 ???????1.jpg100%
New File 239313 ???????2.jpg100%
New File 233341 ???????3.jpg100%
New Dir 2 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Water\Permits & Approvals\Yongcheng 2\????\
New File 220770 ???????1.jpg100%
New File 211287 ???????2.jpg100%
New Dir 5 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Water\Permits & Approvals\Yongcheng 2\????\
New File 348618 ???????1.jpg100%
New File 264977 ???????2.jpg100%
New File 384993 ??????1.jpg100%
New File 375574 ??????2.jpg100%
New File 280306 ??????3.jpg100%
New Dir 3 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Water\Permits & Approvals\Yongcheng 2\???\
New File 963632 ??????????.jpg100%
New File 1.1 m ????????1.jpg100%
New File 813108 ????????2.jpg100%
New Dir 7 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Water\Permits & Approvals\Yongcheng 3\
New File 185004 ???????.jpg100%
New File 56137 ?????????1.jpg100%
New File 54280 ?????????2.jpg100%
New File 5.0 m ???3??.jpg100%
New File 1.5 m ?????.jpg100%
New File 320568 ????.jpg100%
New File 249425 ????.jpg100%
New Dir 2 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Water\Permits & Approvals\Yongcheng 3\????\
New File 270839 ??????1.jpg100%
New File 258741 ??????2.jpg100%
New Dir 2 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Water\Permits & Approvals\Yongcheng 3\???????\
New File 470938 ?????????1.jpg100%
New File 411089 ?????????2.jpg100%
New Dir 8 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Water\Permits & Approvals\Yongcheng 4\
New File 176429 ???????.jpg100%
New File 195860 ????????????.jpg100%
New File 162488 ???????.jpg100%
New File 3.6 m ?????.jpg100%
New File 1.6 m ?????.jpg100%
New File 462160 ??????.jpg100%
New File 2.0 m ??????.jpg100%
New File 195860 ??????.jpg100%
New Dir 2 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Water\Permits & Approvals\Yongcheng 4\????\
New File 836041 ????1.jpg100%
New File 1.2 m ????2.jpg100%
New Dir 2 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Water\Permits & Approvals\Yongcheng 4\????????\
New File 301163 ????????1.jpg100%
New File 646755 ????????2.jpg100%
New Dir 5 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Water\Permits & Approvals\Yongcheng 4\????\
New File 247098 ????????1.jpg100%
New File 293329 ????????2.jpg100%
New File 114014 ?????????1.tif100%
New File 120018 ?????????2.tif100%
New File 525261 ????.jpg100%
New Dir 7 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Water\Permits & Approvals\Yongcheng 4\??????\
New File 3.6 m ????? 001.jpg100%
New File 247098 ??????????1.jpg100%
New File 293329 ??????????2.jpg100%
New File 525261 ????????.jpg100%
New File 1.1 m ????????????1.jpg100%
New File 1.0 m ????????????2.jpg100%
New File 1017402 ????????????3.jpg100%
New Dir 5 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Water\Permits & Approvals\Yongcheng 5\
New File 4.0 m ????????1.jpg100%
New File 705587 ????????2.jpg100%
New File 1.4 m ?????.jpg100%
New File 332325 ??????.jpg100%
New File 107504 ???????.jpg100%
New Dir 2 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Water\Permits & Approvals\Yongcheng 5\??????\
New File 393452 ???????1.jpg100%
New File 341182 ???????2.jpg100%
New Dir 2 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Water\Permits & Approvals\Yongcheng 5\????\
New File 371902 ???????1.jpg100%
New File 303722 ???????2.jpg100%
New Dir 6 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Water\Permits & Approvals\Yongcheng 5\??????\
New File 277481 ??????1.jpg100%
New File 347383 ??????2.jpg100%
New File 365947 ??????3.jpg100%
New File 342502 ??????4.jpg100%
New File 317838 ??????5.jpg100%
New File 172809 ??????6.jpg100%
New Dir 5 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Water\Permits & Approvals\Yongcheng 5\??????\
New File 369074 ??????1.jpg100%
New File 395134 ??????2.jpg100%
New File 443293 ??????3.jpg100%
New File 421445 ??????4.jpg100%
New File 208849 ??????5.jpg100%
New Dir 2 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Water\Permits & Approvals\Yongcheng 5\????\
New File 113015 ???? 2.jpg100%
New File 150976 ????1.jpg100%
New Dir 2 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Water\Permits & Approvals\Yongcheng 5\??????\
New File 1.4 m ???????1.jpg100%
New File 960849 ???????2.jpg100%
New Dir 2 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Asia Cube Water\Permits & Approvals\Yongcheng 5\?????\
New File 248831 ????????? 2.jpg100%
New File 219991 ?????????1.jpg100%
New Dir 0 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Platform Org Chart\
New Dir 5 C:\AdvisianActive\01 Projects\GIC China CHP DD\I
Squared Capital\Platform Org Chart\Others\
New File 471768 2- Business Licenses (????????????).jpg
100%
New File 466274 3- Business Licenses (????????????).jpg
100%
New File 469882 4-Business License(????????????).jpg100%

New File 448926 6-Business License (????????????).jpg100%

New File 125119 8- Business License(????????????).JPG100%

New Dir 0 C:\AdvisianActive\01 Projects\GIC China CHP DD\Q&A\


New Dir 4 C:\AdvisianActive\01 Projects\GIC China CHP DD\Q&A\62
Basis of Design document, including site data and list of\
New File 162 ~$01 (draft)Project Application
Report.docx100%
New File 21.3 m 6201 (draft)Project Application
Report.docx100%
New File 3.3 m 6201 (draft)Project Application
Report.pdf100%
New File 204313 6202 (draft)PID.pdf100%
New Dir 1 C:\AdvisianActive\01 Projects\GIC China CHP DD\Q&A\63
Major equipment and supplier list\
New File 52893 Major equipment and supplier list.pdf100%

New Dir 1 C:\AdvisianActive\01 Projects\GIC China CHP DD\Q&A\64


Project Design Manual (EPC Technical Specification)\
New File 263 6401 Heat Plant Exchanger
Specifications.log100%
New Dir 6 C:\AdvisianActive\01 Projects\GIC China CHP DD\Q&A\65
Annual performance and operation records (Capacity, Outag\
New File 50969 2016?6??10?31???????.pdf100%
New File 51227 2016?6??12?20???????.pdf100%
New File 53203 2016?6??2017?2?24???????.pdf100%
New File 54239 ??????2017?6????????.pdf100%
New File 69643 ???????????????????????????.pdf100%
New File 75518 ???????????????????????????.pdf100%
New Dir 0 C:\AdvisianActive\01 Projects\GIC China CHP DD\Q&A\66
Operation plan/procedure\
New Dir 0 C:\AdvisianActive\01 Projects\GIC China CHP DD\Q&A\69
Training program\
New Dir 0 C:\AdvisianActive\01 Projects\GIC China CHP DD\Q&A\70
O&M Monthly reports\
New Dir 0 C:\AdvisianActive\01 Projects\GIC China CHP DD\Q&A\71
Electricity, steam, chilled water (and other utilities) s\
New Dir 14 C:\AdvisianActive\01 Projects\GIC China CHP
DD\Working\
New File 162 ~$170713 GIC TDD for CHP, WW and
Solar_Report Template_Neoh.docx100%
New File 73118 2015 -
commercial_boiler_efficiency.determine.test_2008.pdf100%
New File 1.6 m 20170713 GIC TDD for CHP, WW and
Solar_Report Template.docx100%
New File 2.5 m 20170713 GIC TDD for CHP, WW and
Solar_Report Template_Neoh_06Aug.docx100%
New File 549258
catalog_of_chp_technologies_appendix_a_expressing_chp_efficiency.pdf100%
New File 536012 CHP Plant.pdf100%
New File 65266 chpefficiencymetrics_epa.pdf100%
New File 24338 CogenerationOptions.pdf100%
New File 85653 Diagrams.pptx100%
New File 155789 IP-29 - CHP calculations.pdf100%
New File 47380 Master Spreadsheet.xlsx100%
New File 115916 news2.pdf100%
New File 596627 Risk Register Template_14 July 2017.xlsx
100%
New File 172124 Risk Register Template_Neoh.xlsx100%
New Dir 27 C:\AdvisianActive\01 Projects\GMR GKEL Arbitration\
New File 165 ~$SOC Analysis.pptx100%
New File 257651 19052017_ sepco Deviation from Contract
Technical Specification_v5.xlsx100%
New File 288201 19052017_ sepco Deviation from Contract
Technical Specification_v5_Advisian_24Aug.xlsx100%
New File 264378 19052017_ sepco Deviation from Contract
Technical Specification_v5_Advisian23 Aug.xlsx100%
New File 288220 19052017_ sepco Deviation from Contract
Technical Specification_v5_Advisian24 Aug.xlsx100%
New File 260542 19052017_ sepco Deviation from Contract
Technical Specification_v5_Neoh.xlsx100%
New File 361392 2_6 Annexures A, B and C of RRT joint
protocol for Units 1, 2 and 3.zip100%
New File 4.3 m 20170822 Preliminary Technical Expert
Report - Template New r1_Neoh.docx100%
New File 4.1 m 20170822 Preliminary Technical Expert
Report - Template New.docx100%
New File 10.6 m 37-F4341C2-J-01 Design Basis Report
RevA.pdf100%
New File 693109 37-F4341C2-J-01 Design Instruction.pdf
100%
New File 15581 400kV Switchyard BOQ Estimation.docx100%

New File 45682 Ash Handling Settlement Tank.docx100%


New File 32948 Ash Handling Settlement Tank_Mukesh
comments.docx100%
New File 259895 Copy of 19052017_ sepco Deviation from
Contract Technical Specification_v5_Advisian.xlsx100%
New File 23447 Defects _SEPCO_20170822_Advisian 23
Aug.xlsx100%
New File 39628 Defects Identification Methodology.docx
100%
New File 432746 GKEL Defects Analysis.xlsx100%
New File 74264 NegotiationMeeting_21July2016.pptx100%
New File 122179
NegotiationMeeting_21July2016_Advisian21Aug.pptx100%
New File 45334 Settlement of Sulphuric Acid Tank.docx
100%
New File 394366 SOC Analysis.pptx100%
New File 3.6 m Study of Technical Issues faced in GKEL -
Steag April 2016.pdf100%
New File 70774 Sulphuric Acid.docx100%
New File 640040 T0327.pdf100%
New File 5.6 m Technical Specification for Erection Work
of BTG Area.pdf100%
New File 61583 TechnicalDeficiencies_Cost_21Aug.xlsx100%

New Dir 5 C:\AdvisianActive\01 Projects\GMR GKEL


Arbitration\Advisian Technical Report dated 13 Sep\
New File 13.1 m 20170913 Preliminary Technical Expert
Report - DRAFT clean.docx100%
New File 13.1 m 20170913 Preliminary Technical Expert
Report - DRAFT clean_Neoh 14Sep.docx100%
New File 13.1 m 20170913 Preliminary Technical Expert
Report - DRAFT clean_Neoh 15Sep.docx100%
New File 13.1 m 20170913 Preliminary Technical Expert
Report - DRAFT clean_Neoh 18Sep.docx100%
New File 790102 Mobile Crusher Location - annotated
Advisian.pdf100%
New Dir 0 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Day 3 23 Aug\
New Dir 1 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Day 4 24 AUg\
New File 284522 19052017_ sepco Deviation from Contract
Technical Specification_v5_Advisian to GKEL_24Aug.xlsx100%
New Dir 1 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\From Adam\
New File 428010 20170716 Preliminary Technical Expert
Report - Template.docx100%
New Dir 0 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\
New Dir 0 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\12 Suspension of Unit 4\
New Dir 0 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\12 Suspension of Unit 4\Unit #4- Mail-1\
New Dir 4 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\12 Suspension of Unit 4\Unit #4- Mail-1\Unit #4- Mail-1\
New File 173056 Actual manufacturing status (component
wise) of GKEL Units 1 2 3 & 4 as on today (25th Jun 2012) .msg100%
New File 166400 GKEL Unitwise Manufacturing Tracking
Record as on 25th May 2012 .msg100%
New File 13411 High Value Items Inspection Latest - 15-
09-2015.xlsx100%
New File 3.5 m High Value Items.zip100%
New Dir 0 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\12 Suspension of Unit 4\Unit #4- Mail-1\Unit #4- Mail-
1\Inspection Call & Report after Nov-11\
New Dir 4 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\12 Suspension of Unit 4\Unit #4- Mail-1\Unit #4- Mail-
1\Inspection Call & Report after Nov-11\Generator Central retaining ring May & Dec-
11\
New File 87040 Inspection Call no. 573.doc100%
New File 86016 Inspection Call no. 872.doc100%
New File 77599 KTPP-Unit4-Generator-GMR-SEPCO-01-FIR-
001-573.pdf100%
New File 189788 KTPP-Unit4-Generator-GMR-SEPCO-01-IR-001-
573.pdf100%
New Dir 9 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\12 Suspension of Unit 4\Unit #4- Mail-1\Unit #4- Mail-
1\Inspection Call & Report after Nov-11\Generator Stator- July-11 to Jan-12\
New File 87552 Inspection Call no. 737.doc100%
New File 86528 Inspection Call no. 866.doc100%
New File 86528 Inspection Call no. 870.doc100%
New File 86528 Inspection Call no. 886.doc100%
New File 228465 KTPP-Unit 4-Generator-GMR-SEPCO-01-IR-
007-866.pdf100%
New File 213364 KTPP-Unit 4-Generator-GMR-SEPCO-01-IR-
008-870.pdf100%
New File 147224 KTPP-Unit4-Generator-GMR-SEPCO-01-FIR-
003-886.pdf100%
New File 262981 KTPP-Unit4-Generator-GMR-SEPCO-01-IR-004-
737.pdf100%
New File 230303 KTPP-Unit4-Generator-GMR-SEPCO-01-IR-010-
879.pdf100%
New Dir 3 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\12 Suspension of Unit 4\Unit #4- Mail-1\Unit #4- Mail-
1\Inspection Call & Report after Nov-11\Intake Butterfly Valve-April-12\
New File 87552 Inspection Call no. 905 rev. 1.doc100%
New File 87040 Inspection Call no. 905.doc100%
New File 320434 KTPP-Intake valve-GMR-SEPCO-01-IR-001-
905.pdf100%
New Dir 0 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\12 Suspension of Unit 4\Unit #4- Mail-1\Unit #4- Mail-
1\Inspection Call & Report upto Nov-11\
New Dir 2 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\12 Suspension of Unit 4\Unit #4- Mail-1\Unit #4- Mail-
1\Inspection Call & Report upto Nov-11\Air cannon-Sep-11\
New File 86016 Inspection Call no. 803-20110910.doc100%

New File 654312 VR #008 IC-803 -14-16-Sept -2011.pdf100%

New Dir 2 C:\AdvisianActive\01 Projects\GMR GKEL


Arbitration\Intralinks\12 Suspension of Unit 4\Unit #4- Mail-1\Unit #4- Mail-
1\Inspection Call & Report upto Nov-11\Ash handling system-Nov-11\
New File 103617 KTPP-1-4 Unit Flash Ash handling System-
GMR-SEPCO-01-IR-001-864.pdf100%
New File 109844 KTPP-1-4 Unit Fly Ash handling System-
GMR-SEPCO-01-IR-002-865.pdf100%
New Dir 3 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\12 Suspension of Unit 4\Unit #4- Mail-1\Unit #4- Mail-
1\Inspection Call & Report upto Nov-11\Boiler Drum- Jul-Aug-11\
New File 88064 Inspection Call no. 767.doc100%
New File 232674 KTPP-#4-Boiler Drum-GMR-SEPCO-01-IR-001-
724.pdf100%
New File 396962 KTPP-#4-Boiler Drum-GMR-SEPCO-01-IR-001-
R1-724.pdf100%
New Dir 2 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\12 Suspension of Unit 4\Unit #4- Mail-1\Unit #4- Mail-
1\Inspection Call & Report upto Nov-11\Boiler Header-Aug-11\
New File 88576 Inspection Call no. 789.doc100%
New File 325946 KTPP-4-Boiler headers-GMR-SEPCO-01-IR-
001-789.pdf100%
New Dir 1 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\12 Suspension of Unit 4\Unit #4- Mail-1\Unit #4- Mail-
1\Inspection Call & Report upto Nov-11\Boiler Heating surfaces-Jul-11\
New File 362758 IR-KTPP-4-Boiler Water Wall Panels &
Coils-01-IR-001-719.pdf100%
New Dir 2 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\12 Suspension of Unit 4\Unit #4- Mail-1\Unit #4- Mail-
1\Inspection Call & Report upto Nov-11\Boiler Steel Structure-633,-Jun-11\
New File 71168 Inspection Call no. 633.doc100%
New File 368074 KTPP-Unit 4#-Boiler Steel Structure-GMR-
SEPCO-01-IR-001.pdf100%
New Dir 3 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\12 Suspension of Unit 4\Unit #4- Mail-1\Unit #4- Mail-
1\Inspection Call & Report upto Nov-11\Butterfly Valve-Unit# 3 & 4-Aug-11\
New File 86016 Inspection Call no. 768 rev-01.doc100%
New File 86016 Inspection Call no. 768.doc100%
New File 416030 KTPP-Unit 3&4-Butterfly Valve-GMR-SEPCO-
01-IR-001-768.pdf100%
New Dir 6 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\12 Suspension of Unit 4\Unit #4- Mail-1\Unit #4- Mail-
1\Inspection Call & Report upto Nov-11\Condenser Pump-Aug-Oct-11\
New File 92160 Inspection Call no. 769.doc100%
New File 89088 Inspection Call no. 835.doc100%
New File 151251 KTPP-Unit4#-Condenser Pump-GMR-SEPCO-01-
IR-001-769.pdf100%
New File 1.0 m KTPP-Unit4#-Condenser Pump-GMR-SEPCO-01-
IR-002-821.pdf100%
New File 183898 KTPP-Unit4#-Condenser Pump-GMR-SEPCO-01-
IR-003-835.pdf100%
New File 1.1 m KTPP-Unit4#-Condenser Pump-GMR-SEPCO-01-
IR-004-835 r1.pdf100%
New Dir 2 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\12 Suspension of Unit 4\Unit #4- Mail-1\Unit #4- Mail-
1\Inspection Call & Report upto Nov-11\Deaerator-Jun-Jul-2010\
New File 86016 Inspection Call no. 685.doc100%
New File 359133 KTPP-Unit 4#-Deaerator-GMR-SEPCO-01-IR-
001-685.pdf100%
New Dir 0 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\12 Suspension of Unit 4\Unit#4- Mail-2\
New Dir 0 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\12 Suspension of Unit 4\Unit#4- Mail-2\Unit#4- Mail-2\
New Dir 0 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\12 Suspension of Unit 4\Unit#4- Mail-2\Unit#4- Mail-
2\Inspection Call & Report upto Nov-11\
New Dir 2 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\12 Suspension of Unit 4\Unit#4- Mail-2\Unit#4- Mail-
2\Inspection Call & Report upto Nov-11\Generator Silcon steel sheet-Jul-11\
New File 86528 Inspection Call no. 705 .doc100%
New File 236796 KTPP-Unit4-Generator-GMR-SEPCO-01-IR-003-
705.pdf100%
New Dir 7 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\12 Suspension of Unit 4\Unit#4- Mail-2\Unit#4- Mail-
2\Inspection Call & Report upto Nov-11\Generator Transformer May-11 to Aug-11\
New File 86016 Inspection Call no. 535 .doc100%
New File 85504 Inspection Call no. 654.doc100%
New File 84480 Inspection Call no. 665 4# Generator
Transformer (663 call).doc100%
New File 47860 KTPP-Unit4#-Generator Transformer-GMR-
SEPCO-01-FIR-001-535.pdf100%
New File 222352 KTPP-Unit4#-Generator transformer-GMR-
SEPCO-01-IR-003-665.pdf100%
New File 437237 KTPP-Unit4#-Generator transformer-GMR-
SEPCO-01-IR-004-674.pdf100%
New File 489837 KTPP-Unit4-Generator transformer-GMR-
SEPCO-01-IR-005-720.pdf100%
New Dir 5 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\12 Suspension of Unit 4\Unit#4- Mail-2\Unit#4- Mail-
2\Inspection Call & Report upto Nov-11\Generator Whole Unit- May-Oct-11\
New File 87552 Inspection Call no. 577.doc100%
New File 90112 Inspection Call no. 807.doc100%
New File 295956 KTPP-Unit4-Generator-GMR-SEPCO-01-IR-002-
577.pdf100%
New File 223703 KTPP-Unit4-Generator-GMR-SEPCO-01-IR-005-
807.pdf100%
New File 243709 KTPP-Unit4-Generator-GMR-SEPCO-01-IR-006-
838.pdf100%
New Dir 9 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\12 Suspension of Unit 4\Unit#4- Mail-2\Unit#4- Mail-
2\Inspection Call & Report upto Nov-11\HP Heater- Nov-10 to Jul-11\
New File 83968 Inspection Call no. 22.doc100%
New File 90112 Inspection Call no. 554.doc100%
New File 88064 Inspection Call no. 729 rev.1.doc100%
New File 88064 Inspection Call no. 729.doc100%
New File 1.4 m KTPP-Unit 4# HP Heater-GMR-SEPCO-01-IR-
003-729.pdf100%
New File 69078 KTPP-Unit4# HP Heater-GMR-SEPCO-01-FIR-
001-554.pdf100%
New File 70063 KTPP-Unit4# HP Heater-GMR-SEPCO-01-FIR-
002-562.pdf100%
New File 151677 KTPP-Unit4# HP Heater-GMR-SEPCO-01-IR-
001-554.pdf100%
New File 340248 KTPP-Unit4# HP Heater-GMR-SEPCO-01-IR-
002-562.pdf100%
New Dir 4 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\12 Suspension of Unit 4\Unit#4- Mail-2\Unit#4- Mail-
2\Inspection Call & Report upto Nov-11\LP Heater-Apr-Aug-11\
New File 91648 Inspection Call no. 447.doc100%
New File 93184 Inspection Call no. 448.doc100%
New File 91136 Inspection Call no. 765.doc100%
New File 93028 KTPP-Unit4#-LP Heater-GMR-SEPCO-01-FIR-
001-447 & 448.pdf100%
New Dir 4 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\12 Suspension of Unit 4\Unit#4- Mail-2\Unit#4- Mail-
2\Inspection Call & Report upto Nov-11\Ring Hammer Crusher-Oct-11\
New File 93184 Inspection Call no. 832.doc100%
New File 316666 KTPP-#3 &#4 Ring hammer crusher-GMR-
SEPCO-01-IR-004-832.pdf100%
New File 161818 KTPP-#3 &#4 Ring hammer crusher-GMR-
SEPCO-01-IR-005-832.pdf100%
New File 287445 KTPP-#3 &#4 Ring hammer crusher-GMR-
SEPCO-01-IR-006-832 rev1.pdf100%
New Dir 6 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\12 Suspension of Unit 4\Unit#4- Mail-2\Unit#4- Mail-
2\Inspection Call & Report upto Nov-11\Station Transformer-Jun-Jul-11\
New File 84992 Inspection Call no. 613 .doc100%
New File 30280 Inspection Call no. 655.docx100%
New File 318863 KTPP-Unit4#-Station Transformer-GMR-
SEPCO-01-IR-001-613.pdf100%
New File 150636 KTPP-Unit4#-Station Transformer-GMR-
SEPCO-01-IR-002-655.pdf100%
New File 261151 KTPP-Unit4#-Station Transformer-GMR-
SEPCO-01-IR-003-675.pdf100%
New File 50597 Punch List Summary for 4# station
transformer in Jinan -613.pdf100%
New Dir 10 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\12 Suspension of Unit 4\Unit#4- Mail-2\Unit#4- Mail-
2\Inspection Call & Report upto Nov-11\Turbine feed water pump-Jun-Aug-11\
New File 86528 Inspection Call no. 660.doc100%
New File 86528 Inspection Call no. 707 .doc100%
New File 83456 Inspection Call no. 710 .doc100%
New File 83968 Inspection Call no. 710-rev.01 .doc100%
New File 87552 Inspection Call no. 711 .doc100%
New File 87552 Inspection Call no. 711-rev.02 .doc100%
New File 87552 Inspection Call no. 750.doc100%
New File 133279 KTPP-Unit4# FWP Turbine-GMR-SEPCO-01-IR-
004-710 r1.pdf100%
New File 247460 KTPP-Unit4#-Feed water Pump Turbine-GMR-
SEPCO-01-IR-002-707.pdf100%
New File 289975 KTPP-Unit4#-Feed water Pump Turbine-GMR-
SEPCO-01-IR-003-750.pdf100%
New Dir 3 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\12 Suspension of Unit 4\Unit#4- Mail-2\Unit#4- Mail-
2\Inspection Call & Report upto Nov-11\Turbine LP Rotor-May-11\
New File 87040 Inspection Call no. 586.doc100%
New File 141918 KTPP-Unit4#-turbine-GMR-SEPCO-01-FIR-001-
586.pdf100%
New File 811232 KTPP-Unit4-Turbine-GMR-SEPCO-01-IR-001-
586.pdf100%
New Dir 0 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\12 Suspension of Unit 4\Unit#4- Mail-2\Unit#4- Mail-
2\Inspection Call & Report upto Nov-11\UAT-Jun-Jul-11\
New Dir 5 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\12 Suspension of Unit 4\Unit#4- Mail-2\Unit#4- Mail-
2\Inspection Call & Report upto Nov-11\UAT-Jun-Jul-11\UAT-1-Jun-Jul-11\
New File 85504 Inspection Call no. 640.doc100%
New File 85504 Inspection Call no. 656.doc100%
New File 151555 KTPP-Unit4#-UA Transformer-GMR-SEPCO-01-
IR-003-656.pdf100%
New File 461684 KTPP-Unit4#-UA Transformer-GMR-SEPCO-01-
IR-006-677 & 723.pdf100%
New File 327901 KTPP-Unit4-UA Transformer-GMR-SEPCO-01-
IR-001-640.pdf100%
New Dir 5 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\12 Suspension of Unit 4\Unit#4- Mail-2\Unit#4- Mail-
2\Inspection Call & Report upto Nov-11\UAT-Jun-Jul-11\UAT-2-Jun-Jul-11\
New File 85504 Inspection Call no. 641.doc100%
New File 85504 Inspection Call no. 657.doc100%
New File 143227 KTPP-Unit4#-UA Transformer-GMR-SEPCO-01-
IR-004-657.pdf100%
New File 461684 KTPP-Unit4#-UA Transformer-GMR-SEPCO-01-
IR-006-723.pdf100%
New File 214932 KTPP-Unit4-UA Transformer-GMR-SEPCO-01-
IR-002-641.pdf100%
New Dir 4 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\12 Suspension of Unit 4\Unit#4- Mail-2\Unit#4- Mail-
2\Inspection Call & Report upto Nov-11\Vaccum pump-Aug-Sep-11\
New File 88064 Inspection Call no. 751.doc100%
New File 86528 Inspection Call no. 763.doc100%
New File 686362 KTPP-Unit 4-vacuum pump-GMR-SEPCO-01-IR-
001-751.pdf100%
New File 339679 KTPP-Unit 4-vacuum pump-GMR-SEPCO-01-IR-
002-763.pdf100%
New Dir 0 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\12 Suspension of Unit 4\Unit#4-Mail-3\
New Dir 0 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\12 Suspension of Unit 4\Unit#4-Mail-3\Unit#4-Mail-3\
New Dir 11 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\12 Suspension of Unit 4\Unit#4-Mail-3\Unit#4-Mail-3\Boiler
feed water pump-Jun-Aug-11\
New File 86016 Inspection Call no. 684 -rev.01 .doc100%

New File 85504 Inspection Call no. 687 .doc100%


New File 89088 Inspection Call no. 712 .doc100%
New File 86528 Inspection Call no. 730.doc100%
New File 86016 Inspection Call no. 732.doc100%
New File 84992 Inspection Call no. 764(BFP motor).doc
100%
New File 882602 KTPP-Unit 4#-BFP Motor-GMR-SEPCO-01-IR-
001-Rev-684.pdf100%
New File 782001 KTPP-Unit 4#-Boiler Feed Water Pump-GMR-
SEPCO-01-IR-001-687.pdf100%
New File 4.6 m KTPP-Unit 4#-Boiler Feed Water Pump-GMR-
SEPCO-01-IR-004-732.pdf100%
New File 2.3 m KTPP-Unit 4#-Boiler Feed Water Pumpr-GMR-
SEPCO-01-IR-005-730.pdf100%
New File 6.9 m KTPP-Unit4#-BFP-GMR-SEPCO-01-IR-003-
712.pdf100%
New Dir 7 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Coal related documents\
New File 94720 COAL ANALYSIS REPORT - IGI.xls100%
New File 459264 COAL ANALYSIS REPORT - Open market.xls
100%
New File 143728 Date wise receipt data.xlsx100%
New File 4.6 m IGI approved.pdf100%
New File 6.2 m IGI Reports.pdf100%
New File 520791 KRE source check.pdf100%
New File 1.3 m Utkal source check.pdf100%
New Dir 228 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Coal related documents\Consumption Data of coal\
New File 44032 Coal receipt of dtd 26-07-13.msg100%
New File 88576 Coal report of dtd 01-12-13 GKEL.msg
100%
New File 88576 Coal report of dtd 02-12-13 GKEL.msg
100%
New File 87552 Coal report of dtd 17-11-13 GKEL.msg
100%
New File 87040 Coal report of dtd 18-11-13 GKEL.msg
100%
New File 91136 Coal report of dtd 19-11-13 GKEL.msg
100%
New File 91648 Coal report of dtd 21-11-13 GKEL.msg
100%
New File 88064 Coal report of dtd 22-11-13 GKEL.msg
100%
New File 89088 Coal report of dtd 24-11-13 GKEL.msg
100%
New File 89088 Coal report of dtd 25-11-13 GKEL.msg
100%
New File 89088 Coal report of dtd 26-11-13 GKEL.msg
100%
New File 88576 Coal report of dtd 27-11-13 GKEL.msg
100%
New File 88576 Coal report of dtd 28-11-13 GKEL.msg
100%
New File 88576 Coal report of dtd 29-11-13 GKEL.msg
100%
New File 88576 Coal report of dtd 30-11-13 GKEL.msg
100%
New File 73216 Coal Stock of GKEL as on dtd 31-03-13
.msg100%
New File 171520 Coal test report of GKEL .msg100%
New File 149504 DPR of CHP & AHP GKEL for dtd 01-03-13
.msg100%
New File 156160 DPR of CHP & AHP GKEL for dtd 01-04-13
.msg100%
New File 179200 DPR of CHP & AHP GKEL for dtd 01-05-13
.msg100%
New File 144384 DPR of CHP & AHP GKEL for dtd 01-06-13
.msg100%
New File 126464 DPR of CHP & AHP GKEL for dtd 01-07-13
.msg100%
New File 122368 DPR of CHP & AHP GKEL for dtd 01-08-13
.msg100%
New File 123392 DPR of CHP & AHP GKEL for dtd 01-09-13
.msg100%
New File 149504 DPR of CHP & AHP GKEL for dtd 02-03-13
.msg100%
New File 173568 DPR of CHP & AHP GKEL for dtd 02-04-13
.msg100%
New File 181248 DPR of CHP & AHP GKEL for dtd 02-05-13
.msg100%
New File 144384 DPR of CHP & AHP GKEL for dtd 02-06-13
.msg100%
New File 126464 DPR of CHP & AHP GKEL for dtd 02-07-13
.msg100%
New File 123392 DPR of CHP & AHP GKEL for dtd 02-09-13
.msg100%
New File 121856 DPR of CHP & AHP GKEL for dtd 02-10-13
.msg100%
New File 151040 DPR of CHP & AHP GKEL for dtd 03-03-13
.msg100%
New File 182784 DPR of CHP & AHP GKEL for dtd 03-04-13
.msg100%
New File 181248 DPR of CHP & AHP GKEL for dtd 03-05-13
.msg100%
New File 144384 DPR of CHP & AHP GKEL for dtd 03-06-13
.msg100%
New File 126464 DPR of CHP & AHP GKEL for dtd 03-07-13
.msg100%
New File 123392 DPR of CHP & AHP GKEL for dtd 03-09-13
.msg100%
New File 122368 DPR of CHP & AHP GKEL for dtd 03-10-13
.msg100%
New File 150528 DPR of CHP & AHP GKEL for dtd 04-03-13
.msg100%
New File 174080 DPR of CHP & AHP GKEL for dtd 04-04-13
(1).msg100%
New File 173056 DPR of CHP & AHP GKEL for dtd 04-04-13
.msg100%
New File 181760 DPR of CHP & AHP GKEL for dtd 04-05-13
.msg100%
New File 144384 DPR of CHP & AHP GKEL for dtd 04-06-13
.msg100%
New File 126464 DPR of CHP & AHP GKEL for dtd 04-07-13
.msg100%
New File 122368 DPR of CHP & AHP GKEL for dtd 04-08-13
.msg100%
New File 123392 DPR of CHP & AHP GKEL for dtd 04-09-13
.msg100%
New File 121856 DPR of CHP & AHP GKEL for dtd 04-10-13
.msg100%
New File 151040 DPR of CHP & AHP GKEL for dtd 05-03-13
.msg100%
New File 181760 DPR of CHP & AHP GKEL for dtd 05-05-13
.msg100%
New File 144384 DPR of CHP & AHP GKEL for dtd 05-06-13
.msg100%
New File 126976 DPR of CHP & AHP GKEL for dtd 05-07-13
.msg100%
New File 123904 DPR of CHP & AHP GKEL for dtd 05-09-13
.msg100%
New File 152064 DPR of CHP & AHP GKEL for dtd 06-03-13
.msg100%
New File 146432 DPR of CHP & AHP GKEL for dtd 06-05-13
.msg100%
New File 132608 DPR of CHP & AHP GKEL for dtd 06-06-13
.msg100%
New File 121344 DPR of CHP & AHP GKEL for dtd 06-08-13
.msg100%
New File 123904 DPR of CHP & AHP GKEL for dtd 06-09-13
.msg100%
New File 122368 DPR of CHP & AHP GKEL for dtd 06-10-13
.msg100%
New File 152064 DPR of CHP & AHP GKEL for dtd 07-03-13
.msg100%
New File 145920 DPR of CHP & AHP GKEL for dtd 07-05-13
.msg100%
New File 132608 DPR of CHP & AHP GKEL for dtd 07-06-13
.msg100%
New File 126976 DPR of CHP & AHP GKEL for dtd 07-07-13
.msg100%
New File 121344 DPR of CHP & AHP GKEL for dtd 07-08-13
.msg100%
New File 152064 DPR of CHP & AHP GKEL for dtd 08-03-13
.msg100%
New File 145920 DPR of CHP & AHP GKEL for dtd 08-05-13
.msg100%
New File 132608 DPR of CHP & AHP GKEL for dtd 08-06-13
.msg100%
New File 126976 DPR of CHP & AHP GKEL for dtd 08-07-13
.msg100%
New File 123904 DPR of CHP & AHP GKEL for dtd 08-09-13
.msg100%
New File 152576 DPR of CHP & AHP GKEL for dtd 09-03-13
.msg100%
New File 173568 DPR of CHP & AHP GKEL for dtd 09-04-13
.msg100%
New File 139776 DPR of CHP & AHP GKEL for dtd 09-05-13
.msg100%
New File 133632 DPR of CHP & AHP GKEL for dtd 09-06-13
.msg100%
New File 121344 DPR of CHP & AHP GKEL for dtd 09-08-13
.msg100%
New File 123904 DPR of CHP & AHP GKEL for dtd 09-09-13
.msg100%
New File 122368 DPR of CHP & AHP GKEL for dtd 09-10-13
.msg100%
New File 153600 DPR of CHP & AHP GKEL for dtd 10-03-13
.msg100%
New File 139264 DPR of CHP & AHP GKEL for dtd 10-05-13
.msg100%
New File 132608 DPR of CHP & AHP GKEL for dtd 10-06-13
.msg100%
New File 126976 DPR of CHP & AHP GKEL for dtd 10-07-13
.msg100%
New File 123392 DPR of CHP & AHP GKEL for dtd 10-09-13
.msg100%
New File 126976 DPR of CHP & AHP GKEL for dtd 10-10-13
.msg100%
New File 154112 DPR of CHP & AHP GKEL for dtd 11-03-13
.msg100%
New File 173568 DPR of CHP & AHP GKEL for dtd 11-04-13
.msg100%
New File 139264 DPR of CHP & AHP GKEL for dtd 11-05-13
.msg100%
New File 132608 DPR of CHP & AHP GKEL for dtd 11-06-13
.msg100%
New File 126976 DPR of CHP & AHP GKEL for dtd 11-07-13
.msg100%
New File 121344 DPR of CHP & AHP GKEL for dtd 11-08-13
.msg100%
New File 124416 DPR of CHP & AHP GKEL for dtd 11-09-13
.msg100%
New File 173568 DPR of CHP & AHP GKEL for dtd 12-04-13
.msg100%
New File 143360 DPR of CHP & AHP GKEL for dtd 12-05-13
.msg100%
New File 128512 DPR of CHP & AHP GKEL for dtd 12-06-13
.msg100%
New File 127488 DPR of CHP & AHP GKEL for dtd 12-07-13
.msg100%
New File 121344 DPR of CHP & AHP GKEL for dtd 12-08-13
.msg100%
New File 123904 DPR of CHP & AHP GKEL for dtd 12-09-13
.msg100%
New File 153088 DPR of CHP & AHP GKEL for dtd 13-03-13
.msg100%
New File 143360 DPR of CHP & AHP GKEL for dtd 13-05-13
.msg100%
New File 128512 DPR of CHP & AHP GKEL for dtd 13-06-13
.msg100%
New File 121344 DPR of CHP & AHP GKEL for dtd 13-08-13
.msg100%
New File 123392 DPR of CHP & AHP GKEL for dtd 13-09-13
.msg100%
New File 127488 DPR of CHP & AHP GKEL for dtd 13-10-13
.msg100%
New File 173568 DPR of CHP & AHP GKEL for dtd 14-04-13
.msg100%
New File 143360 DPR of CHP & AHP GKEL for dtd 14-05-13
.msg100%
New File 128512 DPR of CHP & AHP GKEL for dtd 14-06-13
.msg100%
New File 127488 DPR of CHP & AHP GKEL for dtd 14-07-13
.msg100%
New File 123392 DPR of CHP & AHP GKEL for dtd 14-09-13
.msg100%
New File 176640 DPR of CHP & AHP GKEL for dtd 15-04-13
.msg100%
New File 143360 DPR of CHP & AHP GKEL for dtd 15-05-13
.msg100%
New File 128512 DPR of CHP & AHP GKEL for dtd 15-06-13
.msg100%
New File 123904 DPR of CHP & AHP GKEL for dtd 15-07-13
.msg100%
New File 122368 DPR of CHP & AHP GKEL for dtd 15-08-13
.msg100%
New File 122368 DPR of CHP & AHP GKEL for dtd 15-09-13
.msg100%
New File 156160 DPR of CHP & AHP GKEL for dtd 16-03-13
.msg100%
New File 176640 DPR of CHP & AHP GKEL for dtd 16-04-13
.msg100%
New File 145920 DPR of CHP & AHP GKEL for dtd 16-05-13
.msg100%
New File 128000 DPR of CHP & AHP GKEL for dtd 16-06-13
.msg100%
New File 123904 DPR of CHP & AHP GKEL for dtd 16-07-13
.msg100%
New File 121856 DPR of CHP & AHP GKEL for dtd 16-08-13
.msg100%
New File 121856 DPR of CHP & AHP GKEL for dtd 16-09-13
.msg100%
New File 123904 DPR of CHP & AHP GKEL for dtd 16-10-13
.msg100%
New File 176640 DPR of CHP & AHP GKEL for dtd 17-04-13
.msg100%
New File 145920 DPR of CHP & AHP GKEL for dtd 17-05-13
.msg100%
New File 123904 DPR of CHP & AHP GKEL for dtd 17-07-13
.msg100%
New File 121856 DPR of CHP & AHP GKEL for dtd 17-09-13
.msg100%
New File 111616 DPR of CHP & AHP GKEL for dtd 18-01-13
.msg100%
New File 176640 DPR of CHP & AHP GKEL for dtd 18-04-13
.msg100%
New File 150528 DPR of CHP & AHP GKEL for dtd 18-05-13
.msg100%
New File 129024 DPR of CHP & AHP GKEL for dtd 18-06-13
.msg100%
New File 124416 DPR of CHP & AHP GKEL for dtd 18-07-13
.msg100%
New File 121856 DPR of CHP & AHP GKEL for dtd 18-08-13
.msg100%
New File 121856 DPR of CHP & AHP GKEL for dtd 18-09-13
.msg100%
New File 178688 DPR of CHP & AHP GKEL for dtd 19-04-13
.msg100%
New File 147456 DPR of CHP & AHP GKEL for dtd 19-05-13
.msg100%
New File 130048 DPR of CHP & AHP GKEL for dtd 19-06-13
.msg100%
New File 124416 DPR of CHP & AHP GKEL for dtd 19-07-13
.msg100%
New File 121856 DPR of CHP & AHP GKEL for dtd 19-08-13
.msg100%
New File 121856 DPR of CHP & AHP GKEL for dtd 19-09-13
.msg100%
New File 110592 DPR of CHP & AHP GKEL for dtd 20-01-13
.msg100%
New File 147456 DPR of CHP & AHP GKEL for dtd 20-05-13
.msg100%
New File 130048 DPR of CHP & AHP GKEL for dtd 20-06-13
.msg100%
New File 122368 DPR of CHP & AHP GKEL for dtd 20-08-13
.msg100%
New File 121856 DPR of CHP & AHP GKEL for dtd 20-09-13
.msg100%
New File 118272 DPR of CHP & AHP GKEL for dtd 21-01-13
.msg100%
New File 158208 DPR of CHP & AHP GKEL for dtd 21-03-13
.msg100%
New File 172544 DPR of CHP & AHP GKEL for dtd 21-04-13
.msg100%
New File 147456 DPR of CHP & AHP GKEL for dtd 21-05-13
.msg100%
New File 130048 DPR of CHP & AHP GKEL for dtd 21-06-13
.msg100%
New File 124416 DPR of CHP & AHP GKEL for dtd 21-07-13
.msg100%
New File 122368 DPR of CHP & AHP GKEL for dtd 21-08-13
.msg100%
New File 121856 DPR of CHP & AHP GKEL for dtd 21-09-13
.msg100%
New File 123904 DPR of CHP & AHP GKEL for dtd 21-10-13
.msg100%
New File 172544 DPR of CHP & AHP GKEL for dtd 22-04-13
.msg100%
New File 148992 DPR of CHP & AHP GKEL for dtd 22-05-13
.msg100%
New File 126464 DPR of CHP & AHP GKEL for dtd 22-06-13
.msg100%
New File 172032 DPR of CHP & AHP GKEL for dtd 22-07-13
.msg100%
New File 121856 DPR of CHP & AHP GKEL for dtd 22-08-13
.msg100%
New File 117760 DPR of CHP & AHP GKEL for dtd 23-01-13
.msg100%
New File 172544 DPR of CHP & AHP GKEL for dtd 23-04-13
.msg100%
New File 148992 DPR of CHP & AHP GKEL for dtd 23-05-13
.msg100%
New File 130560 DPR of CHP & AHP GKEL for dtd 23-06-13
.msg100%
New File 122368 DPR of CHP & AHP GKEL for dtd 23-08-13
.msg100%
New File 123392 DPR of CHP & AHP GKEL for dtd 23-09-13
.msg100%
New File 129536 DPR of CHP & AHP GKEL for dtd 24-01-13
.msg100%
New File 172544 DPR of CHP & AHP GKEL for dtd 24-04-13
.msg100%
New File 148992 DPR of CHP & AHP GKEL for dtd 24-05-13
.msg100%
New File 126976 DPR of CHP & AHP GKEL for dtd 24-06-13
.msg100%
New File 123392 DPR of CHP & AHP GKEL for dtd 24-09-13
.msg100%
New File 136192 DPR of CHP & AHP GKEL for dtd 25-02-13
.msg100%
New File 177664 DPR of CHP & AHP GKEL for dtd 25-04-13
.msg100%
New File 147968 DPR of CHP & AHP GKEL for dtd 25-05-13
.msg100%
New File 126976 DPR of CHP & AHP GKEL for dtd 25-06-13
.msg100%
New File 171520 DPR of CHP & AHP GKEL for dtd 25-07-13
.msg100%
New File 122368 DPR of CHP & AHP GKEL for dtd 25-08-13
.msg100%
New File 127488 DPR of CHP & AHP GKEL for dtd 25-09-13
.msg100%
New File 123904 DPR of CHP & AHP GKEL for dtd 25-10-13
.msg100%
New File 140800 DPR of CHP & AHP GKEL for dtd 26-02-13
.msg100%
New File 177664 DPR of CHP & AHP GKEL for dtd 26-04-13
.msg100%
New File 147968 DPR of CHP & AHP GKEL for dtd 26-05-13
.msg100%
New File 127488 DPR of CHP & AHP GKEL for dtd 26-06-13
.msg100%
New File 174080 DPR of CHP & AHP GKEL for dtd 26-07-13
.msg100%
New File 122368 DPR of CHP & AHP GKEL for dtd 26-08-13
.msg100%
New File 122880 DPR of CHP & AHP GKEL for dtd 26-09-13
.msg100%
New File 113152 DPR of CHP & AHP GKEL for dtd 27-01-13
.msg100%
New File 141312 DPR of CHP & AHP GKEL for dtd 27-02-13
.msg100%
New File 177664 DPR of CHP & AHP GKEL for dtd 27-04-13
.msg100%
New File 147968 DPR of CHP & AHP GKEL for dtd 27-05-13
.msg100%
New File 126976 DPR of CHP & AHP GKEL for dtd 27-06-13
.msg100%
New File 122880 DPR of CHP & AHP GKEL for dtd 27-08-13
.msg100%
New File 122368 DPR of CHP & AHP GKEL for dtd 27-09-13
.msg100%
New File 116224 DPR of CHP & AHP GKEL for dtd 28-01-13
.msg100%
New File 143360 DPR of CHP & AHP GKEL for dtd 28-02-13
.msg100%
New File 154112 DPR of CHP & AHP GKEL for dtd 28-03-13
.msg100%
New File 178688 DPR of CHP & AHP GKEL for dtd 28-04-13
.msg100%
New File 147968 DPR of CHP & AHP GKEL for dtd 28-05-13
.msg100%
New File 127488 DPR of CHP & AHP GKEL for dtd 28-06-13
.msg100%
New File 174592 DPR of CHP & AHP GKEL for dtd 28-07-13
.msg100%
New File 123392 DPR of CHP & AHP GKEL for dtd 28-08-13
.msg100%
New File 124416 DPR of CHP & AHP GKEL for dtd 29-01-13
.msg100%
New File 179200 DPR of CHP & AHP GKEL for dtd 29-04-13
.msg100%
New File 144384 DPR of CHP & AHP GKEL for dtd 29-05-13
.msg100%
New File 126464 DPR of CHP & AHP GKEL for dtd 29-06-13
.msg100%
New File 125440 DPR of CHP & AHP GKEL for dtd 29-07-13
.msg100%
New File 123392 DPR of CHP & AHP GKEL for dtd 29-08-13
.msg100%
New File 122880 DPR of CHP & AHP GKEL for dtd 29-09-13
.msg100%
New File 154624 DPR of CHP & AHP GKEL for dtd 30-03-13
.msg100%
New File 179200 DPR of CHP & AHP GKEL for dtd 30-04-13
.msg100%
New File 144384 DPR of CHP & AHP GKEL for dtd 30-05-13
.msg100%
New File 126464 DPR of CHP & AHP GKEL for dtd 30-06-13
.msg100%
New File 123392 DPR of CHP & AHP GKEL for dtd 30-07-13
(1).msg100%
New File 123904 DPR of CHP & AHP GKEL for dtd 30-07-13
.msg100%
New File 123392 DPR of CHP & AHP GKEL for dtd 30-08-13
.msg100%
New File 122368 DPR of CHP & AHP GKEL for dtd 30-09-13
.msg100%
New File 144384 DPR of CHP & AHP GKEL for dtd 31-05-13
.msg100%
New File 99328 FW regarding coal report of 09 06
2013.msg100%
New File 42496 FW Unburnt Carbon analysis of Fly Ash &
Bottom Ash sample submitted at GKEL plant Dhenkanal.msg100%
New File 1.6 m ORT of CHP & AHP-June-13.msg100%
New File 1.6 m ORT of CHP & AHP-Oct-13.msg100%
New File 1.6 m ORT-SEPT-13 of CHP & AHP.msg100%
New File 56320 RE Coal closing stock.msg100%
New File 62976 RE Coal receipt report 10 07 2013.msg
100%
New File 40448 RE Coal test report of GKEL .msg100%
New File 157184 RE DPR of CHP & AHP GKEL for dtd 01-03-
13 .msg100%
New File 139776 RE DPR of CHP & AHP GKEL for dtd 08-06-
13 .msg100%
New File 88576 RE DPR of CHP & AHP GKEL for dtd 14-06-
13 .msg100%
New File 133120 RE DPR of CHP & AHP GKEL for dtd 14-07-
13 (1).msg100%
New File 80384 RE DPR of CHP & AHP GKEL for dtd 14-07-
13 .msg100%
New File 132608 RE DPR of CHP & AHP GKEL for dtd 24-01-
13 .msg100%
New File 63488 Regarding receipt of poor quality of
coal at GKEL .msg100%
New File 33792 Requirement of Coal receipt detais as on
date .msg100%
New Dir 7 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Coal related documents\Final analysis\
New File 162 ~$timate for Oil and Coal for
Commissioning and Startup.doc100%
New File 396417 Bent pipe.png100%
New File 290508 Coal Consumption_GKEL during
commisisoning period.xlsx100%
New File 166951 Coal Consumption_GKEL during
commisisoning period_2.xlsx100%
New File 39424 Estimate for Oil and Coal for
Commissioning and Startup.doc100%
New File 817664 Final analysis report.xls100%
New File 18450 Fuel consumption and estimates.xlsx100%
New Dir 2 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Coal related documents\Final analysis\Ash Handling\
New File 21569 Ash Quantity Calculations.xlsx100%
New File 13.4 m C0101-01-0.pdf100%
New Dir 2 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Coal related documents\Final analysis\Backup files\
New File 467968 COAL ANALYSIS REPORT - GKEL-WO-3 July
Aug.xls100%
New File 104855 Coal Consumption.xlsx100%
New Dir 5 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Coal related documents\Final analysis\Backup files\New
folder\
New File 464896 COAL ANALYSIS REPORT - GKEL.xls100%
New File 443392 COAL ANALYSIS REPORT - GKEL-WO-2.xls100%

New File 535552 COAL ANALYSIS REPORT - GKEL-WO-3.xls100%

New File 852480 COAL ANALYSIS REPORT - GKEL-WO-3-LINKAGE


COAL.XLS100%
New File 798208 COAL ANALYSIS REPORT - GKEL-WO-4-LINKAGE
COAL-41337.xls100%
New Dir 39 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Coal related documents\Invoices\
New File 702889 MCL_Inv_56K_LKG_OFB_BOCP_9052-1111.pdf
100%
New File 630101 MCL_Inv_56K_LKG_OFB_BOCP_9052-1162.pdf
100%
New File 639597 MCL_Inv_56K_LKG_OFB_BOCP_9052-1216.pdf
100%
New File 628021 MCL_Inv_56K_LKG_OFB_BOCP_9052-1259.pdf
100%
New File 256617 MCL_Inv_56K_LKG_OFB_B'PUR_9041-243.pdf
100%
New File 253909 MCL_Inv_56K_LKG_OFB_B'PUR_9041-249.pdf
100%
New File 705969 MCL_Inv_56K_LKG_OFB_HOCP_9051-278.pdf100%

New File 370523 MCL_Inv_84K_LKG_OFB_HOCP_9051-360.pdf100%

New File 609549 MCL_Inv_84K_LKG_OFB_HOCP_9051-373.pdf100%

New File 730825 MCL_Inv_84K_LKG_OFB_HOCP_9051-375.pdf100%

New File 575385 MCL_Inv_84K_LKG_OFB_LOCP_5101-410.pdf100%

New File 584577 MCL_Inv_84K_LKG_OFB_LOCP_5101-430.pdf100%

New File 306501 MCL_Inv_Ant_01-07 Oct_1587.pdf100%


New File 296857 MCL_Inv_Ant_08-14 Oct_1612.pdf100%
New File 636097 MCL_Inv_Ant_15-21 Oct_1633.pdf100%
New File 272097 MCL_Inv_Ant_22-30 Sep_1568.pdf100%
New File 315433 MCL_Inv_Ant_22-31 Oct_1659.pdf100%
New File 484797 MCL_Inv_Bal_01-07 Oct_2104.pdf100%
New File 490173 MCL_Inv_Bal_07-14 Oct_2128.pdf100%
New File 567965 MCL_Inv_Bal_15-21 Oct_2201.pdf100%
New File 1.0 m MCL_Inv_Bal_22-30 Sep_2068.pdf100%
New File 591069 MCL_Inv_Bal_22-31 Oct_2275.pdf100%
New File 260197 MCL_Inv_Bhu_01-07 Oct_125.pdf100%
New File 1.0 m MGBK-01 & 02-FA-INV-BOCM.pdf100%
New File 763245 MGBK-01-FA-RR-BOCM RR-212000618.pdf100%
New File 494533 MGBK-01-INV..pdf100%
New File 551869 MGBK-01-inv.pdf100%
New File 758477 MGBK-02-FA-RR-BOCM RR-212000620.pdf100%
New File 476393 MGBK-02-INV..pdf100%
New File 370909 MGBK-03-FA-INV-LOCM.pdf100%
New File 682177 MGBK-03-FA-RR-LOCM_212002942.pdf100%
New File 402905 MGBK-03-INV..pdf100%
New File 488649 MGBK-03-inv.pdf100%
New File 362013 MGBK-04-FA-INV-LOCM.pdf100%
New File 661101 MGBK-04-FA-RR-LOCM-212002944.pdf100%
New File 559253 MGBK-05-inv.pdf100%
New File 483193 mgbk-06-inv.pdf100%
New File 317165 mgbk-08-inv.pdf100%
New File 629401 mgbk-13-inv.pdf100%
New Dir 4 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Coal related documents\QC at source\
New File 874157 KC Shara Feb 14 Quality Report.pdf100%
New File 1.3 m KC Shara Nov 13 Quality Report.pdf100%
New File 1.3 m mcl gcv mar 14.pdf100%
New File 1.2 m Sample basis source check.pdf100%
New Dir 3 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Lot\
New File 478587 02- L2 Shedule update 20130731 - Pg 9,10
24.pdf100%
New File 15338 04 Ash Quantity Calculations.xlsx100%
New File 209758 23 Revised offer-HP Heater
-17.02.2017.pdf100%
New Dir 3 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Lot\03 Equipment Tech Spec\
New File 31.2 m Boiler.pdf100%
New File 34.5 m ESP + FF.pdf100%
New File 14.1 m Pneumatic Ash Handling System.pdf100%
New Dir 5 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Lot\05 Variation in 400 KV switchyard\
New File 154112 Comments on Technical Specification of
400kV Switchyard.msg100%
New File 1.3 m Deviation of the 400kV switchyard
equipment (transmittal 0446).msg100%
New File 332800 FW Engineering Progress - KTPP-OL-SEPS-
GKEL-0399-Regarding Progress of works at Site.msg100%
New File 15.6 m FW Requisition list for issues related
to 400 KV switchyard.msg100%
New File 411137 MOM.pdf100%
New Dir 6 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Lot\05 Variation in 400 KV switchyard\Contract\
New File 1.6 m 400KV amendment(1).pdf100%
New File 1.6 m 400KV amendment.pdf100%
New File 12.4 m 400KV??????????(20101015)(1).pdf100%
New File 27.5 m Civil works, erection-VOLUME I
(COMMERCIAL PART).pdf100%
New File 39.4 m TECHNICAL SPECIFICATION .pdf100%
New File 27.5 m VOLUME I (COMMERCIAL PART).pdf100%
New Dir 6 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Lot\05 Variation in 400 KV switchyard\SOC ref\
New File 711123 C-101 20110204 GKELShifting of 400 KV
Switchyard coordinates towares GT.pdf100%
New File 181947 C-102 20110223 KTPP-OL-SEPS-GKEL-0208.pdf
100%
New File 1.7 m C-103 KTPP-OL-SEPS-GKEL-0216.pdf100%
New File 1.2 m C-104 20110329 GKEL Email re 400kv
switchyard.pdf100%
New File 832688 C-105 20110329 GKEL letter 807 re Change
in the design of 400kV Switchyard.pdf100%
New File 35115 C-107 SEPCO Monthly Progress Report June
2011 pages 1 and 19.pdf100%
New Dir 0 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Lot\07 Design Correspondence\
New Dir 7 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Lot\07 Design Correspondence\CCB\
New File 353792 excavation plan of CCB's foundation
(transmittal 0393).msg100%
New File 195584 FW Reply on the CCR scheme(transmittal
0160).msg100%
New File 142336 RE excavation plan of CCB's foundation
(transmittal 0393).msg100%
New File 144896 RE T0326-Foundation of CCB-0(transmittal
0540).msg100%
New File 182272 Reply comments on excavation drawing of
CCB fdn (transmittal 0484).msg100%
New File 821019 Resolutions & Content Sheet.pdf100%
New File 1.3 m T0326-Foundation of CCB-0(transmittal
0540).msg100%
New Dir 2 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Lot\07 Design Correspondence\CCB Erection\
New File 2.7 m T0327 comment.pdf100%
New File 5.7 m T0327-0 steel structure for CCB
(transmittal 0666).msg100%
New Dir 29 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Lot\07 Design Correspondence\Chimney delay\
New File 591872 calculation for foundation of chimney
(transmittal 0372).msg100%
New File 3.5 m Chimney Drawing .msg100%
New File 82432 Comments on T0331 Chimney foundation
drawings & calculation (transmittal 0506).msg100%
New File 195072 confirming of chimney design issue(OL
0014).msg100%
New File 200192 Draft of Mechanical Resolutions.msg100%
New File 394752 excavation drawing of chimney & comments
(transmittal 0336).msg100%
New File 338944 excavation plan of chimneys' foundation
pit (transmittal 0329).msg100%
New File 696320 export mode of construction machinery of
chimney (OL-0041).msg100%
New File 850944 foundation drawing of chimney for
prepare discussion.msg100%
New File 423424 FW About the chimney report.msg100%
New File 428544 FW About the chimney report1.msg100%
New File 489984 FW Chimney foundation drawings review
and Approval.msg100%
New File 209920 FW confirming of chimney design issue(OL
0014).msg100%
New File 252928 FW for chimney review .msg100%
New File 253952 FW GEOE 07234 GMR Kamalanga
Calculation values of Chimney raft.msg100%
New File 73216 FW GEOE07234 GMR Kamalanga TPP
Information required from SEPCO for chimney drawings review .msg100%
New File 161280 FW GEOE07234 GMR Kamalanga TPP - Design
of TG Raft Tg Deck and Chimney.msg100%
New File 1.0 m FW T0331 chimney foundation rev-0
(transmittal 0365).msg100%
New File 1.2 m RE Calculation values of Chimney
raft.msg100%
New File 80384 RE Chimney foundation drawings review
and Approval (1).msg100%
New File 146432 RE excavation drawing of chimney &
comments (transmittal 0336).msg100%
New File 143360 RE excavation plan of chimneys'
foundation pit (transmittal 0329).msg100%
New File 161792 RE revised drawings for 4 units
(transmittal 0335).msg100%
New File 95744 Response to chimney drawing.msg100%
New File 998400 T0331- B-CHIMNEY FOUNDATION
DRAWINFS(transmittal 0623).msg100%
New File 1.0 m T0331 Chimney foundation drawings &
calculation (transmittal 0506).msg100%
New File 1041408 T0331 chimney foundation rev-0
(transmittal 0365).msg100%
New File 1.0 m T0331-D chimney foundation (transmittal
0660).msg100%
New File 2.8 m T0332 chimney shell construction
drawings-REV 0 (transmittal 0661).msg100%
New Dir 13 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Lot\07 Design Correspondence\Chimney delay\Useful\
New File 1.3 m C-76 20101029 Minutes of meeting Chimney
Design Discussions.pdf100%
New File 639921 C-77 20101218 Minutes of meeting
Finalisation of Chimney Foundation design.pdf100%
New File 82432 Comments on T0331 Chimney foundation
drawings & calculation (transmittal 0506).msg100%
New File 489984 FW Chimney foundation drawings review
and Approval.msg100%
New File 253952 FW GEOE 07234 GMR Kamalanga
Calculation values of Chimney raft.msg100%
New File 161280 FW GEOE07234 GMR Kamalanga TPP - Design
of TG Raft Tg Deck and Chimney.msg100%
New File 1.2 m RE Calculation values of Chimney
raft.msg100%
New File 80384 RE Chimney foundation drawings review
and Approval (1).msg100%
New File 95744 Response to chimney drawing.msg100%
New File 1.0 m T0331 Chimney foundation drawings &
calculation (transmittal 0506).msg100%
New File 1041408 T0331 chimney foundation rev-0
(transmittal 0365).msg100%
New File 876940 T0331 chimney foundation REV-0.rar100%
New File 2.8 m T0332 chimney shell construction
drawings-REV 0 (transmittal 0661).msg100%
New Dir 4 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Lot\07 Design Correspondence\CW Pump house\
New File 147456 RE S5301Excavation drawings of CW pump
house (transmittal 0437).msg100%
New File 212205 Resolutions.pdf100%
New File 719529 S5301-01.PDF100%
New File 586752 S5301Excavation drawings of CW pump house
(transmittal 0437).msg100%
New Dir 6 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Lot\07 Design Correspondence\DM Water\
New File 163328 RE T0701-A-drawing & calculation of DM
plant (transmittal 0615).msg100%
New File 113664 RE T0701-A-drawing & calculation of DM
plant (transmittal 0615).msg100%
New File 145920 RE T0701-Foundation of DM plant house
and assay building (transmittal 0485).msg100%
New File 1.0 m Resolutions & Content Sheet.pdf100%
New File 1.8 m T0701-A-drawing & calculation of DM
plant (transmittal 0615).msg100%
New File 1.1 m T0701-Foundation of DM plant house and
assay building (transmittal 0485).msg100%
New Dir 14 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Lot\08 Unit 1 commissioning report-pdf\
New File 114427 Annexure-3.1 LDO leak test Report.pdf100%

New File 72654 Annexure-3.2 Boiler Steam blowing data


Sheet.pdf100%
New File 32399 Annexure-3.3 Boiler hangers, support and
expansion readings.pdf100%
New File 3.7 m Annexure-3.4 Photographs.pdf100%
New File 53681 Annexure-5.1 Holding time curve.pdf100%
New File 51848 Annexure-5.2 HP cylinder jacket heating
system.pdf100%
New File 20346 Annexure-5.3 TSI parameters during
rolling.pdf100%
New File 19268 Annexure-5.4 TSI parameters during
3000rpm.pdf100%
New File 880921 Annexure-5.5 AVR test results.pdf100%
New File 8.8 m Annexure-5.6 Unit #1 GCB failure
report.pdf100%
New File 9.4 m Annexure-5.7 Electrical tests after GCB
failure.pdf100%
New File 155198 Annexure-6.1 Main parameters at 350MW.pdf
100%
New File 20136 Annexure-7.1 Summary data Sheet.pdf100%
New File 6.8 m Unit # 1 commissioning report.pdf100%
New Dir 0 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Lot\10 Supply of fuel oil\
New Dir 0 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Lot\10 Supply of fuel oil\Supply of fuel oil\
New Dir 0 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Lot\10 Supply of fuel oil\Supply of fuel oil\12. Supply of
fuel oil\
New Dir 1 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Lot\10 Supply of fuel oil\Supply of fuel oil\12. Supply of
fuel oil\1_1.Purchase records of fuel oil\
New File 1.0 m LDO procurement SAP data.xlsx100%
New Dir 4 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Lot\10 Supply of fuel oil\Supply of fuel oil\12. Supply of
fuel oil\1_2. Fuel Oil stock balance\
New File 78416 Copy of GKEL Coal Requirement.xlsx100%
New File 105578 HFO-RECE.XLS100%
New File 38289 LDO & HFO receipts.xlsx100%
New File 1.0 m LDO procurement SAP data.xlsx100%
New Dir 0 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Lot\10 Supply of fuel oil\Supply of fuel oil\12. Supply of
fuel oil\1_2. Fuel Oil stock balance\Coal & Oil stock statement\
New Dir 2 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Lot\10 Supply of fuel oil\Supply of fuel oil\12. Supply of
fuel oil\1_2. Fuel Oil stock balance\Coal & Oil stock statement\Apr 13\
New File 76022 Apr13 stock-oil.xlsx100%
New File 239769 Coal & Oil Stock Statement as on
30.04.2013.pdf100%
New Dir 2 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Lot\10 Supply of fuel oil\Supply of fuel oil\12. Supply of
fuel oil\1_2. Fuel Oil stock balance\Coal & Oil stock statement\Aug13\
New File 156156 [Untitled]_2013090215040800.pdf100%
New File 15.2 m MIS-AUG'13.xlsx100%
New Dir 7 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Lot\10 Supply of fuel oil\Supply of fuel oil\12. Supply of
fuel oil\1_2. Fuel Oil stock balance\Coal & Oil stock statement\July13\
New File 165604 [Untitled]_2013080610560000.pdf100%
New File 176764 Corrected-July13.pdf100%
New File 10986 HFO-FINAL-JUL-13....xlsx100%
New File 237992 JUL-COAL purchases.xlsx100%
New File 14423 LDO HFO received in July-2013.xlsx100%
New File 13137 LDO-FINAL-JUL-13....xlsx100%
New File 23754 SAP-STOCK-COAL-31-7-13.xlsx100%
New Dir 7 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Lot\10 Supply of fuel oil\Supply of fuel oil\12. Supply of
fuel oil\1_2. Fuel Oil stock balance\Coal & Oil stock statement\June\
New File 792867 Coal register may- jun'13 (2).xlsx100%
New File 16287 HFO as on 300613.xlsx100%
New File 17674 LDO as on 300613.xlsx100%
New File 60301 pivot coal.xlsx100%
New File 50096 SAP stock as on date for Coal-110713.txt
100%
New File 50552 SAP stock as on date for Coal-110713.xlsx
100%
New File 12063 stock jun'13-SAP.xlsx100%
New Dir 2 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Lot\10 Supply of fuel oil\Supply of fuel oil\12. Supply of
fuel oil\1_2. Fuel Oil stock balance\Coal & Oil stock statement\Mar13\
New File 166623 GKEL Closing Stock 31st March 13.pdf100%

New File 130707 LDO &HFO status as on 31.03.13.xlsx.pdf


100%
New Dir 4 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Lot\10 Supply of fuel oil\Supply of fuel oil\12. Supply of
fuel oil\1_2. Fuel Oil stock balance\Coal & Oil stock statement\May 13\
New File 44032 Coal statement as on 310513.xls100%
New File 14944 coal stock recon-310513.xlsx100%
New File 176879 Stock statement-31-05-13.pdf100%
New File 575975 Stock valuation as on 31-05-13.xlsx100%
New Dir 2 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Lot\10 Supply of fuel oil\Supply of fuel oil\12. Supply of
fuel oil\1_2. Fuel Oil stock balance\Coal & Oil stock statement\Oct13\
New File 10.1 m MIS OCT'13...xlsx100%
New File 144067 stock-oct13.pdf100%
New Dir 2 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Lot\10 Supply of fuel oil\Supply of fuel oil\12. Supply of
fuel oil\1_2. Fuel Oil stock balance\Coal & Oil stock statement\Sept 13\
New File 5.4 m MIS OF SEPTEMBER-2013.xlsx100%
New File 156758 mis-Sept13.pdf100%
New Dir 2 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Lot\10 Supply of fuel oil\Supply of fuel oil\12. Supply of
fuel oil\1_2. Fuel Oil stock balance\LDO HFO receipt -fom Sept\
New File 96887 HFO RECEIPT REGISTER (from Nov 12).xlsx
100%
New File 2.6 m LDO RECEIPT REGISTER (from Sept 12).xlsx
100%
New Dir 36 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Lot\10 Supply of fuel oil\Supply of fuel oil\12. Supply of
fuel oil\1_2. Fuel Oil stock balance\Shift incharge reports from 10.07.2013 to
20.07.2013\
New File 121856 A- shift report for dated 10 7 13.msg100%

New File 121344 A shift report for dated 12 07 2013.msg


100%
New File 119296 A-shift report for date 19 07 2013.msg
100%
New File 121856 A-shift report for dated 11 07 2013.msg
100%
New File 119808 A-shift report for dated 13 07 2013.msg
100%
New File 118272 A-shift report for dated 14 07 2013.msg
100%
New File 119296 A-shift report for dated 15 07 2013.msg
100%
New File 193024 A-shift report for dated 16 07 2013.msg
100%
New File 164352 A-shift report for dated 17 07 2013.msg
100%
New File 118784 A-shift report for dated 18 07 2013.msg
100%
New File 125440 A-shift report for dated 20 07 2013.msg
100%
New File 121344 A-shift report for dated 21 07 2013.msg
100%
New File 121344 B shift report for dated 12 07 2013.msg
100%
New File 164352 B-shift report for dated 10 07 2013.msg
100%
New File 129024 B-shift report for dated 11 07 2013.msg
100%
New File 119808 B-shift report for dated 13 07 2013.msg
100%
New File 119296 B-shift report for dated 14 07 2013.msg
100%
New File 118272 B-shift report for dated 15 07 2013.msg
100%
New File 119296 B-shift report for dated 16 07 2013.msg
100%
New File 120320 B-shift report for dated 17 07 2013.msg
100%
New File 165888 B-shift report for dated 18 07 2013.msg
100%
New File 169984 B-shift report for dated 19 07 2013.msg
100%
New File 130560 B-shift report for dated 20 07 2013.msg
100%
New File 120832 B-shift report for dated 21 07 2013.msg
100%
New File 121344 C- shift report for dated 9 7 13.msg100%

New File 118784 C-shift report for date 18 07 2013.msg


100%
New File 122368 c-shift report for dated 10 07 2013.msg
100%
New File 175616 C-shift report for dated 11 07 2013.msg
100%
New File 165376 C-shift report for dated 12 07 2013.msg
100%
New File 118272 C-shift report for dated 13 07 2013.msg
100%
New File 118272 C-shift report for dated 14 07 2013.msg
100%
New File 117760 C-shift report for dated 15 07 2013.msg
100%
New File 118272 C-shift report for dated 16 07 2013.msg
100%
New File 118272 C-shift report for dated 17 07 2013.msg
100%
New File 122880 C-shift report for dated 19 07 2013.msg
100%
New File 130048 C-shift report for dated 20 07 2013.msg
100%
New Dir 5 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Lot\10 Supply of fuel oil\Supply of fuel oil\12. Supply of
fuel oil\1_3.Start up and Shut down activities of Units 1 and 2\
New File 2.7 m Daily Report FY13_14.xlsx100%
New File 3.3 m LDO procurement SAP data.xlsx100%
New File 55740 LDO Receipt details from 01.10.12 to
30.11.2013.xlsx100%
New File 203900 Oil stock -Apr 2013.pdf100%
New File 13897 Unit start stop details_ with oil
consumption.xls100%
New Dir 3 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Lot\10 Supply of fuel oil\Supply of fuel oil\12. Supply of
fuel oil\1_3.Start up and Shut down activities of Units 1 and 2\Unit 1
commissioning report-pdf\
New File 3.7 m Annexure-3.4 Photographs.pdf100%
New File 880921 Annexure-5.5 AVR test results.pdf100%
New File 6.8 m Unit # 1 commissioning report.pdf100%
New Dir 3 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Lot\10 Supply of fuel oil\Supply of fuel oil\12. Supply of
fuel oil\1_4.Grid Clearance\
New File 261644 Synchronisation letter for unit #2.pdf
100%
New File 525862 Synchronisation letter for unit #3.pdf
100%
New File 273237 synchronisation permission ltr Unit
#1.pdf100%
New Dir 2 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Lot\10 Supply of fuel oil\Supply of fuel oil\12. Supply of
fuel oil\1_5. Fuel Requisition\
New File 148779 Fuel Estimate_Letter to SEPCO Site
2508.pdf100%
New File 655360 Fw For the Documents to be
Submitted.msg100%
New Dir 2 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Lot\10 Supply of fuel oil\Supply of fuel oil\12. Supply of
fuel oil\Final analysis\
New File 82722 Delay for Oil Calculation sheet.xlsx100%

New File 13902 Oil consumption calculation


sheet.xls.xlsx100%
New Dir 9 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Lot\10 Supply of fuel oil\Supply of fuel oil\12. Supply of
fuel oil\Final analysis\Invoices of fuel\
New File 3.1 m
fwemailingldo13004306_pdfldo13004307_pdfldo130043.zip100%
New File 2.0 m
fwemailingldo13004319_pdfldo13004320_pdfldo130043.zip100%
New File 3.5 m
fwemailingldo134_pdfldo135_pdfldo136_pdfldo152.zip100%
New File 2.0 m
fwemailingldo161_pdfldo162_pdfldo163_pdfldo165.zip100%
New File 2.1 m
fwemailingldo172_pdfldo214_pdfldo215_pdfldo216.zip100%
New File 2.6 m
fwemailingldo86_pdfldo90_pdfldo91_pdfldo92_pdf.zip100%
New File 5.3 m
fwemailingldo874_pdfldo875_pdfldo876_pdfldo877.zip100%
New File 2.0 m
fwemailingldo886_pdfldo887_pdfldo890_pdfldo153.zip100%
New File 4.1 m fwldoinvoices.zip100%
New Dir 2 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Lot\10 Supply of fuel oil\Supply of fuel oil\12. Supply of
fuel oil\Final analysis\Invoices of fuel\New folder\
New File 76022 Apr13 stock-oil.xlsx100%
New File 3.0 m Daily Report FY13_14.xlsx100%
New Dir 3 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Lot\10 Supply of fuel oil\Supply of fuel oil\12. Supply of
fuel oil\Final analysis\Period 1\
New File 887856 GCB certification.pdf100%
New File 148779 Letter to SEPCO Site-2508 HFO guns.pdf
100%
New File 330577 Letter to SEPCO Site-2652.pdf100%
New Dir 2 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Lot\10 Supply of fuel oil\Supply of fuel oil\12. Supply of
fuel oil\Final analysis\Period 2\
New File 445965 Letter to SEPCO Site-2714.pdf100%
New File 224608 Letter to SEPCO Site-2835.pdf100%
New Dir 0 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Lot\10 Supply of fuel oil\Supply of fuel oil\12. Supply of
fuel oil\Fuel oil agreement\
New Dir 3 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Lot\24 Isolating Damper\
New File 1.0 m FOURESS ENGINEERING (INDIA) LT PO-
4500062335.pdf100%
New File 1.1 m P.O 4500066822 fouress signed copy.pdf
100%
New File 2.8 m PO-TWIN SEAL FLAP ISOLATOR HOT AIR GATE-
FOURESS ENGINEERING.PDF100%
New Dir 0 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Lot\28 GCB Failure report\
New Dir 9 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Lot\28 GCB Failure report\Lindsey\
New File 162 ~$-ANALYSIS REPORT ON GCB FAILURE IN UNIT
1.docx100%
New File 162 ~$ECTION CLAIM FORM.doc100%
New File 126464 ~WRL0001.tmp100%
New File 19772 2.-ANALYSIS REPORT ON GCB FAILURE IN UNIT
1.docx100%
New File 5.0 m Annexures - GCB Failure report.zip100%
New File 1.3 m Damage analysis 4500197711.pdf100%
New File 12.2 m Damage_Inspection_HECS.pdf100%
New File 26.7 m Documents to Insurance Team-
Bangalore.zip100%
New File 612713 SINGLE_LINE_DIAGRAM.pdf100%
New Dir 5 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Lot 2\
New File 15073 11 HFO-LDO Estimate Jul'17.xlsx100%
New File 12.5 m 16 CEMS rectification.zip100%
New File 8.1 m 22. 400 KV Switchyard Design change.msg
100%
New File 1.1 m 26 Invictus Chimney analysis report.msg
100%
New File 248649 29_30 Sepco Deviation from Contract
Technical Specification_v5 (003).xlsx100%
New Dir 2 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Lot 2\27 News Article on Balco Chimney Mishap\
New File 585015 27 Bakshi Report on Korba disaster.pdf
100%
New File 10234 27 SEPCO Projects - Articles.xlsx100%
New Dir 0 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Lot 2\32 Air CARGO\
New Dir 59 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Lot 2\32 Air CARGO\Air Cargo Invoices\
New File 452119 A1.pdf100%
New File 467149 A10.pdf100%
New File 462466 A11.pdf100%
New File 373917 A13.pdf100%
New File 477995 A14.pdf100%
New File 450193 A15.pdf100%
New File 462345 A16.pdf100%
New File 451168 A17.pdf100%
New File 452370 A18.pdf100%
New File 455442 A19.pdf100%
New File 452587 A2.pdf100%
New File 3.9 m A20.pdf100%
New File 457995 A22.pdf100%
New File 450870 A23.pdf100%
New File 480848 A24.pdf100%
New File 452667 A25.pdf100%
New File 4.0 m A26.pdf100%
New File 132262 A28.pdf100%
New File 127116 A29.pdf100%
New File 1.5 m A3.pdf100%
New File 3.8 m A30.pdf100%
New File 162079 A31.pdf100%
New File 476464 A32.pdf100%
New File 170361 A33.pdf100%
New File 151613 A34.pdf100%
New File 136472 A36.pdf100%
New File 149122 A37.pdf100%
New File 167979 A38.pdf100%
New File 136662 A39.pdf100%
New File 5.8 m A4 A7.pdf100%
New File 135924 A40.pdf100%
New File 133674 A41.pdf100%
New File 3.7 m A42.pdf100%
New File 4.1 m A43.pdf100%
New File 3.9 m A45.pdf100%
New File 139761 A46.pdf100%
New File 137927 A47.pdf100%
New File 135851 A48.pdf100%
New File 148434 A49.pdf100%
New File 473784 A5.pdf100%
New File 140903 A50.pdf100%
New File 136252 A51.pdf100%
New File 142974 A52.pdf100%
New File 133343 A53.pdf100%
New File 300630 A55.pdf100%
New File 294034 A56.pdf100%
New File 301749 A58.pdf100%
New File 475661 A6.pdf100%
New File 315222 A61.pdf100%
New File 308865 A62.pdf100%
New File 305537 A63.pdf100%
New File 3.0 m A64 -A70.pdf100%
New File 480402 A8.pdf100%
New File 476919 A9.pdf100%
New File 10.1 m A95-A100,c20,c21 invoice.PDF100%
New File 4.1 m c11.pdf100%
New File 4.1 m C12.pdf100%
New File 153329 C13 inv.pdf100%
New File 138896 C15.pdf100%
New Dir 10 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Lot 2\32 Air CARGO\CD for Insurance & PGT intrument cargoes\
New File 1.2 m A.1 C10A-custom duty-tools.xps100%
New File 122827 A.1 Letter to SEPCO Site-2869-custom
duty.pdf100%
New File 939772 A.2 Duty-40D.pdf100%
New File 1.0 m A.3 Duty-40B.pdf100%
New File 949306 A.4 Duty-40C.pdf100%
New File 385400 A.5 C17 BOE.pdf100%
New File 98990 A.6 A75 BOE.pdf100%
New File 329982 A.7 A32 DCS.pdf100%
New File 584395 A.8 TC20-BOE.pdf100%
New File 19503 Insurance details.xlsx100%
New Dir 17 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Lot 2\32 Air CARGO\CD for Insurance & PGT intrument
cargoes\DCS cards\
New File 95744 FW C&I items.msg100%
New File 93184 FW Update for DCS Cards and UAT 3A low-
voltage bushing (1).msg100%
New File 84480 FW Update for DCS Cards and UAT 3A low-
voltage bushing (4).msg100%
New File 154624 Fw Update for DCS Cards and UAT 3A low-
voltage bushing (6).msg100%
New File 91648 Fw Update for DCS Cards and UAT 3A low-
voltage bushing.msg100%
New File 68608 FW ?? DCS-Damaged cards- URGENT.msg100%

New File 1.5 m FW A32 shipment.msg100%


New File 38400 Fw Unit 3 Bushing and DCS cards.msg100%
New File 99840 RE FW Unit # 2 DCS-Damaged cards-
URGENT.msg100%
New File 122880 RE Update for DCS Cards and UAT 3A low-
voltage bushing (2).msg100%
New File 83456 RE Update for DCS Cards and UAT 3A low-
voltage bushing (3).msg100%
New File 131584 Re Update for DCS Cards and UAT 3A low-
voltage bushing (5).msg100%
New File 41472 Re Update for DCS Cards and UAT 3A low-
voltage bushing (8).msg100%
New File 38400 RE Update for DCS Cards and UAT 3A low-
voltage bushing (9).msg100%
New File 139776 RE Update for DCS Cards and UAT 3A low-
voltage bushing.msg100%
New File 95232 Re ??:RE ??:RE ??:RE A29 A30
C13shipment.msg100%
New File 345088 Update for DCS Cards and UAT 3A low-
voltage bushing.msg100%
New Dir 3 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Lot 2\32 Air CARGO\CD for Insurance & PGT intrument
cargoes\DCS cards\CD Related\
New File 75264 Customs duty approval A 32.msg100%
New File 125440 Re Update for DCS Cards and UAT 3A low-
voltage bushing (7).msg100%
New File 68608 Re FW Checklist of GMR A32 shipment.msg
100%
New Dir 3 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Lot 2\32 Air CARGO\CD for Insurance & PGT intrument
cargoes\Inv-10 Custom duty PGT\
New File 100864 DOCUMENTS REQUIRED FOR PROCESSING OF
INSURANCE CLAIMS.msg100%
New File 271872 RE LV DRY Transformer claim under EAR
policy.msg100%
New File 101888 RE Settlement of marine claim- Damage
to CW pump - GKEL.msg100%
New Dir 2 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Lot 2\36 Lender's Model\
New File 1.8 m GKEL Financial Model_Final for
PIM_09052015-Unlocked.xlsx100%
New File 2.0 m GKEL Lenders Model 20080709 IDFC
FINAL.xls100%
New Dir 10 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\
New File 52728 Copy of Copy of Manpower Review (2)
(2).xlsx100%
New File 33238 Copy of Master Document List-17-07-
2017.xlsx100%
New File 13551 Manpower - RAXA comparison.xlsx100%
New File 36296 Master Document List.xlsx100%
New File 109476 scan 1.pdf100%
New File 412457 SEPCO-GKEL-Arbitration_Architectural-Doc-
Defence[28June17].DOCX100%
New File 47252 SOC analysis - Soumyata - v1.xlsx100%
New File 38581 SOC analysis_Divya - v1.xlsx100%
New File 69226 SOC analysis_Pg 10-74.xlsx100%
New File 10061 SOC Responsibilities.xlsx100%
New Dir 5 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\10. Jinan Meeting\
New File 74752 FW MOM Jinan 06112012.msg100%
New File 81920 MOM Jinan 06112012.msg100%
New File 118272 MOM Jinan 07112012.msg100%
New File 71680 MOM reference.msg100%
New File 91648 RE MOM Jinan 06112012-r1.msg100%
New Dir 0 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\11. Grid Synchronisation\
New Dir 0 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\12. Supply of fuel oil\
New Dir 1 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\12. Supply of fuel oil\1_1.Purchase records of fuel
oil\
New File 1.0 m LDO procurement SAP data.xlsx100%
New Dir 5 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\12. Supply of fuel oil\1_2. Fuel Oil stock balance\
New File 78416 Copy of GKEL Coal Requirement.xlsx100%
New File 105578 HFO-RECE.XLS100%
New File 38289 LDO & HFO receipts.xlsx100%
New File 1.0 m LDO procurement SAP data.xlsx100%
New File 13902 Oil consumption calculation
sheet.xls.xlsx100%
New Dir 0 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\12. Supply of fuel oil\1_2. Fuel Oil stock
balance\Coal & Oil stock statement\
New Dir 2 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\12. Supply of fuel oil\1_2. Fuel Oil stock
balance\Coal & Oil stock statement\Apr 13\
New File 81918 Apr13 stock-oil.xlsx100%
New File 239769 Coal & Oil Stock Statement as on
30.04.2013.pdf100%
New Dir 2 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\12. Supply of fuel oil\1_2. Fuel Oil stock
balance\Coal & Oil stock statement\Aug13\
New File 156156 [Untitled]_2013090215040800.pdf100%
New File 15.2 m MIS-AUG'13.xlsx100%
New Dir 7 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\12. Supply of fuel oil\1_2. Fuel Oil stock
balance\Coal & Oil stock statement\July13\
New File 165604 [Untitled]_2013080610560000.pdf100%
New File 176764 Corrected-July13.pdf100%
New File 10986 HFO-FINAL-JUL-13....xlsx100%
New File 237992 JUL-COAL purchases.xlsx100%
New File 14423 LDO HFO received in July-2013.xlsx100%
New File 13137 LDO-FINAL-JUL-13....xlsx100%
New File 23754 SAP-STOCK-COAL-31-7-13.xlsx100%
New Dir 7 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\12. Supply of fuel oil\1_2. Fuel Oil stock
balance\Coal & Oil stock statement\June\
New File 792867 Coal register may- jun'13 (2).xlsx100%
New File 16287 HFO as on 300613.xlsx100%
New File 17674 LDO as on 300613.xlsx100%
New File 60301 pivot coal.xlsx100%
New File 50096 SAP stock as on date for Coal-110713.txt
100%
New File 50552 SAP stock as on date for Coal-110713.xlsx
100%
New File 12063 stock jun'13-SAP.xlsx100%
New Dir 2 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\12. Supply of fuel oil\1_2. Fuel Oil stock
balance\Coal & Oil stock statement\Mar13\
New File 166623 GKEL Closing Stock 31st March 13.pdf100%

New File 130707 LDO &HFO status as on 31.03.13.xlsx.pdf


100%
New Dir 4 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\12. Supply of fuel oil\1_2. Fuel Oil stock
balance\Coal & Oil stock statement\May 13\
New File 44032 Coal statement as on 310513.xls100%
New File 14944 coal stock recon-310513.xlsx100%
New File 176879 Stock statement-31-05-13.pdf100%
New File 575975 Stock valuation as on 31-05-13.xlsx100%
New Dir 2 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\12. Supply of fuel oil\1_2. Fuel Oil stock
balance\Coal & Oil stock statement\Oct13\
New File 10.1 m MIS OCT'13...xlsx100%
New File 144067 stock-oct13.pdf100%
New Dir 2 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\12. Supply of fuel oil\1_2. Fuel Oil stock
balance\Coal & Oil stock statement\Sept 13\
New File 5.4 m MIS OF SEPTEMBER-2013.xlsx100%
New File 156758 mis-Sept13.pdf100%
New Dir 2 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\12. Supply of fuel oil\1_2. Fuel Oil stock balance\LDO
HFO receipt -fom Sept\
New File 96887 HFO RECEIPT REGISTER (from Nov 12).xlsx
100%
New File 2.6 m LDO RECEIPT REGISTER (from Sept 12).xlsx
100%
New Dir 36 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\12. Supply of fuel oil\1_2. Fuel Oil stock
balance\Shift incharge reports from 10.07.2013 to 20.07.2013\
New File 121856 A- shift report for dated 10 7 13.msg100%

New File 121344 A shift report for dated 12 07 2013.msg


100%
New File 119296 A-shift report for date 19 07 2013.msg
100%
New File 121856 A-shift report for dated 11 07 2013.msg
100%
New File 119808 A-shift report for dated 13 07 2013.msg
100%
New File 118272 A-shift report for dated 14 07 2013.msg
100%
New File 119296 A-shift report for dated 15 07 2013.msg
100%
New File 193024 A-shift report for dated 16 07 2013.msg
100%
New File 164352 A-shift report for dated 17 07 2013.msg
100%
New File 118784 A-shift report for dated 18 07 2013.msg
100%
New File 125440 A-shift report for dated 20 07 2013.msg
100%
New File 121344 A-shift report for dated 21 07 2013.msg
100%
New File 121344 B shift report for dated 12 07 2013.msg
100%
New File 164352 B-shift report for dated 10 07 2013.msg
100%
New File 129024 B-shift report for dated 11 07 2013.msg
100%
New File 119808 B-shift report for dated 13 07 2013.msg
100%
New File 119296 B-shift report for dated 14 07 2013.msg
100%
New File 118272 B-shift report for dated 15 07 2013.msg
100%
New File 119296 B-shift report for dated 16 07 2013.msg
100%
New File 120320 B-shift report for dated 17 07 2013.msg
100%
New File 165888 B-shift report for dated 18 07 2013.msg
100%
New File 169984 B-shift report for dated 19 07 2013.msg
100%
New File 130560 B-shift report for dated 20 07 2013.msg
100%
New File 120832 B-shift report for dated 21 07 2013.msg
100%
New File 121344 C- shift report for dated 9 7 13.msg100%

New File 118784 C-shift report for date 18 07 2013.msg


100%
New File 122368 c-shift report for dated 10 07 2013.msg
100%
New File 175616 C-shift report for dated 11 07 2013.msg
100%
New File 165376 C-shift report for dated 12 07 2013.msg
100%
New File 118272 C-shift report for dated 13 07 2013.msg
100%
New File 118272 C-shift report for dated 14 07 2013.msg
100%
New File 117760 C-shift report for dated 15 07 2013.msg
100%
New File 118272 C-shift report for dated 16 07 2013.msg
100%
New File 118272 C-shift report for dated 17 07 2013.msg
100%
New File 122880 C-shift report for dated 19 07 2013.msg
100%
New File 130048 C-shift report for dated 20 07 2013.msg
100%
New Dir 5 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\12. Supply of fuel oil\1_3.Start up and Shut down
activities of Units 1 and 2\
New File 2.7 m Daily Report FY13_14.xlsx100%
New File 3.3 m LDO procurement SAP data.xlsx100%
New File 55740 LDO Receipt details from 01.10.12 to
30.11.2013.xlsx100%
New File 203900 Oil stock -Apr 2013.pdf100%
New File 13897 Unit start stop details_ with oil
consumption.xls100%
New Dir 3 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\12. Supply of fuel oil\1_3.Start up and Shut down
activities of Units 1 and 2\Unit 1 commissioning report-pdf\
New File 3.7 m Annexure-3.4 Photographs.pdf100%
New File 880921 Annexure-5.5 AVR test results.pdf100%
New File 6.8 m Unit # 1 commissioning report.pdf100%
New Dir 3 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\12. Supply of fuel oil\1_4.Grid Clearance\
New File 261644 Synchronisation letter for unit #2.pdf
100%
New File 525862 Synchronisation letter for unit #3.pdf
100%
New File 273237 synchronisation permission ltr Unit
#1.pdf100%
New Dir 2 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\12. Supply of fuel oil\1_5. Fuel Requisition\
New File 148779 Fuel Estimate_Letter to SEPCO Site
2508.pdf100%
New File 655360 Fw For the Documents to be
Submitted.msg100%
New Dir 2 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\12. Supply of fuel oil\Fuel Agreement\
New File 65536 FW Observations during Steam blowing of
Unit#1.msg100%
New File 61440 Requirement of LDO and HFO quantity .msg
100%
New Dir 0 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\12. Supply of fuel oil\Shift incharge Reports\
New Dir 22 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\12. Supply of fuel oil\Shift incharge
Reports\01.01.13-15.01.2013\
New File 408576 A-shift report for dated 26 01 2013.msg
100%
New File 65024 Boiler Light up Information .msg100%
New File 406528 B-shift report for dated 25 01 2013.msg
100%
New File 402944 C-shift report for dated 25 01 2013.msg
100%
New File 386048 C-shift report for dated 26 01 2013.msg
100%
New File 414208 Day Shift Report -Date-31 12 2012.msg100%
New File 417280 Day shift report for dated 19 01 2013.msg
100%
New File 417280 Day shift report for dated 20 01 2013.msg
100%
New File 410624 Day shift report for dated 24 01 2013.msg
100%
New File 125952 FW Night shift report of 19 01 2013
.msg100%
New File 344064 Main Control Room Shift In-charge mobile
number is 7894471094.msg100%
New File 412160 Night shift report for dated 21 01
2013.msg100%
New File 411648 Night shift report for dated 22 01
2013.msg100%
New File 114688 Shift Report (1).msg100%
New File 124928 shift report .msg100%
New File 400896 Shift Report A shift.msg100%
New File 418304 Shift Report Date-19 1 2013 ( Night Shift
).msg100%
New File 411136 Shift report for 20 1 2013 Night
Shift ).msg100%
New File 408576 Shift Report for Date-23 01 2013.msg100%

New File 393216 SHIFT REPORT FOR THE DATE 01 01 2013.msg


100%
New File 388096 SHIFT REPORT FOR THE DATE 31-12-12 .msg
100%
New File 435200 Shift Report.msg100%
New Dir 42 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\12. Supply of fuel oil\Shift incharge
Reports\15.02.13-25.02.2013\
New File 118784 A shift activity reoprt-22 02 2013.msg
100%
New File 113664 A shift Report for date-21 02 2013.msg
100%
New File 50176 addition of shiftincharge gkel in all
groups.msg100%
New File 107008 A-shift report for dated 15 02 2013.msg
100%
New File 117760 A-shift report for dated 16 02 2013.msg
100%
New File 117248 A-shift report for dated 17 02 2013.msg
100%
New File 121856 A-shift report for dated 18 02 2013.msg
100%
New File 121856 A-shift report for dated 19 02 2013.msg
100%
New File 114688 A-shift report for dated 23 02 2013.msg
100%
New File 111104 A-shift report for dated 24 02 2013.msg
100%
New File 114176 A-shift report for dated 25 02 2013.msg
100%
New File 107520 B shift report -15 02 2013.msg100%
New File 125952 B shift report -24 02 2013.msg100%
New File 123392 B Shift Report -25 02 2013.msg100%
New File 115200 B-shift report for dated 16 02 2013.msg
100%
New File 119808 B-shift report for dated 17 02 2013
(1).msg100%
New File 176128 B-shift report for dated 17 02 2013.msg
100%
New File 123392 B-shift report for dated 18 02 2013.msg
100%
New File 121856 B-shift report for dated 19 02 2013.msg
100%
New File 113664 B-shift report for dated 21 02 2013.msg
100%
New File 116736 B-shift report for dated 22 02 2013.msg
100%
New File 113664 C-shift report for dated 14 02 2013.msg
100%
New File 113664 C-shift report for dated 15 02 2013.msg
100%
New File 118272 C-shift report for dated 16 02 2013.msg
100%
New File 122880 C-shift report for dated 17 02 2013.msg
100%
New File 120832 C-shift report for dated 19 02 2013.msg
100%
New File 113664 C-shift report for dated 21 02 2013.msg
100%
New File 115712 C-shift report for dated 22 02 2013.msg
100%
New File 113664 C-shift report for dated 23 02 2013.msg
100%
New File 117760 Day shift report for dated 20 02 2013.msg
100%
New File 52224 GKEL #1 tripping information.msg100%
New File 56832 GKEL Unit#1 Synchronisation
Information .msg100%
New File 52736 GKEL unit#1 tripping information.msg100%

New File 56832 GKEL Unit#1 Turbine rolling and


Synchronisation Information .msg100%
New File 114688 Night shift report for dated 20 02
2013.msg100%
New File 94720 Night shift report.msg100%
New File 87040 RE C-shift report for dated 24 02
2013.msg100%
New File 45568 regarding control room printer
cartridge.msg100%
New File 55808 Regarding GKEL Unit#1 Synchronisation
.msg100%
New File 64512 Regarding GMR Kamalanga energy unit-1
boiler lit up and synchronisation .msg100%
New File 64512 Regarding GMR Kamalanga energy unit-1
boiler lit up.msg100%
New File 119296 Untitled.msg100%
New Dir 4 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\13. Compliant Coal\
New File 3.6 m Fwd Information Required GKEL.msg100%
New File 4.5 m Fwd Invoice copies of Mar 14.msg100%
New File 2.5 m Fwd Jan 14 Invocices.msg100%
New File 1.8 m Fwd Nov 14 Invoices.msg100%
New Dir 19 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\13. Compliant Coal\13.1 AHP related\
New File 54784 Ash evacuation from ESP to silo.msg100%
New File 2.6 m Ash handling system modications.pdf100%
New File 957001 BOILER EFFICIENCY TEST REPORT OF
UNIT #1.pdf100%
New File 690176 Brief note on modification in the Ash
conveying system .msg100%
New File 67072 Compartive data of ash conveying system
after phasewise modification .msg100%
New File 46592 ESP pipe modification and BLU of Unit#1
for COD.msg100%
New File 301802 F4341C2-C-01-O Design instruction.pdf100%

New File 250459 Fly ash pond OSPCB Letter.pdf100%


New File 43520 FW Ash evacuation transportation from
ESP to ash silo of Unit-I.msg100%
New File 83968 FW Compartive data of ash conveying
system after phasewise modification .msg100%
New File 16.3 m FW Expert help for Unit 1 Ash
evacuation.msg100%
New File 2.9 m Fw Fwd Spillage of Ash at Hydrobin and
Geho Pump Area .msg100%
New File 24064 Fw Unit-1 shutdown due to tha ash
handling system un-working properly.msg100%
New File 75264 MoM of PG test review meeting 02-08-
14.xls100%
New File 2.2 m RE ash conveying issues.msg100%
New File 72704 Re Restarting of Unit-I for COD.msg100%

New File 28672 Re update of ash conveying system.msg


100%
New File 54272 Regarding Trial run of AHP equipments
.msg100%
New File 1.1 m UCT_Report_Unit-1 filled commented by
SEPCO.doc100%
New Dir 2 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\13. Compliant Coal\13.1 AHP related\Coal
Specifications\
New File 2.8 m Comments regarding coal specs_KTPP-OL-
SEPS-GKEL-1109.pdf100%
New File 11244 Vdaf calculation sheet.xlsx100%
New Dir 1 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\13. Compliant Coal\13.1 AHP related\Problem
communication\
New File 67072 SEPCO communication regarding AHS problem
(No mention of coal), GKEL reply.msg100%
New Dir 1 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\13. Compliant Coal\13.1 AHP related\Rectification
communication\
New File 53760 SEPCO suggestion for modification (No
mention of coal issue).msg100%
New Dir 113 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\13. Compliant Coal\Coal MIS\
New File 162304 41337 MT-Linkage Coal Details.msg100%
New File 436736 41337MT- LINKAGE COAL OPEN MARKET 12000
MT DETAILS.msg100%
New File 429568 41337MT- LINKAGE COAL DETAILS (7).msg100%

New File 372224 41337MT- LINKAGE COAL DETAILS.msg100%


New File 315392 93375 MT- LINKAGE COAL DETAILS (1).msg
100%
New File 354816 93375 MT- LINKAGE COAL DETAILS (2).msg
100%
New File 371200 93375 MT- LINKAGE COAL DETAILS (3).msg
100%
New File 487936 93375 MT- LINKAGE COAL DETAILS (5).msg
100%
New File 232448 93375 MT- LINKAGE COAL DETAILS.msg100%
New File 519168 93375 MT-Linkage Coal Details (6).msg100%

New File 435712 93375 MT-Linkage Coal Details.msg100%


New File 84992 DAILY COAL RECEIVING STATUS - GKEL as on
01 06 2013 06 00 am.msg100%
New File 85504 DAILY COAL RECEIVING STATUS - GKEL as on
02 06 2013 06 00 am.msg100%
New File 86016 DAILY COAL RECEIVING STATUS - GKEL as on
11 06 2013 06 00 am.msg100%
New File 86016 DAILY COAL RECEIVING STATUS - GKEL as on
13 06 2013 06 00am.msg100%
New File 85504 DAILY COAL RECEIVING STATUS - GKEL as on
14 06 2013 06 00am.msg100%
New File 85504 DAILY COAL RECEIVING STATUS - GKEL as on
25 05 2013 06 00 am.msg100%
New File 85504 DAILY COAL RECEIVING STATUS - GKEL as on
27 05 2013 06 00 am.msg100%
New File 89088 DAILY COAL RECEIVING STATUS AS ON 03rd-
JUL 13 - 06 00am.msg100%
New File 77824 DAILY COAL RECEIVING STATUS AS ON 18th
June 13 - 06 00hrs.msg100%
New File 78336 DAILY COAL RECEIVING STATUS AS ON 19th
June 13 - 06 00hrs.msg100%
New File 91136 DAILY COAL RECEIVING STATUS AS ON 1st
July 13 - 06 00am.msg100%
New File 77312 DAILY COAL RECEIVING STATUS AS ON 20th
June 13 - 06 00hrs.msg100%
New File 84992 DAILY COAL RECEIVING STATUS AS ON 21st
June 13 - 06 00hrs.msg100%
New File 87040 DAILY COAL RECEIVING STATUS AS ON 22nd
June 13 - 06 00hrs.msg100%
New File 81920 DAILY COAL RECEIVING STATUS AS ON 26th
JUNE 13 - 06 00hrs.msg100%
New File 91648 DAILY COAL RECEIVING STATUS AS ON 29th
JUNE 13 - 06 00am.msg100%
New File 91648 DAILY COAL RECEIVING STATUS AS ON 2nd
July 13 - 06 00am.msg100%
New File 74240 DAILY COAL RECEIVING STATUS AS ON 3 6
13.msg100%
New File 91648 DAILY COAL RECEIVING STATUS AS ON 30th
JUNE 13 - 06 00am.msg100%
New File 75264 DAILY COAL RECEIVING STATUS AS ON 4 6
13.msg100%
New File 74752 DAILY COAL RECEIVING STATUS AS ON 9th
June 13 - 06 00hrs.msg100%
New File 91648 DAILY COAL RECEIVING STATUS GKEL- AS ON
- 05th JULY- 13 - 06 00am.msg100%
New File 111616 DAILY COAL RECEIVING STATUS GKEL- AS ON
- 06th JULY- 13 - 06 00am.msg100%
New File 110592 DAILY COAL RECEIVING STATUS GKEL- AS ON
- 07th JULY- 13 - 06 00am.msg100%
New File 103424 DAILY COAL RECEIVING STATUS GKEL- AS ON
- 08th JULY- 13 - 06 00am.msg100%
New File 84992 DAILY COAL RECEIVING STATUS GKEL- AS ON
- 09th JULY- 13 - 06 00am.msg100%
New File 89600 DAILY COAL RECEIVING STATUS GKEL- AS ON
- 10th Aug- 13 - 06 00am.msg100%
New File 84992 DAILY COAL RECEIVING STATUS GKEL- AS ON
- 10th JULY- 13 - 06 00am.msg100%
New File 87040 DAILY COAL RECEIVING STATUS GKEL- AS ON
- 10th Oct- 13 - 06 00am.msg100%
New File 84992 DAILY COAL RECEIVING STATUS GKEL- AS ON
- 10th Sep- 13 - 06 00am.msg100%
New File 113152 DAILY COAL RECEIVING STATUS GKEL- AS ON
- 11th Aug- 13 - 06 00am.msg100%
New File 107008 DAILY COAL RECEIVING STATUS GKEL- AS ON
- 11th JULY- 13 - 06 00am.msg100%
New File 81408 DAILY COAL RECEIVING STATUS GKEL- AS ON
- 12th Aug- 13 - 06 00am.msg100%
New File 114688 DAILY COAL RECEIVING STATUS GKEL- AS ON
- 12th JULY- 13 - 06 00am.msg100%
New File 115200 DAILY COAL RECEIVING STATUS GKEL- AS ON
- 13th JULY- 13 - 06 00am.msg100%
New File 81408 DAILY COAL RECEIVING STATUS GKEL- AS ON
- 14th Aug- 13 - 06 00am.msg100%
New File 115712 DAILY COAL RECEIVING STATUS GKEL- AS ON
- 14th JULY- 13 - 06 00am.msg100%
New File 112128 DAILY COAL RECEIVING STATUS GKEL- AS ON
- 15th Aug- 13 - 06 00am.msg100%
New File 84992 DAILY COAL RECEIVING STATUS GKEL- AS ON
- 15th JULY- 13 - 06 00am.msg100%
New File 89088 DAILY COAL RECEIVING STATUS GKEL- AS ON
- 16th Aug- 13 - 06 00am.msg100%
New File 84992 DAILY COAL RECEIVING STATUS GKEL- AS ON
- 16th JULY- 13 - 06 00am.msg100%
New File 92160 DAILY COAL RECEIVING STATUS GKEL- AS ON
- 17th Aug- 13 - 06 00am.msg100%
New File 85504 DAILY COAL RECEIVING STATUS GKEL- AS ON
- 17th JULY- 13 - 06 00am.msg100%
New File 85504 DAILY COAL RECEIVING STATUS GKEL- AS ON
- 18th JULY- 13 - 06 00am.msg100%
New File 92160 DAILY COAL RECEIVING STATUS GKEL- AS ON
- 19th JULY- 13 - 06 00am.msg100%
New File 84992 DAILY COAL RECEIVING STATUS GKEL- AS ON
- 20th JULY- 13 - 06 00am.msg100%
New File 84480 DAILY COAL RECEIVING STATUS GKEL- AS ON
- 21st JULY- 13 - 06 00am.msg100%
New File 78336 DAILY COAL RECEIVING STATUS GKEL- AS ON
- 22th JULY- 13 - 06 00am.msg100%
New File 78336 DAILY COAL RECEIVING STATUS GKEL- AS ON
- 23th JULY- 13 - 06 00am.msg100%
New File 84480 DAILY COAL RECEIVING STATUS GKEL- AS ON
- 25th JULY- 13 - 06 00am.msg100%
New File 112640 DAILY COAL RECEIVING STATUS GKEL- AS ON
- 27th JULY- 13 - 06 00am.msg100%
New File 89088 DAILY COAL RECEIVING STATUS GKEL- AS ON
- 29th JULY- 13 - 06 00am.msg100%
New File 88576 DAILY COAL RECEIVING STATUS GKEL- AS ON
- 30th JULY- 13 - 06 00am.msg100%
New File 96768 DAILY COAL RECEIVING STATUS GKEL- AS ON
- 3rd Aug- 13 - 06 00am.msg100%
New File 84480 DAILY COAL RECEIVING STATUS GKEL- AS ON
- 3rd Sep- 13 - 06 00am.msg100%
New File 96768 DAILY COAL RECEIVING STATUS GKEL- AS ON
- 4th Aug- 13 - 06 00am.msg100%
New File 73216 DAILY COAL RECEIVING STATUS GKEL- AS ON
- 5th Aug- 13 - 06 00am.msg100%
New File 73216 DAILY COAL RECEIVING STATUS GKEL- AS ON
- 6th Aug- 13 - 06 00am.msg100%
New File 73216 DAILY COAL RECEIVING STATUS GKEL- AS ON
- 7th Aug- 13 - 06 00am.msg100%
New File 80896 DAILY COAL RECEIVING STATUS GKEL- AS ON
- 8th Aug- 13 - 06 00am.msg100%
New File 80896 DAILY COAL RECEIVING STATUS GKEL- AS ON
- 9th Aug- 13 - 06 00am.msg100%
New File 87040 DAILY COAL RECEIVING STATUS GKEL- AS ON
- 9th Oct- 13 - 06 00am.msg100%
New File 84992 DAILY COAL RECEIVING STATUS GKEL- AS ON
- 9th Sep- 13 - 06 00am.msg100%
New File 91648 DAILY COAL RECEIVING STATUS GKEL- AS ON
04th- JULY- 13 - 06 00am.msg100%
New File 84992 DAILY COAL RECEIVING STATUS GKEL- AS ON
-11th Sep- 13 - 06 00am.msg100%
New File 84992 DAILY COAL RECEIVING STATUS GKEL- AS ON
-12th Sep- 13 - 06 00am (4).msg100%
New File 84992 DAILY COAL RECEIVING STATUS GKEL- AS ON
-12th Sep- 13 - 06 00am.msg100%
New File 87040 DAILY COAL RECEIVING STATUS GKEL- AS ON
-15th Oct- 13 - 06 00am.msg100%
New File 92160 DAILY COAL RECEIVING STATUS GKEL- AS ON
-15th Sep- 13 - 06 00am.msg100%
New File 92160 DAILY COAL RECEIVING STATUS GKEL- AS ON
-16th Oct- 13 - 06 00am.msg100%
New File 84480 DAILY COAL RECEIVING STATUS GKEL- AS ON
-17th Sep- 13 - 06 00am.msg100%
New File 88576 DAILY COAL RECEIVING STATUS GKEL- AS ON
-19th Oct- 13 - 06 00am.msg100%
New File 86528 DAILY COAL RECEIVING STATUS GKEL- AS ON
-1st Oct- 13 - 06 00am.msg100%
New File 88576 DAILY COAL RECEIVING STATUS GKEL- AS ON
-20th Oct- 13 - 06 00am.msg100%
New File 77824 DAILY COAL RECEIVING STATUS GKEL- AS ON
-21st Oct- 13 - 06 00am.msg100%
New File 102912 DAILY COAL RECEIVING STATUS GKEL- AS ON
-22nd Aug 13 - 06 00am.msg100%
New File 110592 DAILY COAL RECEIVING STATUS GKEL- AS ON
-23rd Aug 13 - 06 00am.msg100%
New File 80896 DAILY COAL RECEIVING STATUS GKEL- AS ON
-23rdOct- 13 - 06 00am.msg100%
New File 81408 DAILY COAL RECEIVING STATUS GKEL- AS ON
-24th Oct- 13 - 06 00 am.msg100%
New File 84992 DAILY COAL RECEIVING STATUS GKEL- AS ON
-25th Sep- 13 - 06 00am.msg100%
New File 84992 DAILY COAL RECEIVING STATUS GKEL- AS ON
-26th Sep- 13 - 06 00am.msg100%
New File 84992 DAILY COAL RECEIVING STATUS GKEL- AS ON
-28th Sep- 13 - 06 00am.msg100%
New File 92160 DAILY COAL RECEIVING STATUS GKEL- AS ON
-29th Sep- 13 - 06 00am.msg100%
New File 87040 DAILY COAL RECEIVING STATUS GKEL- AS ON
-2nd Oct- 13 - 06 00am.msg100%
New File 84992 DAILY COAL RECEIVING STATUS GKEL- AS ON
-30th Sep- 13 - 06 00am.msg100%
New File 87040 DAILY COAL RECEIVING STATUS GKEL- AS ON
-3rd Oct- 13 - 06 00am.msg100%
New File 87040 DAILY COAL RECEIVING STATUS GKEL- AS ON
-4th Oct- 13 - 06 00am.msg100%
New File 94720 DAILY COAL RECEIVING STATUS GKEL- AS ON
-5th Oct- 13 - 06 00am.msg100%
New File 84480 DAILY COAL RECEIVING STATUS GKEL- AS ON
-5th Sep- 13 - 06 00am.msg100%
New File 93696 DAILY COAL RECEIVING STATUS GKEL- AS ON
-6th Oct- 13 - 06 00am.msg100%
New File 84992 DAILY COAL RECEIVING STATUS GKEL- AS ON
-6th Sep- 13 - 06 00am.msg100%
New File 86528 DAILY COAL RECEIVING STATUS GKEL- AS ON
-7th Oct- 13 - 06 00am.msg100%
New File 92160 DAILY COAL RECEIVING STATUS GKEL- AS ON
-7th Sep- 13 - 06 00am.msg100%
New File 86528 DAILY COAL RECEIVING STATUS GKEL- AS ON
-8th Oct- 13 - 06 00am.msg100%
New File 75264 FW DAILY COAL RECEIVING STATUS AS ON 5
6 13.msg100%
New File 121344 MIS-Nov & Dec Linkage Rakes at GKEL.msg
100%
New File 156160 MIS-November Linkage Rakes (8).msg100%
New File 139776 MIS-November Linkage Rakes.msg100%
New File 75264 RE DAILY COAL RECEIVING STATUS - GKEL
as on 12 06 2013 .msg100%
New File 75264 RE DAILY COAL RECEIVING STATUS AS ON 6
6 13.msg100%
New File 84992 RE DAILY COAL RECEIVING STATUS GKEL- AS
ON - 24th JULY- 13 - 06 00am.msg100%
New File 90112 RE DAILY COAL RECEIVING STATUS GKEL- AS
ON -22st Oct- 13 - 06 00am.msg100%
New Dir 7 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\14.RRT\
New File 119296 FW Payment of 70 Crore (1).msg100%
New File 113664 FW Payment of 70 Crore.msg100%
New File 477696 FW revert regarding Non- compliance with
milestone schedule & RRT completion.msg100%
New File 53760 regarding sepco person working without
work permit in ID fan-2A.msg100%
New File 19356 Replies.docx100%
New File 32.7 m Report on Reliabality Run Test for
Unit#1.pdf100%
New File 51712 Sepco Person working without work permit
in Unit-2.msg100%
New Dir 0 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\14.RRT\2_6 Annexures A, B and C of RRT joint protocol
for Units 1, 2 and 3\
New Dir 0 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\14.RRT\2_6 Annexures A, B and C of RRT joint protocol
for Units 1, 2 and 3\2_6 Annexures A, B and C of RRT joint protocol for Units 1, 2
and 3\
New Dir 1 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\14.RRT\2_6 Annexures A, B and C of RRT joint protocol
for Units 1, 2 and 3\2_6 Annexures A, B and C of RRT joint protocol for Units 1, 2
and 3\Annexure-A\
New File 16676 Status Annexure- A Unit-1,2 and 3.xlsx
100%
New Dir 1 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\14.RRT\2_6 Annexures A, B and C of RRT joint protocol
for Units 1, 2 and 3\2_6 Annexures A, B and C of RRT joint protocol for Units 1, 2
and 3\Annexure-C\
New File 18205 Status of Annexure -C of RRT Unit-1,2
and 3.xlsx100%
New Dir 3 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\14.RRT\2_6 Annexures A, B and C of RRT joint protocol
for Units 1, 2 and 3\2_6 Annexures A, B and C of RRT joint protocol for Units 1, 2
and 3\Updated Annexure-B of RRT-1, 2 and 3 punch list\
New File 73019 SEPCO Unit#1 Punch points _GKEL 24-09-
14.xlsx100%
New File 75769 SEPCO Unit#3 Punch list as on 19-12-
14.xlsx100%
New File 361772 SEPCO Unit-2 Punch points_GKEL 19-12-
14.xlsx100%
New Dir 3 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\14.RRT\C&I\
New File 1.0 m CEMS commujnication.7z100%
New File 2.5 m RE Requisition list of documents for
issues related to C&I systems.msg100%
New File 224680 SWAS communication.7z100%
New Dir 0 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\14.RRT\SEPCO\
New Dir 6 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\14.RRT\SEPCO\SEPCO\
New File 162 ~$eplies.docx100%
New File 14262 Ash Quantity Calculations.xlsx100%
New File 19356 Replies.docx100%
New File 114688 Requisition list for documents related to
Fuel Oil Supply Issues.msg100%
New File 136192 Requisition list for issues related to
RRT of Units 1 2 and 3.msg100%
New File 8.8 m SEPCO v GKEL - Statement of Claim.pdf100%

New Dir 0 C:\AdvisianActive\01 Projects\GMR GKEL


Arbitration\Intralinks\Reply\14.RRT\SEPCO\SEPCO\2_1 Test Reports\
New Dir 14 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\14.RRT\SEPCO\SEPCO\2_1 Test Reports\Test reports
mails\
New File 75776 RE Coal quality.msg100%
New File 123904 Annexure- 9 &11 of RRT document.msg100%
New File 21.0 m Annexure- 9 10&11 of RRT document.msg100%

New File 313856 commissioning protocol _filled for unit


#2 whole start up.msg100%
New File 463360 Filled RRT protocol.msg100%
New File 305152 FW Boiler light up protocol.msg100%
New File 479744 FW Emailing 4 Protocol_before
RRT(GMR).msg100%
New File 70144 Modifed Protocol _After RRT.msg100%
New File 2.0 m RE RRT document word copy for Unit-3
(1).msg100%
New File 1.3 m RE RRT document word copy for Unit-3.msg
100%
New File 1029632 Reviewed UCT protocol .msg100%
New File 332800 RRT document word copy.msg100%
New File 808960 UCT_Protocol for BTG and auxiliaries.msg
100%
New File 1018880 UCT_Protocol.msg100%
New Dir 0 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\14.RRT\SEPCO\SEPCO\2_10 transmittal which contains
submission of Unit 1 RRT protocol by SEPCO\
New Dir 13 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\14.RRT\SEPCO\SEPCO\2_11 signed copies of boiler light
up, synchronization certificates etc signed by SEPCO to prove COD of Units 1 and 2\
New File 2.3 m BOILER LIGHTUP PROTOCOL- UNIT #1.pdf100%

New File 131931 COMMISSIONING PROTOCOL OF BOILER AND


TURBINE UNIT #1.pdf100%
New File 116659 MILESTONE CERTIFICATE OF BOILER LIGHT UP
UNIT #1.pdf100%
New File 176251 MILESTONE CERTIFICATE OF COAL
SYNCHRONISATION UNIT #1.pdf100%
New File 171287 MILESTONE CERTIFICATE OF OIL
SYNCHRONISATION OF UNIT #1.pdf100%
New File 186819 U#2 COAL SYNCHRO.pdf100%
New File 132495 U#2 INITIAL OPERATION.pdf100%
New File 154631 U#2 LIGHT-UP.pdf100%
New File 183159 U#2 OIL SYNCHRO.pdf100%
New File 5.0 m UNIT WHOLE STARTUP PROTOCOL UNIT #1.pdf
100%
New File 2.6 m Unit-2 Boiler Lightup protocol.pdf100%
New File 2.8 m Unit-2 Unit whole startup protocol.pdf
100%
New File 3.0 m Unit-3 boiler light up protocol..pdf100%

New Dir 1 C:\AdvisianActive\01 Projects\GMR GKEL


Arbitration\Intralinks\Reply\14.RRT\SEPCO\SEPCO\2_12 availability % of all 3 units
during the non-full load period of respective RRTs\
New File 12186 Availability in RRT period.docx100%
New Dir 0 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\14.RRT\SEPCO\SEPCO\2_13 mails correspondences of
instances of November 2013 after RRT of Unit 1 when the work permits were being
rejected by SEPCO to GKEL personnel\
New Dir 0 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\14.RRT\SEPCO\SEPCO\2_14cross check the average daily
specific coal consumption in kgkWh as mentioned in the table on Pg 131 of SOC\
New Dir 0 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\14.RRT\SEPCO\SEPCO\2_15 cross check the equipment
trips outages during RRT of Units 1, 2 and 3 as mentioned in the table on Pg 133
of SOC\
New Dir 0 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\14.RRT\SEPCO\SEPCO\2_16 cross check the chemical log
during RRT of Units 1,2 and 3 as mentioned in the table on Page 134 of SOC\
New Dir 0 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\14.RRT\SEPCO\SEPCO\2_17 cross check the water
chemistry data during RRT of Units 1, 2 and 3 as mentioned in the table on Page 134
of SOC\
New Dir 0 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\14.RRT\SEPCO\SEPCO\2_18 validate the average Moisture
content, Ash, Fixed Carbon, Volatile Matter and Gross Calorific Value of coal
during full load and non-full load periods as set out in tables in Pag\
New Dir 1 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\14.RRT\SEPCO\SEPCO\2_19 daily usage of coal in Kg and
the resultant ash produced during the RRT of Units 1 and 2\
New File 12448 Technical writeup on CHP and AHP.docx100%

New Dir 1 C:\AdvisianActive\01 Projects\GMR GKEL


Arbitration\Intralinks\Reply\14.RRT\SEPCO\SEPCO\2_2 day wise test reports of the 14
day period during RRT of Units 1, 2 and 3\
New File 86.7 m RRT of Unit#3.pdf100%
New Dir 1 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\14.RRT\SEPCO\SEPCO\2_2 day wise test reports of the 14
day period during RRT of Units 1, 2 and 3\RRT document Unit #1 Signed\
New File 32.7 m Report on Reliabality Run Test for
Unit#1.pdf100%
New Dir 13 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\14.RRT\SEPCO\SEPCO\2_2 day wise test reports of the 14
day period during RRT of Units 1, 2 and 3\RRT document Unit #2\
New File 40232 4.Coverpage_RRT Report.docx100%
New File 43008 5.1 Brief.doc100%
New File 284160 5.10Auto loop.doc100%
New File 44074 5.2 Daily report.docx100%
New File 58880 5.3 summary of trippings.doc100%
New File 53248 5.4 Chemical log.doc100%
New File 850944 5.5 Chemical analysis log.doc100%
New File 61440 5.6 Weekly report of chemical laboratory
analysis.doc100%
New File 332800 5.7 Boiler LOG .doc100%
New File 433664 5.8Turbine Log .doc100%
New File 77312 5.9Generater LOG .doc100%
New File 40469 7.Coverpage_Protocol After RRT.docx100%
New File 244887 Annexure-B deffects and
Ommissoins_Updated Punchlist.xlsx100%
New Dir 3 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\14.RRT\SEPCO\SEPCO\2_2 day wise test reports of the 14
day period during RRT of Units 1, 2 and 3\RRT document Unit #2\PRE RRT PROTOCOLS
AND ANNEXURES\
New File 445440 4 Protocol_before RRT(GMR).doc100%
New File 432030 Annexure-10 Warranty Spares updated 15-
06-2013 (3).xlsx100%
New File 360412 Annexure-8 Unit-2 Punch points_GKEL.xlsx
100%
New Dir 1 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\14.RRT\SEPCO\SEPCO\2_20 a write up on the issues
related to Stator Water Quality during RRT of Unit 1\
New File 168547 Letter to SEPCO Site-3575.pdf100%
New Dir 0 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\14.RRT\SEPCO\SEPCO\2_21 copy of the Consent to Operate
for Haryana and GRIDCO\
New Dir 0 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\14.RRT\SEPCO\SEPCO\2_22 invoice from GRIDCO of May
2013\
New Dir 0 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\14.RRT\SEPCO\SEPCO\2_23 technical write up mentioning
why CHP and AHP are very critical to completion of RRT\
New Dir 1 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\14.RRT\SEPCO\SEPCO\2_24 15th Nov 2013 to 30th Nov
2013 (within the Operation Period) how many times was BLU done\
New File 3.3 m Generation Report-Nov13_Main.xls100%
New Dir 0 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\14.RRT\SEPCO\SEPCO\2_25 local police called by SEPCO
on 23rd Nov 2013 or not\
New Dir 0 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\14.RRT\SEPCO\SEPCO\2_26 shift logs generator outputs
to determine Unit 1 start and stop dates in November 2013\
New Dir 12 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\14.RRT\SEPCO\SEPCO\2_27 check the emails letters
stating detailed issues in RRT of Unit 2\
New File 242703 Letter to SEPCO Site-3438.pdf100%
New File 213051 Letter to SEPCO Site-3474.pdf100%
New File 174523 Letter to SEPCO Site-3477.pdf100%
New File 196455 Letter to SEPCO Site-3480.pdf100%
New File 429673 Letter to SEPCO Site-3517.pdf100%
New File 288304 Letter to SEPCO Site-3535.pdf100%
New File 187239 Letter to SEPCO Site-3573.pdf100%
New File 205243 Letter to SEPCO Site-3614.pdf100%
New File 155483 Letter to SEPCO Site-3615.pdf100%
New File 188515 Letter to SEPCO Site-3661.pdf100%
New File 175867 Letter to SEPCO Site-3771.pdf100%
New File 193243 Letter to SEPCO Site-3773.pdf100%
New Dir 0 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\14.RRT\SEPCO\SEPCO\2_3 commissioning report for Unit 1
to\
New Dir 14 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\14.RRT\SEPCO\SEPCO\2_3 commissioning report for Unit 1
to\Unit 1 commissioning report-pdf\
New File 114427 Annexure-3.1 LDO leak test Report.pdf100%

New File 72654 Annexure-3.2 Boiler Steam blowing data


Sheet.pdf100%
New File 32399 Annexure-3.3 Boiler hangers, support and
expansion readings.pdf100%
New File 3.7 m Annexure-3.4 Photographs.pdf100%
New File 53681 Annexure-5.1 Holding time curve.pdf100%
New File 51848 Annexure-5.2 HP cylinder jacket heating
system.pdf100%
New File 20346 Annexure-5.3 TSI parameters during
rolling.pdf100%
New File 19268 Annexure-5.4 TSI parameters during
3000rpm.pdf100%
New File 880921 Annexure-5.5 AVR test results.pdf100%
New File 8.8 m Annexure-5.6 Unit #1 GCB failure
report.pdf100%
New File 9.4 m Annexure-5.7 Electrical tests after GCB
failure.pdf100%
New File 155198 Annexure-6.1 Main parameters at 350MW.pdf
100%
New File 20136 Annexure-7.1 Summary data Sheet.pdf100%
New File 6.8 m Unit # 1 commissioning report.pdf100%
New Dir 0 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\14.RRT\SEPCO\SEPCO\2_4 Shift in-charge operation
report (daily report) of Unit 2 and 3\
New Dir 504 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\14.RRT\SEPCO\SEPCO\2_4 Shift in-charge operation
report (daily report) of Unit 2 and 3\Shift wise operation reports from 06.05.2013
to 24.12.2013\
New File 167424 A -shift report for dated 06 06 2013.msg
100%
New File 113664 A -shift report for dated 10 10 2013 .msg
100%
New File 121856 A- shift report for dated 10 7 13.msg100%
New File 121344 A shift report for dated 12 07 2013.msg
100%
New File 118784 A- shift report for dated 17 06 13.msg
100%
New File 117248 A- shift report for dated 18 06 13.msg
100%
New File 118784 A- shift report for dated 19 06 13.msg
100%
New File 117760 A- shift report for dated 22 06 13.msg
100%
New File 123904 A- shift report for dated 9 7 13.msg100%

New File 119296 A-shift report for date 19 07 2013.msg


100%
New File 107008 A-shift report for dated 01 07 2013.msg
100%
New File 115712 A-shift report for dated 01 08 2013.msg
100%
New File 114688 A-shift report for dated 01 09 2013.msg
100%
New File 103936 A-shift report for dated 01 10 2013.msg
100%
New File 122880 A-shift report for dated 01 11 2013 .msg
100%
New File 118784 A-shift report for dated 02 07 2013.msg
100%
New File 116224 A-shift report for dated 02 08 2013.msg
100%
New File 118272 A-shift report for dated 02 09 2013.msg
100%
New File 105472 A-shift report for dated 02 10 2013.msg
100%
New File 119808 A-shift report for dated 03 06 2013.msg
100%
New File 119296 A-shift report for dated 03 07 2013.msg
100%
New File 117760 A-shift report for dated 03 08 2013.msg
100%
New File 103936 A-shift report for dated 03 09 2013.msg
100%
New File 107008 A-shift report for dated 03 10 2013.msg
100%
New File 118272 A-shift report for dated 04 06 13.msg100%

New File 119808 A-shift report for dated 04 07 2013.msg


100%
New File 117248 A-shift report for dated 04 08 2013.msg
100%
New File 96256 A-shift report for dated 04 09 2013.msg
100%
New File 116224 A-shift report for dated 04 10 2013.msg
100%
New File 171520 A-shift report for dated 05 06 2013.msg
100%
New File 117760 A-shift report for dated 05 07 2013.msg
100%
New File 119808 A-shift report for dated 05 08 2013.msg
100%
New File 117248 A-shift report for dated 05 09 2013.msg
100%
New File 115712 A-shift report for dated 05 10 2013.msg
100%
New File 117248 A-shift report for dated 05 11 2013 .msg
100%
New File 156160 A-shift report for dated 06 07 2013.msg
100%
New File 115712 A-shift report for dated 06 08 2013.msg
100%
New File 116736 A-shift report for dated 06 09 2013.msg
100%
New File 114176 A-shift report for dated 06 10 2013 .msg
100%
New File 117760 A-shift report for dated 07 06 2013.msg
100%
New File 163840 A-shift report for dated 07 07 2013.msg
100%
New File 115712 A-shift report for dated 07 08 2013.msg
100%
New File 114688 A-shift report for dated 07 09 2013.msg
100%
New File 116736 A-shift report for dated 07 10 2013 .msg
100%
New File 118272 A-shift report for dated 08 06 2013.msg
100%
New File 178176 A-shift report for dated 08 07 2013.msg
100%
New File 117248 A-shift report for dated 08 08 2013.msg
100%
New File 115200 A-shift report for dated 08 09 2013.msg
100%
New File 116224 A-shift report for dated 08 10 2013 .msg
100%
New File 160256 A-shift report for dated 09 06 2013.msg
100%
New File 149504 A-shift report for dated 09 08 2013.msg
100%
New File 116224 A-shift report for dated 09 09 2013.msg
100%
New File 115200 A-shift report for dated 09 10 2013 .msg
100%
New File 119296 A-shift report for dated 10 06 2013.msg
100%
New File 117760 A-shift report for dated 10 08 2013.msg
100%
New File 116736 A-shift report for dated 10 09 2013.msg
100%
New File 169472 A-shift report for dated 11 06 2013 .msg
100%
New File 121856 A-shift report for dated 11 07 2013.msg
100%
New File 117248 A-shift report for dated 11 08 2013.msg
100%
New File 117760 A-shift report for dated 11 09 2013.msg
100%
New File 113664 A-shift report for dated 11 10 2013 .msg
100%
New File 120320 A-shift report for dated 12 06 2013.msg
100%
New File 117248 A-shift report for dated 12 08 2013.msg
100%
New File 166400 A-shift report for dated 12 09 2013.msg
100%
New File 118784 A-shift report for dated 12 10 2013 .msg
100%
New File 118272 A-shift report for dated 13 06 2013.msg
100%
New File 119808 A-shift report for dated 13 07 2013.msg
100%
New File 116736 A-shift report for dated 13 08 2013.msg
100%
New File 96768 A-shift report for dated 13 09 2013.msg
100%
New File 110080 A-shift report for dated 13 10 2013 .msg
100%
New File 118784 A-shift report for dated 14 06 2013.msg
100%
New File 118272 A-shift report for dated 14 07 2013.msg
100%
New File 118784 A-shift report for dated 14 08 2013.msg
100%
New File 112128 A-shift report for dated 14 09 2013.msg
100%
New File 113152 A-shift report for dated 14 10 2013 .msg
100%
New File 119296 A-shift report for dated 15 06 2013.msg
100%
New File 119296 A-shift report for dated 15 07 2013.msg
100%
New File 105984 A-shift report for dated 15 08 2013.msg
100%
New File 112640 A-shift report for dated 15 09 2013.msg
100%
New File 114176 A-shift report for dated 15 10 2013 .msg
100%
New File 118272 A-shift report for dated 16 06 2013.msg
100%
New File 193024 A-shift report for dated 16 07 2013.msg
100%
New File 106496 A-shift report for dated 16 08 2013.msg
100%
New File 112128 A-shift report for dated 16 09 2013.msg
100%
New File 113152 A-shift report for dated 16 10 2013 .msg
100%
New File 164352 A-shift report for dated 17 07 2013.msg
100%
New File 118784 A-shift report for dated 17 08 2013.msg
100%
New File 113664 A-shift report for dated 17 09 2013.msg
100%
New File 108032 A-shift report for dated 17 10 2013 .msg
100%
New File 118784 A-shift report for dated 18 07 2013.msg
100%
New File 117760 A-shift report for dated 18 08 2013.msg
100%
New File 113664 A-shift report for dated 18 09 2013.msg
100%
New File 105472 A-shift report for dated 18 10 2013 .msg
100%
New File 124928 A-shift report for dated 19 08 2013.msg
100%
New File 120832 A-shift report for dated 19 09 2013.msg
100%
New File 113152 A-shift report for dated 19 10 2013 .msg
100%
New File 107520 A-shift report for dated 20 06 2013.msg
100%
New File 125440 A-shift report for dated 20 07 2013.msg
100%
New File 124928 A-shift report for dated 20 08 2013.msg
100%
New File 120832 A-shift report for dated 20 09 2013.msg
100%
New File 113664 A-shift report for dated 20 10 2013 .msg
100%
New File 99840 A-shift report for dated 21 06 2013.msg
100%
New File 121344 A-shift report for dated 21 07 2013.msg
100%
New File 117760 A-shift report for dated 21 08 2013.msg
100%
New File 108544 A-shift report for dated 21 09 2013.msg
100%
New File 113664 A-shift report for dated 21 10 2013 .msg
100%
New File 123904 A-shift report for dated 22 07 2013.msg
100%
New File 120320 A-shift report for dated 22 08 2013.msg
100%
New File 103424 A-shift report for dated 22 09 2013.msg
100%
New File 123904 A-shift report for dated 22 10 2013 .msg
100%
New File 119296 A-shift report for dated 23 06 2013.msg
100%
New File 124416 A-shift report for dated 23 07 2013.msg
100%
New File 121856 A-shift report for dated 23 08 2013.msg
100%
New File 95744 A-shift report for dated 23 09 2013.msg
100%
New File 123904 A-shift report for dated 23 10 2013 .msg
100%
New File 121856 A-shift report for dated 24 06 2013.msg
100%
New File 120832 A-shift report for dated 24 07 2013.msg
100%
New File 97792 A-shift report for dated 24 08 2013.msg
100%
New File 113664 A-shift report for dated 24 09 2013.msg
100%
New File 125440 A-shift report for dated 24 10 2013 .msg
100%
New File 119296 A-shift report for dated 25 06 2013.msg
100%
New File 123904 A-shift report for dated 25 07 2013.msg
100%
New File 106496 A-shift report for dated 25 08 2013.msg
100%
New File 115712 A-shift report for dated 25 09 2013.msg
100%
New File 124928 A-shift report for dated 25 10 2013 .msg
100%
New File 118784 A-shift report for dated 26 06 2013.msg
100%
New File 121856 A-shift report for dated 26 07 2013.msg
100%
New File 107008 A-shift report for dated 26 08 2013.msg
100%
New File 114688 A-shift report for dated 26 09 2013.msg
100%
New File 122368 A-shift report for dated 26 10 2013 .msg
100%
New File 155648 A-shift report for dated 27 06 2013.msg
100%
New File 124928 A-shift report for dated 27 07 2013.msg
100%
New File 117760 A-shift report for dated 27 08 2013.msg
100%
New File 115712 A-shift report for dated 27 09 2013.msg
100%
New File 113664 A-shift report for dated 27 10 2013 .msg
100%
New File 155136 A-shift report for dated 28 06 2013.msg
100%
New File 121344 A-shift report for dated 28 07 2013.msg
100%
New File 122368 A-shift report for dated 28 08 2013.msg
100%
New File 119296 A-shift report for dated 28 09 2013.msg
100%
New File 114688 A-shift report for dated 28 10 2013 .msg
100%
New File 162816 A-shift report for dated 29 06 2013.msg
100%
New File 120832 A-shift report for dated 29 07 2013.msg
100%
New File 121344 A-shift report for dated 29 08 2013.msg
100%
New File 117248 A-shift report for dated 29 09 2013.msg
100%
New File 124416 A-shift report for dated 29 10 2013 .msg
100%
New File 106496 A-shift report for dated 30 06 2013.msg
100%
New File 126464 A-shift report for dated 30 07 2013.msg
100%
New File 118784 Ashift report for dated 30 08 2013.msg
100%
New File 116224 A-shift report for dated 30 09 2013.msg
100%
New File 122880 A-shift report for dated 30 10 2013 .msg
100%
New File 121856 A-shift report for dated 31 07 2013.msg
100%
New File 118784 A-shift report for dated 31 08 2013.msg
100%
New File 122368 A-shift report for dated 31 10 2013 .msg
100%
New File 113664 B -shift report for dated 09 10 2013 .msg
100%
New File 121344 B shift report for dated 12 07 2013.msg
100%
New File 118272 B- shift report for dated 17 06 13.msg
100%
New File 116736 B- shift report for dated 18 06 13.msg
100%
New File 118784 B- shift report for dated 19 06 13.msg
100%
New File 118784 B- shift report for dated 20 06 13.msg
100%
New File 117760 B- shift report for dated 21 06 13.msg
100%
New File 120832 B- shift report for dated 7 7 13.msg100%

New File 120320 B- shift report for dated 8 7 13.msg100%

New File 160768 B-shift report for dated 01 07 2013.msg


100%
New File 118272 B-shift report for dated 01 08 2013.msg
100%
New File 115200 B-shift report for dated 01 09 2013.msg
100%
New File 115712 B-shift report for dated 01 10 2013.msg
100%
New File 121856 B-shift report for dated 01 11 2013 .msg
100%
New File 107008 B-shift report for dated 02 07 2013.msg
100%
New File 118272 B-shift report for dated 02 08 2013.msg
100%
New File 116224 B-shift report for dated 02 09 2013.msg
100%
New File 115200 B-shift report for dated 02 10 2013.msg
100%
New File 123904 B-shift report for dated 03 06 2013.msg
100%
New File 107008 B-shift report for dated 03 07 2013.msg
100%
New File 116736 B-shift report for dated 03 08 2013.msg
100%
New File 114688 B-shift report for dated 03 09 2013.msg
100%
New File 116736 B-shift report for dated 03 10 2013.msg
100%
New File 121344 B-shift report for dated 04 06 2013.msg
100%
New File 117248 B-shift report for dated 04 07 2013.msg
100%
New File 117248 B-shift report for dated 04 08 2013.msg
100%
New File 115200 B-shift report for dated 04 09 2013.msg
100%
New File 115712 B-shift report for dated 04 10 2013 .msg
100%
New File 119808 B-shift report for dated 05 06 2013.msg
100%
New File 118272 B-shift report for dated 05 07 2013.msg
100%
New File 119296 B-shift report for dated 05 08 2013.msg
100%
New File 104960 B-shift report for dated 05 09 2013.msg
100%
New File 116224 B-shift report for dated 05 10 2013.msg
100%
New File 117760 B-shift report For dated 06 06 13.msg100%

New File 118784 B-shift report for dated 06 07 2013.msg


100%
New File 116224 B-shift report for dated 06 08 2013.msg
100%
New File 96256 B-shift report for dated 06 09 2013.msg
100%
New File 115712 B-shift report for dated 06 10 2013 .msg
100%
New File 167424 B-shift report for dated 07 06 2013.msg
100%
New File 115712 B-shift report for dated 07 08 2013.msg
100%
New File 117760 B-shift report for dated 07 09 2013.msg
100%
New File 118784 B-shift report for dated 07 10 2013 .msg
100%
New File 120832 B-shift report for dated 08 06 2013.msg
100%
New File 104960 B-shift report for dated 08 08 2013.msg
100%
New File 115712 B-shift report for dated 08 09 2013.msg
100%
New File 113664 B-shift report for dated 08 10 2013 .msg
100%
New File 118272 B-shift report for dated 09 06 2013.msg
100%
New File 183808 B-shift report for dated 09 07 2013.msg
100%
New File 104448 B-shift report for dated 09 08 2013.msg
100%
New File 115712 B-shift report for dated 09 09 2013.msg
100%
New File 118784 B-shift report for dated 10 06 2013.msg
100%
New File 164352 B-shift report for dated 10 07 2013.msg
100%
New File 116736 B-shift report for dated 10 08 2013.msg
100%
New File 115200 B-shift report for dated 10 09 2013.msg
100%
New File 116736 B-shift report for dated 10 10 2013 .msg
100%
New File 121344 B-shift report for dated 11 06 2013.msg
100%
New File 129024 B-shift report for dated 11 07 2013.msg
100%
New File 117760 B-shift report for dated 11 08 2013.msg
100%
New File 114688 B-shift report for dated 11 09 2013.msg
100%
New File 117760 B-shift report for dated 11 10 2013 .msg
100%
New File 118272 B-shift report for dated 12 06 2013.msg
100%
New File 118272 B-shift report for dated 12 08 2013.msg
100%
New File 115200 B-shift report for dated 12 09 2013.msg
100%
New File 112640 B-shift report for dated 12 10 2013 .msg
100%
New File 117760 B-shift report for dated 13 06 2013.msg
100%
New File 119808 B-shift report for dated 13 07 2013.msg
100%
New File 116736 B-shift report for dated 13 08 2013.msg
100%
New File 115200 B-shift report for dated 13 09 2013.msg
100%
New File 113664 B-shift report for dated 13 10 2013 .msg
100%
New File 119296 B-shift report for dated 14 07 2013.msg
100%
New File 117760 B-shift report for dated 14 08 2013.msg
100%
New File 100864 B-shift report for dated 14 09 2013.msg
100%
New File 116224 B-Shift report for dated 14 10 2013 .msg
100%
New File 118272 B-shift report for dated 15 06 2013.msg
100%
New File 118272 B-shift report for dated 15 07 2013.msg
100%
New File 163840 B-shift report for dated 15 08 2013.msg
100%
New File 100352 B-shift report for dated 15 09 2013.msg
100%
New File 114688 B-shift report for dated 15 10 2013 .msg
100%
New File 117760 B-shift report for dated 16 06 2013.msg
100%
New File 119296 B-shift report for dated 16 07 2013.msg
100%
New File 119296 B-shift report for dated 16 08 2013.msg
100%
New File 100864 B-shift report for dated 16 09 2013.msg
100%
New File 119296 B-shift report for dated 16 10 13.msg100%

New File 120320 B-shift report for dated 17 07 2013.msg


100%
New File 106496 B-shift report for dated 17 08 2013.msg
100%
New File 112640 B-shift report for dated 17 09 2013.msg
100%
New File 113664 B-shift report for dated 17 10 2013 .msg
100%
New File 165888 B-shift report for dated 18 07 2013.msg
100%
New File 104960 B-shift report for dated 18 08 2013.msg
100%
New File 113152 B-shift report for dated 18 10 2013 .msg
100%
New File 169984 B-shift report for dated 19 07 2013.msg
100%
New File 110080 B-shift report for dated 19 08 2013.msg
100%
New File 115200 B-shift report for dated 19 09 2013
(9).msg100%
New File 119296 B-shift report for dated 19 09 2013.msg
100%
New File 116224 B-shift report for dated 19 10 2013 .msg
100%
New File 130560 B-shift report for dated 20 07 2013.msg
100%
New File 123392 B-shift report for dated 20 08 2013.msg
100%
New File 118272 B-shift report for dated 20 09 2013.msg
100%
New File 116736 B-shift report for dated 20 10 2013 .msg
100%
New File 120832 B-shift report for dated 21 07 2013.msg
100%
New File 116736 B-shift report for dated 21 08 2013.msg
100%
New File 109568 B-shift report for dated 21 09 2013.msg
100%
New File 116224 B-shift report for dated 21 10 2013 .msg
100%
New File 106496 B-shift report for dated 22 06 2013.msg
100%
New File 127488 B-shift report for dated 22 07 2013.msg
100%
New File 117760 B-shift report for dated 22 08 2013.msg
100%
New File 104448 B-shift report for dated 22 09 2013.msg
100%
New File 122368 B-shift report for dated 22 10 2013 .msg
100%
New File 102400 B-shift report for dated 23 06 2013.msg
100%
New File 126976 B-shift report for dated 23 07 2013
(11).msg100%
New File 128512 B-shift report for dated 23 07 2013.msg
100%
New File 120832 B-shift report for dated 23 08 2013.msg
100%
New File 105472 B-shift report for dated 23 09 2013.msg
100%
New File 124416 B-shift report for dated 23 10 2013 .msg
100%
New File 108544 B-shift report for dated 24 06 2013.msg
100%
New File 120320 B-shift report for dated 24 07 2013.msg
100%
New File 120320 B-shift report for dated 24 08 2013.msg
100%
New File 106496 B-shift report for dated 24 09 2013.msg
100%
New File 124928 B-shift report for dated 24 10 2013 .msg
100%
New File 117760 B-shift report for dated 25 06 2013.msg
100%
New File 120320 B-shift report for dated 25 07 2013.msg
100%
New File 118272 B-shift report for dated 25 08 2013.msg
100%
New File 110080 B-shift report for dated 25 09 2013.msg
100%
New File 129024 B-shift report for dated 25 10 2013 .msg
100%
New File 117760 B-shift report for dated 26 06 2013.msg
100%
New File 120832 B-shift report for dated 26 07 2013.msg
100%
New File 118784 B-shift report for dated 26 08 2013.msg
100%
New File 118784 B-shift report for dated 26 09 2013.msg
100%
New File 121856 B-shift report for dated 26 10 2013 .msg
100%
New File 117248 B-shift report for dated 27 06 2013.msg
100%
New File 125952 B-shift report for dated 27 07 2013.msg
100%
New File 107520 B-shift report for dated 27 08 2013.msg
100%
New File 118272 B-shift report for dated 27 09 2013.msg
100%
New File 121856 B-shift report for dated 27 10 2013 .msg
100%
New File 118272 B-shift report for dated 28 06 2013.msg
100%
New File 122368 B-shift report for dated 28 07 2013.msg
100%
New File 109568 B-shift report for dated 28 08 2013.msg
100%
New File 114176 B-shift report for dated 28 09 2013.msg
100%
New File 122880 B-shift report for dated 28 10 2013 .msg
100%
New File 107520 B-shift report for dated 29 06 2013.msg
100%
New File 121344 B-shift report for dated 29 07 2013.msg
100%
New File 121344 B-shift report for dated 29 08 2013.msg
100%
New File 117248 B-shift report for dated 29 09 2013.msg
100%
New File 122368 B-shift report for dated 29 10 2013 .msg
100%
New File 157696 B-shift report for dated 30 06 2013.msg
100%
New File 123904 B-shift report for dated 30 07 2013.msg
100%
New File 115712 B-shift report for dated 30 09 2013.msg
100%
New File 115712 B-shift report for dated 30 10 2013 .msg
100%
New File 121856 B-shift report for dated 31 07 2013.msg
100%
New File 117760 B-shift report for dated 31 08 2013.msg
100%
New File 122368 B-shift report for dated 31 10 2013 .msg
100%
New File 110080 B-shift report for the dated 14 06
2013.msg100%
New File 115200 C -shift report for dated 09 10 2013 .msg
100%
New File 105984 C- shift report for dated 17 06 13.msg
100%
New File 123904 C- shift report for dated 18 06 13.msg
100%
New File 120320 C- shift report for dated 19 06 13.msg
100%
New File 116736 C- shift report for dated 20 06 13.msg
100%
New File 116736 C- shift report for dated 21 06 13.msg
100%
New File 118272 C shift report for dated 29 06 13 .msg
100%
New File 117760 C shift report for dated 30 06 13 .msg
100%
New File 118784 C- shift report for dated 7 7 13.msg100%

New File 122368 C- shift report for dated 8 7 13.msg100%

New File 121344 C- shift report for dated 9 7 13.msg100%

New File 118784 C-shift report for date 18 07 2013.msg


100%
New File 119296 C-shift report for dated 01 07 2013.msg
100%
New File 115200 C-shift report for dated 01 08 2013.msg
100%
New File 114176 C-shift report for dated 01 09 2013.msg
100%
New File 113152 C-shift report for dated 01 10 2013.msg
100%
New File 112128 C-shift report for dated 01 11 2013 .msg
100%
New File 161792 C-shift report for dated 01 12 2013.msg
100%
New File 155136 C-shift report for dated 02 07 2013.msg
100%
New File 115200 C-shift report for dated 02 08 2013.msg
100%
New File 115200 C-shift report for dated 02 09 2013.msg
100%
New File 112640 C-shift report for dated 02 10 2013.msg
100%
New File 120832 C-shift report for dated 02 11 2013 .msg
100%
New File 161792 C-shift report for dated 02 12 2013.msg
100%
New File 120832 C-shift report for dated 03 06 2013.msg
100%
New File 158208 C-shift report for dated 03 07 2013.msg
100%
New File 115200 C-shift report for dated 03 08 2013.msg
100%
New File 114688 C-shift report for dated 03 09 2013.msg
100%
New File 104960 C-shift report for dated 03 10 2013.msg
100%
New File 123392 C-shift report for dated 03 11 2013 .msg
100%
New File 122368 C-shift report for dated 03 12 2013.msg
100%
New File 121856 C-shift report for dated 04 06 2013.msg
100%
New File 107008 C-shift report for dated 04 07 2013.msg
100%
New File 116736 C-shift report for dated 04 08 2013.msg
100%
New File 114688 C-shift report for dated 04 09 2013.msg
100%
New File 458240 C-shift report for dated 04 10 2013
(3).msg100%
New File 109056 C-shift report for dated 04 10 2013.msg
100%
New File 122368 C-shift report for dated 04 11 2013 .msg
100%
New File 119808 C-shift report for dated 04 12 2013.msg
100%
New File 118784 C-shift report for dated 05 06 2013.msg
100%
New File 107008 C-shift report for dated 05 07 2013.msg
100%
New File 116736 C-shift report for dated 05 08 2013.msg
100%
New File 116224 C-shift report for dated 05 09 2013.msg
100%
New File 115200 C-shift report for dated 05 10 2013 .msg
100%
New File 124928 C-shift report for dated 05 11 2013 .msg
100%
New File 121856 C-shift report for dated 05 12 2013.msg
100%
New File 117248 C-shift report for dated 06 06 2013.msg
100%
New File 117760 C-shift report for dated 06 07 2013.msg
100%
New File 116224 C-shift report for dated 06 08 2013.msg
100%
New File 115200 C-shift report for dated 06 09 2013.msg
100%
New File 115712 C-shift report for dated 06 10 2013 .msg
100%
New File 122880 C-shift report for dated 06 11 2013 .msg
100%
New File 107008 C-shift report for dated 07 06 2013.msg
100%
New File 115712 C-shift report for dated 07 08 2013.msg
100%
New File 103424 C-shift report for dated 07 09 2013.msg
100%
New File 114688 C-shift report for dated 07 10 2013.msg
100%
New File 121856 C-shift report for dated 07 11 2013 .msg
100%
New File 115200 C-shift report for dated 07 12 2013.msg
100%
New File 117760 C-shift report for dated 08 06 2013.msg
100%
New File 116224 C-shift report for dated 08 08 2013
(10).msg100%
New File 115712 C-shift report for dated 08 08 2013.msg
100%
New File 115712 C-shift report for dated 08 09 2013.msg
100%
New File 113152 C-shift report for dated 08 10 2013 .msg
100%
New File 121856 C-shift report for dated 08 11 2013 .msg
100%
New File 114688 C-shift report for dated 08 12 2013.msg
100%
New File 117760 C-shift report for dated 09 06 2013.msg
100%
New File 116224 C-shift report for dated 09 08 2013.msg
100%
New File 166912 C-shift report for dated 09 09 2013.msg
100%
New File 114176 C-shift report for dated 09 11 2013 .msg
100%
New File 114688 C-shift report for dated 09 12 2013.msg
100%
New File 118784 C-shift report for dated 10 06 2013.msg
100%
New File 122368 c-shift report for dated 10 07 2013.msg
100%
New File 104960 C-shift report for dated 10 08 2013.msg
100%
New File 113664 C-shift report for dated 10 09 2013.msg
100%
New File 113664 C-shift report for dated 10 10 2013 .msg
100%
New File 119296 C-shift report for dated 10 11 2013 .msg
100%
New File 163840 C-shift report for dated 10 12 2013.msg
100%
New File 118272 C-shift report for dated 11 06 2013.msg
100%
New File 175616 C-shift report for dated 11 07 2013.msg
100%
New File 105472 C-shift report for dated 11 08 2013.msg
100%
New File 113664 C-shift report for dated 11 09 2013.msg
100%
New File 113664 C-shift report for dated 11 10 2013 .msg
100%
New File 110080 C-shift report for dated 11 11 2013 .msg
100%
New File 117760 C-shift report for dated 12 06 2013.msg
100%
New File 165376 C-shift report for dated 12 07 2013.msg
100%
New File 105472 C-shift report for dated 12 08 2013.msg
100%
New File 114688 C-shift report for dated 12 09 2013.msg
100%
New File 111104 C-shift report for dated 12 10 2013 .msg
100%
New File 123904 C-shift report for dated 12 11 2013 .msg
100%
New File 122368 C-shift report for dated 12 12 2013.msg
100%
New File 118272 C-shift report for dated 13 06 2013.msg
100%
New File 118272 C-shift report for dated 13 07 2013.msg
100%
New File 115712 C-shift report for dated 13 08 2013.msg
100%
New File 114176 C-shift report for dated 13 09 2013.msg
100%
New File 103936 C-shift report for dated 13 10 2013 .msg
100%
New File 175616 C-shift report for dated 13 11 2013 .msg
100%
New File 120320 C-shift report for dated 13 12 2013.msg
100%
New File 118272 C-shift report for dated 14 06 2013.msg
100%
New File 118272 C-shift report for dated 14 07 2013.msg
100%
New File 116736 C-shift report for dated 14 08 2013.msg
100%
New File 111616 C-shift report for dated 14 09 2013.msg
100%
New File 115200 C-shift report for dated 14 10 2013 .msg
100%
New File 122880 C-shift report for dated 14 11 2013 .msg
100%
New File 121344 C-shift report for dated 14 12 2013.msg
100%
New File 116736 C-shift report for dated 15 06 2013.msg
100%
New File 117760 C-shift report for dated 15 07 2013.msg
100%
New File 118784 C-shift report for dated 15 08 2013.msg
100%
New File 111616 C-shift report for dated 15 09 2013.msg
100%
New File 117248 C-shift report for dated 15 10 2013 .msg
100%
New File 123392 C-shift report for dated 15 11 2013 .msg
100%
New File 119808 C-shift report for dated 15 12 2013.msg
100%
New File 110592 C-shift report for dated 16 06 2013.msg
100%
New File 118272 C-shift report for dated 16 07 2013.msg
100%
New File 117760 C-shift report for dated 16 08 2013.msg
100%
New File 112128 C-shift report for dated 16 09 2013.msg
100%
New File 112128 C-shift report for dated 16 10 2013 .msg
100%
New File 123904 C-shift report for dated 16 11 2013 .msg
100%
New File 159232 C-shift report for dated 16 12 2013.msg
100%
New File 118272 C-shift report for dated 17 07 2013.msg
100%
New File 119296 C-shift report for dated 17 08 2013.msg
100%
New File 101888 C-shift report for dated 17 09 2013.msg
100%
New File 113152 C-shift report for dated 17 10 2013 .msg
100%
New File 122368 C-shift report for dated 17 11 2013 .msg
100%
New File 114176 C-shift report for dated 17 12 2013.msg
100%
New File 117248 C-shift report for dated 18 08 2013.msg
100%
New File 104448 C-shift report for dated 18 09 2013.msg
100%
New File 111616 C-shift report for dated 18 10 2013 .msg
100%
New File 121856 C-shift report for dated 18 11 2013 .msg
100%
New File 114176 C-shift report for dated 18 12 2013.msg
100%
New File 122880 C-shift report for dated 19 07 2013.msg
100%
New File 121344 C-shift report for dated 19 08 2013.msg
100%
New File 120320 C-shift report for dated 19 09 2013.msg
100%
New File 122368 C-shift report for dated 19 10 2013 .msg
100%
New File 113664 C-shift report for dated 19 11 2013 .msg
100%
New File 130048 C-shift report for dated 20 07 2013.msg
100%
New File 109056 C-shift report for dated 20 08 2013.msg
100%
New File 118784 C-shift report for dated 20 09 2013.msg
100%
New File 124928 C-shift report for dated 20 10 2013 .msg
100%
New File 125440 C-shift report for dated 21 07 2013.msg
100%
New File 97792 C-shift report for dated 21 08 2013.msg
100%
New File 113152 C-shift report for dated 21 09 2013.msg
100%
New File 122368 C-shift report for dated 21 10 2013 .msg
100%
New File 123904 C-shift report for dated 21 11 2013 .msg
100%
New File 120320 C-shift report for dated 21 12 2013.msg
100%
New File 117248 C-shift report for dated 22 06 2013.msg
100%
New File 127488 C-shift report for dated 22 07 2013.msg
100%
New File 117248 C-shift report for dated 22 08 2013.msg
100%
New File 113664 C-shift report for dated 22 09 2013.msg
100%
New File 108544 C-shift report for dated 22 10 2013 .msg
100%
New File 118784 C-shift report for dated 22 11 2013 .msg
100%
New File 120320 C-shift report for dated 23 06 2013.msg
100%
New File 121856 C-shift report for dated 23 07 2013.msg
100%
New File 117248 C-shift report for dated 23 08 2013.msg
100%
New File 113152 C-shift report for dated 23 09 2013.msg
100%
New File 117248 C-shift report for dated 23 10 2013 .msg
100%
New File 158720 C-shift report for dated 24 06 2013.msg
100%
New File 121344 C-shift report for dated 24 07 2013.msg
100%
New File 116736 C-shift report for dated 24 08 2013.msg
100%
New File 159232 C-shift report for dated 24 09 2013.msg
100%
New File 122880 C-shift report for dated 24 10 2013 .msg
100%
New File 105984 C-shift report for dated 25 06 2013.msg
100%
New File 120320 C-shift report for dated 25 07 2013.msg
100%
New File 117248 C-shift report for dated 25 08 2013.msg
100%
New File 111104 C-shift report for dated 25 09 2013.msg
100%
New File 124416 C-shift report for dated 25 10 2013 .msg
100%
New File 117248 C-shift report for dated 26 06 2013.msg
100%
New File 121344 C-shift report for dated 26 07 2013.msg
100%
New File 116736 C-shift report for dated 26 08 2013.msg
100%
New File 110592 C-shift report for dated 26 09 2013.msg
100%
New File 120320 C-shift report for dated 26 10 2013 .msg
100%
New File 117760 C-shift report for dated 27 06 2013.msg
100%
New File 121856 C-shift report for dated 27 07 2013.msg
100%
New File 119808 C-shift report for dated 27 08 2013.msg
100%
New File 114176 C-shift report for dated 27 09 2013.msg
100%
New File 120832 C-shift report for dated 27 10 2013 .msg
100%
New File 117248 C-shift report for dated 28 06 2013.msg
100%
New File 120832 C-shift report for dated 28 07 2013.msg
100%
New File 119296 C-shift report for dated 28 08 2013.msg
100%
New File 113664 C-shift report for dated 28 09 2013.msg
100%
New File 123904 C-shift report for dated 28 10 2013 .msg
100%
New File 122368 C-shift report for dated 29 07 2013.msg
100%
New File 98816 C-shift report for dated 29 08 2013.msg
100%
New File 114688 C-shift report for dated 29 09 2013.msg
100%
New File 121344 C-shift report for dated 29 10 2013 .msg
100%
New File 124928 C-shift report for dated 30 07 2013.msg
100%
New File 98816 C-shift report for dated 30 08 2013.msg
100%
New File 117760 C-shift report for dated 30 09 2013.msg
100%
New File 120832 C-shift report for dated 30 10 2013 .msg
100%
New File 118784 C-shift report for dated 31 07 2013.msg
100%
New File 113152 C-shift report for dated 31 08 2013.msg
100%
New File 112640 C-shift report for dated 31 10 2013 .msg
100%
New File 124416 Night-shift report for dated 20 11
2013 .msg100%
New File 122880 Night-shift report for dated 23 11
2013 .msg100%
New File 122880 Night-shift report for dated 24 11
2013 .msg100%
New File 108032 Night-shift report for dated 25 11
2013 .msg100%
New File 124928 Night-shift report for dated 26 11
2013 .msg100%
New File 122880 Night-shift report for dated 27 11
2013 .msg100%
New File 115712 Night-shift report for dated 29 11
2013 .msg100%
New File 140800 Night-shift report for dated 30 11
2013.msg100%
New Dir 0 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\14.RRT\SEPCO\SEPCO\2_5 emails letter communication on
Ash Handling plant with SEPCO\
New Dir 0 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\14.RRT\SEPCO\SEPCO\2_6 Annexures A, B and C of RRT
joint protocol for Units 1, 2 and 3\
New Dir 1 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\14.RRT\SEPCO\SEPCO\2_6 Annexures A, B and C of RRT
joint protocol for Units 1, 2 and 3\Annexure-A\
New File 15629 Status Annexure- A Unit-1,2 and 3.xlsx
100%
New Dir 1 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\14.RRT\SEPCO\SEPCO\2_6 Annexures A, B and C of RRT
joint protocol for Units 1, 2 and 3\Annexure-C\
New File 16719 Status of Annexure -C of RRT Unit-1,2
and 3.xlsx100%
New Dir 3 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\14.RRT\SEPCO\SEPCO\2_6 Annexures A, B and C of RRT
joint protocol for Units 1, 2 and 3\Updated Annexure-B of RRT-1, 2 and 3 punch
list\
New File 75769 Annexure-B Unit#3 Punch list as on 19-
12-14.xlsx100%
New File 73019 Annexure-B Unit#1 Punch points _GKEL 24-
09-14.xlsx100%
New File 361772 Annexure-BUnit-2 Punch points_GKEL 19-12-
14.xlsx100%
New Dir 0 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\14.RRT\SEPCO\SEPCO\2_7 compliance list or declaring
RRT to be successful\
New Dir 0 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\14.RRT\SEPCO\SEPCO\2_8 Communication by GKEL to SEPCO
that Test Procedures\
New Dir 0 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\14.RRT\SEPCO\SEPCO\2_9 RRT test reports of Units 1 and
2, highlight the items equipment system parameters (other than AHP) which
exhibited anomalies\
New Dir 5 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\14.RRT\SEPCO\SEPCO\mails\
New File 5.1 m Charging code for back charging of GT-2
of GKEL project .msg100%
New File 187904 Erection completion check sheet format
and protocol for boiler steam blowing.msg100%
New File 166912 RE Reviewed copy for colour coding of
pipelines.msg100%
New File 61440 Requirement of LDO and HFO quantity .msg
100%
New File 626176 unit characteristics test .msg100%
New Dir 9 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\15. UCT & PGT\
New File 130560 Correspondence with SEPCO for PG test
reprot .msg100%
New File 46592 FW GKEL Site Meeting Action Points.msg
100%
New File 229376 LII comments on PG Test report.msg100%
New File 1.1 m mail communications with SEPCO.msg100%
New File 213504 Mom with SEPCO for PG test points.msg100%

New File 1.3 m PG test procedure.msg100%


New File 124928 RE GKEL Site Meeting Action Points
(1).msg100%
New File 75264 Re GKEL Site Meeting Action Points.msg
100%
New File 2.6 m UCT report submitted by SEPCO.msg100%
New Dir 2 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\18. Payment\
New File 124876 SEPCO civil-onshore inv- -091014
(Autosaved).xlsx100%
New File 220804 SEPCO Offshore.xlsx100%
New Dir 0 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\18. Payment\mail communication\
New Dir 26 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\18. Payment\mail communication\LC\
New File 46592 FW FW LC FOR USD 8 78 084 - FAVG
SEPCO (1).msg100%
New File 845312 Fw FW LC FOR USD 8 78 084 - FAVG
SEPCO .msg100%
New File 100864 FW LC format for second consignment.msg
100%
New File 103424 Fw GKEL - LC Payment mechanism to SEPCO
(4).msg100%
New File 126464 FW GKEL - LC Payment mechanism to SEPCO
(6).msg100%
New File 108032 FW GKEL - LC Payment mechanism to
SEPCO.msg100%
New File 679936 FW OPEN AND ISSUE THE L C(OL-0029)
(1).msg100%
New File 669184 FW OPEN AND ISSUE THE L C(OL-0029).msg
100%
New File 49664 FW Payment received.msg100%
New File 58368 FW Revised covering letter of SEPCO.msg
100%
New File 45568 FW SEPCO - Payment received.msg100%
New File 85504 LC format for second consignment.msg100%

New File 77824 payment for the sencond consignment.msg


100%
New File 61440 RE FW LC FOR USD 8 78 084 - FAVG
SEPCO (2).msg100%
New File 57344 Re FW LC FOR USD 8 78 084 - FAVG
SEPCO .msg100%
New File 83968 Re RE GKEL - LC Payment mechanism to
SEPCO.msg100%
New File 68096 Re GKEL - LC Payment mechanism to SEPCO
(1).msg100%
New File 109568 Re GKEL - LC Payment mechanism to SEPCO
(10).msg100%
New File 101888 Re GKEL - LC Payment mechanism to SEPCO
(2).msg100%
New File 73216 Re GKEL - LC Payment mechanism to SEPCO
(3).msg100%
New File 109056 RE GKEL - LC Payment mechanism to SEPCO
(5).msg100%
New File 90112 RE GKEL - LC Payment mechanism to SEPCO
(7).msg100%
New File 88064 Re GKEL - LC Payment mechanism to SEPCO
(8).msg100%
New File 156672 RE GKEL - LC Payment mechanism to SEPCO
(9).msg100%
New File 143872 RE GKEL - LC Payment mechanism to
SEPCO.msg100%
New File 39424 Revise of LC format.msg100%
New Dir 2 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\19.Entry Tax & Service Tax Issues\
New File 63488 RE Entry Tax Details for Sepco .msg100%

New File 3.2 m ?? Tax to be claimed from GMR.msg100%


New Dir 0 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\19.Entry Tax & Service Tax Issues\Tax to be claimed
from GMR\
New Dir 2 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\19.Entry Tax & Service Tax Issues\Tax to be claimed
from GMR\Tax to be claimed from GMR\
New File 14210 Contract clause for reimbursement of
TAX.docx100%
New File 12038 Tax reimbusement status from GMR .xlsx
100%
New Dir 2 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\19.Entry Tax & Service Tax Issues\Tax to be claimed
from GMR\Tax to be claimed from GMR\ET Claim documents\
New File 323109 ET001.pdf100%
New File 695261 ET002.jpg100%
New Dir 0 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\19.Entry Tax & Service Tax Issues\Tax to be claimed
from GMR\Tax to be claimed from GMR\ST Claim documents\
New Dir 7 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\19.Entry Tax & Service Tax Issues\Tax to be claimed
from GMR\Tax to be claimed from GMR\ST Claim documents\Balance short reimbursement
of ST\
New File 4.0 m Audit conclusion ST12-13.bmp100%
New File 596504 KTPP-OL-SEPS-GKEL-0609.pdf100%
New File 329150 MOM service tax.pdf100%
New File 79378 Notification_No._24_2012_-
_Service_Tax,_dated_06-06-2012.html100%
New File 25389 SEPCO ST workings - # 4.xlsx100%
New File 31570 SEPCO ST workings# 1,2,3.xlsx100%
New File 29234 service tax opinion 09-12-2014.docx100%
New Dir 4 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\19.Entry Tax & Service Tax Issues\Tax to be claimed
from GMR\Tax to be claimed from GMR\ST Claim documents\ST 41.2lacs claim\
New File 4.0 m Audit conclusion ST12-13.bmp100%
New File 253166 KTPP-OL-SEPS-GKEL-0467.pdf100%
New File 123491 Notification of changing tax rate.pdf100%

New File 134144 POT.PPT100%


New Dir 2 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\19.Entry Tax & Service Tax Issues\Tax to be claimed
from GMR\Tax to be claimed from GMR\ST Claim documents\ST return\
New File 475901 Form ST-3 12-13Q-2.pdf100%
New File 119467 Sepco2 St3 H2 13-14 (org).pdf100%
New Dir 1 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\20. Suspension of Unit#4\
New File 520283 SHP01.jpg100%
New Dir 1 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\3. Late & Impeded Site Access\
New File 1.7 m Letter to SEPCO Site-306.pdf100%
New Dir 0 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\3. Late & Impeded Site Access\Boundary Wall\
New Dir 1 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\3. Late & Impeded Site Access\Delay\
New File 1.4 m MIX DESIGN.PDF100%
New Dir 16 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\3. Late & Impeded Site Access\Land\
New File 6.7 m Doc-1-GKEL to IPICOL.7z100%
New File 8.6 m Doc-5.7z100%
New File 19316 Land Cost details paid to IDCO.xlsx100%
New File 19278 M.1 Land_No objection from Panchayat
1050MW.pdf100%
New File 144621 M.2 Approval from Gram Panchayat
regarding 1400MW.pdf100%
New File 114035 M.3 Approval from Gram Panchayat
regarding watch dogs.pdf100%
New File 157195 M.4 Approval from Gram Panchayat
regarding Township.pdf100%
New File 1010176 Monthly report april 2010(transmittal
0220).msg100%
New File 70298 O.1 Strenghtening of Road rwd.pdf100%
New File 174600 O.2 Permission for strengthening
bridge.pdf100%
New File 165888 RE Monthly progress report -may 2010
(transmittal 0253) (1).msg100%
New File 156672 RE Monthly progress report -may 2010
(transmittal 0253).msg100%
New File 8.8 m RE Requisitions for land acquisition
issue SEPCO Arbitration (1).msg100%
New File 6.8 m RE Requisitions for land acquisition
issue SEPCO Arbitration .msg100%
New File 207872 reply comments on monthly
report(transmittal 0226).msg100%
New File 207872 reply on comments of monthly
report(transmittal 0164).msg100%
New Dir 4 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\3. Late & Impeded Site Access\Masterlist\
New File 854528 12. FW Excavation Scheme of Main Building
Boiler Foundation of Unit 123.msg100%
New File 1.7 m 16. RE SEPCO Arbitration Requisitions
Clarifications for site access issue.msg100%
New File 1.5 m 16. Sahu Family Dispute -Case.pdf100%
New File 138240 5. Comments on Monthly Progress Report
-January 2010.msg100%
New Dir 4 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\3. Late & Impeded Site Access\Masterlist\1. soil
investigation report\
New File 1.7 m 414.pdf100%
New File 1.4 m 415.pdf100%
New File 1.4 m 416.pdf100%
New File 1.4 m 417.pdf100%
New Dir 1 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\3. Late & Impeded Site Access\Masterlist\1. soil
investigation report\Geo tech report\
New File 5.5 m FW GEOE07234 3X350 MW GKEl TPP Commnets
on Geo technical investigation Report .msg100%
New Dir 15 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\3. Late & Impeded Site Access\Masterlist\4. Blasting
License\
New File 134663 1765.pdf100%
New File 130415 782.pdf100%
New File 279560 annex_3003201109010400.pdf100%
New File 439076 Approval for extension of blasting
license upto 31.03.2012.pdf100%
New File 556112 Approval for MAA Tarini-64.pdf100%
New File 465228 Approvals for Shiv shakti and Swapenswar-
960.pdf100%
New File 478104 Blasting extension till 31.03.2012-
728.pdf100%
New File 408330 blasting-ps.pdf100%
New File 205129 blating.pdf100%
New File 269792 extension of blasting time.pdf100%
New File 147183 Let to DM - approval of blasting agency -
Burhani Exp Ltd.pdf100%
New File 307323 Letter No 800-BSP.pdf100%
New File 841803 MoM on Blasting dated 04.05.11.pdf100%
New File 342776 Monthly Report on Blasting 228.pdf100%
New File 153745 TARENI EXPLOSIVES.pdf100%
New Dir 1 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\3. Late & Impeded Site Access\Schedule\
New File 78336 RE Ambiguity regarding the L2 Schedules
Schedule L1 & L2.msg100%
New Dir 0 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\3. Late & Impeded Site Access\Schedule\L1 and L2
schedule of SEPCO\
New Dir 1 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\3. Late & Impeded Site Access\Schedule\L1 and L2
schedule of SEPCO\L1 schedule\
New File 231555 KTPP-0-SEPC-PLA-SH-0001 Schedule
level ?.pdf100%
New Dir 2 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\3. Late & Impeded Site Access\Schedule\L1 and L2
schedule of SEPCO\L2 schedule\
New File 1020983 KTPP-0-SEPC-PLA-SH-0002 Schedule level ?
(1).pdf100%
New File 1.3 m The recover L-2 schedule(20110610).pdf
100%
New Dir 20 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\3. Late & Impeded Site Access\Schedule\shipping
schedules\
New File 16.8 m Copy of Shipping Schedule for GMR
Kamalanga4350MW Power Plant 100613.xls100%
New File 1.4 m final shipping schedule for GMR
Kamalanga4x350MW Power plant Rev.D (2).doc100%
New File 1.4 m final shipping schedule for GMR
Kamalanga4x350MW Power plant Rev.D (3).doc100%
New File 1.4 m final shipping schedule for GMR
Kamalanga4x350MW Power plant Rev.D.doc100%
New File 31578 Revised SEPCO shipping-invoicing .xlsx
100%
New File 31690 SEPCO BBU n shipping schedule.xlsx100%
New File 1046016 shipping schedule for GMR Kamalanga
3x350MW Power plant Rev.B.doc100%
New File 937079 Shipping Schedule for GMR Kamalanga
Project Rev F (2).pdf100%
New File 937079 Shipping Schedule for GMR Kamalanga
Project Rev F (3).pdf100%
New File 937079 Shipping Schedule for GMR Kamalanga
Project Rev F.pdf100%
New File 440148 Shipping Schedule for GMR Kamalanga Rev E
(3).pdf100%
New File 325632 Shipping Schedule for GMR Kamalanga Rev E
(3).xls100%
New File 1026560 shipping schedule for GMR
Kamalanga3x350MW Power plant.doc100%
New File 1037312 shipping schedule for GMR
Kamalanga3x350MW Power plant-RevA.doc100%
New File 1.0 m shipping schedule for GMR Kamalanga3350MW
Power plant-A.doc100%
New File 1.9 m shipping schedule for GMR
Kamalanga4x350MW Power plant Rev.D.DOC100%
New File 958278 shipping schedule for GMR
Kamalanga4x350MW Power plant Rev.D.PDF100%
New File 10.0 m Shipping schedule(signed and stamped).pdf
100%
New File 10.0 m Shipping schedule(signed and stamped)-rev
F.pdf100%
New File 10.2 m signed shipping schedule.pdf100%
New Dir 12 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\3. Late & Impeded Site Access\Schedule\shipping
schedules\Shipping sch\
New File 40042 bill of entry details-SEPCO.xlsx100%
New File 24705 Comprison of original shipping schedule
vs actual-till Jan14.xlsx100%
New File 16.8 m Copy of Shipping Schedule for GMR
Kamalanga4350MW Power Plant 100613.xls100%
New File 1.4 m final shipping schedule for GMR
Kamalanga4x350MW Power plant Rev.D.doc100%
New File 1046016 shipping schedule for GMR Kamalanga
3x350MW Power plant Rev.B.doc100%
New File 937079 Shipping Schedule for GMR Kamalanga
Project Rev F.pdf100%
New File 440148 Shipping Schedule for GMR Kamalanga Rev E
(3).pdf100%
New File 3.6 m Shipping Schedule for GMR Kamalanga
USD.rar100%
New File 1037312 shipping schedule for GMR
Kamalanga3x350MW Power plant-RevA.doc100%
New File 1.0 m shipping schedule for GMR Kamalanga3350MW
Power plant-A.doc100%
New File 1.9 m shipping schedule for GMR
Kamalanga4x350MW Power plant Rev.D.DOC100%
New File 958278 shipping schedule for GMR
Kamalanga4x350MW Power plant Rev.D.PDF100%
New Dir 9 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\3. Late & Impeded Site Access\Schedule\shipping
schedules\Shipping Schedule\
New File 231555 KTPP-0-SEPC-PLA-SH-0001 Schedule
level ?.pdf100%
New File 1020983 KTPP-0-SEPC-PLA-SH-0002 Schedule level ?
(1).pdf100%
New File 84992 KTPP-OT-SEPC-GKEL-2153.doc100%
New File 16.4 m L2 Schedule.pdf100%
New File 937079 Shipping Schedule for GMR Kamalanga
Project Rev F.pdf100%
New File 440148 Shipping Schedule for GMR Kamalanga Rev E
(3).pdf100%
New File 325632 Shipping Schedule for GMR Kamalanga Rev E
(3).xls100%
New File 10.0 m Shipping schedule(signed and stamped)-rev
F.pdf100%
New File 1.3 m The recover L-2 schedule(20110610).pdf
100%
New Dir 1 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\3. Late & Impeded Site Access\Sushil Sir\
New File 8.5 m RE SEPCO Arbitration Requisitions
Clarifications for site access issue.msg100%
New Dir 9 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\4. Construction Water\
New File 5.0 m C-57 GKEL-Angul-SEPCO-10-11-674
reimbursement for payment made against construction water.pdf100%
New File 418816 FW Commissioning report of flow meter
for construction water.msg100%
New File 44544 FW construction water pipe line job .msg
100%
New File 38912 FW Construction Water water pumping to
reservoir..msg100%
New File 2.9 m GMR Quarterly Progress Report no 3.pdf
100%
New File 5.4 m GMR Quarterly Progress Report no 4.pdf
100%
New File 229655 Ground Water Permission.pdf100%
New File 2.3 m Letter to SEPCO Site-1863.pdf100%
New File 1.7 m Letter to SEPCO Site-306.pdf100%
New Dir 6 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\4. Construction Water\Water Tankers PO\
New File 1.0 m 4800007860.pdf100%
New File 1.0 m 4800008460.pdf100%
New File 1.0 m 4800010126.pdf100%
New File 1.0 m 4800011502.pdf100%
New File 1.0 m 4800017616.pdf100%
New File 1.0 m PO-Water Tanker-Basant Jena-2010.pdf100%

New Dir 4 C:\AdvisianActive\01 Projects\GMR GKEL


Arbitration\Intralinks\Reply\5. Preliminary\
New File 2.6 m C-71 Dliverable list and submission
schedule dated and signed 22 Jan 2010.pdf100%
New File 18813 Drawing Details_WIP.xlsx100%
New File 389120 FW Revision of Document Deliverable
Schedule - Monthly report (transmittal 0324).msg100%
New File 4.0 m kom 23.07.09_2707200911094900.pdf100%
New Dir 4 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\5. Preliminary\Deliverable Schedule\
New File 4.0 m 3 monthly drawing schedule(transmittal
0183).msg100%
New File 192872 annexure-I- Drawings schedule -20100904
Rev A.xlsx100%
New File 90112 KTPP-OT-SEPC-GKEL-0151.doc100%
New File 118272 schedule cover-A.DOC100%
New Dir 1 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\5. Preliminary\Deliverable Schedule\C&I\
New File 104960 adnexa 4-Updated GMR project deliverable
schedule 26 03 10(I&C).xls100%
New Dir 1 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\5. Preliminary\Deliverable Schedule\Civil\
New File 126976 adnexa 1-Updated GMR project deliverable
schedule 26 03 10(civil).xls100%
New Dir 1 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\5. Preliminary\Deliverable Schedule\Electrical\
New File 393728 adnexa 2-Updated GMR project deliverable
schedule 26 03 10(Electrical).xls100%
New Dir 1 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\5. Preliminary\Deliverable Schedule\Mechanical\
New File 241152 adnexa 3-Updated GMR project deliverable
schedule 26 03 10(Mechnical).xls100%
New Dir 7 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\5. Preliminary\Design\
New File 173056 Design principle considering 4 units.msg
100%
New File 17218 Drawing Details_Final_v1.xlsx100%
New File 633344 Drawings Deliverables Status - Edited
Copy.xls100%
New File 633344 Drawings Deliverables Status.xls100%
New File 389120 FW Revision of Document Deliverable
Schedule - Monthly report (transmittal 0324).msg100%
New File 37034 Master List of Preliminary Engineering
docs.xlsx100%
New File 4.7 m Resulations on M-01-08.pdf100%
New Dir 7 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\5. Preliminary\Design\CCB\
New File 353792 excavation plan of CCB's foundation
(transmittal 0393).msg100%
New File 195584 FW Reply on the CCR scheme(transmittal
0160).msg100%
New File 142336 RE excavation plan of CCB's foundation
(transmittal 0393).msg100%
New File 144896 RE T0326-Foundation of CCB-0(transmittal
0540).msg100%
New File 182272 Reply comments on excavation drawing of
CCB fdn (transmittal 0484).msg100%
New File 821019 Resolutions & Content Sheet.pdf100%
New File 1.3 m T0326-Foundation of CCB-0(transmittal
0540).msg100%
New Dir 2 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\5. Preliminary\Design\CCB Erection\
New File 2.7 m T0327 comment.pdf100%
New File 5.7 m T0327-0 steel structure for CCB
(transmittal 0666).msg100%
New Dir 59 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\5. Preliminary\Design\Chimney delay\
New File 591872 calculation for foundation of chimney
(transmittal 0372).msg100%
New File 3.5 m Chimney Drawing .msg100%
New File 46080 chimney foundation & ESP foundation &
track hopper drawing review.msg100%
New File 44544 chimney foundation drawing review.msg100%

New File 56320 Chimney foundation drawings review.msg


100%
New File 82432 Comments on T0331 Chimney foundation
drawings & calculation (transmittal 0506).msg100%
New File 195072 confirming of chimney design issue(OL
0014).msg100%
New File 200192 Draft of Mechanical Resolutions.msg100%
New File 394752 excavation drawing of chimney & comments
(transmittal 0336).msg100%
New File 338944 excavation plan of chimneys' foundation
pit (transmittal 0329).msg100%
New File 696320 export mode of construction machinery of
chimney (OL-0041).msg100%
New File 850944 foundation drawing of chimney for
prepare discussion.msg100%
New File 423424 FW About the chimney report.msg100%
New File 428544 FW About the chimney report1.msg100%
New File 5.0 m FW Chimney Contractor for GKEL -
Transmittal from SEPCO site KTPP-OT-SEPS-GKEL-0045.msg100%
New File 489984 FW Chimney foundation drawings review
and Approval.msg100%
New File 51200 FW confirming of chimney design issue(OL
0014) (1).msg100%
New File 44032 FW confirming of chimney design issue(OL
0014) (2).msg100%
New File 209920 FW confirming of chimney design issue(OL
0014).msg100%
New File 60416 FW export mode of construction machinery
of chimney (OL-0041).msg100%
New File 252928 FW for chimney review .msg100%
New File 253952 FW GEOE 07234 GMR Kamalanga
Calculation values of Chimney raft.msg100%
New File 73216 FW GEOE07234 GMR Kamalanga TPP
Information required from SEPCO for chimney drawings review .msg100%
New File 161280 FW GEOE07234 GMR Kamalanga TPP - Design
of TG Raft Tg Deck and Chimney.msg100%
New File 81408 FW GMR Kamalanga Chimney discussions
on 29th October'10.msg100%
New File 1.0 m FW Review of 275m tall chimney design -
Commented drg of embedded parts.msg100%
New File 1.0 m FW Review of 275m tall chimney design -
embedded parts.msg100%
New File 992768 FW Review of design of 275m tall chimney
Embedded parts.msg100%
New File 903168 FW Review of design of 275m tall chimney
Reinforcement around openings .msg100%
New File 1.0 m FW T0331 chimney foundation rev-0
(transmittal 0365).msg100%
New File 136704 FW Visit of Mr Onkar kapoor on 24th
Sept' 2010.msg100%
New File 116224 General working instructions of
Chimney.msg100%
New File 103424 GEOE07234 GMR Kamalanga TPP - Design of
TG Raft Tg Deck and Chimney.msg100%
New File 133632 GMR Kamalanga Chimney discussions on
29th October'10.msg100%
New File 1.2 m RE Calculation values of Chimney
raft.msg100%
New File 80384 RE Chimney foundation drawings review
and Approval (1).msg100%
New File 76800 RE Chimney foundation drawings review
and Approval.msg100%
New File 146432 RE excavation drawing of chimney &
comments (transmittal 0336).msg100%
New File 143360 RE excavation plan of chimneys'
foundation pit (transmittal 0329).msg100%
New File 56832 RE export mode of construction machinery
of chimney (OL-0041) (1).msg100%
New File 62976 RE export mode of construction machinery
of chimney (OL-0041).msg100%
New File 65536 RE General working instructions of
Chimney.msg100%
New File 140800 RE GMR Kamalanga Chimney discussions
on 29th October'10 (1).msg100%
New File 152064 RE GMR Kamalanga Chimney discussions
on 29th October'10 (2).msg100%
New File 163328 RE GMR Kamalanga Chimney discussions
on 29th October'10 (3).msg100%
New File 261632 RE GMR Kamalanga Chimney discussions
on 29th October'10.msg100%
New File 161792 RE revised drawings for 4 units
(transmittal 0335).msg100%
New File 2.5 m RE T0331-D chimney foundation
(transmittal 0660).msg100%
New File 147968 RE T0334-0-Maintenance Platforms'
drawings of stack(transmittal 0773).msg100%
New File 156160 RE T0401-0-Construction drawing of flue
gas duct racks (transmittal 0770).msg100%
New File 109056 RE Visit of Mr Onkar kapoor on 24th
Sept' 2010.msg100%
New File 58880 Resolutions for T0333.msg100%
New File 95744 Response to chimney drawing.msg100%
New File 998400 T0331- B-CHIMNEY FOUNDATION
DRAWINFS(transmittal 0623).msg100%
New File 1.0 m T0331 Chimney foundation drawings &
calculation (transmittal 0506).msg100%
New File 1041408 T0331 chimney foundation rev-0
(transmittal 0365).msg100%
New File 1.0 m T0331-D chimney foundation (transmittal
0660).msg100%
New File 2.8 m T0332 chimney shell construction
drawings-REV 0 (transmittal 0661).msg100%
New File 157696 T0333-Chimney inner tube (transmittal
0772).msg100%
New Dir 4 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\5. Preliminary\Design\CW Pump house\
New File 147456 RE S5301Excavation drawings of CW pump
house (transmittal 0437).msg100%
New File 212205 Resolutions.pdf100%
New File 719529 S5301-01.PDF100%
New File 586752 S5301Excavation drawings of CW pump house
(transmittal 0437).msg100%
New Dir 6 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\5. Preliminary\Design\DM Water\
New File 163328 RE T0701-A-drawing & calculation of DM
plant (transmittal 0615).msg100%
New File 113664 RE T0701-A-drawing & calculation of DM
plant (transmittal 0615).msg100%
New File 145920 RE T0701-Foundation of DM plant house
and assay building (transmittal 0485).msg100%
New File 1.0 m Resolutions & Content Sheet.pdf100%
New File 1.8 m T0701-A-drawing & calculation of DM
plant (transmittal 0615).msg100%
New File 1.1 m T0701-Foundation of DM plant house and
assay building (transmittal 0485).msg100%
New Dir 0 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\5. Preliminary\Masterlist\
New Dir 12 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\5. Preliminary\Masterlist\Chimney Design\
New File 53248 Chimney design.msg100%
New File 676436 Chimney.zip100%
New File 2.5 m Commented drawings..msg100%
New File 3.0 m FW BALCO Chimney collapse analysis
report .msg100%
New File 99328 FW Comments on T0331 Chimney foundation
drawings calculation (transmittal 0506).msg100%
New File 3.4 m FW Design Informations on Chimney at
GKEL..msg100%
New File 1048064 FW T0331-D chimney foundation
(transmittal 0660).msg100%
New File 131584 Jiangsu xinggang company brief.msg100%
New File 3.0 m jiangsu xinggang form.msg100%
New File 1.6 m Minutes of meeting(Chimney).pdf100%
New File 1.2 m RE Calculationvalues of Chimney raft.msg
100%
New File 1.6 m Review of 275m tall chimney design -
Approved Foundation drawings.msg100%
New Dir 0 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\5. Preliminary\Unit 1- 3\
New Dir 3 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\5. Preliminary\Unit 4\
New File 3.0 m FW BALCO Chimney collapse analysis
report .msg100%
New File 68608 RE Comments on Technical specification
of CCWP&CTP and Steam Turbine Aux Oil Pumps.msg100%
New File 11.8 m RE Requisition list for issues related
to design changes caused by introduction of Unit 4.msg100%
New Dir 0 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\6. CHP\
New Dir 0 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\6. CHP\drawing\
New Dir 0 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\6. CHP\drawing\Detail Design\
New Dir 3 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\6. CHP\drawing\IFC\
New File 972563 Content Sheet.pdf100%
New File 3.6 m Resolutions.pdf100%
New File 1.7 m T0601-01.PDF100%
New Dir 2 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\6. CHP\drawing\Preliminary Dwg\
New File 4.8 m Coal Handling Plant - 2009.pdf100%
New File 860068 Z-01-[4x350]-Civil.pdf100%
New Dir 8 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\6. CHP\drawing\Preliminary Dwg\2010\
New File 496257 37-F4341C2-M-02.PDF100%
New File 603041 37-F4341C2-M-03.PDF100%
New File 205198 37-F4341C2-M-04.PDF100%
New File 371942 37-F4341C2-M-05.PDF100%
New File 419345 37-F4341C2-M-06.PDF100%
New File 278496 37-F4341C2-M-07.PDF100%
New File 343129 37-F4341C2-M-08.PDF100%
New File 888335 37-F4341C2-Z-02.PDF100%
New Dir 4 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\6. CHP\ESP\
New File 5.4 m FW clarification on Engineering Scale
Plan (ESP) of Railway Siding.msg100%
New File 5.2 m FW Engineering Scale Plan (ESP) of
Railway Siding.msg100%
New File 8.5 m FW Layout & Schematic Drawing of Raw
Water Pump House.msg100%
New File 9.5 m Reply to Cao Mail.msg100%
New Dir 20 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\6. CHP\para 287\
New File 160768 para 287- point 10-T0611-REV.0 Structural
drawing of No.2 conveyor gallery and lighting house (transmittal 0896).msg100%
New File 158208 para 287- point 11-T0604-Structural
drawing of TT2-REV.0(transmittal 0971).msg100%
New File 314368 para 287- point 13 and reply-FW GEOE07234
GKEL 4 x 350 MW TPP Comments on Structural dwg of crusher house- REV 0 calc
T0606.msg100%
New File 237568 para 287- point 13-delay- RE T0606-
Structural drawing of crusher house- REV 0 calculation (transmittal 1063).msg100%

New File 125440 para 287- point 14 and reply-FW K0226


FEEDWATER PUMP PROPER SYSTEM PID WITH IO AND EQUIPMENT LIST(transmittal 1094).msg
100%
New File 4.5 m para 287- point 1-T0609-0-STRUCTURAL
DRAWING OF NO.6 TRANSFER TOWER REV0 (transmittal 0596)-.msg100%
New File 2.2 m para 287- point 2-T0614 CONSTRUCTION
DRAWING OF NO.6 CONVEYOR GALLERY RVE-0 (transmittal 0598).msg100%
New File 7.0 m para 287- point 3-T0615-0-Structural
drawing of No.8 conveyor gallery and lighting house (transmittal 0604).msg100%
New File 4.4 m para 287- point 4-T0613-0 drawing
calculation of No. 4 conveyor gallery(transmittal 0625).msg100%
New File 159744 para 287- point 5 and reply-RE T0603-0-
Structural drawing of No.1 transfer tower (transmittal 0650).msg100%
New File 160768 para 287- point 6-T0612-0-NO.3 CONVERYOR
GALLERY (transmittal 0698).msg100%
New File 160256 para 287- point 7 and reply-RE T0605-
STRUCTURAL DRAWING OF No.3 TRANSFER TOWER (transmittal 0750).msg100%
New File 157184 para 287- point 8 and reply-RE
T0608(2)UNDERGROUND STRUCTURAL DRAWING OF TT5 (transmittal 0751).msg100%
New File 248320 para 287- points 9, 10 and 12-Drawing
status 20110308-0.msg100%
New File 237568 para 287- reply of point 13-RE T0606-
Structural drawing of crusher house- REV 0 calculation (transmittal 1063).msg100%

New File 145408 para 287- reply of point 1-RE T0609-0-


STRUCTURAL DRAWING OF NO.6 TRANSFER TOWER REV0 (transmittal 0596).msg100%
New File 152064 para 287- reply of point 2-RE T0614
CONSTRUCTION DRAWING OF NO.6 CONVEYOR GALLERY RVE-0 (transmittal 0598).msg100%
New File 154624 para 287- reply of point 3- RE T0615-0-
Structural drawing of No.8 conveyor gallery and lighting house (transmittal
0604).msg100%
New File 152576 para 287- reply of point 4-RE T0613-0
drawing calculation of No. 4 conveyor gallery(transmittal 0625).msg100%
New File 158208 para 287- reply of point 6-RE T0612-0-
NO.3 CONVERYOR GALLERY (transmittal 0698).msg100%
New Dir 5 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\7. Variation in 400 KV switchyard\
New File 154112 Comments on Technical Specification of
400kV Switchyard.msg100%
New File 1.3 m Deviation of the 400kV switchyard
equipment (transmittal 0446).msg100%
New File 332800 FW Engineering Progress - KTPP-OL-SEPS-
GKEL-0399-Regarding Progress of works at Site.msg100%
New File 15.6 m FW Requisition list for issues related
to 400 KV switchyard.msg100%
New File 411137 MOM.pdf100%
New Dir 6 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\7. Variation in 400 KV switchyard\Contract\
New File 1.6 m 400KV amendment(1).pdf100%
New File 1.6 m 400KV amendment.pdf100%
New File 12.4 m 400KV??????????(20101015)(1).pdf100%
New File 27.5 m Civil works, erection-VOLUME I
(COMMERCIAL PART).pdf100%
New File 61.3 m TECHNICAL SPECIFICATION .pdf100%
New File 27.5 m VOLUME I (COMMERCIAL PART).pdf100%
New Dir 6 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\7. Variation in 400 KV switchyard\SOC ref\
New File 711123 C-101 20110204 GKELShifting of 400 KV
Switchyard coordinates towares GT.pdf100%
New File 181947 C-102 20110223 KTPP-OL-SEPS-GKEL-0208.pdf
100%
New File 1.7 m C-103 KTPP-OL-SEPS-GKEL-0216.pdf100%
New File 1.2 m C-104 20110329 GKEL Email re 400kv
switchyard.pdf100%
New File 832688 C-105 20110329 GKEL letter 807 re Change
in the design of 400kV Switchyard.pdf100%
New File 35115 C-107 SEPCO Monthly Progress Report June
2011 pages 1 and 19.pdf100%
New Dir 7 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\8. Change in Law\
New File 52934 Appendix - 7 Circulars - on Foreign
Nationals in India.pdf100%
New File 144559 Appendix - 9 -rajya sabha-empolyment
visa.xps100%
New File 143360 ATTACHMENT VIII Man Power Deployment
Schedule 24.06.09.xls100%
New File 159329 Man power deployment.zip100%
New File 11562 manpower analysis.xlsx100%
New File 19162 Sepco Manpower List.zip100%
New File 39486 visa guidelines for chinese
streamlined.mht100%
New Dir 8 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\9. Custom Duty\
New File 269312 Addendum-project policy.doc100%
New File 77734 custom clearance process.docx100%
New File 22833 Custom clearance.xlsx100%
New File 3.3 m Custom Clearence.zip100%
New File 641536 FW Privileged and Confidential Request
for details regarding Customs Clearance.msg100%
New File 1001472 FW shipping schedule.msg100%
New File 615473 Project insurance-(Marine_SCE).pdf100%
New File 375808 RE Privileged and Confidential Request
for details regarding Customs Clearance.msg100%
New Dir 16 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\9. Custom Duty\Mail communication\
New File 202240 Billing Breakup for Civil works.msg100%
New File 66048 Confirmation of the port of loading of
critical items.msg100%
New File 29184 Fw 2nd Shipment.msg100%
New File 168448 FW Customs Registration.msg100%
New File 97280 FW duty calculation for silver safety A
C GMR.msg100%
New File 48128 FW Incorporate Site Address in IEC.msg
100%
New File 740864 FW Notification of 4th shipment(OL-
0033).msg100%
New File 179200 FW scan copy of DD.msg100%
New File 153781 Letter to SEPCO Site-1426.pdf100%
New File 91136 Minutes of Meeting_20 10
10_commercial.msg100%
New File 45568 Project Insurance for 4th Unit.msg100%
New File 36864 Re 2nd Shipment.msg100%
New File 98304 RE Delivery Notification of the third
country cargos (OL-0092).msg100%
New File 96768 RE duty calculation for silver safety A
C GMR.msg100%
New File 59392 RE Fw Project registration documents
for GMR required.msg100%
New File 56320 RE Notification of 4th shipment(OL-
0033).msg100%
New Dir 4 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\9. Custom Duty\Mail communication\10th Shipment\
New File 55296 FW PAYMENT NOTICE.msg100%
New File 328950 KTPP-OL-SEPS-GKEL-0231.pdf100%
New File 378866 KTPP-OL-SEPS-GKEL-0241.pdf100%
New File 122465 Letter to SEPCO Site-832.pdf100%
New Dir 1 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\9. Custom Duty\Mail communication\12th Shipment\
New File 81408 RE Request for Customs duty approval for
12B and 13th shipment.msg100%
New Dir 6 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\9. Custom Duty\Mail communication\17th shipment\
New File 67072 FW 17th shipment Customs duty working
(1).msg100%
New File 126464 FW 17th shipment Customs duty
working.msg100%
New File 301806 KTPP-OL-SEPS-GKEL-0272.pdf100%
New File 348266 KTPP-OL-SEPS-GKEL-0275.pdf100%
New File 1.1 m Letter to SEPCO Site-1022.pdf100%
New File 532188 Letter to SEPCO Site-1056.pdf100%
New Dir 1 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\9. Custom Duty\Mail communication\21st shipment\
New File 217600 FW Delivery Notification of 21th
Shipment from shanghai(OL-0154) .msg100%
New Dir 10 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\9. Custom Duty\Mail communication\24th 25th shipment\
New File 170496 FW Delivery Notification of 24th
Shipment(0L-0188).msg100%
New File 640000 FW Documents of GMR 24th shipment M V
PRINCE HENRY.msg100%
New File 724721 KTPP-OL-SEPS-GKEL-0367.pdf100%
New File 263405 KTPP-OL-SEPS-GKEL-0375.pdf100%
New File 328926 KTPP-OL-SEPS-GKEL-0380.pdf100%
New File 208673 Letter to SEPCO Site-1303.pdf100%
New File 145913 Letter to SEPCO Site-1425.pdf100%
New File 209885 Letter to SEPCO Site-1475.pdf100%
New File 61952 RE Letter from Andhra Bank.msg100%
New File 198144 RE Re Regarding documents of GMR 25th
shipment M V J SHINE.msg100%
New Dir 1 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\9. Custom Duty\Mail communication\29th Shipment\
New File 414881 Letter to SEPCO Site-1642.pdf100%
New Dir 17 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\9. Custom Duty\Mail communication\3rd Shipment\
New File 2.2 m BoE-MV SIVER Safety, GMR0001.pdf100%
New File 116141 DD.pdf100%
New File 625188 Document of 3rd Shipment.doc100%
New File 78336 FW Delivery notification of 3rd shipment
(OL-0034) (1).msg100%
New File 698368 FW Delivery notification of 3rd shipment
(OL-0034).msg100%
New File 696320 FW Destination port of 3rd shipment(OL-
0030) (1).msg100%
New File 1.3 m FW Document of 3rd shipment (OL-
0035).msg100%
New File 717824 FW Notification of 3rd shipment(OL-
0024).msg100%
New File 139776 FW GMR 3rd Shipment customs duty
working.msg100%
New File 73216 FW Mv.Silver Safety - 3rd shipment of GMR
- Bill of Entry.msg100%
New File 466412 Letter to SEPCO Site-517.pdf100%
New File 62976 RE Delivery notification of 3rd shipment
(OL-0034).msg100%
New File 78336 RE Destination port of 3rd shipment(OL-
0030).msg100%
New File 65536 RE Document of 3rd shipment (OL-0035)
(1).msg100%
New File 64000 RE Document of 3rd shipment (OL-
0035).msg100%
New File 118784 RE Transportation Status of 3rd
shipment.msg100%
New File 107520 RE Fw GMR3?????.msg100%
New Dir 6 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\9. Custom Duty\Mail communication\4th Shipment\
New File 767870 BOE-4th shipment.pdf100%
New File 2.2 m FW Document of 4th Shipment(OL-0047).msg
100%
New File 333686 KTPP-OL-SEPS-GKEL-0160.pdf100%
New File 473642 KTPP-OL-SEPS-GKEL-0168.pdf100%
New File 358928 Letter to SEPCO Site-601.pdf100%
New File 87552 RE GMR4th shipment duty.msg100%
New Dir 17 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\9. Custom Duty\Mail communication\7th Shipment\
New File 59904 Custom duty for 7th shipment-1.msg100%
New File 57856 FW Document of 7th shipment (OL-0074)
(3).msg100%
New File 85504 FW Document of 7th shipment (OL-0074)
(4).msg100%
New File 2.2 m FW Document of 7th shipment (OL-0074)
(5).msg100%
New File 2.2 m FW Document of 7th shipment (OL-0074)
(6).msg100%
New File 45568 FW Document of 7th shipment (OL-
0074).msg100%
New File 45056 FW Import certificate by Energy
Secretary - Govt of Orissa.msg100%
New File 711680 Notification of 7th shipment(OL-0054).msg
100%
New File 73216 RE Custom duty for 7th shipment (1).msg
100%
New File 70144 RE Custom duty for 7th shipment (2).msg
100%
New File 49152 RE Custom duty for 7th shipment (3).msg
100%
New File 73216 RE Custom duty for 7th shipment -2.msg
100%
New File 72192 RE Custom duty for 7th shipment.msg100%

New File 64000 RE Document of 7th shipment (OL-0074)


(1).msg100%
New File 39936 RE Document of 7th shipment (OL-0074)
(2).msg100%
New File 67072 RE Document of 7th shipment (OL-
0074).msg100%
New File 65024 RE Slow progress of discharge at
Paradip.msg100%
New Dir 11 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\9. Custom Duty\Mail communication\Project import\
New File 641536 FW Privileged and Confidential Request
for details regarding Customs Clearance.msg100%
New File 716800 FW Project Import Certificate (4).msg
100%
New File 710144 FW Project Import Certificate (5).msg
100%
New File 739840 FW Project Import Certificate.msg100%
New File 64000 Letter to PS for Project Import
Certificate.msg100%
New File 208673 Letter to SEPCO Site-1303.pdf100%
New File 375808 RE Privileged and Confidential Request
for details regarding Customs Clearance.msg100%
New File 48128 Re Project Import Certificate (1).msg
100%
New File 52224 RE Project Import Certificate (2).msg
100%
New File 62464 RE Project Import Certificate (3).msg
100%
New File 54272 RE Project Import Certificate.msg100%
New Dir 1 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\9. Custom Duty\Mail communication\TC\
New File 193536 FW Document of TC4 & TC5 shipment(OL-
0126).msg100%
New Dir 0 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\9. Custom Duty\Project Documents\
New Dir 50 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\9. Custom Duty\Project Documents\Project Documents\
New File 107044 13) Mega Power Status Certificate.pdf100%

New File 238296 1491_001.pdf100%


New File 67584 Anil Varne April 2015 Demurrage and
detention charges.msg100%
New File 338944 Approval for Project Policy Extension of
Kamalanga Project expiring on 19th Nov 2012.msg100%
New File 683270 Bill of Lading.pdf100%
New File 244224 Certificate-SCAN-MARINE.doc100%
New File 9.2 m Construction Power Completion.pdf100%
New File 543380 Custom letter for BG.pdf100%
New File 49150 Customs duty Paid Abstract-GKEL-
301214.xlsx100%
New File 80384 Drum lifting of unit-II of GKEL on 31 05
11 early hours.msg100%
New File 191195 ENERGY 7272.pdf100%
New File 59392 FW Custom duty Calculation for TC-6&TC-7
shipments a c GMR-Reg .msg100%
New File 53760 FW Customs duty vide Inv No SEPCO-
GKEL-OFFSHORE-003 TC (USD) Dt 22 02 2011 A c GMR TC-3rd Shipment.msg100%
New File 3.5 m FW Document of 19th Shipment(OL-0155)
.msg100%
New File 2.2 m FW Document of 20th Shipment(OL-0158)
.msg100%
New File 549376 FW Draft Report in GKEL-SEPCO - Steps
forward.msg100%
New File 41472 FW Release of 17 c Consignment.msg100%
New File 66048 FW Request Letters for TRA for TC6 &
7.msg100%
New File 98304 Fwd 17th shipment Customs duty
working.msg100%
New File 758272 Fwd Custom duty Calculation for TC-6&TC-
7 shipments a c GMR-Reg .msg100%
New File 72192 Fwd Despatch report for A-1 and A-2 A c
GMR.msg100%
New File 402944 Fwd Dispatch report of GMR17th
shipment.msg100%
New File 52736 Fwd Duty Cal Sheet Per Vsl M V KOTA PURI
V-049 A C GMR.msg100%
New File 37888 Fwd Regarding commercial invoice of 18th
shipment.msg100%
New File 49664 Fwd Request Letters for TRA for TC 6 &
7.msg100%
New File 89088 Fwd TC-5 SHIPMENT Custom DD.msg100%
New File 54784 Fwd urgent need materials in 17th
shipment.msg100%
New File 13816 GKEL INSURANCE DETAILS.XLSX100%
New File 12506 GKEL Policy Deails.xls.xlsx100%
New File 198275 Import certificate by Secretary Energy-
GKEL.pdf100%
New File 545375 Import certificate-Annexure.pdf100%
New File 7.5 m Insurance kamlanga.pdf100%
New File 332800 Invoice for 18th A shipment.msg100%
New File 1.5 m KM 13 th April 2015 Demurrage and
detention charges.msg100%
New File 24064 Letter to Energy Department.doc100%
New File 93094 Marine Inusrance dated 05th May 2012.pdf
100%
New File 970240 Payment proof for C17 shipment.msg100%
New File 615473 Project insurance-(Marine_SCE).pdf100%
New File 627712 Re RE RE letters of credit of 19th
shipment(OL-0153).msg100%
New File 95744 Re Boiler Drum Lifting of Unit-3 at GKEL
Kamalanga.msg100%
New File 42496 RE Kurnool - Regarding PD Bond for TC5
Shipment.msg100%
New File 69632 Re RE Discrepancy in CNY invoices of A1
and A2 cargo.msg100%
New File 62976 Re RE letters of credit of 19th
shipment(OL-0153).msg100%
New File 139264 RE RE Regarding to marine insurance
policy.msg100%
New File 196608 RE Kurnool - Reply - 17th shipment
Customs duty working.msg100%
New File 32768 Regarding PD Bond for TC5 Shipment.msg
100%
New File 424877 Request letter for amendment in
essentiality.pdf100%
New File 171520 Requisition list for Customs Clearance
issue .msg100%
New File 68608 Steam Drum U#1despatch Intimation.msg100%

New File 167424 Urgent cargo in 18th shipment.msg100%


New Dir 76 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\9. Custom Duty\Project Documents\Project
Documents\Delivery Notifications\
New File 114688 Delivery notification for 21th
shipment.msg100%
New File 113152 Delivery notification for GMR TC8&TC9
shipment.msg100%
New File 2.4 m FW Delivery Notification and Document of
A4 Shipment(OL-0272) (16).msg100%
New File 2.4 m FW Delivery Notification and Document of
A4 Shipment(OL-0272).msg100%
New File 725504 FW Delivery Notification and Document of
A7 Shipment doc(OL-0283) (9).msg100%
New File 725504 FW Delivery Notification and Document of
A7 Shipment doc(OL-0283).msg100%
New File 889344 FW Delivery Notification and Document of
TC18 Shipment doc(OL-0253) (22).msg100%
New File 889344 FW Delivery Notification and Document of
TC18 Shipment doc(OL-0253).msg100%
New File 162304 FW Delivery Notification of TC12
Shipment(OL-208).msg100%
New File 235008 FW Delivery Notification of 22nd
Shipment(OL-0174) .msg100%
New File 217088 FW DELIVERY NOTIFICATION OF 23rd
SHIPMENT(OL-0184).msg100%
New File 210432 FW Delivery Notification of 24th
Shipment(0L-0188).msg100%
New File 204800 FW Delivery Notification of 25th
Shipment(OL-202).msg100%
New File 184832 FW Delivery Notification of 26th
Shipment(OL-206).msg100%
New File 211456 FW Delivery Notification of 27th
Shipment(OL-213).msg100%
New File 184320 FW Delivery Notification of 32nd
Shipment(OL-0245) (23).msg100%
New File 184320 FW Delivery Notification of 32nd
Shipment(OL-0245).msg100%
New File 195584 FW Delivery Notification of 35 36 and
A8 Shipment(OL-0286) (8).msg100%
New File 195584 FW Delivery Notification of 35 36 and
A8 Shipment(OL-0286).msg100%
New File 180736 FW Delivery Notification of 37th
Shipment(OL-0295) (6).msg100%
New File 180736 FW Delivery Notification of 37th
Shipment(OL-0295).msg100%
New File 188928 FW Delivery Notification of 38th
Shipment(OL-0303) (2).msg100%
New File 188928 FW Delivery Notification of 38th
Shipment(OL-0303).msg100%
New File 155648 FW Delivery Notification of A3
Shipment(OL-0198).msg100%
New File 173568 FW Delivery Notification of A9
Shipment(OL-0287) (7).msg100%
New File 173568 FW Delivery Notification of A9
Shipment(OL-0287).msg100%
New File 184832 FW Delivery Notification of A9
Shipment(OL-0298) (5).msg100%
New File 184832 FW Delivery Notification of A9
Shipment(OL-0298) .msg100%
New File 176128 FW Delivery Notification of C3 Shipment
doc(OL-0258) (18).msg100%
New File 176128 FW Delivery Notification of C3 Shipment
doc(OL-0258).msg100%
New File 187392 FW Delivery Notification of C4 and 33rd
Shipment(OL-0262) (17).msg100%
New File 187392 FW Delivery Notification of C4 and 33rd
Shipment(OL-0262).msg100%
New File 176128 FW Delivery Notification of C5 Shipment
doc(OL-0276) (13).msg100%
New File 176128 FW Delivery Notification of C5 Shipment
doc(OL-0276).msg100%
New File 189952 FW Delivery Notification of C6 and 34th
Shipment(OL-0278) (10).msg100%
New File 189952 FW Delivery Notification of C6 and 34th
Shipment(OL-0278).msg100%
New File 184832 FW Delivery Notification of C7 and 39th
Shipment(OL-0308) (1).msg100%
New File 184832 FW Delivery Notification of C7 and 39th
Shipment(OL-0308).msg100%
New File 189440 FW Delivery Notification of TC11
Shipment(OL-0195).msg100%
New File 188928 FW Delivery Notification of TC13
Shipment(OL-218).msg100%
New File 175616 FW Delivery Notification of TC14&TC15
Shipment doc(OL-0222).msg100%
New File 178688 FW Delivery Notification of TC16
Shipment(OL-0224).msg100%
New File 166400 FW Delivery Notification of TC19
Shipment(OL-0256) (19).msg100%
New File 182272 FW Delivery Notification of TC19
Shipment(OL-0256) (20).msg100%
New File 182272 FW Delivery Notification of TC19
Shipment(OL-0256) (21).msg100%
New File 166400 FW Delivery Notification of TC19
Shipment(OL-0256).msg100%
New File 199168 FW Delivery Notification of TC8 & TC9
Shipment.msg100%
New File 556032 FW Document of A10 Shipment and Delivery
Notification of A11 Shipment(OL-0301) (3).msg100%
New File 556032 FW Document of A10 Shipment and Delivery
Notification of A11 Shipment(OL-0301).msg100%
New File 143360 Fwd Delivery Notification of 22nd
Shipment.msg100%
New File 133632 Fwd Delivery Notification of 23th
Shipment.msg100%
New File 56320 Fwd Delivery Notification of 28th
Shipment.msg100%
New File 64512 Fwd Delivery Notification of 30th
Shipment.msg100%
New File 68608 Fwd Delivery Notification of 32nd
Shipment (24).msg100%
New File 68608 Fwd Delivery Notification of 32nd
Shipment.msg100%
New File 61952 Fwd OL-0276-20120416-Delivery
Notification of C5 Shipment (12).msg100%
New File 64000 Fwd OL-0276-20120416-Delivery
Notification of C5 Shipment (14).msg100%
New File 64000 Fwd OL-0276-20120416-Delivery
Notification of C5 Shipment (15).msg100%
New File 61952 Fwd OL-0276-20120416-Delivery
Notification of C5 Shipment.msg100%
New File 65024 Fwd OL-0278-20120420-Delivery
Notification of C6 and 34th Shipment (11).msg100%
New File 65024 Fwd OL-0278-20120420-Delivery
Notification of C6 and 34th Shipment.msg100%
New File 43520 Re Delivery notification for TC17
shipment (25).msg100%
New File 41984 Re Delivery notification for TC17
shipment (26).msg100%
New File 41984 Re Delivery notification for TC17
shipment (27).msg100%
New File 40448 Re Delivery notification for TC17
shipment (28).msg100%
New File 40448 Re Delivery notification for TC17
shipment (29).msg100%
New File 43520 Re Delivery notification for TC17
shipment.msg100%
New File 86016 RE DELIVERY NOTIFICATION OF 23rd
SHIPMENT(OL-0184).msg100%
New File 188416 RE Delivery Notification of A10
Shipment(OL-0298) (4).msg100%
New File 188416 RE Delivery Notification of A10
Shipment(OL-0298) .msg100%
New File 102400 Re FW DELIVERY NOTIFICATION OF 23rd
SHIPMENT(OL-0184).msg100%
New File 62464 Re FW Delivery Notification of 28th
Shipment.msg100%
New File 81408 RE Re Re delivery notification for
critical items 23rd shipment.msg100%
New File 61440 Re Re Re delivery notification for
critical items.msg100%
New File 81408 Re RE Re Re delivery notification for
critical items 23rd shipment (30).msg100%
New File 90624 RE RE Re Re delivery notification for
critical items 23rd shipment.msg100%
New Dir 8 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\Others\
New File 30877 Deviations and defects _SEPCO.xlsx100%
New File 3.1 m FW shipping schedule-D & comments reply
(transmittal 0304).msg100%
New File 9.0 m FW Supply contract of Generator.msg100%

New File 9.3 m FW Supply contract of Steam Turbine.msg


100%
New File 9.0 m FW Supply contracts-Supply contract of
boiler.msg100%
New File 5.4 m FW Emailing Site Construction Pictures 13
May 2011.docx.msg100%
New File 5.1 m FW L1L2 SCHEDULE reply comments of the
schedule L1 L2(transmittal 1082).msg100%
New File 409676 MPR Details.docx100%
New Dir 2 C:\AdvisianActive\01 Projects\GMR GKEL
Arbitration\Intralinks\Reply\Others\As Built Drawing\
New File 1.2 m FW Communications regarding as built
drawing trasmittal 2230.msg100%
New File 502272 RE Fw Re RE RE All the AS- BUILT
drawings (transmittal 2230).msg100%
New Dir 2 C:\AdvisianActive\01 Projects\GMR Norton Rose
Fulbright (Asia) LLP - Technical Services Expert Advisor\
New File 55868 Statement of Claim - referencing document
(2).docx100%
New File 57297 Statement of Claim - referencing document
ZN.docx100%
New Dir 5 C:\AdvisianActive\01 Projects\JEV M&E Audit\
New File 2.1 m EC Kick Off Meeting_Draft.pptx100%
New File 955466 JEV Audit Work Plan_27Jul.pdf100%
New File 25194 JEV M&E Audit Info RFI.xlsx100%
New File 1.0 m JEV Site Visit Agenda.docx100%
New File 60135 JEV Site Visit Agenda.pdf100%
New Dir 7 C:\AdvisianActive\01 Projects\JEV M&E Audit\Comments
on Draft Report from JEV\
New File 65358 Draft report review v3- Advisian
rev1_25Oct.xlsx100%
New File 15402 Draft report review v5- JEV
rev1_27Oct_Neoh.xlsx100%
New File 6.5 m JEV ME Audit Report 171025 - 3rd Draft to
Client- Rev D.docx100%
New File 6.5 m JEV ME Audit Report 171025 - 3rd Draft to
Client- Rev D_rev1.docx100%
New File 6.9 m JEV ME Audit Report 171025 - 3rd Draft to
Client- Rev D_tc.docx100%
New File 6.5 m JEV ME Audit Report 171027 - 3rd Draft to
Client- Rev D_Neoh.docx100%
New File 6.5 m JEV ME Audit Report 171030 - 3rd Draft to
Client- Rev E_tc.docx100%
New Dir 3 C:\AdvisianActive\01 Projects\JEV M&E Audit\Draft
Final 01 November 2017\
New File 3.0 m JEV M&E Audit Report Draft_01November.pdf
100%
New File 5.8 m JEV ME Audit Report 171101 - Final Draft
to EC- Rev F -clean.docx100%
New File 5.9 m JEV ME Audit Report 171101 - Final Draft
to EC- Rev F -tc.docx100%
New Dir 1 C:\AdvisianActive\01 Projects\JEV M&E Audit\ref\
New File 17.8 m Individual Report - Jimah (Malaysia)
FINAL.docx100%
New Dir 2 C:\AdvisianActive\01 Projects\JEV M&E Audit\Sent to
Finance\
New File 16796 JEV M&E Audit Work Budget.xlsx100%
New File 16082 JEV ME Audit Work Budget_r1.xlsx100%
New Dir 4 C:\AdvisianActive\01 Projects\JEV M&E Audit\Site
Field Exit Meeting\
New File 1.4 m JEV Field Exit Meeting_10Aug.pptx100%
New File 503931 JEV Field Exit Meeting_10Aug_Final.pdf
100%
New File 1.4 m JEV Field Exit Meeting_15Aug.pptx100%
New File 504920 JEV Field Exit Meeting_15Aug_rev1.pdf100%

New Dir 20 C:\AdvisianActive\01 Projects\JEV M&E Audit\Working\


New File 323394 JEV Financial Performance Assessment.docx
100%
New File 22523 JEV Financial Worksheet (final).xlsx100%

New File 737217 JEV Financials_working_19June.xlsx100%


New File 774049 JEV Financials_working_23Oct.xlsx100%
New File 4.5 m JEV ME Audit Report 170918- Draft 1-
Internal Review.docx100%
New File 4.5 m JEV ME Audit Report 170918- Draft 1-
Internal Review_Neoh.docx100%
New File 6.9 m JEV ME Audit Report 170918- Draft 2.1-
Internal Review.docx100%
New File 6.9 m JEV ME Audit Report 170918- Draft 2.1-
Internal Review_Neoh.docx100%
New File 6.6 m JEV ME Audit Report 170929- Internal
Draft Final.docx100%
New File 6.8 m JEV ME Audit Report 171002- First Draft
to Client - Rev B- clean.docx100%
New File 6.8 m JEV ME Audit Report 171002- First Draft
to Client - Rev B- tc.docx100%
New File 6.5 m JEV ME Audit Report 171009 - 2nd Draft to
Client- Rev C.docx100%
New File 3.2 m JEV ME Audit Report 171009 - 2nd Draft to
Client- Rev C.pdf100%
New File 6.9 m JEV ME Audit Report 171009 - Second Draft
to Client - Rev C- clean.docx100%
New File 6.9 m JEV ME Audit Report 171009 - Second Draft
to Client - Rev C- clean_rev1.docx100%
New File 7.0 m JEV ME Audit Report 171009 - Second Draft
to Client - Rev C- clean_rev1_Neoh.docx100%
New File 6.9 m JEV ME Audit Report 171009 - Second Draft
to Client - Rev C- tc.docx100%
New File 6.5 m JEV ME Audit Report 171025 - 3rd Draft to
Client- Rev D_rev1.docx100%
New File 77472 Manpower Benchmark.xlsx100%
New File 531908 NEO Compiled from ST Reports.xlsx100%
New Dir 37 C:\AdvisianActive\01 Projects\Kanbauk FS\
New File 45575 Advisian Financial Inputs Sheet
170816.docx100%
New File 119830 COMBINED CYCLE POWER PLANTi EMPLOYER
MFS.docx100%
New File 1.0 m Copy of SIEMENS B1 AK1_Neoh_AK 30Aug.xlsm
100%
New File 1.5 m Copy of SIEMENS Kanbauk
08Oct_FINAL_new_graphs_rev1 AK.xlsm100%
New File 1.5 m Copy of SIEMENS Kanbauk
08Oct_FINAL_new_graphs_rev3AK.xlsm100%
New File 44370 Copy of Simplified levelized tariff CCGT
07Jan2016_SIPP.xlsx100%
New File 22523 Financial Inputs Sheet.docx100%
New File 1.0 m Financial model clarifications_neoh.docx
100%
New File 196609 FM Inputs Deck.pptx100%
New File 361007 Gas Consumptions.xlsx100%
New File 360937 Gas Consumptions_rev1.xlsx100%
New File 18752 Kanbauk 2 Units H_560MW Analysis_No
PTT.pdf100%
New File 68070 Kanbauk Kickoff Meeting MOM_neoh.docx100%

New File 627101 MIC IRR calculation_IPP portion.xlsx100%

New File 1030008 SIEMENS B1 AK1_Neoh 29Aug.xlsm100%


New File 1.2 m SIEMENS Kanbauk 02Oct.xlsm100%
New File 1.2 m SIEMENS Kanbauk 03Oct.xlsm100%
New File 1.2 m SIEMENS Kanbauk 04Oct.xlsm100%
New File 1.2 m SIEMENS Kanbauk 04Oct_trial.xlsm100%
New File 1.4 m SIEMENS Kanbauk 06 Oct_656pm.xlsm100%
New File 1.4 m SIEMENS Kanbauk 06 Oct_712pm.xlsm100%
New File 1.4 m SIEMENS Kanbauk 07Oct_FINAL.xlsm100%
New File 1.4 m SIEMENS Kanbauk 07Oct_FINAL_rev1.xlsm100%

New File 1.4 m SIEMENS Kanbauk 07Oct_FINAL_rev2.xlsm100%

New File 1.4 m SIEMENS Kanbauk 07Oct_FINAL_rev3.xlsm100%

New File 1.4 m SIEMENS Kanbauk 08Oct_FINAL.xlsm100%


New File 1.4 m SIEMENS Kanbauk
08Oct_FINAL_new_graphs.xlsm100%
New File 1.4 m SIEMENS Kanbauk
08Oct_FINAL_new_graphs_rev1.xlsm100%
New File 1.4 m SIEMENS Kanbauk
08Oct_FINAL_new_graphs_rev2.xlsm100%
New File 1.4 m SIEMENS Kanbauk 08Oct_FINAL_rev1.xlsm100%

New File 1.5 m SIEMENS Kanbauk 09Oct.xlsm100%


New File 2.0 m SIEMENS Kanbauk 10Oct.xlsm100%
New File 1.6 m SIEMENS Kanbauk 10Oct_6pm.xlsm100%
New File 1.6 m SIEMENS Kanbauk 11Oct_rev1.xlsm100%
New File 1.6 m SIEMENS Kanbauk 11Oct_rev2.xlsm100%
New File 1.6 m SIEMENS Kanbauk 11Oct_rev4.xlsm100%
New File 578456 SPG Siemens Total Project Structure.pdf
100%
New Dir 5 C:\AdvisianActive\01 Projects\Kanbauk FS\Proposal
Materials\
New File 5.0 m 20170622 Kanbauk Proposal.pptx100%
New File 3.2 m 20170627 Kanbauk Power Proposal -
Technical - Final.pdf100%
New File 2.6 m 20170629 Kanbauk Power Tender
Presentation.pdf100%
New File 5.8 m 20170629 Kanbauk Power Tender
Presentation.pptx100%
New File 469315 Kanbauk Feasibility Study TOR.pdf100%
New Dir 1 C:\AdvisianActive\01 Projects\Kanbauk FS\Proposal
Materials\Siemens Total Materials\
New File 3.0 m Kanbauk FS Presentation 090717.pdf100%
New Dir 3 C:\AdvisianActive\01 Projects\Kanbauk FS\ref\
New File 5.9 m CCGT Template.xlsm100%
New File 857138 Coal Plant.xlsx100%
New File 3.5 m IPP Financial Modeling_rev 00_for
Poyry_20150608.xlsm100%
New Dir 52 C:\AdvisianActive\01 Projects\Kanbauk FS\superceded\
New File 1.3 m Copy of SIEMENS Kanbauk 02Oct-FD
Edit0H.xlsm100%
New File 1.1 m Demo FM Mini.xlsm100%
New File 3.7 m DEMO Project Financial Model
201700808.xlsm100%
New File 3.7 m DEMO Project Financial Model
20170628.xlsm100%
New File 16384 F797C030100%
New File 1.0 m SIEMENS B1 AK1_Neoh_AK 30Aug.xlsm100%
New File 1.3 m SIEMENS Kanbauk 02Oct-FD Edit0C_Neoh.xlsm
100%
New File 1.3 m SIEMENS Kanbauk 02Oct-FD
Edit0C_Neoh_rev1.xlsm100%
New File 1.3 m SIEMENS Kanbauk 02Oct-FD
Edit0C_Neoh_rev2.xlsm100%
New File 1.3 m SIEMENS Kanbauk 02Oct-FD
Edit0C_Neoh_rev3.xlsm100%
New File 1.3 m SIEMENS Kanbauk 02Oct-FD Edit0H_Neoh.xlsm
100%
New File 1.3 m SIEMENS Kanbauk 02Oct-FD Edit0K1-
ProjectIRR2 (TL).xlsm100%
New File 1.3 m SIEMENS Kanbauk 02Oct-FD Edit0K1-
ProjectIRR2.xlsm100%
New File 1.3 m SIEMENS Kanbauk 02Oct-FD Edit0K1-
ProjectIRR2_Neoh.xlsm100%
New File 1.4 m SIEMENS Kanbauk 06 Oct.xlsm100%
New File 1.4 m SIEMENS Kanbauk 06 Oct_430pm.xlsm100%
New File 1.4 m SIEMENS Kanbauk 06 Oct_435pm.xlsm100%
New File 1.4 m SIEMENS Kanbauk 06 Oct_550pm.xlsm100%
New File 1.4 m SIEMENS Kanbauk 06 Oct_611pm.xlsm100%
New File 1.4 m SIEMENS Kanbauk 06 Oct_630pm.xlsm100%
New File 1.4 m SIEMENS Kanbauk 06 Oct_645pm.xlsm100%
New File 1.4 m SIEMENS Kanbauk 06 Oct_915pm.xlsm100%
New File 1.4 m SIEMENS Kanbauk 06 Oct_931pm.xlsm100%
New File 1.4 m SIEMENS Kanbauk 07Oct_1030am.xlsm100%
New File 1.4 m SIEMENS Kanbauk 07Oct_1130am.xlsm100%
New File 1.4 m SIEMENS Kanbauk 07Oct_1153am.xlsm100%
New File 1.4 m SIEMENS Kanbauk 07Oct_115pm.xlsm100%
New File 1.4 m SIEMENS Kanbauk 07Oct_130pm.xlsm100%
New File 1.4 m SIEMENS Kanbauk 07Oct_230pm.xlsm100%
New File 1.4 m SIEMENS Kanbauk 07Oct_236pm.xlsm100%
New File 1.4 m SIEMENS Kanbauk 07Oct_245pm.xlsm100%
New File 1.4 m SIEMENS Kanbauk 07Oct_251pm.xlsm100%
New File 1.4 m SIEMENS Kanbauk 07Oct_315pm.xlsm100%
New File 1.4 m SIEMENS Kanbauk 07Oct_339pm.xlsm100%
New File 1.4 m SIEMENS Kanbauk 07Oct_354pm.xlsm100%
New File 1.4 m SIEMENS Kanbauk 07Oct_430pm.xlsm100%
New File 1.4 m SIEMENS Kanbauk 07Oct_450pm.xlsm100%
New File 1.4 m SIEMENS Kanbauk 07Oct_520pm.xlsm100%
New File 1.4 m SIEMENS Kanbauk 07Oct_620pm.xlsm100%
New File 1.4 m SIEMENS Kanbauk 07Oct_631pm.xlsm100%
New File 1.4 m SIEMENS Kanbauk 07Oct_640pm.xlsm100%
New File 1.4 m SIEMENS Kanbauk 07Oct_645pm.xlsm100%
New File 1.5 m SIEMENS Kanbauk 10Oct.xlsm100%
New File 1.0 m SIEMENS Kanbauk 12Sept.xlsm100%
New File 1.0 m SIEMENS Kanbauk 12Sept_rev1.xlsm100%
New File 1.1 m SIEMENS Kanbauk 12Sept_rev1_internal
neoh.xlsm100%
New File 1.0 m SIEMENS Kanbauk 13Sept.xlsm100%
New File 1.0 m SIEMENS Kanbauk 26Sept.xlsm100%
New File 1.0 m SIEMENS Kanbauk 26Sept_rev1.xlsm100%
New File 1024031 SIEMENS Kanbauk 26Sept_rev2.xlsm100%
New File 1.1 m SIEMENS Kanbauk 26Sept_rev3.xlsm100%
New File 1.2 m SIEMENS Kanbauk 26Sept_rev4.xlsm100%
New Dir 1 C:\AdvisianActive\01 Projects\KEV - Tariff Review\
New File 1.4 m ADVISIAN CONTRACT_Final.docx100%
New Dir 0 C:\AdvisianActive\01 Projects\KEV - Tariff
Review\Engagement Letter\
New Dir 2 C:\AdvisianActive\01 Projects\KEV - Tariff
Review\Project Management\
New File 315723 2240 CSOC KEV_neoh.docx100%
New File 87978 2240 CSOC KEV_SIGNED.pdf100%
New Dir 30 C:\AdvisianActive\01 Projects\KEV M&E Audit\
New File 165 ~$20170314 KEV_Budget.xlsx100%
New File 165 ~$Kick Off Meeting with EC.pptx100%
New File 18809 20170314 KEV_Budget.xlsx100%
New File 92966 20170317 KEV_Budget.xlsx100%
New File 94283 20170321 KEV_Budget.xlsx100%
New File 9.5 m 20170329 Full Report - VOL 2_Rev B.docx
100%
New File 1.7 m 5YX326782_Ranhill Rugading ME
Audit_Internal Kick-off_draft.pptx100%
New File 24883 Appendix A.xlsx100%
New File 63518 Audit Plan - KEV ME Audit (30-10-
2017)_Neoh.docx100%
New File 524820 DOSH Availability Calculation.xlsx100%
New File 2.1 m Internal Kick Off Meeting & Scoping
Opportunity for KEV_150317.pdf100%
New File 391798 Kapar-Logo1.png100%
New File 319977 KEV 0129.pdf100%
New File 21006 KEV Asset Overview.docx100%
New File 167936 KEV CTR.xls100%
New File 470016 KEV M&E Audit Schedule.mpp100%
New File 97737 KEV M&E Audit Schedule.pdf100%
New File 13800 KEV Target Questions.xlsx100%
New File 4.6 m Kick Off Meeting with EC.pptx100%
New File 77448 Manpower Benchmark.xlsx100%
New File 162299 Master Spreadsheet.pptx100%
New File 127015 Master Spreadsheet.xlsx100%
New File 255405 medium_fuel_oil.jpg100%
New File 4.2 m Meeting with KEV.pptx100%
New File 48520 Org Chart.pptx100%
New File 295044 Org Chart_withpic.pptx100%
New File 171466 R3 - Journey Risk Assessment.docx100%
New File 89388 R3 - Journey Risk Assessment.pdf100%
New File 97837 RFS.pdf100%
New File 98034 Scope for WP Singapore.docx100%
New Dir 1 C:\AdvisianActive\01 Projects\KEV M&E Audit\Advisian
Team Internal Kick Off\
New File 1.5 m Advisian KEV Internal Kick Off.pptx100%
New Dir 1 C:\AdvisianActive\01 Projects\KEV M&E Audit\Budget
Tracking\
New File 94350 20170321 KEV_Budget_FINAL.xlsx100%
New Dir 1 C:\AdvisianActive\01 Projects\KEV M&E Audit\Budget
Tracking\WE 05 May\
New File 107229 KEV_Budget_FINAL_WE05May.xlsx100%
New Dir 1 C:\AdvisianActive\01 Projects\KEV M&E Audit\Budget
Tracking\WE 12 May\
New File 107259 KEV_Budget_FINAL_WE12May.xlsx100%
New Dir 1 C:\AdvisianActive\01 Projects\KEV M&E Audit\Budget
Tracking\WE 14 Apr\
New File 106896 20170324 KEV_Budget_FINAL.xlsx100%
New Dir 1 C:\AdvisianActive\01 Projects\KEV M&E Audit\Budget
Tracking\WE 19 May\
New File 107268 KEV_Budget_FINAL_WE19May.xlsx100%
New Dir 1 C:\AdvisianActive\01 Projects\KEV M&E Audit\Budget
Tracking\WE 21 Apr\
New File 106700 20170324 KEV_Budget_FINAL.xlsx100%
New Dir 1 C:\AdvisianActive\01 Projects\KEV M&E Audit\Budget
Tracking\WE 24 Mar\
New File 94364 20170324 KEV_Budget_FINAL.xlsx100%
New Dir 1 C:\AdvisianActive\01 Projects\KEV M&E Audit\Budget
Tracking\WE 28 APr\
New File 106811 20170324 KEV_Budget_FINAL.xlsx100%
New Dir 2 C:\AdvisianActive\01 Projects\KEV M&E Audit\Draft
Submitted to EC 31 Jul\
New File 5.1 m KEV ME Audit Report Draft
Final_31July.docx100%
New File 3.6 m KEV ME Audit Report Draft
Final_31July.pdf100%
New Dir 3 C:\AdvisianActive\01 Projects\KEV M&E Audit\Field
Exit Meeting\
New File 573321 KEV Field Exit Meeting_04May17.pptx100%
New File 455509 KEV Field Exit Meeting_16May.pdf100%
New File 573808 KEV Field Exit Meeting_16May.pptx100%
New Dir 2 C:\AdvisianActive\01 Projects\KEV M&E Audit\Internal
Kick Off With KEV\
New File 2.1 m KEV Internal Kick Off Meeting 160317.pdf
100%
New File 1.5 m KEV Internal Kick Off.pptx100%
New Dir 4 C:\AdvisianActive\01 Projects\KEV M&E Audit\KEV Audit
Work Plan\
New File 2.8 m KEV Audit Work Plan.pdf100%
New File 4.6 m KEV Audit Work Plan.pptx100%
New File 2.3 m KEV Audit Work Plan_20Apr.pdf100%
New File 4.6 m KEV Audit Work Plan_20Apr.pptx100%
New Dir 1 C:\AdvisianActive\01 Projects\KEV M&E Audit\Labour
Summary from Finance\
New File 163896 Project Labour Summary_WE
12May2017_302020-00442 KEV M&E Audit.xlsx100%
New Dir 1 C:\AdvisianActive\01 Projects\KEV M&E Audit\Meeting
with KEV Management\
New File 664875 M&E Audit Outcome.pptx100%
New Dir 27 C:\AdvisianActive\01 Projects\KEV M&E Audit\Neoh
Working\
New File 162 ~$V ME Audit Report Draft
Final_31July.docx100%
New File 162 ~$V ME Audit Report Draft_19July.docx100%

New File 162 ~$V ME Audit Report Working_23May.docx


100%
New File 802273 KEV Financials_working.xlsx100%
New File 857042 KEV Financials_working_09May.xlsx100%
New File 870569 KEV Financials_working_20Jul.xlsx100%
New File 3.1 m KEV M&E Audit Report Structure_08May.docx
100%
New File 3.1 m KEV M&E Audit Report Structure_10May.docx
100%
New File 3.5 m KEV M&E Audit Report Structure_12May.docx
100%
New File 3.5 m KEV M&E Audit Report Structure_15May.docx
100%
New File 2.1 m KEV ME Audit Info RFI_Neoh Working.xlsx
100%
New File 5.1 m KEV ME Audit Report Draft
Final_31July.docx100%
New File 3.6 m KEV ME Audit Report Draft
Final_31July.pdf100%
New File 4.5 m KEV ME Audit Report Draft_12June.docx100%

New File 4.5 m KEV ME Audit Report Draft_13June KEV


comments.docx100%
New File 4.5 m KEV ME Audit Report Draft_13June.docx100%

New File 2.5 m KEV ME Audit Report Draft_13June.pdf100%

New File 4.9 m KEV ME Audit Report Draft_20July.docx100%

New File 4.2 m KEV ME Audit Report Structure_16May.docx


100%
New File 4.2 m KEV ME Audit Report Structure_16May_neoh
commented.docx100%
New File 4.4 m KEV ME Audit Report Working_08June.docx
100%
New File 4.4 m KEV ME Audit Report Working_09June.docx
100%
New File 4.5 m KEV ME Audit Report Working_11June.docx
100%
New File 4.4 m KEV ME Audit Report Working_22May_r1.docx
100%
New File 4.4 m KEV ME Audit Report Working_22May_r2.docx
100%
New File 4.4 m KEV ME Audit Report Working_23May.docx
100%
New File 703259 KEV_Availability Records.xlsx100%
New Dir 16 C:\AdvisianActive\01 Projects\KEV M&E Audit\ref\
New File 5.0 m 1_ST_Proses semakan dan keputusan
penetapan tarif elektrik di semenanjung malaysia (1).pdf100%
New File 3.1 m 110618 GNS_CCGTIE_Proposal_20120926.doc
100%
New File 68393 4,NERC GADS DATA (GTCC).pdf100%
New File 81.9 m Annual Monitoring Report 2012 Rev 1.docx
100%
New File 1.1 m B&V - NREL- cost - report.pdf100%
New File 3.0 m BLCP DD Draft Final Report(clean).doc100%

New File 171081 Copy_of


2010_Only_Generating_Unit_Statistical_Brochure_ All_ Units_ Reporting.zip100%
New File 55482 GADS 2011-2015 Statistics.xlsx100%
New File 8.2 m M5 TEDD Report_final_17 Dec 2013
(clean).doc100%
New File 6.3 m MD2 Final Due Diligence Report_Rev1.doc
100%
New File 79360 NERC GADS Definitions.doc100%
New File 44.0 m NS Draft Prelim Due Diligence
Report_2011.04.12.doc100%
New File 234172 Pahlawan Panglima costs 160902.xlsx100%
New File 4.9 m Performance Analysis
DL_2011_RARPR_FINAL.pdf100%
New File 4.7 m
PUB_Performance_of_Generating_Plant_2010_WEC.pdf100%
New File 4.2 m Registered Guidelines on Tariff
Determination Under IBR for TNB.pdf100%
New Dir 3 C:\AdvisianActive\01 Projects\KEV M&E Audit\Report
Structure\
New File 162 ~$set 10.docx100%
New File 2.8 m Asset 10.docx100%
New File 3.0 m KEV M&E Audit Report Structure_07May.docx
100%
New Dir 1 C:\AdvisianActive\01 Projects\KEV M&E Audit\Sent to
Finance\
New File 16830 KEV M&E Audit Work Budget.xlsx100%
New Dir 3 C:\AdvisianActive\01 Projects\KEV M&E Audit\Sent to
KEV\
New File 1.4 m Additional Data from KEV_07June.docx100%

New File 1.4 m Additional Data from KEV_16May.docx100%


New File 2.1 m KEV M&E Audit Info RFI.xlsx100%
New Dir 2 C:\AdvisianActive\01 Projects\KEV M&E Audit\Site
Visit Agenda\
New File 1.0 m KEV Site Visit Agenda_03-04May.docx100%
New File 107596 KEV Site Visit Agenda_03-04May.pdf100%
New Dir 8 C:\AdvisianActive\01 Projects\Manjung 4 IE\
New File 2.4 m 102020-00026-IE-REP-1020 High Speed and
Delayed Auto Reclosing.doc100%
New File 1.1 m 102020-00026-IE-REP-1020 High Speed and
Delayed Auto Reclosing.pdf100%
New File 2.8 m 102020-00026-IE-REP-1021 Submit Data and
Simulation Model.doc100%
New File 6.7 m 102020-00026-IE-REP-1021 Submit Data and
Simulation Model.pdf100%
New File 550623 APS-TNBJ-7714 Manjung-4-Auto-Reclosing -
Addendum.pdf100%
New File 104313 APS-TNBJ-7714.pdf100%
New File 129965 APS-TNBJ-7728.pdf100%
New File 9.8 m Final Report on Model Development and
Validation for Mnjg U4 20170418.pdf100%
New Dir 4 C:\AdvisianActive\01 Projects\Manjung 4 IE\Old
Reports\
New File 3.2 m 102020-00026-IE-REP-1016 High Speed and
Delayed Auto Reclosing.pdf100%
New File 718848 102020-00026-IE-REP-1016 High Speed and
Delayed Autro Reclosing 1.doc100%
New File 299520 102020-00026-IE-REP-1017 Generator
Parameter Verification Test.doc100%
New File 6.8 m 102020-00026-IE-REP-1017 Generator
Parameter Verification.pdf100%
New Dir 40 C:\AdvisianActive\01 Projects\Nebras - Equis
Acquisition\
New File 162 ~$170930 Project Horse List of Parties
v1_advisian.docx100%
New File 236802 20170921_Zenith_MP_Negroni_Agenda.pdf100%

New File 39597 20170922 - Hours Estimate.xlsx100%


New File 165063 20170930 Project Horse List of Parties
v1_advisian.docx100%
New File 231021 20171005 Project Horse - Financial Inputs
Sheet.xlsx100%
New File 261435 20171013 Project Horse - Financial Inputs
Sheet_rev1.xlsx100%
New File 261434 20171013 Project Horse - Financial Inputs
Sheet_TW_PH.xlsx100%
New File 261880 20171013 Project Horse - Financial Inputs
Sheet_TW_PH_15Oct.xlsx100%
New File 268834 20171013 Project Horse - Financial Inputs
Sheet_TW_PH_16Oct.xlsx100%
New File 15580 20171013 Project Horse - info request
(Advisian).xlsx100%
New File 55138 20171014 Project Horse - QA_14Oct.xlsx
100%
New File 1.6 m Advisian Nebras Equis DD Internal Kick
Off.pptx100%
New File 1.6 m Advisian Nebras Equis DD Internal Kick
Off_rev1.pptx100%
New File 1.3 m Advisian Nebras Equis DD Kick Off
Meeting.pdf100%
New File 1.5 m Advisian Nebras Equis DD Kick Off
Meeting.pptx100%
New File 251722 Asset List.xlsx100%
New File 5.9 m Evaluation Matrix.xlsx100%
New File 6.0 m Evaluation Matrix_12Oct.xlsx100%
New File 6.0 m Evaluation Matrix_13Oct.xlsx100%
New File 6.0 m Evaluation Matrix_15Oct.xlsx100%
New File 5.9 m Evaluation Matrix_rev1.xlsx100%
New File 5.9 m Evaluation Matrix_rev2.xlsx100%
New File 230346 Financial Inputs Sheet.xlsx100%
New File 37421 Flow Chart.docx100%
New File 2.4 m Japan Projects.pdf100%
New File 36144 Net Generation Calculations R3.docx100%
New File 37374 Net Generation Calculations R3_neoh.docx
100%
New File 14057 Notes.docx100%
New File 20565 O&M Estimates 19Oct.docx100%
New File 3.7 m Project Horse - Australian Red Flag Map
and Checklist.docx100%
New File 230239 Project Horse - Financial Inputs
Sheet_Neoh.xlsx100%
New File 243183 Project Horse - Financial Inputs
Sheet_rev1.xlsx100%
New File 3.7 m Project Horse - Philippines Red Flag Map
and Checklist.docx100%
New File 981296 Project Horse - Philippines Red Flag Map
and Checklist_16Oct_rev1.pdf100%
New File 3.7 m Project Horse - Philippines Red Flag Map
and Checklist_rev1.docx100%
New File 3.6 m Project Horse - Red Flag Map and
Checklist_Neoh.docx100%
New File 3.6 m Project Horse - Red Flag Map and Project
Checklist.docx100%
New File 1.0 m Project Horse - Taiwan Red Flag Map and
Checklist_Rev1.pdf100%
New File 13442 Red Flag Map.xlsx100%
New File 22739 Tax information checklist.xlsx100%
New Dir 1 C:\AdvisianActive\01 Projects\Nebras - Equis
Acquisition\Agreement\
New File 1.4 m Nebras_Advisian Due Diligence
Contract_03Oct17.docx100%
New Dir 6 C:\AdvisianActive\01 Projects\Nebras - Equis
Acquisition\From Llewellyn\
New File 300815 02.03.01.01 Downer - CAPE YORK SOLAR
STORAGE PROJECT - Energy Yield Report.pdf100%
New File 977225 02.03.01.04 Jacobs Cape York Solar Farm
Resource and Yield Assessment Report 12072017.pdf100%
New File 3.6 m 160719 AC009 Manildra FINAL DRAFT.docx
100%
New File 193212 AC009- Manildra Solar Farm R1.docm100%
New File 3.6 m Equis DD - Solar template.docx100%
New File 1.4 m Equis DD - wind template.docx100%
New Dir 5 C:\AdvisianActive\01 Projects\Nebras - Equis
Acquisition\Lantau Group\
New File 2.2 m Backup Material TLG_PH v2 _20171016.pptx
100%
New File 1.0 m Backup Material TLG_TW v2_20171016.pptx
100%
New File 8.2 m Financial Model TLG Indicative
Inputs_ID_20171016.zipx100%
New File 208725 Financial Model TLG
Inputs_PH_20171016.xlsx100%
New File 699031 Financial Model TLG
Inputs_TW_20171016.xlsx100%
New Dir 11 C:\AdvisianActive\01 Projects\Nebras - Equis
Acquisition\Management Presentations\
New File 614619 Expert Session A (Distribution Structure)
- Negroni.pdf100%
New File 4.6 m Expert Session A (Legal & Tax Structure)
- Negroni.pdf100%
New File 1.9 m Expert Session B (Finance and Financial
Performance) - Negroni.pdf100%
New File 2.1 m Expert Session B (Financial Modeling and
Forecasts) - Negroni.pdf100%
New File 21.7 m Expert Session C & D (Resource Assessment
& Site Feasibility, O&M, Monitoring & Construction) - Negroni.pdf100%
New File 8.0 m Expert Session E (Country Development
Strategies & Status Quo) - PPT - Negroni.pdf100%
New File 893174 Expert Session E (Country Development
Strategies & Status Quo)_Mingus Case Study - Negroni.pdf100%
New File 3.2 m Expert Session E (Country Development
Strategies & Status Quo)_Wawa - Negroni.pdf100%
New File 9.7 m Expert Session E (Country Development
Strategies & Status Quo)_Word - Negroni.pdf100%
New File 18.2 m Management Presentation Slides (Day 1) -
Negroni.pdf100%
New File 24.5 m Zenith Information Memorandum vFinal-
Swami Comment.pdf100%
New Dir 0 C:\AdvisianActive\01 Projects\Nebras - Equis
Acquisition\Project Zenith Phase 2\
New Dir 0 C:\AdvisianActive\01 Projects\Nebras - Equis
Acquisition\Project Zenith Phase 2\1.0 Global\
New Dir 0 C:\AdvisianActive\01 Projects\Nebras - Equis
Acquisition\Project Zenith Phase 2\1.0 Global\1.3 Virtual Data Room Checklists\
New Dir 8 C:\AdvisianActive\01 Projects\Nebras - Equis
Acquisition\Project Zenith Phase 2\1.0 Global\1.3 Virtual Data Room
Checklists\1.3.8 29 September 2017\
New File 236029 1.3.8.1 20170929 VDR checklist -
Philippines.pdf100%
New File 138536 1.3.8.2 20170929 VDR checklist -
Taiwan.pdf100%
New File 41931 1.3.8.3 20170929 VDR checklist -
Thailand.pdf100%
New File 168112 1.3.8.4 20170929 VDR checklist -
Australia.pdf100%
New File 16343 1.3.8.5 20170929 VDR checklist - Japan KK
Entities.pdf100%
New File 435965 1.3.8.6 20170929 VDR checklist -
Japan.pdf100%
New File 230126 1.3.8.7 20170929 VDR checklist -
Indonesia.pdf100%
New File 172250 1.3.8.8 20170929 VDR checklist -
India.pdf100%
New Dir 2 C:\AdvisianActive\01 Projects\Nebras - Equis
Acquisition\Proposal\
New File 141532 Cover Letter_Nebras Power_Advisian
Proposal_22092017.pdf100%
New File 11.2 m Nebras Project Horse Due Diligence
Proposal Rev0.pdf100%
New Dir 4 C:\AdvisianActive\01 Projects\Nebras - Equis
Acquisition\Proposal\RFP\
New File 94333 CRF Project Horse.xlsx100%
New File 244849 CSOC COF-0008-COR-EN.docx100%
New File 57320 Due Diligence Contract.docx100%
New File 607469 Technical RFP - Project Horse (Final)
Advisian.pdf100%
New Dir 0 C:\AdvisianActive\01 Projects\Nebras - Equis
Acquisition\Q&A\
New Dir 2 C:\AdvisianActive\01 Projects\Nebras - Equis
Acquisition\Q&A\Batch 1 08 Oct\
New File 17090 20170930 Project Horse - QA -
Advisian_Tech.xlsx100%
New File 17367 20171006 Project Horse - Info request
list - Advisian_Tech.xlsx100%
New Dir 10 C:\AdvisianActive\01 Projects\Nebras - Equis
Acquisition\Report Template\
New File 162 ~$uis DD - Solar_Neoh.docx100%
New File 162 ~$uis DD - wind template_Nebras.docx100%

New File 3.6 m Equis DD - Solar template.docx100%


New File 3.6 m Equis DD - Solar template_Nebras.docx100%

New File 681161 Equis DD - Solar template_Nebras.pdf100%

New File 3.6 m Equis DD - Solar.docx100%


New File 3.6 m Equis DD - Solar_Neoh.docx100%
New File 1.4 m Equis DD - wind template.docx100%
New File 1.4 m Equis DD - wind template_Nebras.docx100%

New File 422109 Equis DD - wind template_Nebras.pdf100%


New Dir 4 C:\AdvisianActive\01 Projects\PLNE\
New File 166887 02. Bascom.xlsx100%
New File 2.0 m Advisian Track 4B FPTA Internal Kick
Off.pptx100%
New File 1.7 m PLN Enjiniring_Kick Off Meeting 30th
August 2017.pptx100%
New File 4.4 m PLN Enjiniring_Technical Team
Presentation_03042017.pptx100%
New Dir 4 C:\AdvisianActive\01 Projects\Project Light\
New File 10.0 m Project Light Technology Due Diligence
Report - Appendix A Gas Assets-clean .docx100%
New File 3.7 m Project Light Technology Due Diligence
Report - Appendix B Hydro Assets_....pdf100%
New File 1.3 m Project Light Technology Due Diligence
Report - Appendix C Geothermal Assets_14 Dec 2016.docx100%
New File 15.7 m Project Light Technology Due Diligence
Report - Executive Summary Draft.docx100%
New Dir 25 C:\AdvisianActive\01 Projects\Project Lighthouse\
New File 165 ~$Master Spreadsheet.xlsx100%
New File 2.5 m 20170313 Advisian WorleyParsons
Proposal_Technical Due Diligence.pdf100%
New File 1.3 m 202 GPRI 2017-2020 budget_Neoh.xls100%
New File 1.3 m 202.01 GPRI 2017-2020
budget_reforecast_Neoh.xls100%
New File 3.0 m 205.01 PPC 2017-2021
budget_reforecast_Neoh.xls100%
New File 128970 301 List of PSAs with Contract Capacity
in MW.pdf100%
New File 19185 ADIA-Logo-360x200.png100%
New File 1.9 m Annual Report.pdf100%
New File 1.0 m Asset Information.xlsx100%
New File 17121 Electrical.docx100%
New File 170281 Master Spreadsheet.xlsx100%
New File 274709 Master Spreadsheet_v2.xlsx100%
New File 121601 Meralco Distribution Service.pdf100%
New File 1013229 Meralco Shareholding Structure.pdf100%
New File 146147 Plant assumptions_TLG 070417_neoh.docx
100%
New File 4.7 m Project Beagle - Report Template.docx100%

New File 1.3 m Project Beagle_Teaser_vF.PDF100%


New File 96518 Risk Register Template_Lighthouse.xlsx
100%
New File 145001 Risk Register
Template_Lighthouse_13Apr_Neoh.xlsx100%
New File 229226 Risk Register
Template_Lighthouse_31Mar.xlsx100%
New File 96517 Risk Register Template_Lighthouse_v2.xlsx
100%
New File 221017 Risk Register Template_Lighthouse_v3.xlsx
100%
New File 66840 Standard Table of Contents.docx100%
New File 18957 Toledo Power Site Visit.docx100%
New File 5.0 m Vol 4 Project Beagle - Global Business
Power (GBP) (Tim, Llewellyn, Gabriel).docx100%
New Dir 2 C:\AdvisianActive\01 Projects\Project
Lighthouse\BACKUP\
New File 3.3 m April 6 Plant Tour Materials - Cebu
Site.pptx100%
New File 1.7 m Cebu Site TSD report.pptx100%
New Dir 0 C:\AdvisianActive\01 Projects\Project
Lighthouse\BACKUP\1. Plant Performance Reports for Plant Operational Plants (2011
to present)\
New Dir 1 C:\AdvisianActive\01 Projects\Project
Lighthouse\BACKUP\1. Plant Performance Reports for Plant Operational Plants (2011
to present)\CEDC\
New File 58394 Plant Performance Reports for CEDC from
(2012 to present).xlsx100%
New Dir 6 C:\AdvisianActive\01 Projects\Project
Lighthouse\BACKUP\1. Plant Performance Reports for Plant Operational Plants (2011
to present)\CPS\
New File 43663 2011 TPC CPS Operational Statistics.xlsx
100%
New File 44306 2012 TPC CPS Operational Statistics.xlsx
100%
New File 44752 2013 TPC CPS Operational Statistics.xlsx
100%
New File 44637 2014 TPC CPS Operational Statistics.xlsx
100%
New File 44686 2015 TPC CPS Operational Statistics.xlsx
100%
New File 44957 2016 TPC CPS Operational Statistics.xlsx
100%
New Dir 2 C:\AdvisianActive\01 Projects\Project
Lighthouse\BACKUP\1. Plant Performance Reports for Plant Operational Plants (2011
to present)\SPS\
New File 40073 2011-2016 SPS TG4 Operational
Statistics.xlsx100%
New File 40009 2011-2016 SPS TG5 Operational
Statistics.xlsx100%
New Dir 0 C:\AdvisianActive\01 Projects\Project
Lighthouse\BACKUP\1. Plant Performance Reports for Plant Operational Plants (2011
to present)\TPC1A\
New Dir 1 C:\AdvisianActive\01 Projects\Project
Lighthouse\BACKUP\MOH REPORT\
New File 12.5 m U3 MOH Accomplishment Report January 14-
Feb.7 2017.docx100%
New Dir 1 C:\AdvisianActive\01 Projects\Project
Lighthouse\BACKUP\PEDC Info\
New File 915585 WESM Registration.pdf100%
New Dir 2 C:\AdvisianActive\01 Projects\Project
Lighthouse\BACKUP\PEDC Info\List of Outages\
New File 302485 PEDC Unit 1 List of Outages 2011-2016.pdf
100%
New File 313238 PEDC Unit 2 List of Outages 2011-2016.pdf
100%
New Dir 12 C:\AdvisianActive\01 Projects\Project
Lighthouse\BACKUP\PEDC Info\Maintenance Activities\
New File 766289 2016 Annual Technical Services Department
Report Annexes.pdf100%
New File 3.8 m 2016 Annual Technical Services Department
Report.pdf100%
New File 914451 PEDC Annual PMS Actual Costing.pptx100%
New File 20911 PEDC Annual PMS Costing.xlsx100%
New File 394855 PEDC New Design of Vortex Finder
Drawing.pdf100%
New File 925289 PEDC U1 Furnace Air Nozzles Report.pdf
100%
New File 2.4 m PEDC U1 Post Project Report on Refractory
Works.pdf100%
New File 609984 PEDC U1 Post Project Report on Thermal
Coat Application Works.pdf100%
New File 592646 PEDC U1 Project Report on Thermal Coat
Application.pdf100%
New File 190305 PEDC U1 Q Map.pdf100%
New File 596980 PEDC U2 Project Report on Thermal Coat
Application.pdf100%
New File 343809 PEDC U2 Q Map.pdf100%
New Dir 10 C:\AdvisianActive\01 Projects\Project
Lighthouse\BACKUP\PEDC Info\Maintenance Activities\PEDC MOH&PMS Executive
Summaries\
New File 134672 Unit-1 2011 PMS ES.pdf100%
New File 262945 Unit-1 2012 PMS ES.pdf100%
New File 126473 Unit-1 2013 PMS ES.pdf100%
New File 104707 Unit-1 2014 PMS ES.pdf100%
New File 43922 Unit-1 2015 MOH ES.pdf100%
New File 127425 Unit-2 2012 PMS ES.pdf100%
New File 98106 Unit-2 2013 PMS ES.pdf100%
New File 243827 Unit-2 2014 PMS ES.pdf100%
New File 202212 Unit-2 2015 PMS ES.pdf100%
New File 108118 Unit-2 2016 MOH ES.pdf100%
New Dir 5 C:\AdvisianActive\01 Projects\Project
Lighthouse\BACKUP\PEDC Info\Monthly Operational Report\
New File 77504 Monthly Operational Report PEDC 12
2012.tif100%
New File 59537 Monthly Operational Report PEDC 12
2013.pdf100%
New File 451727 Monthly Operational Report PEDC 12
2014.pdf100%
New File 51274 Monthly Operational Report PEDC 12
2015.pdf100%
New File 52361 Monthly Operational Report PEDC 12
2016.pdf100%
New Dir 5 C:\AdvisianActive\01 Projects\Project
Lighthouse\BACKUP\PEDC Info\Permits\
New File 1.7 m DENR ECC PEDC.pdf100%
New File 1.1 m DENR PTO PEDC.pdf100%
New File 3.6 m ERC 2016 GCMR and GCIS PEDC.pdf100%
New File 1000018 ERC COC PEDC 1&2.pdf100%
New File 536943 ERC PAO PEDC3.pdf100%
New Dir 12 C:\AdvisianActive\01 Projects\Project
Lighthouse\BACKUP\PEDC Info\QAQC and PLE Activities\
New File 231034 2017 CBM with PM Module and WO.xlsx100%
New File 594432 FIR-QAC-17-001 U1 PMS DEC 2016 - JAN
2017.doc100%
New File 3.4 m FIR-QAC-17-001.pdf100%
New File 30.3 m FIR-QAC-17-002 U1 PMS Dec 25-Jan14 2017
Electrical-NMT.doc100%
New File 1.3 m FIR-QAC-17-002.pdf100%
New File 735212 FIR-QAC-17-003 UTG of unit 1 boiler and
backpass.docx100%
New File 5.5 m FIR-QAC-17-003.pdf100%
New File 164352 FIR-QAC-17-004 LPT of unit 1 Turbine
blade and valve joints of steam drum.doc100%
New File 941986 FIR-QAC-17-004.pdf100%
New File 236032 FIR-QAC-17-005 MPT of unit 1 Daerator
and valve joints of steam drum -.doc100%
New File 1.7 m FIR-QAC-17-005.pdf100%
New File 66048 PEDC PLANT ENGINEERING AND DESIGN-6 Year
PMS Program.xls100%
New Dir 4 C:\AdvisianActive\01 Projects\Project
Lighthouse\BACKUP\PPC & GBHPRI Info\
New File 984650 ERC 2016 GCMR and GCIS GBHPRI.pdf100%
New File 3.7 m ERC 2016 GCMR and GCIS PPC.pdf100%
New File 40407 FUEL DATA (5 years).xlsx100%
New File 915585 WESM Registration.pdf100%
New Dir 3 C:\AdvisianActive\01 Projects\Project
Lighthouse\BACKUP\PPC & GBHPRI Info\GBHPRI Permits\
New File 1.1 m DENR ECC GBHPRI.pdf100%
New File 1.1 m DENR PTO GBHPRI.PDF100%
New File 589111 ERC COC GBHPRI.pdf100%
New Dir 5 C:\AdvisianActive\01 Projects\Project
Lighthouse\BACKUP\PPC & GBHPRI Info\Monthly Operational Report\
New File 1.8 m 2012 PPC & GBHPRI Plant MOR.PDF100%
New File 2.4 m 2013 PPC & GBHPRI Plant MOR.PDF100%
New File 264558 2014 PPC & GBHPRI Plant MOR.PDF100%
New File 223344 2015 PPC & GBHPRI Plant MOR.PDF100%
New File 2.4 m 2016 PPC & GBHPRI Plant MOR.PDF100%
New Dir 6 C:\AdvisianActive\01 Projects\Project
Lighthouse\BACKUP\PPC & GBHPRI Info\Plant Outages\
New File 199844 2012 PPC & GBH Summary of Outages.pdf100%

New File 73497 2013 PPC and GBH Summary of Outages.pdf


100%
New File 1.0 m 2014 PPC & GBH Summary of Outages.pdf100%

New File 127674 2015 PPC and GBHPRI Summary of


Outages.pdf100%
New File 136418 2016 PPC and GBHPRI Summary of
Outages.pdf100%
New File 1.1 m 2017 PPC & GBH Summary of Outages.pdf100%

New Dir 5 C:\AdvisianActive\01 Projects\Project


Lighthouse\BACKUP\PPC & GBHPRI Info\PMS Implementation\
New File 141989 PPC & GBH - PMS IMPLEMENTATION 2012.pdf
100%
New File 75268 PPC & GBH - PMS IMPLEMENTATION 2013.pdf
100%
New File 74791 PPC & GBH - PMS IMPLEMENTATION 2014.pdf
100%
New File 68895 PPC & GBH - PMS IMPLEMENTATION 2015.pdf
100%
New File 29565 PPC & GBH - PMS IMPLEMENTATION 2016.pdf
100%
New Dir 9 C:\AdvisianActive\01 Projects\Project
Lighthouse\BACKUP\PPC & GBHPRI Info\PPC Permits\
New File 2.0 m DENR ECC PPC 1&2.pdf100%
New File 3.6 m DENR ECC PPC 3.pdf100%
New File 1.5 m DENR ECC PPC 4.pdf100%
New File 1.0 m DENR PTO PPC 1&2.pdf100%
New File 219187 DENR PTO PPC 3.pdf100%
New File 414929 DENR PTO PPC 4.pdf100%
New File 1.0 m ERC COC PPC 1&2.pdf100%
New File 2.2 m ERC COC PPC 3.pdf100%
New File 2.2 m ERC COC PPC 4.pdf100%
New Dir 1 C:\AdvisianActive\01 Projects\Project
Lighthouse\BACKUP\System Volume Information\
New File 76 IndexerVolumeGuid100%
New Dir 2 C:\AdvisianActive\01 Projects\Project
Lighthouse\Budget from Llewellyn\
New File 89864 Beagle Project structure.pptx100%
New File 21492 Copy of Project Beagle_Budget_R1.xlsx100%

New Dir 4 C:\AdvisianActive\01 Projects\Project Lighthouse\Cebu


Power (CEDC)\
New File 3.3 m April 6 Plant Tour Materials - Cebu
Site.pptx100%
New File 1.7 m Cebu Site TSD report.pptx100%
New File 155691 GBPC Single Line Diagram 2-2-2017.pdf100%

New File 28915 Toledo Power Site Visit TJ_neoh.docx100%

New Dir 0 C:\AdvisianActive\01 Projects\Project Lighthouse\Cebu


Power (CEDC)\1. Plant Performance Reports for Plant Operational Plants (2011 to
present)\
New Dir 1 C:\AdvisianActive\01 Projects\Project Lighthouse\Cebu
Power (CEDC)\1. Plant Performance Reports for Plant Operational Plants (2011 to
present)\CEDC\
New File 58394 Plant Performance Reports for CEDC from
(2012 to present).xlsx100%
New Dir 6 C:\AdvisianActive\01 Projects\Project Lighthouse\Cebu
Power (CEDC)\1. Plant Performance Reports for Plant Operational Plants (2011 to
present)\CPS (Carmen)\
New File 43663 2011 TPC CPS Operational Statistics.xlsx
100%
New File 44306 2012 TPC CPS Operational Statistics.xlsx
100%
New File 44752 2013 TPC CPS Operational Statistics.xlsx
100%
New File 44637 2014 TPC CPS Operational Statistics.xlsx
100%
New File 44686 2015 TPC CPS Operational Statistics.xlsx
100%
New File 44957 2016 TPC CPS Operational Statistics.xlsx
100%
New Dir 2 C:\AdvisianActive\01 Projects\Project Lighthouse\Cebu
Power (CEDC)\1. Plant Performance Reports for Plant Operational Plants (2011 to
present)\SPS\
New File 40073 2011-2016 SPS TG4 Operational
Statistics.xlsx100%
New File 40009 2011-2016 SPS TG5 Operational
Statistics.xlsx100%
New Dir 0 C:\AdvisianActive\01 Projects\Project Lighthouse\Cebu
Power (CEDC)\1. Plant Performance Reports for Plant Operational Plants (2011 to
present)\TPC1A\
New Dir 1 C:\AdvisianActive\01 Projects\Project Lighthouse\Cebu
Power (CEDC)\MOH REPORT\
New File 12.5 m U3 MOH Accomplishment Report January 14-
Feb.7 2017.docx100%
New Dir 2 C:\AdvisianActive\01 Projects\Project
Lighthouse\Panay Power\
New File 162 ~$tes on Site Visit to PEDC and PPC on
Thursday 6 April 2017_neoh.docx100%
New File 38245 Notes on Site Visit to PEDC and PPC on
Thursday 6 April 2017_neoh.docx100%
New Dir 1 C:\AdvisianActive\01 Projects\Project
Lighthouse\Panay Power\PEDC Info\
New File 915585 WESM Registration.pdf100%
New Dir 2 C:\AdvisianActive\01 Projects\Project
Lighthouse\Panay Power\PEDC Info\List of Outages\
New File 302485 PEDC Unit 1 List of Outages 2011-2016.pdf
100%
New File 313238 PEDC Unit 2 List of Outages 2011-2016.pdf
100%
New Dir 12 C:\AdvisianActive\01 Projects\Project
Lighthouse\Panay Power\PEDC Info\Maintenance Activities\
New File 766289 2016 Annual Technical Services Department
Report Annexes.pdf100%
New File 3.8 m 2016 Annual Technical Services Department
Report.pdf100%
New File 914451 PEDC Annual PMS Actual Costing.pptx100%
New File 20911 PEDC Annual PMS Costing.xlsx100%
New File 394855 PEDC New Design of Vortex Finder
Drawing.pdf100%
New File 925289 PEDC U1 Furnace Air Nozzles Report.pdf
100%
New File 2.4 m PEDC U1 Post Project Report on Refractory
Works.pdf100%
New File 609984 PEDC U1 Post Project Report on Thermal
Coat Application Works.pdf100%
New File 592646 PEDC U1 Project Report on Thermal Coat
Application.pdf100%
New File 190305 PEDC U1 Q Map.pdf100%
New File 596980 PEDC U2 Project Report on Thermal Coat
Application.pdf100%
New File 343809 PEDC U2 Q Map.pdf100%
New Dir 10 C:\AdvisianActive\01 Projects\Project
Lighthouse\Panay Power\PEDC Info\Maintenance Activities\PEDC MOH&PMS Executive
Summaries\
New File 134672 Unit-1 2011 PMS ES.pdf100%
New File 262945 Unit-1 2012 PMS ES.pdf100%
New File 126473 Unit-1 2013 PMS ES.pdf100%
New File 104707 Unit-1 2014 PMS ES.pdf100%
New File 43922 Unit-1 2015 MOH ES.pdf100%
New File 127425 Unit-2 2012 PMS ES.pdf100%
New File 98106 Unit-2 2013 PMS ES.pdf100%
New File 243827 Unit-2 2014 PMS ES.pdf100%
New File 202212 Unit-2 2015 PMS ES.pdf100%
New File 108118 Unit-2 2016 MOH ES.pdf100%
New Dir 5 C:\AdvisianActive\01 Projects\Project
Lighthouse\Panay Power\PEDC Info\Monthly Operational Report\
New File 77504 Monthly Operational Report PEDC 12
2012.tif100%
New File 59537 Monthly Operational Report PEDC 12
2013.pdf100%
New File 451727 Monthly Operational Report PEDC 12
2014.pdf100%
New File 51274 Monthly Operational Report PEDC 12
2015.pdf100%
New File 52361 Monthly Operational Report PEDC 12
2016.pdf100%
New Dir 5 C:\AdvisianActive\01 Projects\Project
Lighthouse\Panay Power\PEDC Info\Permits\
New File 1.7 m DENR ECC PEDC.pdf100%
New File 1.1 m DENR PTO PEDC.pdf100%
New File 3.6 m ERC 2016 GCMR and GCIS PEDC.pdf100%
New File 1000018 ERC COC PEDC 1&2.pdf100%
New File 536943 ERC PAO PEDC3.pdf100%
New Dir 12 C:\AdvisianActive\01 Projects\Project
Lighthouse\Panay Power\PEDC Info\QAQC and PLE Activities\
New File 231034 2017 CBM with PM Module and WO.xlsx100%
New File 594432 FIR-QAC-17-001 U1 PMS DEC 2016 - JAN
2017.doc100%
New File 3.4 m FIR-QAC-17-001.pdf100%
New File 30.3 m FIR-QAC-17-002 U1 PMS Dec 25-Jan14 2017
Electrical-NMT.doc100%
New File 1.3 m FIR-QAC-17-002.pdf100%
New File 735212 FIR-QAC-17-003 UTG of unit 1 boiler and
backpass.docx100%
New File 5.5 m FIR-QAC-17-003.pdf100%
New File 164352 FIR-QAC-17-004 LPT of unit 1 Turbine
blade and valve joints of steam drum.doc100%
New File 941986 FIR-QAC-17-004.pdf100%
New File 236032 FIR-QAC-17-005 MPT of unit 1 Daerator
and valve joints of steam drum -.doc100%
New File 1.7 m FIR-QAC-17-005.pdf100%
New File 66048 PEDC PLANT ENGINEERING AND DESIGN-6 Year
PMS Program.xls100%
New Dir 4 C:\AdvisianActive\01 Projects\Project
Lighthouse\Panay Power\PPC & GBHPRI Info\
New File 984650 ERC 2016 GCMR and GCIS GBHPRI.pdf100%
New File 3.7 m ERC 2016 GCMR and GCIS PPC.pdf100%
New File 40407 FUEL DATA (5 years).xlsx100%
New File 915585 WESM Registration.pdf100%
New Dir 3 C:\AdvisianActive\01 Projects\Project
Lighthouse\Panay Power\PPC & GBHPRI Info\GBHPRI Permits\
New File 1.1 m DENR ECC GBHPRI.pdf100%
New File 1.1 m DENR PTO GBHPRI.PDF100%
New File 589111 ERC COC GBHPRI.pdf100%
New Dir 5 C:\AdvisianActive\01 Projects\Project
Lighthouse\Panay Power\PPC & GBHPRI Info\Monthly Operational Report\
New File 1.8 m 2012 PPC & GBHPRI Plant MOR.PDF100%
New File 2.4 m 2013 PPC & GBHPRI Plant MOR.PDF100%
New File 264558 2014 PPC & GBHPRI Plant MOR.PDF100%
New File 223344 2015 PPC & GBHPRI Plant MOR.PDF100%
New File 2.4 m 2016 PPC & GBHPRI Plant MOR.PDF100%
New Dir 6 C:\AdvisianActive\01 Projects\Project
Lighthouse\Panay Power\PPC & GBHPRI Info\Plant Outages\
New File 199844 2012 PPC & GBH Summary of Outages.pdf100%

New File 73497 2013 PPC and GBH Summary of Outages.pdf


100%
New File 1.0 m 2014 PPC & GBH Summary of Outages.pdf100%

New File 127674 2015 PPC and GBHPRI Summary of


Outages.pdf100%
New File 136418 2016 PPC and GBHPRI Summary of
Outages.pdf100%
New File 1.1 m 2017 PPC & GBH Summary of Outages.pdf100%

New Dir 5 C:\AdvisianActive\01 Projects\Project


Lighthouse\Panay Power\PPC & GBHPRI Info\PMS Implementation\
New File 141989 PPC & GBH - PMS IMPLEMENTATION 2012.pdf
100%
New File 75268 PPC & GBH - PMS IMPLEMENTATION 2013.pdf
100%
New File 74791 PPC & GBH - PMS IMPLEMENTATION 2014.pdf
100%
New File 68895 PPC & GBH - PMS IMPLEMENTATION 2015.pdf
100%
New File 29565 PPC & GBH - PMS IMPLEMENTATION 2016.pdf
100%
New Dir 9 C:\AdvisianActive\01 Projects\Project
Lighthouse\Panay Power\PPC & GBHPRI Info\PPC Permits\
New File 2.0 m DENR ECC PPC 1&2.pdf100%
New File 3.6 m DENR ECC PPC 3.pdf100%
New File 1.5 m DENR ECC PPC 4.pdf100%
New File 1.0 m DENR PTO PPC 1&2.pdf100%
New File 219187 DENR PTO PPC 3.pdf100%
New File 414929 DENR PTO PPC 4.pdf100%
New File 1.0 m ERC COC PPC 1&2.pdf100%
New File 2.2 m ERC COC PPC 3.pdf100%
New File 2.2 m ERC COC PPC 4.pdf100%
New Dir 1 C:\AdvisianActive\01 Projects\Project
Lighthouse\SBPL\
New File 1.4 m SBPL Quezon_Project Presentation for Site
Visit-04052017 .pptx100%
New Dir 50 C:\AdvisianActive\01 Projects\Project Lighthouse\Site
Visit Photos\
New File 3.3 m 20170404_131928.jpg100%
New File 3.9 m 20170404_131937.jpg100%
New File 4.3 m 20170404_132209.jpg100%
New File 4.2 m 20170404_132211.jpg100%
New File 3.7 m 20170404_184926.jpg100%
New File 3.2 m 20170404_185521.jpg100%
New File 3.3 m 20170404_185524.jpg100%
New File 4.2 m 20170404_185705.jpg100%
New File 3.0 m 20170404_195438.jpg100%
New File 3.4 m 20170404_195447.jpg100%
New File 3.0 m 20170404_200235.jpg100%
New File 2.9 m 20170404_200259.jpg100%
New File 3.3 m 20170404_200339.jpg100%
New File 4.5 m 20170406_062726.jpg100%
New File 4.5 m 20170406_062729.jpg100%
New File 3.8 m 20170406_062744.jpg100%
New File 5.3 m 20170406_062815.jpg100%
New File 5.8 m 20170406_062817.jpg100%
New File 3.9 m 20170406_162720.jpg100%
New File 4.0 m 20170406_162730.jpg100%
New File 3.6 m 20170406_162738.jpg100%
New File 3.6 m 20170406_162744.jpg100%
New File 3.5 m 20170406_162801.jpg100%
New File 3.8 m 20170406_162806.jpg100%
New File 3.2 m 20170406_162810.jpg100%
New File 3.2 m 20170406_162814.jpg100%
New File 3.2 m 20170406_162817.jpg100%
New File 3.4 m 20170406_162821.jpg100%
New File 3.5 m 20170406_192223.jpg100%
New File 3.7 m 20170407_062333.jpg100%
New File 3.4 m 20170407_064651.jpg100%
New File 3.0 m 20170407_064654.jpg100%
New File 4.6 m 20170407_073233(0).jpg100%
New File 4.2 m 20170407_073233.jpg100%
New File 5.3 m 20170407_073452(0).jpg100%
New File 3.7 m 20170407_075522.jpg100%
New File 3.5 m 20170407_075550.jpg100%
New File 3.4 m 20170407_075551.jpg100%
New File 3.6 m 20170407_075627.jpg100%
New File 3.6 m 20170407_075705.jpg100%
New File 3.4 m 20170407_075723.jpg100%
New File 3.3 m 20170407_075737.jpg100%
New File 3.0 m 20170407_080325_001.jpg100%
New File 2.8 m 20170407_134411.jpg100%
New File 2.9 m 20170407_134412.jpg100%
New File 3.0 m 20170407_134413.jpg100%
New File 3.6 m 20170407_134415.jpg100%
New File 3.5 m 20170407_191544.jpg100%
New File 4.4 m 20170408_111018.jpg100%
New File 4.1 m 20170408_111020.jpg100%
New Dir 25 C:\AdvisianActive\01 Projects\Project Lighthouse\Site
Visit Photos\CEDC\
New File 3.2 m 20170407_104012.jpg100%
New File 3.2 m 20170407_104017.jpg100%
New File 3.2 m 20170407_104041.jpg100%
New File 4.0 m 20170407_104808.jpg100%
New File 3.9 m 20170407_105421.jpg100%
New File 2.0 m 20170407_105826_001.jpg100%
New File 4.5 m 20170407_105835.jpg100%
New File 4.1 m 20170407_110428.jpg100%
New File 4.0 m 20170407_110527.jpg100%
New File 3.8 m 20170407_110627.jpg100%
New File 4.4 m 20170407_110629.jpg100%
New File 4.3 m 20170407_110746.jpg100%
New File 4.1 m 20170407_110813.jpg100%
New File 4.3 m 20170407_110817.jpg100%
New File 4.6 m 20170407_111614.jpg100%
New File 3.9 m 20170407_111819.jpg100%
New File 4.6 m 20170407_111835.jpg100%
New File 2.5 m 20170407_111855.jpg100%
New File 5.4 m 20170407_112245.jpg100%
New File 3.8 m 20170407_112541.jpg100%
New File 3.2 m 20170407_112638_001.jpg100%
New File 4.1 m 20170407_112927.jpg100%
New File 5.4 m 20170407_113203.jpg100%
New File 5.2 m 20170407_113212.jpg100%
New File 5.4 m 20170407_113228.jpg100%
New Dir 35 C:\AdvisianActive\01 Projects\Project Lighthouse\Site
Visit Photos\PEDC\
New File 3.6 m 20170406_105625.jpg100%
New File 3.3 m 20170406_105637.jpg100%
New File 4.9 m 20170406_110007.jpg100%
New File 6.3 m 20170406_110113.jpg100%
New File 6.3 m 20170406_110116.jpg100%
New File 6.6 m 20170406_110120.jpg100%
New File 6.4 m 20170406_110151.jpg100%
New File 4.4 m 20170406_110208.jpg100%
New File 4.6 m 20170406_110550.jpg100%
New File 4.8 m 20170406_110915.jpg100%
New File 3.9 m 20170406_111137.jpg100%
New File 3.9 m 20170406_111141.jpg100%
New File 3.8 m 20170406_111411.jpg100%
New File 4.9 m 20170406_111811.jpg100%
New File 3.6 m 20170406_111816.jpg100%
New File 4.7 m 20170406_111954.jpg100%
New File 4.5 m 20170406_112134.jpg100%
New File 4.6 m 20170406_112135.jpg100%
New File 4.6 m 20170406_112155.jpg100%
New File 4.1 m 20170406_112410.jpg100%
New File 4.2 m 20170406_112518.jpg100%
New File 4.5 m 20170406_112610.jpg100%
New File 4.4 m 20170406_112743.jpg100%
New File 4.2 m 20170406_112842.jpg100%
New File 3.6 m 20170406_112849.jpg100%
New File 4.8 m 20170406_112917.jpg100%
New File 3.7 m 20170406_114652.jpg100%
New File 3.2 m 20170406_114722.jpg100%
New File 4.0 m 20170406_115126.jpg100%
New File 3.5 m 20170406_115447.jpg100%
New File 2.1 m 20170406_115454.jpg100%
New File 4.4 m 20170406_115702.jpg100%
New File 5.3 m 20170406_120011.jpg100%
New File 5.4 m 20170406_120012.jpg100%
New File 4.5 m 20170406_134228.jpg100%
New Dir 11 C:\AdvisianActive\01 Projects\Project Lighthouse\Site
Visit Photos\PPC\
New File 3.8 m 20170406_134354.jpg100%
New File 5.4 m 20170406_134426.jpg100%
New File 5.2 m 20170406_134433.jpg100%
New File 4.5 m 20170406_134508.jpg100%
New File 4.3 m 20170406_135113.jpg100%
New File 4.4 m 20170406_135242.jpg100%
New File 3.8 m 20170406_135311.jpg100%
New File 3.7 m 20170406_135413.jpg100%
New File 4.7 m 20170406_135609.jpg100%
New File 4.1 m 20170406_135639.jpg100%
New File 4.2 m 20170406_140504.jpg100%
New Dir 5 C:\AdvisianActive\01 Projects\Project Lighthouse\Site
Visit Photos\SBPL Site Visit\
New File 4.1 m 20170405_110908.jpg100%
New File 4.1 m 20170405_110921.jpg100%
New File 4.7 m 20170405_111126.jpg100%
New File 5.1 m 20170405_111915.jpg100%
New File 4.9 m 20170405_112557.jpg100%
New Dir 17 C:\AdvisianActive\01 Projects\Project Needle\
New File 162 ~$170123 Project Needle Proposal
FFFF.docx100%
New File 4.7 m 20170109 Briefing on Reimagining TNB to
Tech Advisor.pptx100%
New File 5.0 m 20170123 Project Needle Proposal
FFFF.docx100%
New File 129482 20170208 Repowering Plan.pdf100%
New File 21574 20170225 Financial Inputs_neoh.xlsx100%
New File 1.0 m Agenda Advisian.docx100%
New File 20280 Gaps in the Report.docx100%
New File 1.0 m KEV - Plant Information.docx100%
New File 19349 Project Needle Site Visit Plan_7 Feb 2017
v1.xlsx100%
New File 26332 Project Needle Technical Document Request
List_9 Feb 2016.xlsx100%
New File 304109 Project Needle_Execution
Plan_25012017_V1.pdf100%
New File 1.0 m Project Needle_Site Visit Questionnaire
and WalkDown List_V3.xlsx100%
New File 1.0 m Project Needle_Site Visit Questionnaire
and WalkDown List_V4.xlsx100%
New File 76320 REAP_04042017_Capacity Factor for TNB
Power Plants (2017-2036)_latest run.xlsx100%
New File 105472 Report Submission Cover Letter.doc100%
New File 194168 Report Submission Cover Letter.pdf100%
New File 1.0 m TNB Janamanjung - Plant Information.docx
100%
New Dir 1 C:\AdvisianActive\01 Projects\Project Needle\Advisors
Meeting (26 Jan)\
New File 4.6 m Project Needle - Advisors Briefing -
20170126 v4.pptx100%
New Dir 0 C:\AdvisianActive\01 Projects\Project Needle\Asset
Data Extraction\
New Dir 0 C:\AdvisianActive\01 Projects\Project Needle\Asset
Data Extraction\Team 1\
New Dir 0 C:\AdvisianActive\01 Projects\Project Needle\Asset
Data Extraction\Team 1\SJ Serdang (Putrajaya)\
New Dir 0 C:\AdvisianActive\01 Projects\Project Needle\Asset
Data Extraction\Team 1\SJ Sultan Iskandar (Johor)\
New Dir 0 C:\AdvisianActive\01 Projects\Project Needle\Asset
Data Extraction\Team 1\SJ Tuanku Jaafar (Negeri Sembilan)\
New Dir 0 C:\AdvisianActive\01 Projects\Project Needle\Asset
Data Extraction\Team 1\SJCB Connaught Bridge (Selangor)\
New Dir 0 C:\AdvisianActive\01 Projects\Project Needle\Asset
Data Extraction\Team 2\
New Dir 0 C:\AdvisianActive\01 Projects\Project Needle\Asset
Data Extraction\Team 2\SJ Gelugor\
New Dir 0 C:\AdvisianActive\01 Projects\Project Needle\Asset
Data Extraction\Team 2\SJ Sultan Ismail (PAKA)\
New Dir 0 C:\AdvisianActive\01 Projects\Project Needle\Asset
Data Extraction\Team 2\TNB Prai\
New Dir 0 C:\AdvisianActive\01 Projects\Project Needle\Asset
Data Extraction\Team 3\
New Dir 0 C:\AdvisianActive\01 Projects\Project Needle\Asset
Data Extraction\Team 3\KEV\
New Dir 0 C:\AdvisianActive\01 Projects\Project Needle\Asset
Data Extraction\Team 3\TNB Janamanjung\
New Dir 0 C:\AdvisianActive\01 Projects\Project Needle\Asset
Data Extraction\Team 4\
New Dir 0 C:\AdvisianActive\01 Projects\Project Needle\Asset
Data Extraction\Team 4\SSJ Bersia & Temenggor\
New Dir 0 C:\AdvisianActive\01 Projects\Project Needle\Asset
Data Extraction\Team 4\SSJ Cameron Highlands\
New Dir 0 C:\AdvisianActive\01 Projects\Project Needle\Asset
Data Extraction\Team 4\SSJ Kenyir\
New Dir 0 C:\AdvisianActive\01 Projects\Project Needle\Asset
Data Extraction\Team 4\SSJ Pergau\
New Dir 1 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\
New File 14196 List of Generation Document rev i.xlsx
100%
New Dir 0 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\
New Dir 0 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Accounting\
New Dir 0 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Accounting\Annual Return\
New Dir 0 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Accounting\Audit Financial Statement\
New Dir 1 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Accounting\Division Account\
New File 467524 DA Period 11 Report for FY2016
(Generation).pdf100%
New Dir 0 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Accounting\Financial Projection\
New Dir 0 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Accounting\Management Account\
New Dir 0 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Agreements\
New Dir 0 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Agreements\EPC\
New Dir 1 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Agreements\GSA\
New File 18.5 m GSA Final_signed stamped copy.pdf100%
New Dir 0 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Agreements\LLA\
New Dir 0 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Agreements\LTMP\
New Dir 5 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Agreements\LTMP\Final LTMP II Agreement\
New File 1.3 m Part 1.pdf100%
New File 4.2 m Part 2.pdf100%
New File 2.6 m Part 3.pdf100%
New File 2.5 m Part 4.pdf100%
New File 1.7 m Part 5.pdf100%
New Dir 5 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Agreements\LTMP\LTMP for SJ Tuanku Jaafar\
New File 1.3 m Part 1.pdf100%
New File 4.2 m Part 2.pdf100%
New File 2.6 m Part 3.pdf100%
New File 2.5 m Part 4.pdf100%
New File 1.7 m Part 5.pdf100%
New Dir 12 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Agreements\O&M\
New File 9.5 m Appendix A.pdf100%
New File 304240 Appendix B.pdf100%
New File 395335 Appendix C.pdf100%
New File 172297 Appendix D.pdf100%
New File 370283 Appendix E.pdf100%
New File 444080 Appendix F.pdf100%
New File 26.4 m Continues of Schedule A.pdf100%
New File 13.2 m Contract Agreement TNB 346-2014.pdf100%
New File 413335 Flowchart Remaco SCM.pdf100%
New File 9.1 m MSA Contract Agreement TNB 346-2014 MSA -
No Figure 1.pdf100%
New File 26.5 m Schedule A.pdf100%
New File 4.1 m Schedule B.pdf100%
New Dir 1 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Agreements\PSA\
New File 889944 Parts and Services Agreement between TNB
REMACO and GE Energy Parts International and GE Power System (Malaysia) and%.pdf
100%
New Dir 2 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Agreements\SLA\
New File 3.8 m CAMERON HIGHLANDS SLA.pdf100%
New File 32.0 m HULU TERENGGANU SLA.pdf100%
New Dir 14 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Agreements\SLA\SLA SJ Connaught Bridge\
New File 1.2 m 3_CBPS_3rd Letter_28Sep2014.pdf100%
New File 755894 Appendix A.pdf100%
New File 813977 Appendix B.pdf100%
New File 667072 Appendix C.pdf100%
New File 198295 Appendix D.pdf100%
New File 270385 Appendix E.pdf100%
New File 112627 Appendix F.pdf100%
New File 1010025 Appendix G.pdf100%
New File 122931 Appendix H.pdf100%
New File 59586 Appendix I.pdf100%
New File 99642 Appendix J.pdf100%
New File 198517 Appendix L.pdf100%
New File 5.7 m CBPS.rar100%
New File 2.1 m SLA TD & GD CBS.pdf100%
New Dir 14 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Agreements\SLA\SLA SJ Putrajaya\
New File 353420 Appendix A.pdf100%
New File 637464 Appendix B.pdf100%
New File 677866 Appendix C.pdf100%
New File 192673 Appendix D.pdf100%
New File 287917 Appendix E.pdf100%
New File 16329 Appendix F.pdf100%
New File 576356 Appendix G.pdf100%
New File 127419 Appendix H.pdf100%
New File 60552 Appendix I.pdf100%
New File 102447 Appendix J.pdf100%
New File 150420 Appendix L.pdf100%
New File 61359 PJPS GT4 & GT5 10 yr Extension - Offer
Letter from EC.pdf100%
New File 281069 PJPS GT4 & GT5 Supplemental Agreement.pdf
100%
New File 1.6 m SLA TD &GD SJ Putrajaya.pdf100%
New Dir 7 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Agreements\SLA\SLA SJ Sultan Mahmud Kenyir\
New File 598678 App A.pdf100%
New File 1.2 m App B.pdf100%
New File 857874 App C & D.pdf100%
New File 1.2 m App E & G.pdf100%
New File 2.0 m App H, I & L.pdf100%
New File 133728 Exhibit.pdf100%
New File 3.1 m Main Body.pdf100%
New Dir 14 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Agreements\SLA\SLA SJ Sungai Perak\
New File 973906 Appendix B.pdf100%
New File 278839 Appendix C.pdf100%
New File 203347 Appendix D.pdf100%
New File 239777 Appendix E.pdf100%
New File 472179 Appendix G.pdf100%
New File 133677 Appendix H.pdf100%
New File 76735 Appendix I.pdf100%
New File 195545 Appendix L.pdf100%
New File 178130 Contents SLA Between PD & GD.pdf100%
New File 41937 Exhibit 2.pdf100%
New File 27457 Exhibit 3.pdf100%
New File 75844 Exhibit 4.pdf100%
New File 4.5 m PGAU.rar100%
New File 1.8 m SLA Agreement.pdf100%
New Dir 1 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Agreements\SLA\SLA SJ Sungai Perak\SJ Pergau\
New File 352068 Appendix A.pdf100%
New Dir 0 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Agreements\SLA\SLA SJSI Pasir Gudang\
New Dir 0 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Agreements\SLA\SLA TJPS Port Dickson\
New Dir 6 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Agreements\SLA\SLA TJPS Port Dickson\SLA TJPS
GF1\
New File 14.0 m 4344_001.pdf100%
New File 2.1 m 4344_033.pdf100%
New File 2.1 m 4344_072.pdf100%
New File 2.1 m 4344_108.pdf100%
New File 2.1 m 4344_146.pdf100%
New File 1.2 m 4344_173.pdf100%
New Dir 15 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Agreements\SLA\SLA TJPS Port Dickson\SLA TJPS
GF2\
New File 1.2 m Appendix A.pdf100%
New File 2.0 m Appendix B.pdf100%
New File 682740 Appendix C.pdf100%
New File 281002 Appendix D.pdf100%
New File 2.4 m Appendix E.pdf100%
New File 78058 Appendix F.pdf100%
New File 1.5 m Appendix G.pdf100%
New File 201086 Appendix H.pdf100%
New File 104606 Appendix I.pdf100%
New File 165426 Appendix J.pdf100%
New File 263970 Appendix L.pdf100%
New File 214378 Exhibit.pdf100%
New File 2.2 m Main Body.pdf100%
New File 321810 PD2 COD.pdf100%
New File 10.5 m PORT DICKSON2 SLA.pdf100%
New Dir 17 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Agreements\State Water Agreements\
New File 2.3 m Agreement - State & LLN.pdf100%
New File 212331 Batang Padang Hydro-Electric Scheme
Agreement.pdf100%
New File 813027 Batang Padang Supplimentary Agreement.PDF
100%
New File 676293 Bersia Hydro-Electric Project
Agreement.pdf100%
New File 617705 Bersia Supplimentary Agreement.pdf100%
New File 1.9 m CAMERON HIGHLANDS HYDRO-ELECTRIS
SCHEME.pdf100%
New File 646681 Chenderoh Hydro-Electric Scheme
Agreement.pdf100%
New File 505172 Chenderoh Supplimentary Agreement.pdf100%

New File 1.0 m Kajian Semula bayaran Tahunan Untuk


Penjanaan Elekt Oleh Tnb bg SJ Sultan Mahmud Kenyir.pdf100%
New File 731637 Kenering Hydro-Electric Project
Agreement.pdf100%
New File 784892 Kenering Supplimentary Agreement.pdf100%

New File 1.1 m pergau agreement.pdf100%


New File 1.8 m Perjanjian Tambahan Kedua Royalti
Penggunaan Air SJSM Kenyir.pdf100%
New File 1.2 m Sg. Piah Agreement.pdf100%
New File 1.7 m Temengor agreement.pdf100%
New File 1.2 m Temengor Hydro-Electricity Scheme
Agreement.pdf100%
New File 839737 Temengor Supplimentary Agreement.pdf100%

New Dir 1 C:\AdvisianActive\01 Projects\Project


Needle\Dataroom\Generation 08 FEb\Asset Management Plan (AMP)\
New File 230582 AMP for AM Department 2017 - final.xlsx
100%
New Dir 5 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Asset Management Plan (AMP)\AMP SJ Gelugor\
New File 3.4 m AMP FY1617.pdf100%
New File 421888 Copy of Copy of Copy of Copy of GAMM -10
years service delivery plan 11th March 2016.xls100%
New File 22427 SJ Gelugor Annex C Asset
ManagementPerformance Measures and Targets_28012016.docx100%
New File 19311 SJ Gelugor Annex G Asset Management
Continual Improvement Checklist (2) (2).docx100%
New File 17533 SJ Gelugor Annex H Service Level Measures
and Targets (2).docx100%
New Dir 5 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Asset Management Plan (AMP)\AMP SJ Putrajaya\
New File 842459 AMP FY1516 Rev02 Signed.pdf100%
New File 282370 Annex C.pdf100%
New File 40025 Annex G Asset Management Continual
Improvement Checklist FY17.pdf100%
New File 40920 Annex H Service Level Measures and
Targets FY17.pdf100%
New File 308736 PJPS GAMM - AMP FY1516 rev03.xls100%
New Dir 4 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Asset Management Plan (AMP)\AMP SJCB\
New File 19430 Annex C Asset ManagementPerformance
Measures and Targets.docx100%
New File 17522 Annex G Asset Management Continual
Improvement Checklist.docx100%
New File 14571 Annex H Service Level Measures and
Targets.docx100%
New File 389120 SJJC_Strategic Asset Management Plan
FY14-18 review 19_02_2016.xls100%
New Dir 6 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Asset Management Plan (AMP)\AMP SJCH\
New File 56533 AMP CHPS 16 rev2.xlsx100%
New File 76369 AMP CHPS 16 rev3.xlsx100%
New File 20338 Annex C Asset ManagementPerformance
Measures and Targets - CHPS 16.docx100%
New File 26618 Annex G Asset Management Continual
Improvement Checklist - SJJCH Overall.docx100%
New File 19856 Annex H Service Level Measures and
Targets.docx100%
New File 28103 Project List CHPS 16 Rev 2.xlsx100%
New Dir 3 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Asset Management Plan (AMP)\AMP SJSI Paka\
New File 132477 SJSI PAKA AMP FY16-17- Revised.xlsx100%
New File 14843 SJSI Paka Annex G Asset Management
Continual Improvement Checklist October __Submission.docx100%
New File 17710 SJSI Paka Annex H Service Level Measures
and Targets Oct _Submission.docx100%
New Dir 3 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Asset Management Plan (AMP)\AMP SJSI Pasir
Gudang\
New File 15680 Annex G Asset Management Continual
Improvement Checklist.docx100%
New File 14521 Annex H Service Level Measures and
Targets.docx100%
New File 359424 SJSI PG AMP - Service Delivery Plan as
4.4.2016.xls100%
New Dir 0 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Asset Management Plan (AMP)\AMP SJSM Kenyir\
New Dir 5 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Asset Management Plan (AMP)\AMP SJTJ Port
Dickson\
New File 636116 AMP_TJPS.pptx100%
New File 18911 Annex C Asset ManagementPerformance
Measures and Targets oct 2016.docx100%
New File 18679 Annex G Asset Management Continual
Improvement Checklist oct 2016.docx100%
New File 17541 Annex H Service Level Measures and
Targets update Oct 2016.docx100%
New File 344064 Copy of TJPS Asset Management Plan (10-
Year)-update Oct 16.xls100%
New Dir 5 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Asset Management Plan (AMP)\AMP SSJ Sungai Perak\
New File 359424 AMP Template FY2016 - FY2026 rev 1.xls
100%
New File 16423 Annex C Asset ManagementPerformance
Measures and Targets.docx100%
New File 21155 Annex G Asset Management Continual
Improvement Checklist_SGPK.docx100%
New File 15537 Annex H Service Level Measures and
Targets.docx100%
New File 18632 Annex H Service Level Measures and
Targets_FY2016.docx100%
New Dir 5 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Asset Management Plan (AMP)\Revised AMP Document
for 5 stations\
New File 14439 Annex H Service Level Measures and
Targets - PGPS.docx100%
New File 18905 Annex H Service Level Measures and
Targets SJSM Kenyir 2017.docx100%
New File 14682 Annex H Service Level Measures and
Targets-FY1617 CBPS.docx100%
New File 16039 CHPS Annex H Service Level Measures and
Targets.docx100%
New File 15099 SJ Gelugor Annex H Service Level Measures
and Targets GLGR.docx100%
New Dir 0 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Financial\
New Dir 0 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Financial\Corporate Financing\
New Dir 0 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Financial\Financial Model\
New Dir 0 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Financial\Financial Model\DSPM\
New Dir 2 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Financial\Generation EBIT, R&M and Budget\
New File 408726 EBITDA R&M and BUDGET.xlsx100%
New File 16879 PM & CM Cost.xlsx100%
New Dir 0 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Financial\Project Financing\
New Dir 0 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Financial\Treasury\
New Dir 0 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Generation Division Organizational Structure\
New Dir 7 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Generation Division Organizational
Structure\Organisation Structure Generation Divison\
New File 978744 11. Kelulusan JTK Struktur Aset Operasi&
Aset Mgmt.pdf100%
New File 171520 3. AO Structure Tree (ORI) lulus
01.08.2013.vsd100%
New File 151040 4. AM Structure Tree (ORI) Lulus
01.08.2013.vsd100%
New File 69338 Approved HQ Gen Struktur Organisasi Makro
Penjanaan.pdf100%
New File 79354 Kelulusan SMOD PMO.pdf100%
New File 79229 SMOD 01012015.PDF100%
New File 69338 Struktur Organisasi Makro Penjanaan.pdf
100%
New Dir 2 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Generation Division Organizational
Structure\Organisation Structure SJ Gelugor\
New File 94141 Approved non Exec SJ Gelugur 10072015.pdf
100%
New File 182548 Gelugor PS Org Chart Exec.jpg100%
New Dir 2 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Generation Division Organizational
Structure\Organisation Structure SJCB Klang\
New File 1008828 Approved Structure Stesen Jambatan
Connaught - 01.01.2015.pdf100%
New File 135460 CBPS Non Exec Approved by EC Nov14.pdf
100%
New Dir 2 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Generation Division Organizational
Structure\Organisation Structure SJCH\
New File 145392 Approved Exec Structure Cameron Highlands
by Group.pdf100%
New File 296448 Final Cadangan Non Exec Structure Ulu
Jelai 31102014 - Dispensary Amendments with names.vsd100%
New Dir 2 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Generation Division Organizational
Structure\Organisation Structure SJSI Paka\
New File 21118 SJ_Paka_new Org Struc as at June 2014.pdf
100%
New File 357376 Structure Of Paka_Non Exec as of April
2015.vsd100%
New Dir 2 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Generation Division Organizational
Structure\Organisation Structure SJSI Pasir Gudang\
New File 347136 Non Exec - SJSIP Gudang Dec2015.vsd100%

New File 53760 struktur organisasi Eksekutif Pasir


Gudang 2014.xls100%
New Dir 3 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Generation Division Organizational
Structure\Organisation Structure SJSM Kenyir\
New File 147166 Approved Exec Structure Sultan Mahmud
Kenyir by Group.pdf100%
New File 206369 SJSM Kenyir_Exec_Organizational Structure
with Names_Apr 2015.jpg100%
New File 298141 SJSM Kenyir_Non Exec_Organizational
Structure with Names.jpg100%
New Dir 2 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Generation Division Organizational
Structure\Organisation structure SJTJ Port Dickson\
New File 74879 TJPS Executive Organisational Structure
with Names, 19 Jan 2015.pdf100%
New File 128417 TJPS Non Executive Organisational
Structure with Names, 5 Jan 2015.pdf100%
New Dir 2 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Generation Division Organizational
Structure\Organisation Structure SSJ Sungai Perak\
New File 90933 SSJ SG Perak Approved Exec Structure
071014.pdf100%
New File 61780 Structure SSJ Sg Perak Non Exec.pptx100%

New Dir 1 C:\AdvisianActive\01 Projects\Project


Needle\Dataroom\Generation 08 FEb\Generation Division Organizational
Structure\Organisational Structure SJ Putrajaya\
New File 35351 PJPS 2014 structure (June)- no name.pdf
100%
New Dir 3 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Generation Division Performance Report\
New File 8.1 m Generation Division Annual report FY
2016.pdf100%
New File 7.0 m GENERATION DIVISION ANNUAL REPORT FY2014
Draft.pdf100%
New File 4.8 m Generation Division Annual Report
FY2015.pdf100%
New Dir 1 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Generation Division Performance Report\Asset
Management Implementation Plan to Energy Comission\
New File 6.7 m Asset Management Implementation Plan
Report 2015.pdf100%
New Dir 1 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Generation Division Performance Report\Asset
Management Performance Report to Energy Comission\
New File 2.0 m GD Asset Performance Report FY2015.pdf
100%
New Dir 1 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Generation Division Performance Report\GD
Strategic Asset Management Plan\
New File 5.1 m TNB Generation Division SAMP.pdf100%
New Dir 4 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Generation Transformation\
New File 1.4 m 20150618 Gen Transformation - Progress
Update Report to Steering Committee.pdf100%
New File 1.9 m 20150812 Gen Transformation - Progress
Update Report to Steering Committee.pdf100%
New File 39790 20161212 List of Power Plants and PPA
Expiry Date.pdf100%
New File 28815 20161212 TNB EBITDA per MW Analysis.pdf
100%
New Dir 0 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Health Safety and Environment (HSE)\
New Dir 2 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Health Safety and Environment (HSE)\Accidents
Description and Audit Score\
New File 241537 MAKLUMAT KEMALANGAN A_KERJA TNB TNBG 2011
- 2016.xlsx100%
New File 234318 Score SEMS for all power plants and
remaco_2013.pdf100%
New Dir 0 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Health Safety and Environment (HSE)\HSE
Performance Reports\
New Dir 2 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Health Safety and Environment (HSE)\HSE
Performance Reports\FY 2014_2015\
New File 142336 1._EC_Report_2015_GEN.xls100%
New File 757107 LAPORAN_ST__2015_v3a.pdf100%
New Dir 1 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Health Safety and Environment (HSE)\HSE
Performance Reports\FY 2015_2016\
New File 1.7 m LAPORAN ST 2016 V3.pdf100%
New Dir 9 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Health Safety and Environment (HSE)\HSE
Statistical Data (SLA Plants)\
New File 160659 Statistical SJ Cameron Highlands.xlsx100%

New File 173380 Statistical SJ Connaught Bridge.xlsx100%

New File 155935 Statistical SJ Gelugor.xlsx100%


New File 386560 Statistical SJ Putrajaya.xls100%
New File 654848 Statistical SJ Sultan Iskandar Pasir
Gudang.xls100%
New File 1.5 m Statistical SJ Sultan Ismail Paka.xls100%

New File 2.9 m Statistical SJ Sultan Mahmud Kenyir.xlsx


100%
New File 4.8 m Statistical SJ Sungai Perak.xls100%
New File 265252 Statistical SJ Tuanku Jaafar PD.xlsx100%

New Dir 0 C:\AdvisianActive\01 Projects\Project


Needle\Dataroom\Generation 08 FEb\Legal\
New Dir 0 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Legal\Assets\
New Dir 0 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Legal\Assets\Encumbrances & Caveat\
New Dir 0 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Legal\Assets\Land Property Development Agreement\
New Dir 0 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Legal\Assets\Land Title\
New Dir 0 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Legal\Assets\Lease Agreement\
New Dir 17 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Legal\Assets\State Water Agreement\
New File 2.3 m Agreement - State & LLN.pdf100%
New File 212331 Batang Padang Hydro-Electric Scheme
Agreement.pdf100%
New File 813027 Batang Padang Supplimentary Agreement.PDF
100%
New File 676293 Bersia Hydro-Electric Project
Agreement.pdf100%
New File 617705 Bersia Supplimentary Agreement.pdf100%
New File 1.9 m CAMERON HIGHLANDS HYDRO-ELECTRIS
SCHEME.pdf100%
New File 646681 Chenderoh Hydro-Electric Scheme
Agreement.pdf100%
New File 505172 Chenderoh Supplimentary Agreement.pdf100%

New File 1.0 m Kajian Semula bayaran Tahunan Untuk


Penjanaan Elekt Oleh Tnb bg SJ Sultan Mahmud Kenyir.pdf100%
New File 731637 Kenering Hydro-Electric Project
Agreement.pdf100%
New File 784892 Kenering Supplimentary Agreement.pdf100%

New File 1.1 m pergau agreement.pdf100%


New File 1.8 m Perjanjian Tambahan Kedua Royalti
Penggunaan Air SJSM Kenyir.pdf100%
New File 1.2 m Sg. Piah Agreement.pdf100%
New File 1.7 m Temengor agreement.pdf100%
New File 1.2 m Temengor Hydro-Electricity Scheme
Agreement.pdf100%
New File 839737 Temengor Supplimentary Agreement.pdf100%

New Dir 0 C:\AdvisianActive\01 Projects\Project


Needle\Dataroom\Generation 08 FEb\Legal\Assets\Summary of Freehold & Leasehold
Agreement\
New Dir 0 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Legal\Assets\Tenancy Agreement\
New Dir 0 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Legal\Assets\Way Leave & Right of Way Agreement\
New Dir 0 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Legal\Contract\
New Dir 0 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Legal\Contract\Agreement exceeding threshold\
New Dir 0 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Legal\Contract\Joint Development Agreement\
New Dir 0 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Legal\Contract\Joint Venture Agreement\
New Dir 0 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Legal\Contract\Memorandum of Understanding\
New Dir 0 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Legal\Contract\Shareholder's Agreement\
New Dir 0 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Legal\Corporate Document\
New Dir 0 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Legal\Insurance\
New Dir 0 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Legal\Intellectual Properties Document\
New Dir 0 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Legal\Intellectual Properties Document\TNB's
Registered Trade Marks\
New Dir 2 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Legal\License\
New File 1.6 m New Generating License ST 2014.pdf100%
New File 4.9 m TNB HULU TERENGGANU LICENSE
LA12_1_1_39(G) wef 20082015.pdf100%
New Dir 0 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Legal\Litigation\
New Dir 0 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Legal\Litigation\List of Panel Lawyers\
New Dir 0 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Legal\Litigation\Material Litigation\
New Dir 0 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Operation Plans\
New Dir 5 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Operation Plans\Approved Plan Outage Schedule\
New File 741513 Approved Planned Outage Schedule
CY2015.pdf100%
New File 799058 Approved Planned Outage Schedule
CY2016.pdf100%
New File 907379 Approved Planned Outage Schedule for
CY2014.pdf100%
New File 1.5 m POS 2016 - 2017.pdf100%
New File 3.5 m TNBG.pdf100%
New Dir 7 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Operation Plans\Plants Outage Monitoring\
New File 45602 Generation Division Outage Monitoring
FY1011-1.xlsx100%
New File 27485 Generation Division Outage Monitoring
FY1112.xlsx100%
New File 44026 Generation Division Outage Monitoring
FY1213.xlsx100%
New File 64263 Generation Division Outage Monitoring
FY1314.xlsx100%
New File 47245 Generation Division Outage Monitoring
FY1415.xlsx100%
New File 20707 Generation Division Outage Monitoring
FY1516 - (Sep - Dec) Finance.xlsx100%
New File 210258 TNBG_POSCY2017-2021_Rev1 6 dec.xlsx100%
New Dir 0 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Performance Report\
New Dir 9 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Performance Report\Annual Reports\
New File 6.4 m Generation Division Annual Report
2008.pdf100%
New File 5.9 m Generation Division Annual Report
2011.pdf100%
New File 8.1 m Generation Division Annual report FY
2016.pdf100%
New File 3.0 m Generation Division Annual Report
FY2009.pdf100%
New File 3.7 m Generation Division Annual report
FY2010.pdf100%
New File 7.0 m Generation Division Annual report
FY2014.pdf100%
New File 4.8 m Generation Division Annual Report
FY2015.pdf100%
New File 5.5 m TNB Annual Report FY 2012.pdf100%
New File 5.2 m TNB Annual Report FY2013.pdf100%
New Dir 1 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Performance Report\Asset Management
Implementation Plan to Energy Comission\
New File 6.7 m Asset Management Implementation Plan
Report 2015.pdf100%
New Dir 1 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Performance Report\Asset Management Performance
Report to Energy Comission\
New File 2.0 m GD Asset Performance Report FY2015.pdf
100%
New Dir 1 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Performance Report\Strategic Asset Management
Plan\
New File 5.1 m TNB Generation Division SAMP.pdf100%
New Dir 0 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Tax\
New Dir 0 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Tax\GST Payment\
New Dir 0 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Tax\GST Return\
New Dir 0 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Tax\Income Tax Payment\
New Dir 0 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Tax\Income Tax Return\
New Dir 0 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Tax\Tax Audit\
New Dir 0 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Tax\Tax Estimates\
New Dir 0 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Tax\Tax Exemption Incentive\
New Dir 0 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Tax\Withholding Tax\
New Dir 6 C:\AdvisianActive\01 Projects\Project
Needle\Dataroom\Generation 08 FEb\Valuer Report (Power Plant)\
New File 1.5 m 3441_002.pdf100%
New File 629918 3442_001.pdf100%
New File 3.1 m CV SJ CONNAUGHT BRIDGE.pdf100%
New File 2.6 m CV SJ SULTAN ISKANDAR P.GUDANG.pdf100%
New File 3.3 m CV SJ TUANKU JAAFAR P.DICKSON.pdf100%
New File 792324 CV TANJONG 12, SEPANG POWER.pdf100%
New Dir 1 C:\AdvisianActive\01 Projects\Project Needle\FM
Models from Maybank\
New File 6.2 m Project Needle - GenCo Model_Second
Draft_Advisian.xlsx100%
New Dir 7 C:\AdvisianActive\01 Projects\Project Needle\KPI
Templates\
New File 39741 1.0 Asset X - Plant Information.xlsx100%

New File 1.0 m 2.0 Asset X - PPA.xlsx100%


New File 1.0 m 3.0 Asset X - O&M Evaluation.xlsx100%
New File 1.0 m 4.0 Asset X - Lost Production Data.xlsx
100%
New File 1.0 m 5.0 Asset X - LTSA Evaluation.xlsx100%
New File 32791 6.0 Asset X - FSA_CSA_Coal.xlsx100%
New File 31953 6.0 Asset X - FSA_GSA_Gas.xlsx100%
New Dir 1 C:\AdvisianActive\01 Projects\Project Needle\LTSA
Review\
New File 251 Notes.txt100%
New Dir 4 C:\AdvisianActive\01 Projects\Project Needle\LTSA
Review\Reference Files\
New File 60037 comments on LTSA DR.docx100%
New File 10987 costs ltsa R1.xlsx100%
New File 3.0 m DD MEPE Myanmar Thaketa 151109 final
draft+rk.docx100%
New File 524288 Jacobs comments CSA_PUP7_ENAP - Aconcagua
- Chile_2014-08-04_R6.doc100%
New Dir 12 C:\AdvisianActive\01 Projects\Project
Needle\Presentations to TNB\
New File 975595 20170308_Project Needle Advisian Debrief
to Dato Zainuddin.pdf100%
New File 1.8 m 20170308_Project Needle Advisian Debrief
to Dato Zainuddin2.pdf100%
New File 176183 Highlights in PSC Meeting.pptx100%
New File 7.3 m Presentation to TNBG_v3.pptx100%
New File 1.0 m Project Needle - Advisian Progress Update
for 14Apr2017.pptx100%
New File 7.3 m Project Needle_TNB CFO Meeting_Advisian
Technical Uplift Review Findings_26032017.pptx100%
New File 939166 Project Needle_TNB CFO Meeting_Advisian
Technical Uplift Review Findings_26032017_FINAL.pdf100%
New File 887060 Project Needle_TNB CFO Meeting_Advisian
Technical Uplift Review Findings_27032017.pdf100%
New File 6.8 m Project Needle_TNB Generation Meeting 18
Apr.pptx100%
New File 1.1 m Project Needle_TNB Generation Meeting 18
Apr_rev1.pdf100%
New File 7.1 m Project Needle_TNB Generation Meeting 18
Apr_rev1.pptx100%
New File 1.4 m Repositioning of TNB Assets for
CAPEX.pptx100%
New Dir 2 C:\AdvisianActive\01 Projects\Project Needle\Project
Needle Kick-off (25 Jan)\
New File 498883 Project Needle - key contact list -
20170125.pptx100%
New File 1.8 m Project Needle kick-off - 20170125
(FINAL).pdf100%
New Dir 3 C:\AdvisianActive\01 Projects\Project Needle\Project
Needle Templates\
New File 1.0 m Project Needle - workplan template -
20170125 v0.1.pptx100%
New File 1.0 m Project Needle - workstream progress
template - 20170125 v0.1.pptx100%
New File 21765 Project Needle_Workplan_Site Visit
Questionnaire and WalkDown List_25012017_V1.xlsx100%
New Dir 1 C:\AdvisianActive\01 Projects\Project
Needle\Reference\
New File 2.9 m Ancillary Service Study.pdf100%
New Dir 3 C:\AdvisianActive\01 Projects\Project
Needle\Reference\Manjung 4 PPA\
New File 1.4 m Appendix to Tender (Amended 6 May
2011) .pdf100%
New File 522098 PPA - Responsibility of IE Highlighted -
MAN.pdf100%
New File 500502 TNBJ Main Body - POWER PURCHASE
AGREEMENT.pdf100%
New Dir 17 C:\AdvisianActive\01 Projects\Project
Needle\Reference\Manjung 4 PPA\PPA - Appendix\
New File 249339 A - Project Description Design
Conditions.pdf100%
New File 85881 B - FACILITY TECH REQ AND OPER CHAR.pdf
100%
New File 77807 C - TEST - CAP, HEAT RATE ANNUAL AVA
CAP.pdf100%
New File 57139 D - ENERGY ACCOUNTING AND TNB METERING
EQUIPMENT.pdf100%
New File 112678 E - DESIGN OF THE INTERCONNECTION
FACILITIES.pdf100%
New File 65279 F- FUEL FACILITIES.pdf100%
New File 192717 G - PAYMENT FOR ENERGY, AVAILABILITY AND
START-UPS.pdf100%
New File 31177 H - OPERATION AND MAINTENANCE.pdf100%
New File 113930 I - ENVIRONMENTAL STANDARDS.pdf100%
New File 238180 J - DETERMINATION OF FUEL PRICE.pdf100%
New File 68087 K - CONSEQUENCES OF TERMINATION.pdf100%
New File 35712 L- Description Of Site.pdf100%
New File 27129 M - INPUT DATA AND INITIAL FINANCIAL
MODEL.pdf100%
New File 12614 N - WALK AWAY EVENTS.pdf100%
New File 24581 O - SHARED FACILITIES.pdf100%
New File 18392 P - PRINCIPLES FOR SHARED FACILITIES
AGREEMENT.pdf100%
New File 15872 Thumbs.db100%
New Dir 2 C:\AdvisianActive\01 Projects\Project Needle\Site
Visit\
New File 162 ~$sir Gudang.docx100%
New File 31983 Pasir Gudang.docx100%
New Dir 9 C:\AdvisianActive\01 Projects\Project
Needle\superceded slides\
New File 7.3 m Presentation to TNB CFO.pptx100%
New File 7.3 m Presentation to TNB CFO_v2.pptx100%
New File 7.3 m Presentation to TNB CFO_v3.pptx100%
New File 7.3 m Presentation to TNB CFO_v4.pptx100%
New File 7.3 m Presentation to TNB CFO_v5.pptx100%
New File 7.5 m Presentation to TNBG.pptx100%
New File 7.5 m Presentation to TNBG_v1.pptx100%
New File 975646 Presentation to TNBG_v2.pdf100%
New File 7.4 m Presentation to TNBG_v2.pptx100%
New Dir 6 C:\AdvisianActive\01 Projects\Project Needle\TNBG
Transformation\
New File 1.4 m 20150618 Gen Transformation - Progress
Update Report to Steering Committee.pdf100%
New File 1.9 m 20150812 Gen Transformation - Progress
Update Report to Steering Committee.pdf100%
New File 2.1 m 20160405 COE roll out Exec.pdf100%
New File 39790 20161212 List of Power Plants and PPA
Expiry Date.pdf100%
New File 28815 20161212 TNB EBITDA per MW Analysis.pdf
100%
New File 143998 TNB Procurement Transformation.pdf100%
New Dir 17 C:\AdvisianActive\01 Projects\Project Needle\Working
Files\
New File 89498 20161212 List of Power Plants and PPA
Expiry Date.xlsx100%
New File 88698 20161212 List of Power Plants and PPA
Expiry Date_v2.xlsx100%
New File 6.0 m 20170302 Full Report_draft - VOL 2.docx
100%
New File 7.2 m 20170315 Full Report_draft - VOL 1.docx
100%
New File 810496 EBITDA R&M and BUDGET_neoh.xls100%
New File 417057 EBITDA R&M and BUDGET_neoh.xlsx100%
New File 30337 Graphical Indicators.xlsx100%
New File 30053 Graphical Indicators_v2.xlsx100%
New File 1.4 m Graphical.pptx100%
New File 1.4 m Graphical_v2.pptx100%
New File 89267 Malaysia Power Market.pptx100%
New File 59356 Manpower Benchmark.xlsx100%
New File 599492 Master Spreadsheet_Combined.xlsx100%
New File 2.5 m Project Needle - Advisian Opportunity and
Risk Matrix.docx100%
New File 65117 Project Needle - Compiled Risk Register
20170324.xlsx100%
New File 1.5 m Risks Reward Profile.pptx100%
New File 1.6 m Scenario Analysis Asset X.pptx100%
New Dir 11 C:\AdvisianActive\01 Projects\Project Needle\Working
Files\FM inputs Neoh\
New File 28816 20170225 Financial Inputs_WBedit.xlsx100%

New File 1003592 20170330 Advisian CAPEX OPEX


Projections_v3.xlsx100%
New File 1029029 20170402 Advisian CAPEX OPEX
Projections_v3.xlsx100%
New File 1.1 m 20170405 Advisian CAPEX OPEX
Projections_v3.xlsx100%
New File 1.2 m 20170406 Advisian CAPEX OPEX
Projections_v3.xlsx100%
New File 1.2 m 20170413 Advisian CAPEX OPEX
Projections_v4.xlsx100%
New File 1.2 m 20170418 Advisian CAPEX OPEX
Projections_v4.xlsx100%
New File 1.2 m 20170419 Advisian CAPEX OPEX
Projections_v4.xlsx100%
New File 15215 Availability and Capacity Factor
Inputs.xlsx100%
New File 160944 Generated Energy Based on REAP
Forecast.xlsx100%
New File 92380 Project Needle - Advisian
Discussion_Neoh.pptx100%
New Dir 6 C:\AdvisianActive\01 Projects\Project Needle\Working
Files\FM inputs Neoh\Superceded\
New File 501452 20170321 Advisian CAPEX OPEX
Projections.xlsx100%
New File 538978 20170322 Advisian CAPEX OPEX
Projections.xlsx100%
New File 716472 20170323 Advisian CAPEX OPEX
Projections.xlsx100%
New File 809166 20170328 Advisian CAPEX OPEX
Projections.xlsx100%
New File 901876 20170328 Advisian CAPEX OPEX
Projections_v2.xlsx100%
New File 905434 20170328 Advisian CAPEX OPEX
Projections_v3.xlsx100%
New Dir 16 C:\AdvisianActive\01 Projects\Project Needle\Working
Files\FROM TNBG\
New File 162 ~$170315 Volume 1_Opportunity
Identification Scoping Rev B (DRAFT) 22MAR.docx100%
New File 162 ~$170315 Volume 1_Opportunity
Identification Scoping Rev B (DRAFT)_Neoh11Apr.docx100%
New File 7.9 m 20170315 Volume 1_Opportunity
Identification Scoping Rev B (DRAFT)_24Apr_clean.docx100%
New File 8.6 m 20170315 Volume 1_Opportunity
Identification Scoping Rev B (DRAFT)_24Apr_trackchanged.docx100%
New File 8.3 m 20170315 Volume 1_Opportunity
Identification Scoping Rev B (DRAFT)_Neoh18Apr.docx100%
New File 8.7 m 20170315 Volume 1_Opportunity
Identification Scoping Rev B (DRAFT)_Neoh19Apr.docx100%
New File 8.7 m 20170315 Volume 1_Opportunity
Identification Scoping Rev B (DRAFT)_Neoh21Apr.docx100%
New File 6.3 m 20170425 Volume 1_Opportunity
Identification Scoping Rev C (DRAFT).pdf100%
New File 8.0 m 20170425 Volume 1_Opportunity
Identification Scoping Rev C (DRAFT)_clean.docx100%
New File 8.6 m 20170425 Volume 1_Opportunity
Identification Scoping Rev C (DRAFT)_trackchanged.docx100%
New File 8.7 m 20170425 Volume 1_Opportunity
Identification Scoping Rev C (DRAFT)_trackchanged_with comments.docx100%
New File 6.3 m 20170425 Volume 1_Opportunity
Identification Scoping Rev C (DRAFT)_trackchanged_with comments.pdf100%
New File 7.3 m Comments from VP GD based on Volume 1
report.msg100%
New File 39207 Recommendations High Level Action
Plan_rev ii(WB).xlsx100%
New File 39558 Recommendations High Level Action
Plan_rev ii_17Apr Advisian.xlsx100%
New File 7.3 m Tracked change_20170425 Volume
1_Opportunity Identification Scoping Rev C (DRAFT).pdf100%
New Dir 9 C:\AdvisianActive\01 Projects\Project Needle\Working
Files\FROM TNBG\Superceded\
New File 7.5 m 20170315 Volume 1_Opportunity
Identification Scoping Rev B (DRAFT) 01Apr.docx100%
New File 7.5 m 20170315 Volume 1_Opportunity
Identification Scoping Rev B (DRAFT) 02Apr.docx100%
New File 7.3 m 20170315 Volume 1_Opportunity
Identification Scoping Rev B (DRAFT) 22MAR.docx100%
New File 7.3 m 20170315 Volume 1_Opportunity
Identification Scoping Rev B (DRAFT) 29MAR.docx100%
New File 7.5 m 20170315 Volume 1_Opportunity
Identification Scoping Rev B (DRAFT)_Neoh10Apr.docx100%
New File 8.7 m 20170315 Volume 1_Opportunity
Identification Scoping Rev B (DRAFT)_Neoh11Apr.doc100%
New File 7.7 m 20170315 Volume 1_Opportunity
Identification Scoping Rev B (DRAFT)_Neoh11Apr.docx100%
New File 7.7 m 20170315 Volume 1_Opportunity
Identification Scoping Rev B (DRAFT)_Neoh17Apr.docx100%
New File 7.5 m 20170315 Volume 1_Opportunity
Identification Scoping Rev B (DRAFT)_WB(6Apr).docx100%
New Dir 10 C:\AdvisianActive\01 Projects\Project Needle\Working
Files\Pasir Gudang\
New File 165 ~$CCGT Typical Curve.xlsx100%
New File 165 ~$Master Spreadsheet.xlsx100%
New File 162 ~$sir Gudang Draft.docx100%
New File 637754 CCGT Typical Curve.xlsx100%
New File 267827 Master Spreadsheet.xlsx100%
New File 85809 Pasir Gudang Putrajaya Draft_neoh.docx
100%
New File 75357 Pasir Gudang & Putrajaya Draft.docx100%
New File 45064 Pasir Gudang Draft.docx100%
New File 31983 Pasir Gudang.docx100%
New File 30156 Work Notes Neoh.docx100%
New Dir 2 C:\AdvisianActive\01 Projects\Project Needle\Working
Files\Pasir Gudang\Project Needle Documents SJSI\
New File 165 ~$Project Needle_Site Visit Questionnaire
and WalkDown List_Gas - Worley Parsons.xlsx100%
New File 54413 Project Needle_Site Visit Questionnaire
and WalkDown List_Gas - Worley Parsons.xlsx100%
New Dir 7 C:\AdvisianActive\01 Projects\Project Needle\Working
Files\Pasir Gudang\Project Needle Documents SJSI\Alstom GT3A Dec 2016 C-Insp
Commissioning Report\
New File 2.2 m CFRG034566_Recommissioning_161128_1.pdf
100%
New File 2.8 m CFRG034566_Recommissioning_161128_2.pdf
100%
New File 3.0 m CFRG034566_Recommissioning_161128_3.pdf
100%
New File 3.3 m CFRG034566_Recommissioning_161128_4.pdf
100%
New File 5.8 m CFRG034566_Recommissioning_161128_5.pdf
100%
New File 891168 CFRG034566_Recommissioning_161128_6.pdf
100%
New File 60928 RE Costing for PGPS GT3A
Commissioning.msg100%
New Dir 1 C:\AdvisianActive\01 Projects\Project Needle\Working
Files\Pasir Gudang\Project Needle Documents SJSI\Alstom GT3B Oct 2015 C-Insp
Commissioning Report\
New File 7.1 m GT3B Commissioning Report.pdf100%
New Dir 9 C:\AdvisianActive\01 Projects\Project Needle\Working
Files\Pasir Gudang\Project Needle Documents SJSI\Annual Reports\
New File 2.1 m Annual Report FY1213 - 1 of 2.pdf100%
New File 1.8 m Annual Report FY1213 - 2 of 2.pdf100%
New File 370608 Annual Report FY1314.pdf100%
New File 2.1 m Annual Report FY1415 - 1 of 3.pdf100%
New File 2.1 m Annual Report FY1415 - 2 of 3.pdf100%
New File 1.1 m Annual Report FY1415 - 3 of 3.pdf100%
New File 2.1 m Annual Report FY1516 - 1 of 3.pdf100%
New File 2.1 m Annual Report FY1516 - 2 of 3.pdf100%
New File 1.4 m Annual Report FY1516 - 3 of 3.pdf100%
New Dir 1 C:\AdvisianActive\01 Projects\Project Needle\Working
Files\Pasir Gudang\Project Needle Documents SJSI\Audit Documents\
New File 54874 Project Needle_Site Visit Questionnaire
and WalkDown List_Gas - Worley Parsons rev6.xlsx100%
New Dir 7 C:\AdvisianActive\01 Projects\Project Needle\Working
Files\Pasir Gudang\Project Needle Documents SJSI\Audit Documents\Alstom GT3A Dec
2016 C-Insp Commissioning Report\
New File 2.2 m CFRG034566_Recommissioning_161128_1.pdf
100%
New File 2.8 m CFRG034566_Recommissioning_161128_2.pdf
100%
New File 3.0 m CFRG034566_Recommissioning_161128_3.pdf
100%
New File 3.3 m CFRG034566_Recommissioning_161128_4.pdf
100%
New File 5.8 m CFRG034566_Recommissioning_161128_5.pdf
100%
New File 891168 CFRG034566_Recommissioning_161128_6.pdf
100%
New File 60928 RE Costing for PGPS GT3A
Commissioning.msg100%
New Dir 1 C:\AdvisianActive\01 Projects\Project Needle\Working
Files\Pasir Gudang\Project Needle Documents SJSI\Audit Documents\Alstom GT3B Oct
2015 C-Insp Commissioning Report\
New File 7.1 m GT3B Commissioning Report.pdf100%
New Dir 9 C:\AdvisianActive\01 Projects\Project Needle\Working
Files\Pasir Gudang\Project Needle Documents SJSI\Audit Documents\Annual Reports\
New File 2.1 m Annual Report FY1213 - 1 of 2.pdf100%
New File 1.8 m Annual Report FY1213 - 2 of 2.pdf100%
New File 370608 Annual Report FY1314.pdf100%
New File 2.1 m Annual Report FY1415 - 1 of 3.pdf100%
New File 2.1 m Annual Report FY1415 - 2 of 3.pdf100%
New File 1.1 m Annual Report FY1415 - 3 of 3.pdf100%
New File 2.1 m Annual Report FY1516 - 1 of 3.pdf100%
New File 2.1 m Annual Report FY1516 - 2 of 3.pdf100%
New File 1.4 m Annual Report FY1516 - 3 of 3.pdf100%
New Dir 5 C:\AdvisianActive\01 Projects\Project Needle\Working
Files\Pasir Gudang\Project Needle Documents SJSI\Audit Documents\Before vs After
DMC Upgrade\
New File 1.7 m Alstom Presentation After GT3B DMC.pdf
100%
New File 65032 Before DMC Upgrading simulation Data.pdf
100%
New File 3.4 m DMC Correction Curve.pdf100%
New File 2.6 m GT3B 13D Performance Test Report Before
and After Compresor Upgrading.pdf100%
New File 934817 Performance test procedure Pasir Gudang
DMC GT3B.pdf100%
New Dir 4 C:\AdvisianActive\01 Projects\Project Needle\Working
Files\Pasir Gudang\Project Needle Documents SJSI\Audit Documents\CCP Performance
during COD\
New File 655585 Performance Test during COD 1of 4.pdf100%

New File 184049 Performance Test during COD 2 of 4.pdf


100%
New File 3.5 m Performance Test during COD 3 of 4.pdf
100%
New File 3.2 m Performance Test during COD 4 of 4.pdf
100%
New Dir 4 C:\AdvisianActive\01 Projects\Project Needle\Working
Files\Pasir Gudang\Project Needle Documents SJSI\Audit Documents\GT3A 2016 Pre and
Post Overhaul Performance Report\
New File 896639 0769_001.pdf100%
New File 1.0 m PGPS GT3A 7th C-Inspection Pre Outage
Performance Assessment - Sep 16 pdf.pdf100%
New File 1.5 m PGPS GT3A Post Outage Assessment.pptx100%

New File 1.4 m PGPS Post Mortem Meeting - GT3A Vibration


Performance After Major Overha....pptx100%
New Dir 7 C:\AdvisianActive\01 Projects\Project Needle\Working
Files\Pasir Gudang\Project Needle Documents SJSI\Audit Documents\Monthly
Performance Reports\
New File 1.0 m MPR_11-12_rev2.xls100%
New File 1.1 m MPR_12-13.xls100%
New File 1.3 m MPR_13-14.xls100%
New File 1.5 m MPR_13-14rev1.xls100%
New File 1.5 m MPR_14-15 (August 2015).xls100%
New File 1.6 m MPR_15-16.xls100%
New File 1.5 m MPR_16-17.xls100%
New Dir 1 C:\AdvisianActive\01 Projects\Project Needle\Working
Files\Pasir Gudang\Project Needle Documents SJSI\Audit Documents\Performance Test
by Remaco (Dec 2016)\
New File 9.8 m Full Performance Test Rev 1.pdf100%
New Dir 1 C:\AdvisianActive\01 Projects\Project Needle\Working
Files\Pasir Gudang\Project Needle Documents SJSI\Audit Documents\Performance Test
by Remaco (Jan 2016)\
New File 11.4 m Test Report.pdf100%
New Dir 1 C:\AdvisianActive\01 Projects\Project Needle\Working
Files\Pasir Gudang\Project Needle Documents SJSI\Audit Documents\Station
Commissioning Report\
New File 3.7 m CCP Planned Outaged for Major Overhaul
Commissioning Report Oct 2015.pdf100%
New Dir 1 C:\AdvisianActive\01 Projects\Project Needle\Working
Files\Pasir Gudang\Project Needle Documents SJSI\Audit Documents\TAAC CY 2017\
New File 10.9 m TAAC Report for SJSI.pdf100%
New Dir 5 C:\AdvisianActive\01 Projects\Project Needle\Working
Files\Pasir Gudang\Project Needle Documents SJSI\Before vs After DMC Upgrade\
New File 1.7 m Alstom Presentation After GT3B DMC.pdf
100%
New File 65032 Before DMC Upgrading simulation Data.pdf
100%
New File 3.4 m DMC Correction Curve.pdf100%
New File 2.6 m GT3B 13D Performance Test Report Before
and After Compresor Upgrading.pdf100%
New File 934817 Performance test procedure Pasir Gudang
DMC GT3B.pdf100%
New Dir 4 C:\AdvisianActive\01 Projects\Project Needle\Working
Files\Pasir Gudang\Project Needle Documents SJSI\CCP Performance during COD\
New File 3.5 m Performance Test during COD 1of 4.pdf100%

New File 184049 Performance Test during COD 2 of 4.pdf


100%
New File 3.5 m Performance Test during COD 3 of 4.pdf
100%
New File 3.2 m Performance Test during COD 4 of 4.pdf
100%
New Dir 4 C:\AdvisianActive\01 Projects\Project Needle\Working
Files\Pasir Gudang\Project Needle Documents SJSI\GT3A 2016 Pre and Post Overhaul
Performance Report\
New File 896639 0769_001.pdf100%
New File 1.0 m PGPS GT3A 7th C-Inspection Pre Outage
Performance Assessment - Sep 16 pdf.pdf100%
New File 1.5 m PGPS GT3A Post Outage Assessment.pptx100%

New File 1.4 m PGPS Post Mortem Meeting - GT3A Vibration


Performance After Major Overha....pptx100%
New Dir 7 C:\AdvisianActive\01 Projects\Project Needle\Working
Files\Pasir Gudang\Project Needle Documents SJSI\Monthly Performance Reports\
New File 1.0 m MPR_11-12_rev2.xls100%
New File 1.1 m MPR_12-13.xls100%
New File 1.3 m MPR_13-14.xls100%
New File 1.5 m MPR_13-14rev1.xls100%
New File 1.5 m MPR_14-15 (August 2015).xls100%
New File 1.6 m MPR_15-16.xls100%
New File 1.5 m MPR_16-17.xls100%
New Dir 1 C:\AdvisianActive\01 Projects\Project Needle\Working
Files\Pasir Gudang\Project Needle Documents SJSI\Performance Test by Remaco (Dec
2016)\
New File 9.8 m Full Performance Test Rev 1.pdf100%
New Dir 1 C:\AdvisianActive\01 Projects\Project Needle\Working
Files\Pasir Gudang\Project Needle Documents SJSI\Performance Test by Remaco (Jan
2016)\
New File 11.4 m Test Report.pdf100%
New Dir 0 C:\AdvisianActive\01 Projects\Project Needle\Working
Files\Pasir Gudang\Project Needle Documents SJSI\SLA\
New Dir 16 C:\AdvisianActive\01 Projects\Project Needle\Working
Files\Pasir Gudang\Project Needle Documents SJSI\SLA\PGPS\
New File 2.6 m Appendix A.pdf100%
New File 679418 Appendix B.pdf100%
New File 650690 Appendix C.pdf100%
New File 183387 Appendix D.pdf100%
New File 308691 Appendix E.pdf100%
New File 71114 Appendix F.pdf100%
New File 899663 Appendix G.pdf100%
New File 124247 Appendix H.pdf100%
New File 110750 Appendix I.pdf100%
New File 101863 Appendix J.pdf100%
New File 148967 Appendix L.pdf100%
New File 2.2 m Contents.pdf100%
New File 87362 Exhibit 2.pdf100%
New File 30033 Exhibit 3.pdf100%
New File 56217 Exhibit 4.pdf100%
New File 7.5 m SJPG.rar100%
New Dir 1 C:\AdvisianActive\01 Projects\Project Needle\Working
Files\Pasir Gudang\Project Needle Documents SJSI\Station Commissioning Report\
New File 3.7 m CCP Planned Outaged for Major Overhaul
Commissioning Report Oct 2015.pdf100%
New Dir 1 C:\AdvisianActive\01 Projects\Project Needle\Working
Files\Pasir Gudang\Project Needle Documents SJSI\TAAC CY 2017\
New File 10.9 m TAAC Report for SJSI.pdf100%
New Dir 9 C:\AdvisianActive\01 Projects\Project Needle\Working
Files\Recevied from TNB 18 May\
New File 162 ~$170519 Volume 1_Opportunity
Identification Scoping Rev D (Final)_shar.docx100%
New File 8.2 m 20170425 Volume 1_Opportunity
Identification Scoping Rev C (DRAFT)_clean_NEOH WIP.docx100%
New File 8.2 m 20170519 Volume 1_Opportunity
Identification Scoping Rev D (Final)_shar.docx100%
New File 8.2 m 20170519 Volume 1_Opportunity
Identification Scoping Rev D (Final)_tracked change.docx100%
New File 8.1 m 20170605 Volume 1_Opportunity
Identification Scoping Final Report_Rev 0.docx100%
New File 7.2 m 20170605 Volume 1_Opportunity
Identification Scoping Final Report_Rev 0.pdf100%
New File 8.1 m 20170605 Volume 1_Opportunity
Identification Scoping Rev D (Final).docx100%
New File 5.7 m 20170605 Volume 2_Opportunity
Identification Scoping Final Report_Rev 0.pdf100%
New File 8.2 m 20170605 Volume 2_Opportunity
Identification Scoping Final_Rev 0.docx100%
New Dir 1 C:\AdvisianActive\01 Projects\Project Needle\Working
Files\Recevied from TNB 18 May\Sent to Client\
New File 3.9 m 20170605 Volume 1_Opportunity
Identification Scoping Final Report_Rev 0.pdf100%
New Dir 10 C:\AdvisianActive\01 Projects\Project Needle\Working
Files\Ref\
New File 1.7 m 1July2014-
Review_of_Vesting_Contract_Level_Revised_Draft_Report_.pdf100%
New File 8.3 m ESCRI-General-Project-Report-Phase-1.pdf
100%
New File 267348 ESCRI-General-Project-Report-Phase-
1_Executive Summary.pdf100%
New File 713380 Guide to Ancillary Services in the
National Electricity Market.pdf100%
New File 11.6 m IRENA_Power_to_Change_2016.pdf100%
New File 335042
Loads_providing_Ancillary_Services_main_report_62701.pdf100%
New File 773376 NEMS_111010.pdf100%
New File 602911 Phillippines ANCILLARY SERVICES
Procurement Plan.pdf100%
New File 1.4 m ppt_pgen16c_mt.pdf100%
New File 360279 stuandhughflorida.pdf100%
New Dir 6 C:\AdvisianActive\01 Projects\Project Needle\Working
Files\Risk Register\
New File 55150 Project Needle - Consolidated Risk
Register.xlsm100%
New File 105499 Project Needle - Risk Parameter (2).pdf
100%
New File 126460 Project Needle - Technical Risk Register
(2).pdf100%
New File 99305 Risk Parameters 5 June.pdf100%
New File 330571 TNB Risk Parameter_Post Workshop (with
comments).pdf100%
New File 149961 TNB Risk Parameter_Post Workshop.pdf100%

New Dir 11 C:\AdvisianActive\01 Projects\Project Needle\Working


Files\Sent to Maybank\
New File 23891 20170225 Financial Inputs.xlsx100%
New File 42015 20170303 Project Needle_ CAPEX OPEX
Projections by Advisian.xlsx100%
New File 70899 20170310 Project Needle_ CAPEX OPEX
Projections by Advisian.xlsx100%
New File 70865 20170313 Project Needle_ CAPEX OPEX
Projections by Advisian.xlsx100%
New File 251993 20170328 Project Needle_CAPEX OPEX
Projections by Advisian.xlsx100%
New File 358161 20170330 Advisian CAPEX OPEX Projections
by Advisian.xlsx100%
New File 399054 20170406 Project Needle_CAPEX OPEX
Projections by Advisian.xlsx100%
New File 502416 20170419 Project Needle_CAPEX OPEX
Projections by Advisian.xlsx100%
New File 540514 20170419 Project Needle_CAPEX OPEX
Projections by Advisian_FINAL.xlsx100%
New File 10954 Availability and Capacity Factor
Inputs.xlsx100%
New File 136001 Generated Energy Based on REAP
Forecast_Maybank.xlsx100%
New Dir 7 C:\AdvisianActive\01 Projects\Project Needle\Working
Files\Sent to Maybank\PDF\
New File 115257 1 FM Inputs - Cover Page.pdf100%
New File 110739 2 Scenario Integration.pdf100%
New File 243994 3 Base Case - BAU.pdf100%
New File 246441 4 Case 1.pdf100%
New File 247568 5 Case 2.pdf100%
New File 246968 6 Case 3.pdf100%
New File 608500 Appendix G - Financial Model Inputs.pdf
100%
New Dir 2 C:\AdvisianActive\01 Projects\Project Needle\Working
Files\Sent to TNB\
New File 7.2 m 20170315 Volume 1_Opportunity
Identification & Scoping Rev B (DRAFT).docx100%
New File 7.2 m 20170605 Volume 1_Opportunity
Identification Scoping Final Report_Rev 0.pdf100%
New Dir 27 C:\AdvisianActive\01 Projects\Project Needle\Working
Files\superceded reports\
New File 2.4 m 20170224 Full Report_draft - Neoh
Working.docx100%
New File 5.0 m 20170226 Full Report_draft - Neoh
Update.docx100%
New File 479854 20170227 Advisian CAPEX OPEX
Projections.xlsx100%
New File 5.0 m 20170227 Full Report_draft - Neoh Update
section 3.docx100%
New File 5.0 m 20170227 Full Report_draft - Neoh
Update.docx100%
New File 3.5 m 20170228 Full Report_draft - VOL 1_Neoh
Update.docx100%
New File 5.5 m 20170228 Full Report_draft - VOL 2_neoh
update.docx100%
New File 3.5 m 20170301 Full Report_draft - VOL 1.docx
100%
New File 481066 20170302 Advisian CAPEX OPEX
Projections.xlsx100%
New File 3.6 m 20170302 Full Report_draft - VOL 1.docx
100%
New File 3.6 m 20170302 Full Report_draft - VOL 1_Neoh
Update.docx100%
New File 6.8 m 20170302 Full Report_draft - VOL 2
updated.docx100%
New File 7.0 m 20170302 Full Report_draft - VOL 2.docx
100%
New File 3.7 m 20170305 Full Report_draft - VOL 1_Neoh
Update.docx100%
New File 8.8 m 20170305 Full Report_draft - VOL 2_Rev
A(13Mar)_Neoh Comment.docx100%
New File 503746 20170306 Advisian CAPEX OPEX
Projections.xlsx100%
New File 3.8 m 20170306 Full Report_draft - VOL 1_Neoh
Update2.docx100%
New File 3.6 m 20170306 Full Report_draft - VOL 1_Neoh
Update3.docx100%
New File 3.6 m 20170306 Full Report_draft - VOL 1_Neoh
Update4.docx100%
New File 512413 20170307 Advisian CAPEX OPEX
Projections.xlsx100%
New File 3.8 m 20170307 Full Report_draft - VOL 1.docx
100%
New File 3.8 m 20170308 Full Report_draft - VOL 1.docx
100%
New File 514136 20170310 Advisian CAPEX OPEX
Projections.xlsx100%
New File 4.2 m 20170312 Full Report_draft - VOL 1.docx
100%
New File 499395 20170313 Advisian CAPEX OPEX
Projections.xlsx100%
New File 7.1 m 20170313 Full Report_draft - VOL 1.docx
100%
New File 14784 Outlook PM 2016 (1) 32.docx100%
New Dir 3 C:\AdvisianActive\01 Projects\Project Needle\Working
Files\TOC Sent to EY\
New File 614486 Project Needle - Advisian Opportunity and
Risk Matrix.pdf100%
New File 239986 Project Needle - Volume 1_ Opportunity
Identification & Scoping.pdf100%
New File 282152 Project Needle - Volume 2_ Asset Level
Review-TOC.pdf100%
New Dir 1 C:\AdvisianActive\01 Projects\Project Needle\Working
Files\Volume 2 latest\
New File 9.5 m 20170329 Full Report - VOL 2_Rev B.docx
100%
New Dir 4 C:\AdvisianActive\01 Projects\San Pedro South Africa
Plant\
New File 1007052 Energies FinModel_5175xof sens_v4 .xlsx
100%
New File 75089 Snedai_Broto700MW_CostEstimate_v2.xlsx
100%
New File 15.1 m Tech fin analysis_neoh.docx100%
New File 15.1 m Tech& fin analysis.docx100%
New Dir 12 C:\AdvisianActive\01 Projects\SBPC M&E Audit\
New File 18539 20170314_Sepangar Bay_Budget_Neoh.xlsx
100%
New File 191058 Org Chart_withpic.pptx100%
New File 1.3 m SBPC Field Exit Meeting_07Aug_draft.pptx
100%
New File 774222 SBPC Field Exit Meeting_07Aug_Final.pdf
100%
New File 1.3 m SBPC Field Exit Meeting_07Aug_Final.pptx
100%
New File 1.0 m SBPC Finance Meeting.docx100%
New File 3.3 m SBPC Kick Off Meeting.pptx100%
New File 536576 SBPC M&E Audit Schedule.mpp100%
New File 17179 SBPC M&E Audit Work Budget_20June.xlsx
100%
New File 4.5 m SBPC ME Audit Report_Draft_17Aug_Neoh
comments.docx100%
New File 1.0 m SBPC Site Visit Agenda.docx100%
New File 59582 SBPC Site Visit Agenda.pdf100%
New Dir 4 C:\AdvisianActive\01 Projects\SBPC M&E Audit\Audit
Work Plan\
New File 1.0 m SBPC Audit Work Plan_19June.pdf100%
New File 1.2 m SBPC Audit Work Plan_19June.pptx100%
New File 1.0 m SBPC Audit Work Plan_Final.pdf100%
New File 1.2 m SBPC Audit Work Plan_Final.pptx100%
New Dir 2 C:\AdvisianActive\01 Projects\SBPC M&E Audit\Draft
Submitted to ST 21 Sep\
New File 2.1 m SBPC M&E Audit Report_Draft
Final_21Sep.pdf100%
New File 3.1 m SBPC ME Audit Report_Final Draft to ST
RevD_21Sep_clean.docx100%
New Dir 3 C:\AdvisianActive\01 Projects\SBPC M&E Audit\Request
for Information\
New File 2.1 m SBPC M&E Audit Info RFI.xlsx100%
New File 32137 SBPC M&E Audit Info RFI_Finance_v2.xlsx
100%
New File 25379 SBPC M&E Audit Info RFI_v2.xlsx100%
New Dir 5 C:\AdvisianActive\01 Projects\SBPC M&E Audit\Working\
New File 315920 SBPC Financial Performance
Assessment.docx100%
New File 750948 SBPC Financials_working_19June.xlsx100%
New File 4.1 m SBPC ME Audit Report Draft_11August.docx
100%
New File 24.1 m SBPC ME Audit Report_Draft 2-
1_22AugNeoh.docx100%
New File 3.2 m SBPC ME Audit Report_Draft 23Aug.docx100%

New Dir 38 C:\AdvisianActive\01 Projects\SIPP Lenders LTA\


New File 162 ~$ Extract - Technical_Advisian23Aug.docx
100%
New File 7.0 m 20170518 Advisian Proposal_LTA SIPP.pptx
100%
New File 7.9 m 20170618 FPTA SIPP Track 4A Tech DD.docx
100%
New File 8.0 m 20170619 FPTA SIPP Track 4A Tech DD_First
Draft.docx100%
New File 3.5 m 20170619 FPTA SIPP Track 4A Tech DD_First
Draft.pdf100%
New File 8.0 m 20170713 FPTA SIPP Track 4A Tech DD_First
Draft_neoh.docx100%
New File 8.1 m 20170713 FPTA SIPP Track 4A Tech DD_First
Draft_neoh_r1.docx100%
New File 11.7 m 20170717 FPTA SIPP Track 4A Tech DD
TC_Neoh 19Jul.docx100%
New File 11.5 m 20170719 ITA SIPP Track 4A Tech DD
tc_neoh 20Jul.docx100%
New File 9.3 m 20170720 ITA SIPP Track 4A Tech DD tc
r1_Neoh26Jul.docx100%
New File 1.0 m 2017-L001_ITA Cert.doc100%
New File 1.0 m 2017-L001_ITA Cert_Milestone Offshore
A.doc100%
New File 1.1 m 4A Project_ LTA Agreement Appendix
1_draft #1.docx100%
New File 1.1 m 4A Project_ LTA Agreement Appendix
2_draft #1.docx100%
New File 1.4 m 4A Project_LTA Agreement DRAFT.docx100%
New File 1.0 m Advisian Track 4A FPTA Internal Kick
Off.pdf100%
New File 1.3 m Advisian Track 4A FPTA Internal Kick
Off.pptx100%
New File 146819 Bouchain Operations.txt100%
New File 214795 Bouchain Operations.xlsx100%
New File 16940 Contact Details_LTA_Advisian.docx100%
New File 282225 CSOC - Melaka 020517.docx100%
New File 282564 CSOC - Track 4A.docx100%
New File 327726 Degradation Curve.xlsx100%
New File 10724 Delay Analysis.xlsx100%
New File 247793 Figures for report.pptx100%
New File 1.1 m Financial Model_Example_Advisian.docx100%

New File 8.0 m FPTA SIPP TEMPLATE_Rev 1.0 NEOH


170616.docx100%
New File 5.2 m FPTA SIPP TEMPLATE_Rev 1.0 Neoh.docx100%

New File 4.7 m FPTA SIPP TEMPLATE_Rev 1.0.docx100%


New File 52758 IM Extract - Technical (Sept
14)_Advisian.docx100%
New File 53734 IM Extract - Technical_Advisian23Aug.docx
100%
New File 54152 IM Extract - Technical_Advisian24Aug.docx
100%
New File 30884 L-00XX-2015-SD_ICE Cert_draft 24 Nov.docx
100%
New File 1.1 m L-XX_ITA Cert_draft 23Oct.doc100%
New File 1.8 m SIPP CSOC & RCF.zip100%
New File 14816 SIPP Track 4A_Division of Works.xlsx100%

New File 466432 SPG ITA Questionnaire 2017_Neoh jz.doc


100%
New File 472064 SPG ITA Questionnaire 2017_Neoh.doc100%
New Dir 2 C:\AdvisianActive\01 Projects\SIPP Lenders
LTA\Budget\
New File 20220 SIPP LTA_Budget_Neoh.xlsx100%
New File 19480 SIPP LTA_Budget_Neoh_v1.xlsx100%
New Dir 1 C:\AdvisianActive\01 Projects\SIPP Lenders LTA\Budget
Tracking\
New File 167209 Project Labour Summary_WE
16Jun2017_302020-00447 SIPP LTA-Track 4A SIPP 1440MW.lsx.xlsx100%
New Dir 3 C:\AdvisianActive\01 Projects\SIPP Lenders
LTA\dataroom\
New File 1.6 m 170710 EIA Approval.pdf100%
New File 354370 170804 Degradation Table.pdf100%
New File 964778 Draft LTSA rev5.pdf100%
New Dir 5 C:\AdvisianActive\01 Projects\SIPP Lenders
LTA\dataroom\6. Lenders model\
New File 5.9 m CCGT Template.xlsm100%
New File 5.6 m Track4A Lenders Model - 22 May 2017 v1.4_
[email protected]%
New File 5.6 m Track4A Lenders Model - 22 May 2017 v1.5
(1).xlsm100%
New File 5.6 m Track4A Lenders Model - 22 May 2017
v1.6.xlsm100%
New File 5.8 m Track4A Lenders Model - 22 May 2017
v1.8.xlsm100%
New Dir 0 C:\AdvisianActive\01 Projects\SIPP Lenders
LTA\dataroom\Additional Info dated 06 July\
New Dir 2 C:\AdvisianActive\01 Projects\SIPP Lenders
LTA\dataroom\Additional Info dated 06 July\01.1 Supplemental PPA\
New File 594954 SUPPLEMENT PPA-13062017094105.pdf100%
New File 9216 Thumbs.db100%
New Dir 3 C:\AdvisianActive\01 Projects\SIPP Lenders
LTA\dataroom\Additional Info dated 06 July\04.1 Supplemental EPC Contract\
New File 465162 Supp EPCC Contract Page 75, 79, 80, 81,
88 & 114.pdf100%
New File 931306 Supplemental EPCC Mainbody.pdf100%
New File 51200 Thumbs.db100%
New Dir 8 C:\AdvisianActive\01 Projects\SIPP Lenders
LTA\dataroom\Additional Info dated 06 July\04.1 Supplemental EPC
Contract\Supplemental EPCC Schedules\
New File 283320 Schedule CC page 54.pdf100%
New File 30.4 m Schedule CC.pdf100%
New File 6.8 m Schedule DD.pdf100%
New File 565449 Schedule EE,FF & GG.pdf100%
New File 2.0 m Schedule O.pdf100%
New File 63243 Schedule S.pdf100%
New File 437070 Schedule U & V.pdf100%
New File 148992 Thumbs.db100%
New Dir 0 C:\AdvisianActive\01 Projects\SIPP Lenders
LTA\dataroom\Additional Info dated 06 July\Additional info From batch 1 QA\
New Dir 5 C:\AdvisianActive\01 Projects\SIPP Lenders
LTA\dataroom\Additional Info dated 06 July\Additional info From batch 1 QA\15.
Civil Contractors Reference List\
New File 43648 Experience list - MIEI.PDF100%
New File 8.2 m Experience list - Sumitomo.pdf100%
New File 165884 Experience list - TCC.PDF100%
New File 87050 Experience list - TEPC.PDF100%
New File 47104 Thumbs.db100%
New Dir 2 C:\AdvisianActive\01 Projects\SIPP Lenders
LTA\dataroom\Additional Info dated 06 July\Additional info From batch 1 QA\22.
Extract Letter from EC\
New File 125760 160527 - EC to SIPP.pdf100%
New File 48128 Thumbs.db100%
New Dir 2 C:\AdvisianActive\01 Projects\SIPP Lenders
LTA\dataroom\Additional Info dated 06 July\Additional info From batch 1 QA\36.
Draft O&M Agreement\
New File 12800 Thumbs.db100%
New File 1.2 m Track 4A OM Agreement version 4 draft
(issued 18 June 2017).pdf100%
New Dir 2 C:\AdvisianActive\01 Projects\SIPP Lenders
LTA\dataroom\Additional Info dated 06 July\Additional info From batch 1 QA\61. PGU
Specification\
New File 123346 160907_Letter to SIPP_Gas Composition.pdf
100%
New File 29184 Thumbs.db100%
New Dir 3 C:\AdvisianActive\01 Projects\SIPP Lenders
LTA\dataroom\Batch 1 Questionnaire\
New File 99571 Advisian QA_batch 1_08June2017-
responses16june2017.xlsx100%
New File 830163 SUPPLEMENT PPA-13062017094105.pdf100%
New File 9216 Thumbs.db100%
New Dir 0 C:\AdvisianActive\01 Projects\SIPP Lenders
LTA\dataroom\Batch 1 Questionnaire\1.EIA Report\
New Dir 5 C:\AdvisianActive\01 Projects\SIPP Lenders
LTA\dataroom\Batch 1 Questionnaire\1.EIA Report\Vol 1\
New File 169201 0_Environmental Review Criteria.pdf100%
New File 4.5 m 1_EXECUTIVE SUMMARY.pdf100%
New File 4.4 m 2_RINGKASAN EKSEKUTIF.pdf100%
New File 43.8 m 3_EIA MAIN REPORT.pdf100%
New File 56832 Thumbs.db100%
New Dir 2 C:\AdvisianActive\01 Projects\SIPP Lenders
LTA\dataroom\Batch 1 Questionnaire\1.EIA Report\Vol 2\
New File 386990 COVER FOR APPENDICES.pdf100%
New File 77312 Thumbs.db100%
New Dir 4 C:\AdvisianActive\01 Projects\SIPP Lenders
LTA\dataroom\Batch 1 Questionnaire\1.EIA Report\Vol 2\A_SCOPING MEETING\
New File 725543 1_NOTA MESYUARAT (SIGNED).pdf100%
New File 2.1 m 2_LAMPIRAN 1_SLAID PEMBENTANGAN PENGGERAK
PROJEK.pdf100%
New File 13.5 m 3_LAMPIRAN 2_SLAID PEMBENTANGAN
JURURUNDING EIA.pdf100%
New File 7870 dividers (BLUE COLOR PAPER).pdf100%
New Dir 1 C:\AdvisianActive\01 Projects\SIPP Lenders
LTA\dataroom\Batch 1 Questionnaire\1.EIA Report\Vol 2\B_BASELINE FIELD WORKS
REPORT\
New File 6.1 m Baseline Field Work Report.pdf100%
New Dir 4 C:\AdvisianActive\01 Projects\SIPP Lenders
LTA\dataroom\Batch 1 Questionnaire\1.EIA Report\Vol 2\C_COA OF BASELINE STUDY
RESULTS\
New File 4.3 m 1_Pasir Gudang Ambient Air COA.pdf100%
New File 6.5 m 2_Pasir Gudang Marine Water COA.pdf100%
New File 1.2 m 3_Pasir Gudang River Water COA.pdf100%
New File 8589 dividers (BLUE COLOR PAPER).pdf100%
New Dir 1 C:\AdvisianActive\01 Projects\SIPP Lenders
LTA\dataroom\Batch 1 Questionnaire\1.EIA Report\Vol 2\D_QUESTIONNAIRE FOR SOCIO AND
PUBLIC HEALTH\
New File 913089 QUESTIONNAIRE.pdf100%
New Dir 1 C:\AdvisianActive\01 Projects\SIPP Lenders
LTA\dataroom\Batch 1 Questionnaire\1.EIA Report\Vol 2\E_ADM REPORT\
New File 8.3 m AQ WRITE-UP (STAND ALONE).pdf100%
New Dir 13 C:\AdvisianActive\01 Projects\SIPP Lenders
LTA\dataroom\Batch 1 Questionnaire\1.EIA Report\Vol 2\F_QRA MODELLING RESULTS AND
CONTOURS\
New File 42235 Appendix F1.pdf100%
New File 50207 Appendix F10.pdf100%
New File 50210 Appendix F11.pdf100%
New File 43951 Appendix F2.pdf100%
New File 44658 Appendix F3.pdf100%
New File 38466 Appendix F4.pdf100%
New File 39979 Appendix F5.pdf100%
New File 38743 Appendix F6.pdf100%
New File 40076 Appendix F7.pdf100%
New File 36423 Appendix F8.pdf100%
New File 50814 Appendix F9.pdf100%
New File 3.9 m CONTOURS.pdf100%
New File 15252 dividers (BLUE COLOR PAPER).pdf100%
New Dir 2 C:\AdvisianActive\01 Projects\SIPP Lenders
LTA\dataroom\Batch 1 Questionnaire\1.EIA Report\Vol 2\G_COASTAL HYDRAULIC REPORT\
New File 2.7 m Hydraulic Study SIPP.pdf100%
New File 16384 Thumbs.db100%
New Dir 6 C:\AdvisianActive\01 Projects\SIPP Lenders
LTA\dataroom\Batch 1 Questionnaire\1.EIA Report\Vol 2\G_COASTAL HYDRAULIC
REPORT\APPENDICES\
New File 2.8 m APPENDIX A LAYOUT PLAN (A1 SIZE).pdf100%

New File 1.6 m APPENDIX B Grab Sampling.pdf100%


New File 279801 APPENDIX C TempProf.pdf100%
New File 9.1 m APPENDIX D TSS.pdf100%
New File 480358 APPENDIX E_SURVEY PLAN.pdf100%
New File 9907 dividers (BLUE COLOR PAPER).pdf100%
New Dir 7 C:\AdvisianActive\01 Projects\SIPP Lenders
LTA\dataroom\Batch 1 Questionnaire\19.EPC Schedules\
New File 6.7 m Schedule CC.pdf100%
New File 6.8 m Schedule DD.pdf100%
New File 565449 Schedule EE,FF & GG.pdf100%
New File 2.0 m Schedule O.pdf100%
New File 63243 Schedule S.pdf100%
New File 437070 Schedule U & V.pdf100%
New File 133632 Thumbs.db100%
New Dir 2 C:\AdvisianActive\01 Projects\SIPP Lenders
LTA\dataroom\Batch 1 Questionnaire\3. EPC Slides\
New File 33280 Thumbs.db100%
New File 2.6 m Track 4A Project CCGT - EPC
(Construction) 15.06.17 [Compatibility Mod....pdf100%
New Dir 3 C:\AdvisianActive\01 Projects\SIPP Lenders
LTA\dataroom\Batch 1 Questionnaire\4.Owner's project and construction management
organisation chart\
New File 399089 4a.SPG Org Chart 20170614.pdf100%
New File 52901 4b.OE Org Chart.pptx100%
New File 31744 Thumbs.db100%
New Dir 2 C:\AdvisianActive\01 Projects\SIPP Lenders
LTA\dataroom\Batch 1 Questionnaire\5. OE TOR\
New File 19456 Thumbs.db100%
New File 814652 TOR OE for Project 4A Issued.pdf100%
New Dir 2 C:\AdvisianActive\01 Projects\SIPP Lenders
LTA\dataroom\Batch 1 Questionnaire\7.Supplemental EPCC\
New File 931306 7.Supplemental EPCC.pdf100%
New File 21504 Thumbs.db100%
New Dir 11 C:\AdvisianActive\01 Projects\SIPP Lenders
LTA\dataroom\Batch 1 Questionnaire\A. Additional information\
New File 182832 275kV Power Cable Datasheet (20170327-
01).pdf100%
New File 2.0 m 275kV Power cable routing.pdf100%
New File 246860 9HA.02 Fuel Transfer
Philosophy_Preliminary_20160606.pdf100%
New File 12681 ABB Reference List_Rev 2017-02-09.pdf100%

New File 320184 Hyosung reference list for TR.pdf100%


New File 54039 Hyundai Reference for TR above
1,000MVA.PDF100%
New File 5.7 m LS 66-500kV EHV Cable system.pdf100%
New File 1.5 m Nexans 60-
500_kV_High_Voltage_full_BD2.pdf100%
New File 8627 TBEA reference list for Transformers
Above 1000MVA.pdf100%
New File 51712 Thumbs.db100%
New File 94127 TMEIC_Reference List of Generator
Transformer Toshiba CTC.pdf100%
New Dir 1 C:\AdvisianActive\01 Projects\SIPP Lenders
LTA\dataroom\Batch 2 Questionnaire\
New File 106259 Advisian QA_batch 2_28 June 2017-All.xlsx
100%
New Dir 4 C:\AdvisianActive\01 Projects\SIPP Lenders
LTA\dataroom\dataroom\
New File 548280 SPG Track 4A EPC Contract Supplemental
Agreement (version 5 18 May 2017)....pdf100%
New File 34816 Thumbs.db100%
New File 561595 TNB 4A Pasir Gudang OM Agreement (version
2 20 April 2017)_THL_127445481....pdf100%
New File 1.8 m Track 4A draft Long Term Service
Agreement Revision 2 (22 May 2017)_THL_....pdf100%
New Dir 17 C:\AdvisianActive\01 Projects\SIPP Lenders
LTA\dataroom\dataroom\01 Power Purchase Agreement\
New File 6.6 m APPENDIX A.pdf100%
New File 9.2 m APPENDIX B.pdf100%
New File 3.0 m APPENDIX C.pdf100%
New File 1.6 m APPENDIX D.pdf100%
New File 7.1 m APPENDIX E.pdf100%
New File 755701 APPENDIX F.pdf100%
New File 9.5 m APPENDIX G.pdf100%
New File 1.1 m APPENDIX H.pdf100%
New File 971214 APPENDIX I.pdf100%
New File 1.1 m APPENDIX J.pdf100%
New File 2.9 m APPENDIX K.pdf100%
New File 842483 APPENDIX L.pdf100%
New File 830373 APPENDIX M.pdf100%
New File 190974 APPENDIX N.pdf100%
New File 1.9 m EXHIBIT 1.pdf100%
New File 24.4 m STAMPED COPY. PPA041016.pdf100%
New File 80896 Thumbs.db100%
New Dir 2 C:\AdvisianActive\01 Projects\SIPP Lenders
LTA\dataroom\dataroom\02 Gas Sales Agreement\
New File 15.1 m Gas Sales Agreement.pdf100%
New File 6144 Thumbs.db100%
New Dir 2 C:\AdvisianActive\01 Projects\SIPP Lenders
LTA\dataroom\dataroom\03 Land Lease Agreement\
New File 832986 Land Lease Agreement.pdf100%
New File 7680 Thumbs.db100%
New Dir 32 C:\AdvisianActive\01 Projects\SIPP Lenders
LTA\dataroom\dataroom\04 EPC Contract\
New File 444928 Thumbs.db100%
New File 74.0 m Track 4A_745972_signed_Main Body.pdf100%

New File 770.2 m Track 4A_745972_signed_Schedule A.pdf 0%


100%
New File 2.1 m Track 4A_745972_signed_Schedule AA.pdf
100%
New File 161860 Track 4A_745972_signed_Schedule B.pdf100%

New File 6.4 m Track 4A_745972_signed_Schedule BB.pdf


100%
New File 102941 Track 4A_745972_signed_Schedule C.pdf100%

New File 1.1 g Track 4A_745972_signed_Schedule CC.pdf


0% 100%
New File 197066 Track 4A_745972_signed_Schedule D.pdf100%

New File 39.7 m Track 4A_745972_signed_Schedule DD.pdf


100%
New File 164933 Track 4A_745972_signed_Schedule E.pdf100%

New File 153944 Track 4A_745972_signed_Schedule F.pdf100%

New File 15.3 m Track 4A_745972_signed_Schedule G.pdf100%

New File 169758 Track 4A_745972_signed_Schedule H.pdf100%

New File 162129 Track 4A_745972_signed_Schedule I.pdf100%

New File 107354 Track 4A_745972_signed_Schedule J.pdf100%

New File 112064 Track 4A_745972_signed_Schedule K.pdf100%

New File 106315 Track 4A_745972_signed_Schedule L.pdf100%

New File 108030 Track 4A_745972_signed_Schedule M.pdf100%

New File 1.0 m Track 4A_745972_signed_Schedule N.pdf100%

New File 115019 Track 4A_745972_signed_Schedule O.pdf100%

New File 107628 Track 4A_745972_signed_Schedule P.pdf100%

New File 151166 Track 4A_745972_signed_Schedule Q.pdf100%

New File 335298 Track 4A_745972_signed_Schedule R.pdf100%

New File 170239 Track 4A_745972_signed_Schedule S.pdf100%

New File 436081 Track 4A_745972_signed_Schedule T.pdf100%

New File 202809 Track 4A_745972_signed_Schedule U.pdf100%

New File 5.9 m Track 4A_745972_signed_Schedule V.pdf100%

New File 1017079 Track 4A_745972_signed_Schedule W.pdf100%


New File 773315 Track 4A_745972_signed_Schedule X.pdf100%

New File 853623 Track 4A_745972_signed_Schedule Y.pdf100%

New File 132676 Track 4A_745972_signed_Schedule Z.pdf100%

New Dir 3 C:\AdvisianActive\01 Projects\SIPP Lenders


LTA\dataroom\Executed agreemtn\
New File 4.7 m EPC Supplemental Agreement No 2.pdf100%
New File 3.9 m Long Term Service Agreement.pdf100%
New File 17.1 m Operation and Maintenance Agreement.pdf
100%
New Dir 3 C:\AdvisianActive\01 Projects\SIPP Lenders
LTA\dataroom\LTSA\
New File 1.4 m Track 4A draft LTSA Revision 7 GE
response version - 9 Aug 2017 -sent.doc100%
New File 1.5 m Track 4A Pasir Gudang draft FINAL LTSA
Revision 10 (7 September 2017) (clean)-ExecutionCopy-R2.doc100%
New File 1.3 m Track 4A Pasir Gudang draft FINAL LTSA
Revision 8 (27 August 2017)_THL_1....doc100%
New Dir 2 C:\AdvisianActive\01 Projects\SIPP Lenders
LTA\dataroom\O&M Agreement\
New File 33.3 m SPG Track 4A draft FINAL OM Agreement
version 8 (3 September 2017) (clean).docx100%
New File 2.3 m SPG Track 4A draft FINAL OM Agreement
version 8 (3 September 2017) (compared with version 7 dated 28 August 2017).pdf100%

New Dir 1 C:\AdvisianActive\01 Projects\SIPP Lenders LTA\Draft


Report Comments from Client\
New File 3.6 m 20170704 FPTA SIPP Track 4A Tech DD_First
Draft (FA)_GF TNB.pdf100%
New Dir 9 C:\AdvisianActive\01 Projects\SIPP Lenders
LTA\Experience List\
New File 6.5 m Advisian Capability Track Records.zip100%

New File 1.5 m Advisian Lenders Engineer Experience.pdf


100%
New File 854427 Advisian Power Due Diligence Offering and
Expertise.pdf100%
New File 236544 i) Transaction Services Team
Experience.doc100%
New File 37072 i) Transaction Services Team
Experience.pdf100%
New File 232448 ii) H-Class Machine Experience.doc100%
New File 39185 ii) H-Class Machine Experience.pdf100%
New File 395388 Master List GT and Class Experience.pdf
100%
New File 415242 Technical and Commercial Due Dilligence
PRINT.pdf100%
New Dir 4 C:\AdvisianActive\01 Projects\SIPP Lenders
LTA\Experience List\Advisian Corporate Brochures\
New File 1.7 m
CorporateBrochure_Bro_210mmx210mm_APAC_0516-Rev0-LoRes.pdf100%
New File 630119 Finance Project Finance and PPP PRINT.pdf
100%
New File 1.0 m Fossil Power flier.pdf100%
New File 757325 Resource and Industry Power Capability-
ver4-web.pdf100%
New Dir 6 C:\AdvisianActive\01 Projects\SIPP Lenders
LTA\Experience List\Advisian Experience List\
New File 1.5 m Advisian Lenders Engineer Experience.pdf
100%
New File 854427 Advisian Power Due Diligence Offering and
Expertise.pdf100%
New File 37072 i) Transaction Services Team
Experience.pdf100%
New File 39185 ii) H-Class Machine Experience.pdf100%
New File 395388 Master List GT and Class Experience.pdf
100%
New File 415242 Technical and Commercial Due Dilligence
PRINT.pdf100%
New Dir 3 C:\AdvisianActive\01 Projects\SIPP Lenders LTA\Final
Draft Submitted to Client\
New File 8.6 m 20170726 ITA SIPP Track 4A Tech DD
clean.docx100%
New File 3.4 m 20170726 ITA SIPP Track 4A Tech DD
clean.pdf100%
New File 9.4 m 20170726 ITA SIPP Track 4A Tech DD
tc.docx100%
New Dir 6 C:\AdvisianActive\01 Projects\SIPP Lenders LTA\Final
Draft to Client 07 Aug\
New File 8.6 m 20170808 ITA SIPP Track 4A Tech DD
clean.docx100%
New File 3.4 m 20170808 ITA SIPP Track 4A Tech DD
clean.pdf100%
New File 8.6 m 20170808 ITA SIPP Track 4A Tech DD.docx
100%
New File 3.4 m 20170808 ITA SIPP Track 4A Tech DD.pdf
100%
New File 8.7 m 20170910 ITA SIPP Track 4A Tech DD
tc.docx100%
New File 52304 Comments ITA SIPP Track 4A Tech DD Draft
Final 170807.docx100%
New Dir 21 C:\AdvisianActive\01 Projects\SIPP Lenders LTA\Final
Draft to JLM 11 Sept\
New File 8.6 m 20170911 ITA SIPP Track 4A Tech DD
clean.docx100%
New File 8.7 m 20170911 ITA SIPP Track 4A Tech DD
tc.docx100%
New File 3.1 m 20170911 ITA SIPP Track 4A Tech DD.pdf
100%
New File 8.7 m 20170916 ITA SIPP Track 4A Tech DD
clean.docx100%
New File 3.1 m 20170916 ITA SIPP Track 4A Tech DD
clean.pdf100%
New File 3.2 m 20170916 ITA SIPP Track 4A Tech DD
Final.pdf100%
New File 8.8 m 20170916 ITA SIPP Track 4A Tech DD
tc.docx100%
New File 8.7 m 20170918 ITA SIPP Track 4A Tech DD
clean.docx100%
New File 8.7 m 20170918 ITA SIPP Track 4A Tech DD
clean_rev2.docx100%
New File 8.7 m 20170918 ITA SIPP Track 4A Tech DD
clean_rev3.docx100%
New File 8.7 m 20170918 ITA SIPP Track 4A Tech DD
clean_rev4.docx100%
New File 3.2 m 20170918 ITA SIPP Track 4A Tech DD
Final.pdf100%
New File 3.2 m 20170918 ITA SIPP Track 4A Tech DD
Final_rev1.pdf100%
New File 3.2 m 20170918 ITA SIPP Track 4A Tech DD
Final_rev2.pdf100%
New File 3.2 m 20170918 ITA SIPP Track 4A Tech DD
Final_rev3.pdf100%
New File 3.2 m 20170918 ITA SIPP Track 4A Tech DD
Final_rev4.pdf100%
New File 8.7 m 20170918 ITA SIPP Track 4A Tech DD
tc.docx100%
New File 8.7 m 20170918 ITA SIPP Track 4A Tech DD
tc_rev2.docx100%
New File 8.7 m 20170918 ITA SIPP Track 4A Tech DD
tc_rev3.docx100%
New File 766957 Summary of Comments on Report Advisian
from JLM 12 Sep.pdf100%
New File 761579 Summary of Comments on Report Advisian
from JLM 12 Sep_Advisian.pdf100%
New Dir 3 C:\AdvisianActive\01 Projects\SIPP Lenders LTA\First
Draft Submitted to Client\
New File 8.0 m 20170619 FPTA SIPP Track 4A Tech DD_First
Draft.docx100%
New File 3.5 m 20170619 FPTA SIPP Track 4A Tech DD_First
Draft.pdf100%
New File 37376 Thumbs.db100%
New Dir 8 C:\AdvisianActive\01 Projects\SIPP Lenders LTA\IE
Agreements\
New File 1.1 m 4A Project_IE Agreement Appendix 1_draft
#1.docx100%
New File 1.1 m 4A Project_IE Agreement Appendix 1_draft
#1_NA_Advisian23Oct.docx100%
New File 1.1 m 4A Project_IE Agreement Appendix 2_draft
#1.docx100%
New File 1.1 m 4A Project_IE Agreement Appendix 2_draft
#1_rev1.docx100%
New File 1.1 m 4A Project_IE Agreement Appendix 2_draft
#1_rev2.docx100%
New File 1.1 m 4A Project_IE Agreement Appendix 2_draft
#1_rev2_Advisian23Oct.docx100%
New File 1.4 m 4A Project_IE Agreement_DRAFT_180817.docx
100%
New File 797433 IE Proposal_Reltency_Neoh.pdf100%
New Dir 2 C:\AdvisianActive\01 Projects\SIPP Lenders LTA\IE
Agreements\superceded\
New File 1.4 m 4A Project_IE Agreement DRAFT.docx100%
New File 1.4 m 4A Project_LTA
Agreement_DRAFT_260517.docx100%
New Dir 1 C:\AdvisianActive\01 Projects\SIPP Lenders LTA\IE
Scope to LEONG\
New File 202789 Independent Engineer Scope of Work.docx
100%
New Dir 15 C:\AdvisianActive\01 Projects\SIPP Lenders LTA\LTA
Agreements\
New File 121856 01a Cover Letter_Mandate.doc100%
New File 130295 01a Cover Letter_Mandate.docx100%
New File 249925 2142 - CSOC Tract 4A Rev00
6Sep17_Final.docx100%
New File 1.1 m 4A Project_ LTA Agreement Appendix
1_draft_260517.docx100%
New File 1.1 m 4A Project_ LTA Agreement Appendix
1_Final.docx100%
New File 115855 4A Project_ LTA Agreement Appendix
1_Final.pdf100%
New File 1.1 m 4A Project_ LTA Agreement Appendix
2_draft_260517.docx100%
New File 1.1 m 4A Project_ LTA Agreement Appendix
2_Final.docx100%
New File 52123 4A Project_ LTA Agreement Appendix
2_Final.pdf100%
New File 1.4 m 4A Project_LTA
Agreement_DRAFT_260517.docx100%
New File 244535 4A Project_LTA
Agreement_FINAL_06Sep17.pdf100%
New File 1.4 m 4A Project_LTA
Agreement_FINAL_06Sep17_rev1.docx100%
New File 1.5 m 4A Project_LTA
Agreement_FINAL_06Sep17_rev2.docx100%
New File 4.0 m Advisian - Sub - Lenders Technical
Advisors (LTA) Mandate Signing_signed.pdf100%
New File 3.1 m img-X25101622-0001.pdf100%
New Dir 4 C:\AdvisianActive\01 Projects\SIPP Lenders LTA\LTA
Agreements\14 Aug\
New File 1.1 m 170724 4A Project_ LTA Agreement Appendix
2_draft_19062017 Advisian Com. (TNB - 28 July 2017)_Advisian 14Aug.docx100%
New File 1.2 m 4A Project_ LTA Agreement Appendix
1_draft_19062017 Advisian Comments_06072017 (TNB - 28 July 2017)_Advisian
14Aug.docx100%
New File 1.4 m 4A Project_LTA Agreement_DRAFT_190617
Advisian Comments_06072017 (TNB - ....docx100%
New File 1.4 m 4A Project_LTA Agreement_DRAFT_190617
Advisian Comments_06072017 (TNB - 28 July 2017) Advisian 14Aug2017.docx100%
New Dir 3 C:\AdvisianActive\01 Projects\SIPP Lenders LTA\LTA
Agreements\Advisian Comments\
New File 1.1 m 4A Project_ LTA Agreement Appendix
1_draft_19062017 Advisian Comments_06072017.docx100%
New File 1.1 m 4A Project_ LTA Agreement Appendix
2_draft_19062017 Advisian Comments_06072017.docx100%
New File 1.5 m 4A Project_LTA Agreement_DRAFT_190617
Advisian Comments_06072017.docx100%
New Dir 3 C:\AdvisianActive\01 Projects\SIPP Lenders LTA\LTA
Agreements\Final Clean 29 Aug\
New File 1.4 m 4A Project_LTA Agreement_DRAFT_29Aug
Clean.docx100%
New File 1.4 m 4A Project_LTA Agreement_DRAFT_30Aug
Clean.docx100%
New File 283235 CSOC - SIPP Track 4A 30Aug.docx100%
New Dir 2 C:\AdvisianActive\01 Projects\SIPP Lenders LTA\LTA
Agreements\Final Clean 29 Aug\From TNB 29 Aug\
New File 1.4 m 4A Project_LTA Agreement_DRAFT_190617
Advisian Comments_Advisian 14Aug20...(TNB 29082017).docx100%
New File 1.6 m RE Track 4a Advisisan Draft engagement
letter for Independent Technical Advisor (ITA).msg100%
New Dir 1 C:\AdvisianActive\01 Projects\SIPP Lenders LTA\LTA
Agreements\ref\
New File 3.9 m 2015 09 29 GNPD_BV Professional Services
Agreement_GNPDrev clean_BV Accepted revClients v 3_Final 15032016.docx100%
New Dir 2 C:\AdvisianActive\01 Projects\SIPP Lenders LTA\LTA
Agreements\superceded\
New File 1.4 m 4A Project_LTA Agreement Client
Suggestions_DRAFT_250517 Rev01_Neoh.docx100%
New File 1.4 m 4A Project_LTA Agreement DRAFT.docx100%
New Dir 0 C:\AdvisianActive\01 Projects\SIPP Lenders LTA\Q&A\
New Dir 1 C:\AdvisianActive\01 Projects\SIPP Lenders
LTA\Q&A\Batch 1\
New File 12063 Advisian Q&A_batch 1_07June2017.xlsx100%

New Dir 1 C:\AdvisianActive\01 Projects\SIPP Lenders


LTA\Q&A\Batch 2\
New File 104665 Advisian QA_batch 2_28 June 2017.xlsx100%

New Dir 3 C:\AdvisianActive\01 Projects\SIPP Lenders LTA\ref\


New File 13.1 m GE Power and Renewable Energy Investor
Meeting 030817.pdf100%
New File 517453 gea32885-bouchain-whitepaper-final-aug-
2016.pdf100%
New File 643070 GT-Development-Roadmaps_2017-04-19.pdf
100%
New Dir 0 C:\AdvisianActive\01 Projects\SIPP Lenders
LTA\ref\Questions-Info fr Poyry\
New Dir 1 C:\AdvisianActive\01 Projects\SIPP Lenders
LTA\ref\Questions-Info fr Poyry\batch 1\
New File 69246 Manjung 5 Tech and Env DD QA batch 1
(27082013)_TNB Respond 30082013.pdf100%
New Dir 4 C:\AdvisianActive\01 Projects\SIPP Lenders
LTA\ref\Questions-Info fr Poyry\batch 2\
New File 23600 Poyry Q&A_batch 2_6 Sept 2013.xlsx100%
New File 69632 Poyry QA_financial model_batch 2_7
Oct.xls100%
New File 14831 Q33_noise guarantees.docx100%
New File 19102 Q40_CW intake pipe design.docx100%
New Dir 5 C:\AdvisianActive\01 Projects\SIPP Lenders
LTA\ref\Questions-Info fr Poyry\batch 3\
New File 318206 Poyry QA_batch 3_7Oct - Main
(18102013).xlsx100%
New File 310078 Poyry QA_batch 3_7Oct.xlsx100%
New File 13291 Q73 attachment.docx100%
New File 16008 Q74 attachment.docx100%
New File 14604 Q9 attachment.docx100%
New Dir 1 C:\AdvisianActive\01 Projects\SIPP Lenders
LTA\ref\Questions-Info fr Poyry\batch 4 - tech & financial\
New File 64097 Poyry QA_batch 4_24 Oct 2013.xlsx100%
New Dir 2 C:\AdvisianActive\01 Projects\SIPP Lenders
LTA\ref\Questions-Info fr Poyry\batch 5\
New File 64627 Poyry QA_batch 5_29 Oct 2013 -
Answers.xlsx100%
New File 64592 Poyry QA_batch 5_29 Oct 2013.xlsx100%
New Dir 1 C:\AdvisianActive\01 Projects\SIPP Lenders
LTA\ref\Questions-Info fr Poyry\batch 6\
New File 66158 Poyry QA_batch 6_4 Nov 2013.xlsx100%
New Dir 2 C:\AdvisianActive\01 Projects\SIPP Lenders
LTA\ref\Questions-Info fr Poyry\financial model\
New File 14056 Poyry Q&A_financial model_9 Sept
2013.xlsx100%
New File 17139 Q6_scheduled maintenance plan.docx100%
New Dir 4 C:\AdvisianActive\01 Projects\SIPP Lenders LTA\REF 3B
draft LTA Agreement\
New File 41964 3B Project_ LTA Agreement Appendix
1_draft #1.doc.zip100%
New File 16731 3B Project_ LTA Agreement Appendix
2_draft #1.doc.zip100%
New File 23824 3B Project_ LTA Agreement Appendix
3_draft #1.doc.zip100%
New File 35554 3B Project_ LTA Agreement main body_draft
#1.doc.zip100%
New Dir 0 C:\AdvisianActive\01 Projects\SIPP Lenders LTA\REF 3B
draft LTA Agreement\password 3a3b\
New Dir 2 C:\AdvisianActive\01 Projects\SIPP Lenders LTA\SIPP
CSOC & RCF\
New File 438185 CRF-0043_005_Project.pdf100%
New File 2.0 m Track 4a Advisisan Draft engagement
letter for Independent Technical Advisor (ITA).msg100%
New Dir 2 C:\AdvisianActive\01 Projects\SIPP Lenders
LTA\superceded\
New File 1.2 m 4A Project_ LTA Agreement Appendix
1_draft #1.doc100%
New File 1.2 m 4A Project_ LTA Agreement Appendix
2_draft #1.doc100%
New Dir 4 C:\AdvisianActive\01 Projects\TNB Life Extension
Report by Paul\
New File 1.5 m Asset Life Extension Report_CBPS CCGT Rev
0_6 Apr 2011.pdf100%
New File 2.0 m Microsoft Word - Asset Life Extension
Report Rev 1 25-3-2011.pdf100%
New File 4.3 m TNB 101010-00023 REP 0002 PASIR GUDANG
Rev 0_280712_final.pdf100%
New File 4.6 m TNB Report_PAKA_102020-00023-REP-0001
final.pdf100%
New Dir 21 C:\AdvisianActive\01 Projects\TNBJ M&E Audit\
New File 156665 302020-00445TP-L001 - Performance
Guarantee Submission.pdf100%
New File 221804 Asset 7.docx100%
New File 73143 Bank Draft for Performance Bond.pdf100%
New File 297804 IRF TNBJ M&E Audit Kick Off.pdf100%
New File 38496 IRF-030-Mayflower cars rental_Lumut.docx
100%
New File 471915 janamanjung-100112231301-phpapp01.pdf100%

New File 2.1 m KEV M&E Audit Info RFI.xlsx100%


New File 196230 Master Spreadsheet.pptx100%
New File 123447 Master Spreadsheet.xlsx100%
New File 525926 NEO Compiled from ST Reports.xlsx100%
New File 266328 Org Chart.pptx100%
New File 109568 Performance Guarantee Submission.doc100%

New File 148060 Picture 001.jpg100%


New File 2.3 m TNBJ Kick Off Meeting.pptx100%
New File 1.4 m TNBJ M&E Audit Bank
Guarantee_Advisian.pdf100%
New File 2.1 m TNBJ M&E Audit Info RFI.xlsx100%
New File 25136 TNBJ M&E Audit Info RFI_v2.xlsx100%
New File 63706 TNBJ M&E Audit Manning Schedule.pdf100%
New File 1.0 m TNBJ Site Visit Agenda_12 July.docx100%
New File 56387 TNBJ Site Visit Agenda_12 July.pdf100%
New File 1.0 m TNBJ Site Visit Agenda_14-15 June.docx
100%
New Dir 7 C:\AdvisianActive\01 Projects\TNBJ M&E Audit\Audit
Work Plan\
New File 4.6 m TNBJ Audit Work Plan_20Apr.pptx100%
New File 711674 TNBJ Audit Work Plan_26May.pdf100%
New File 1.0 m TNBJ Audit Work Plan_26May.pptx100%
New File 719862 TNBJ Audit Work Plan_26May_final.pdf100%

New File 1.0 m TNBJ Audit Work Plan_26May_final.pptx100%

New File 719046 TNBJ Audit Work Plan_26May_rev2.pdf100%


New File 1.0 m TNBJ Audit Work Plan_26May_rev2.pptx100%

New Dir 3 C:\AdvisianActive\01 Projects\TNBJ M&E Audit\Budget


sent to Finance\
New File 25917 20170315_TNBJ M&E_Budget_Neoh_v3.xlsx100%

New File 15909 TNBJ M&E Audit Work Budget_26May.xlsx100%

New File 16117 TNBJ M&E Audit Work Budget_29June.xlsx


100%
New Dir 2 C:\AdvisianActive\01 Projects\TNBJ M&E Audit\Draft
Submitted to EC 07 Sep\
New File 4.1 m TNBJ ME Audit Report
Draft_07September_clean.docx100%
New File 2.3 m TNBJ ME Audit Report
Draft_07September_clean.pdf100%
New Dir 11 C:\AdvisianActive\01 Projects\TNBJ M&E Audit\Draft
Submitted to TNBJ 11Aug\
New File 4.2 m TNBJ ME Audit Report Draft_01Sep.docx100%

New File 111449 TNBJ ME Audit Report Draft_04September -


comments .docx100%
New File 4.3 m TNBJ ME Audit Report
Draft_04September.docx100%
New File 4.3 m TNBJ ME Audit Report
Draft_07September.docx100%
New File 4.1 m TNBJ ME Audit Report
Draft_07September_clean.docx100%
New File 2.3 m TNBJ ME Audit Report
Draft_07September_clean.pdf100%
New File 4.1 m TNBJ ME Audit Report Draft_11August.docx
100%
New File 4.1 m TNBJ ME Audit Report Draft_24August.docx
100%
New File 360307 TNBJ ME Audit Report Draft_25August -
comments_Neoh29Aug.docx100%
New File 4.1 m TNBJ ME Audit Report Draft_25August.docx
100%
New File 4.2 m TNBJ ME Audit Report
Draft_29August_Neoh.docx100%
New Dir 1 C:\AdvisianActive\01 Projects\TNBJ M&E Audit\from PF\
New File 779197 TNBJ_Availability Records.xlsx100%
New Dir 2 C:\AdvisianActive\01 Projects\TNBJ M&E
Audit\Schedule\
New File 624640 TNBJ M&E Audit Schedule.mpp100%
New File 413696 TNBJ M&E Audit Schedule_v2.mpp100%
New Dir 3 C:\AdvisianActive\01 Projects\TNBJ M&E Audit\Site
Field Exit Meeting\
New File 1.6 m TNBJ Field Exit Meeting_03Aug.pptx100%
New File 1.0 m TNBJ Field Exit Meeting_03Aug_final.pdf
100%
New File 1.7 m TNBJ Field Exit Meeting_03Aug_final.pptx
100%
New Dir 14 C:\AdvisianActive\01 Projects\TNBJ M&E Audit\Working\
New File 162 ~$BJ ME Audit Report Draft_04July.docx
100%
New File 162 ~$BJ ME Audit Report Draft_13June.docx
100%
New File 77487 Manpower Benchmark.xlsx100%
New File 123592 Master Spreadsheet.xlsx100%
New File 739671 TNBJ Financials_working_19June.xlsx100%
New File 4.1 m TNBJ ME Audit Report Draft_04July.docx
100%
New File 4.3 m TNBJ ME Audit Report Draft_06August.docx
100%
New File 4.3 m TNBJ ME Audit Report Draft_07August.docx
100%
New File 4.1 m TNBJ ME Audit Report Draft_09August.docx
100%
New File 4.1 m TNBJ ME Audit Report Draft_11August.docx
100%
New File 4.1 m TNBJ ME Audit Report Draft_13June.docx
100%
New File 360307 TNBJ ME Audit Report Draft_25August -
comments_Neoh.docx100%
New File 4.3 m TNBJ ME Audit Report Draft_31Jul.docx100%

New File 723292 TNBJ_Availability Records.xlsx100%


New Dir 19 C:\AdvisianActive\01 Projects\Track 4B Edra LTA\
New File 94680 20171003_Edra and Advisian Meeting
Agenda_Advisian response to comments (Neoh).docx100%
New File 69833 Advisian QA_batch 1_14August.xlsx100%
New File 72063 Advisian QA_batch 2_30August.xlsx100%
New File 72422 Advisian QA_batch 2_30August_rev1.xlsx
100%
New File 2.0 m Advisian Track 4B FPTA Internal Kick
Off.pptx100%
New File 1.0 m Advisian Track 4B FPTA Internal Kick
Off_14Aug.pdf100%
New File 15533 Contact Details.docx100%
New File 332579 Degradation Curve.xlsx100%
New File 115621 Edra Alor Gajah_EC Review.docx100%
New File 48785 Edra and Advisian Meeting Agenda_Advisian
response to comments (ADVISIAN 05 Oct).docx100%
New File 20713 Edra LTA_Budget_Neoh.xlsx100%
New File 20813 Edra LTA_Budget_Neoh_r1.xlsx100%
New File 21853 Edra LTA_Budget_Neoh_r2.xlsx100%
New File 52840 IM Extract - Technical (Sept 14).docx100%

New File 52752 IM Extract - Technical (Sept


14)_Advisian.docx100%
New File 268276 Melaka - Information Memorandum (for
Advisian's confirmation)_Advisian 23 Oct.docx100%
New File 74240 Queries on Advisian - Draft report dated
9 Oct_Advisian.doc100%
New File 216576 Queries on draft report to Advisian (4
Oct 2017)(CIMB)_advisian.doc100%
New File 220672 Queries on draft report to Advisian (4
Oct 2017)(CIMB)_advisian_09Oct.doc100%
New Dir 7 C:\AdvisianActive\01 Projects\Track 4B Edra
LTA\dataroom\
New File 18.6 m 03 LNTP Agreement dd 23 Mar 2017.pdf100%

New File 72.6 m 06 Gas Supply Agreement dd 11 Apr


2017.pdf100%
New File 70217 Advisian QA_batch 1_14August_reply (21-
08-2017).xlsx100%
New File 97525 Draft EESB-KNSB OM Agreement (clean)
(12102017).docx100%
New File 50505 Edra Energy - KNSB technical and
management services agreement (GL 30 12....docx100%
New File 5.3 m Project Melaka Model 20171011 v1 (Sent to
KPMG).xlsm100%
New File 5.3 m Project Melaka Model 20171016 v1 (Sent to
KPMG).xlsm100%
New Dir 0 C:\AdvisianActive\01 Projects\Track 4B Edra
LTA\dataroom\01\
New Dir 0 C:\AdvisianActive\01 Projects\Track 4B Edra
LTA\dataroom\01\00 EIA Report\
New Dir 11 C:\AdvisianActive\01 Projects\Track 4B Edra
LTA\dataroom\01\00 EIA Report\Appendices\
New File 7.9 m App 1.1 PAT Endorsement.pdf100%
New File 49.2 m App 2.1 Land Titles.pdf100%
New File 111.0 m App 4.1 Test Results.pdf100%
New File 9.2 m App 4.2(a) Survey forms.pdf100%
New File 11.4 m App 4.2(b) Minutes.pdf100%
New File 92.8 m App 5.1 Hydraulic Report.pdf100%
New File 7.7 m App 5.2(a) Consequence Modelling
Results.pdf100%
New File 7.6 m App 5.2(b) Failure Frequencies.pdf100%
New File 7.7 m App 5.3(a) Peak Runoff Estimation.pdf100%

New File 8.0 m App 5.3(b) USLE and Sediment Yield


Calculation.pdf100%
New File 11.2 m App 5.3(c) Conceptual ESCP.pdf100%
New Dir 11 C:\AdvisianActive\01 Projects\Track 4B Edra
LTA\dataroom\01\00 EIA Report\Main Report\
New File 46.8 m Cover_declaration.pdf100%
New File 8.0 m EV803-8013-Chap1-final.pdf100%
New File 13.5 m EV803-8013-Chap2-final.pdf100%
New File 7.7 m EV803-8013-Chap3-final.pdf100%
New File 37.0 m EV803-8013-Chap4-final.pdf100%
New File 31.1 m EV803-8013-Chap5-final.pdf100%
New File 8.2 m EV803-8013-Chap6-final.pdf100%
New File 7.7 m EV803-8013-Chap7-final.pdf100%
New File 9.8 m EV803-8013-ES-final.pdf100%
New File 9.8 m EV803-8013-RE-final.pdf100%
New File 7.9 m EV803-8013-TOC-final.pdf100%
New Dir 1 C:\AdvisianActive\01 Projects\Track 4B Edra
LTA\dataroom\01\01 Addendum Report\
New File 12.1 m Addendum Report -final.pdf100%
New Dir 1 C:\AdvisianActive\01 Projects\Track 4B Edra
LTA\dataroom\01\02 Additional QRA Report\
New File 11.4 m Additional QRA Study-gas buffer-
190916.pdf100%
New Dir 4 C:\AdvisianActive\01 Projects\Track 4B Edra
LTA\dataroom\01 PPA\
New File 81.2 m 01 PPA dd 20 Apr 2017 (Appx A - C).pdf
0% 100%
New File 99.0 m 01 PPA dd 20 Apr 2017 (Appx D - N &
Exhibits).pdf 0% 100%
New File 116.2 m 01 PPA dd 20 Apr 2017 (Main body).pdf 0%
100%
New File 34816 Thumbs.db100%
New Dir 3 C:\AdvisianActive\01 Projects\Track 4B Edra
LTA\dataroom\02\
New File 9.2 m Surat Kelulusan Laporan EIA.pdf100%
New File 8.7 m Surat keputusan rayuan semakan syarat
kelulusan EIA no 31, 31 dan 33.pdf100%
New File 15.8 m Syarat-syarat kelulusan EIA.pdf100%
New Dir 2 C:\AdvisianActive\01 Projects\Track 4B Edra
LTA\dataroom\03\
New File 7.8 m OE Organization Chart.pdf100%
New File 9.2 m Project Melaka - Project Management
Organization.pdf100%
New Dir 2 C:\AdvisianActive\01 Projects\Track 4B Edra
LTA\dataroom\04\
New File 10.1 m OE Services Agreement - Signed.pdf100%
New File 28.3 m Owner's Engineer experience list.pdf100%

New Dir 2 C:\AdvisianActive\01 Projects\Track 4B Edra


LTA\dataroom\05. LTSA dated 30 May 2017\
New File 51.0 m 05. LTSA dated 30 May 2017.pdf100%
New File 12800 Thumbs.db100%
New Dir 6 C:\AdvisianActive\01 Projects\Track 4B Edra
LTA\dataroom\06\
New File 18566 Bob Cuthbertson (OE Project Manager).docx
100%
New File 18506 Matthew Loughnan (OE Engineering
Manager).docx100%
New File 21358 Md Shamsul Bahrin Hussain (Edra Project
Director).docx100%
New File 18944 Mun Sang Yip (Edra Deputy Project
Director).docx100%
New File 18901 Peter Smart (OE Project Director).docx
100%
New File 18694 Tham Weng Choun (Edra Project
Manager).docx100%
New Dir 1 C:\AdvisianActive\01 Projects\Track 4B Edra
LTA\dataroom\07\
New File 7.7 m Indicative OM Organization Structure.pdf
100%
New Dir 0 C:\AdvisianActive\01 Projects\Track 4B Edra
LTA\dataroom\08\
New Dir 2 C:\AdvisianActive\01 Projects\Track 4B Edra
LTA\dataroom\08\KM1\
New File 9.1 m 10 F1321A - 1ap Edra Energy Sdn.Bhd.-
Model.pdf100%
New File 9.8 m 11 F1321 - Edra Energy.pdf100%
New Dir 3 C:\AdvisianActive\01 Projects\Track 4B Edra
LTA\dataroom\08\KM2\
New File 8.0 m F1421 - 001A (19-01-2017)-Model.pdf100%
New File 8.2 m F1421 - Conditional Approval.pdf100%
New File 8.2 m F1421 - Rezoning SPC Approval.pdf100%
New Dir 9 C:\AdvisianActive\01 Projects\Track 4B Edra
LTA\dataroom\EPC\
New File 43.4 m Melaka EPC Volume 1 of 8_CIMB.pdf 0%
100%
New File 69.9 m Melaka EPC Volume 2 of 8_CIMB.pdf 0%
100%
New File 70.1 m Melaka EPC Volume 3 of 8_CIMB.pdf 0%
100%
New File 49.5 m Melaka EPC Volume 4 of 8_CIMB.pdf100%
New File 63.1 m Melaka EPC Volume 5 of 8_CIMB.pdf100%
New File 67.7 m Melaka EPC Volume 6 of 8_CIMB.pdf 0%
100%
New File 22.2 m Melaka EPC Volume 7 of 8_CIMB.pdf100%
New File 18.2 m Melaka EPC Volume 8 of 8_CIMB.pdf100%
New File 84480 Thumbs.db100%
New Dir 2 C:\AdvisianActive\01 Projects\Track 4B Edra
LTA\dataroom\EPC Contractor\
New File 24.2 m 6. Capability of and certainty of plant
delivery by the EPC contractor.pdf100%
New File 20992 Thumbs.db100%
New Dir 3 C:\AdvisianActive\01 Projects\Track 4B Edra
LTA\dataroom\Feasibility Study Final Report\
New File 19.6 m 7. Melaka - Feasibility Study Final
Report (Annex) 23-Mar-15.pdf100%
New File 12.7 m 7. Melaka - Feasibility Study Final
Report 23-Mar-15.pdf100%
New File 20992 Thumbs.db100%
New Dir 1 C:\AdvisianActive\01 Projects\Track 4B Edra
LTA\dataroom\FM\
New File 5.3 m Project Melaka Model 20170804 v1
(Sent).xlsm100%
New Dir 9 C:\AdvisianActive\01 Projects\Track 4B Edra
LTA\dataroom\Land Docs\
New File 2.3 m 08 & 09 SPA Malacca Land dd 21 Mar
2016.pdf100%
New File 1.9 m 11 SPA YM-EESB Lot 4676 partial dd 31 May
2016.pdf100%
New File 1.4 m 13 LLA Lot 4695 dd 27 Jul 2016.pdf100%
New File 1.4 m 14 LLA Lot 9323 dd 27 Jul 2016.pdf100%
New File 1.9 m 15. LLA Panglima (Lot 14770) dated
7.12.2016.pdf100%
New File 1.9 m 16. LLA Panglima (Lot 4640) dated
7.12.2016.pdf100%
New File 2.0 m 17. LLA Powertek (Lot 4702) dated
7.12.2016.pdf100%
New File 2.0 m 18. LLA Powertek (Lot 4703) dated
7.12.2016.pdf100%
New File 41984 Thumbs.db100%
New Dir 4 C:\AdvisianActive\01 Projects\Track 4B Edra
LTA\dataroom\LNTP Insurance Policies\
New File 477940 19.1 LNTP - Cover Note.pdf100%
New File 3.3 m 19.2 Project Melaka - LNTP - CAR.pdf100%

New File 804367 19.3 Project Melaka - LNTP - WC.pdf100%


New File 29184 Thumbs.db100%
New Dir 1 C:\AdvisianActive\01 Projects\Track 4B Edra
LTA\dataroom\Q&A First Batch\
New File 70217 Advisian QA_batch 1_14August_reply (21-
08-2017).xlsx100%
New Dir 0 C:\AdvisianActive\01 Projects\Track 4B Edra
LTA\dataroom\Q&A First Batch\01\
New Dir 0 C:\AdvisianActive\01 Projects\Track 4B Edra
LTA\dataroom\Q&A First Batch\01\00 EIA Report\
New Dir 12 C:\AdvisianActive\01 Projects\Track 4B Edra
LTA\dataroom\Q&A First Batch\01\00 EIA Report\Appendices\
New File 7.9 m App 1.1 PAT Endorsement.pdf100%
New File 49.2 m App 2.1 Land Titles.pdf100%
New File 111.0 m App 4.1 Test Results.pdf 0% 100%
New File 9.2 m App 4.2(a) Survey forms.pdf100%
New File 11.4 m App 4.2(b) Minutes.pdf100%
New File 92.8 m App 5.1 Hydraulic Report.pdf100%
New File 7.7 m App 5.2(a) Consequence Modelling
Results.pdf100%
New File 7.6 m App 5.2(b) Failure Frequencies.pdf100%
New File 7.7 m App 5.3(a) Peak Runoff Estimation.pdf100%

New File 8.0 m App 5.3(b) USLE and Sediment Yield


Calculation.pdf100%
New File 11.2 m App 5.3(c) Conceptual ESCP.pdf100%
New File 22016 Thumbs.db100%
New Dir 12 C:\AdvisianActive\01 Projects\Track 4B Edra
LTA\dataroom\Q&A First Batch\01\00 EIA Report\Main Report\
New File 46.8 m Cover_declaration.pdf100%
New File 8.0 m EV803-8013-Chap1-final.pdf100%
New File 13.5 m EV803-8013-Chap2-final.pdf100%
New File 7.7 m EV803-8013-Chap3-final.pdf100%
New File 37.0 m EV803-8013-Chap4-final.pdf100%
New File 31.1 m EV803-8013-Chap5-final.pdf100%
New File 8.2 m EV803-8013-Chap6-final.pdf100%
New File 7.7 m EV803-8013-Chap7-final.pdf100%
New File 9.8 m EV803-8013-ES-final.pdf100%
New File 9.8 m EV803-8013-RE-final.pdf100%
New File 7.9 m EV803-8013-TOC-final.pdf100%
New File 153088 Thumbs.db100%
New Dir 2 C:\AdvisianActive\01 Projects\Track 4B Edra
LTA\dataroom\Q&A First Batch\01\01 Addendum Report\
New File 12.1 m Addendum Report -final.pdf 0% 100%
New File 14336 Thumbs.db100%
New Dir 2 C:\AdvisianActive\01 Projects\Track 4B Edra
LTA\dataroom\Q&A First Batch\01\02 Additional QRA Report\
New File 11.4 m Additional QRA Study-gas buffer-
190916.pdf100%
New File 19968 Thumbs.db100%
New Dir 4 C:\AdvisianActive\01 Projects\Track 4B Edra
LTA\dataroom\Q&A First Batch\02\
New File 9.2 m Surat Kelulusan Laporan EIA.pdf100%
New File 8.7 m Surat keputusan rayuan semakan syarat
kelulusan EIA no 31, 31 dan 33.pdf100%
New File 15.8 m Syarat-syarat kelulusan EIA.pdf 0% 100%

New File 105472 Thumbs.db100%


New Dir 3 C:\AdvisianActive\01 Projects\Track 4B Edra
LTA\dataroom\Q&A First Batch\03\
New File 7.8 m OE Organization Chart.pdf100%
New File 9.2 m Project Melaka - Project Management
Organization.pdf100%
New File 109568 Thumbs.db100%
New Dir 3 C:\AdvisianActive\01 Projects\Track 4B Edra
LTA\dataroom\Q&A First Batch\04\
New File 10.1 m OE Services Agreement - Signed.pdf100%
New File 28.3 m Owner's Engineer experience list.pdf100%

New File 28672 Thumbs.db100%


New Dir 6 C:\AdvisianActive\01 Projects\Track 4B Edra
LTA\dataroom\Q&A First Batch\06\
New File 18566 Bob Cuthbertson (OE Project Manager).docx
100%
New File 18506 Matthew Loughnan (OE Engineering
Manager).docx100%
New File 21358 Md Shamsul Bahrin Hussain (Edra Project
Director).docx100%
New File 18944 Mun Sang Yip (Edra Deputy Project
Director).docx100%
New File 18901 Peter Smart (OE Project Director).docx
100%
New File 18694 Tham Weng Choun (Edra Project
Manager).docx100%
New Dir 2 C:\AdvisianActive\01 Projects\Track 4B Edra
LTA\dataroom\Q&A First Batch\07\
New File 7.7 m Indicative OM Organization Structure.pdf
100%
New File 25600 Thumbs.db100%
New Dir 0 C:\AdvisianActive\01 Projects\Track 4B Edra
LTA\dataroom\Q&A First Batch\08\
New Dir 3 C:\AdvisianActive\01 Projects\Track 4B Edra
LTA\dataroom\Q&A First Batch\08\KM1\
New File 9.1 m 10 F1321A - 1ap Edra Energy Sdn.Bhd.-
Model.pdf100%
New File 9.8 m 11 F1321 - Edra Energy.pdf100%
New File 36352 Thumbs.db100%
New Dir 4 C:\AdvisianActive\01 Projects\Track 4B Edra
LTA\dataroom\Q&A First Batch\08\KM2\
New File 8.0 m F1421 - 001A (19-01-2017)-Model.pdf100%
New File 8.2 m F1421 - Conditional Approval.pdf100%
New File 8.2 m F1421 - Rezoning SPC Approval.pdf100%
New File 123904 Thumbs.db100%
New Dir 2 C:\AdvisianActive\01 Projects\Track 4B Edra
LTA\dataroom\Track Record\
New File 15.7 m 8. Track Record of and Service Support
for the Power Plant Technology.pdf 0% 100%
New File 17920 Thumbs.db100%
New Dir 48 C:\AdvisianActive\01 Projects\Track 4B Edra LTA\First
Draft to Client 29 Aug\
New File 162 ~$171106 FPTEA Edra Track 4B Tech DD-
Final.docx100%
New File 8.6 m 201709 FPTEA Edra Track 4B Tech DD_neoh-
tc.docx100%
New File 8.2 m 20170918 FPTEA Edra Track 4B Tech
DD_clean.docx100%
New File 2.4 m 20170918 FPTEA Edra Track 4B Tech
DD_clean.pdf100%
New File 8.3 m 20170918 FPTEA Edra Track 4B Tech
DD_clean_rev1.docx100%
New File 2.4 m 20170918 FPTEA Edra Track 4B Tech
DD_clean_rev1.pdf100%
New File 9.4 m 20170918 FPTEA Edra Track 4B Tech
DD_tc.docx 0% 100%
New File 3.0 m 20170918 FPTEA Edra Track 4B Tech
DD_tc.pdf100%
New File 8.3 m 20170918 FPTEA Edra Track 4B Tech
DD_tc_rev1.docx100%
New File 2.3 m 20170918 FPTEA Edra Track 4B Tech
DD_tc_rev1.pdf100%
New File 8.7 m 20171002 FPTEA Edra Track 4B Tech DD-
clean.docx100%
New File 2.6 m 20171002 FPTEA Edra Track 4B Tech DD-
clean.pdf100%
New File 8.7 m 20171002 FPTEA Edra Track 4B Tech DD-
tc.docx100%
New File 3.7 m 20171002 FPTEA Edra Track 4B Tech DD-
tc.pdf100%
New File 8.7 m 20171006 FPTEA Edra Track 4B Tech DD-
clean_rev1_EL.docx 0% 100%
New File 8.7 m 20171006 FPTEA Edra Track 4B Tech DD-
tc.docx 0% 100%
New File 8.7 m 20171006 FPTEA Edra Track 4B Tech DD-
tc_rev1.docx 0% 100%
New File 8.7 m 20171009 FPTEA Edra Track 4B Tech DD-
clean.docx100%
New File 2.6 m 20171009 FPTEA Edra Track 4B Tech DD-
clean.pdf100%
New File 8.8 m 20171009 FPTEA Edra Track 4B Tech DD-
tc.docx 0% 100%
New File 2.7 m 20171009 FPTEA Edra Track 4B Tech DD-
tc.pdf100%
New File 8.7 m 20171017 FPTEA Edra Track 4B Tech DD-
clean.docx 0% 100%
New File 2.7 m 20171017 FPTEA Edra Track 4B Tech DD-
clean.pdf100%
New File 8.7 m 20171017 FPTEA Edra Track 4B Tech DD-
tc.docx100%
New File 2.7 m 20171017 FPTEA Edra Track 4B Tech DD-
tc.pdf100%
New File 8.7 m 20171020 FPTEA Edra Track 4B Tech DD-
tc_Final.docx 0% 100%
New File 2.7 m 20171031 FPTEA Edra Track 4B Tech DD-
Clean_Final(FA) comments 02 Nov.pdf100%
New File 8.7 m 20171031 FPTEA Edra Track 4B Tech DD-
tc_Final.docx100%
New File 8.7 m 20171102 FPTEA Edra Track 4B Tech DD-
clean_Final.docx 0% 100%
New File 2.7 m 20171102 FPTEA Edra Track 4B Tech DD-
clean_Final.pdf100%
New File 8.7 m 20171102 FPTEA Edra Track 4B Tech DD-
tc_Final.docx100%
New File 2.7 m 20171102 FPTEA Edra Track 4B Tech DD-
tc_Final.pdf100%
New File 8.7 m 20171106 FPTEA Edra Track 4B Tech DD-
Final.docx 0% 100%
New File 2.7 m 20171106 FPTEA Edra Track 4B Tech DD-
Final.pdf100%
New File 8.8 m 20171106 FPTEA Edra Track 4B Tech DD-
tc_Final.docx100%
New File 74983 Advisian QA_batch 2_30August_rev1
(Response) Advisian 18 Aug.xlsm100%
New File 6.7 m FPTEA Edra Track 4B Tech DD_20170829-
Draft_Clean for submission.docx100%
New File 6.8 m FPTEA Edra Track 4B Tech DD_20170829-
Draft_Comments from FA 09Sep.docx100%
New File 3.0 m FPTEA Edra Track 4B Tech DD_20170829-
Draft_for submission.pdf100%
New File 7.7 m FPTEA Edra Track 4B Tech DD_20170829-
Draft_redline.docx100%
New File 9.1 m FPTEA Edra Track 4B Tech DD_20170915-
Final.docx 0% 100%
New File 8.9 m FPTEA Edra Track 4B Tech DD_20170915-
Final_Emily_TT.docx100%
New File 182784 Queries on draft report to Advisian (27
Sep 2017)(CIMB) - Advisian 02 Oct.doc100%
New File 167038 Risk Register Template_Edra_EPC-
20170915.xlsx100%
New File 165897 Risk Register Template_Edra_EPC-
20170918.xlsx100%
New File 1.3 m Summary of Comments on Report Advisian 08
Sep from CIMB FA.pdf100%
New File 2.7 m Summary of Comments on Report Advisian
from Edra.pdf100%
New File 15591 To Fransesco.docx100%
New Dir 11 C:\AdvisianActive\01 Projects\Track 4B Edra LTA\LTA
Agreements\
New File 129485 01a Cover Letter_Mandate.docx100%
New File 1.1 m 4B Project_ LTA Agreement Appendix
1_draft_290517.docx100%
New File 1.1 m 4B Project_ LTA Agreement Appendix
1_Final.docx100%
New File 1.1 m 4B Project_ LTA Agreement Appendix
2_draft_290517.docx100%
New File 1.1 m 4B Project_ LTA Agreement Appendix
2_Final.docx100%
New File 1.4 m 4B Project_LTA Agreement DRAFT.docx100%
New File 1.4 m 4B Project_LTA Agreement_DRAFT_290517
(CIMB 230617) Rev01 Advisian 16July2017.docx100%
New File 1.4 m 4B Project_LTA Agreement_DRAFT_290517
(CIMB 230617) Rev02 Advisian 17July2017.docx100%
New File 1.4 m 4B Project_LTA
Agreement_DRAFT_290517.docx100%
New File 1.4 m 4B Project_LTA
Agreement_Final_07November2017.docx100%
New File 4.1 m RE Advisian for Project Melaka - Finance
Parties' Technical Environmental Advisor RFP.msg100%
New Dir 1 C:\AdvisianActive\01 Projects\Track 4B Edra LTA\LTA
Agreements\to Client 17 Aug\
New File 1.4 m 4B Project_LTA Agreement_DRAFT_290517
Rev02 Advisian 17July2017(Edra CIMB 070817)_Advisian 17Aug.docx100%
New Dir 10 C:\AdvisianActive\01 Projects\Track 4B Edra
LTA\Working\
New File 162 ~$A Edra Track 4B Tech
DD_TT_Neoh_20170816.docx100%
New File 6.8 m ITA Edra Track 4B Tech DD.docx100%
New File 5.8 m ITA Edra Track 4B Tech DD_201708028-
Compilation 2_TT_NEOH29Aug.docx100%
New File 4.8 m ITA Edra Track 4B Tech DD_AVAILABILITY
SECTION 7.2.12.docx100%
New File 5.3 m ITA Edra Track 4B Tech
DD_TT_20170816.docx100%
New File 5.3 m ITA Edra Track 4B Tech
DD_TT_Neoh_20170824.docx100%
New File 42179 PPA_Neoh.xlsx100%
New File 34455 Review on PPA, GSA, LTSA.docx100%
New File 166635 Risk Register Template_Edra_EPC- 20170829
Emily_TT_Neoh.xlsx100%
New File 166625 Risk Register Template_Edra_EPC- 20170829
Emily_TT_Neoh_v2.xlsx100%
New Dir 13 C:\AdvisianActive\02 Commercial\
New File 8.4 m 20170122 URA CM Technical Proposal_FULL
SET.PDF100%
New File 11.6 m 20170220 Presentation to
SEDA_v1_Neoh.pptx100%
New File 84594 AdvisianOverview_Info_A3_Glo_0116.pdf100%

New File 6.3 m ATM-2017PA0008_Advisian Response.pdf.pdf


100%
New File 246701 Case Study - DD for ARENA.pdf100%
New File 345905 Case Study - DD for ARENA.pptx100%
New File 1.7 m
CorporateBrochure_Bro_210mmx210mm_APAC_0516-Rev0-LoRes.pdf100%
New File 1.6 m ESCRI (Energy Storage for Renewable
Integration).pdf100%
New File 5.7 m ISD-17-6146 - Advisian - Regional Rail
Transaction Management V2 - Non-Commercial Schedules.pdf100%
New File 1.4 m Malaysia Terms of Engagement - Review
Services, Due Dilligence, Reliance.docx100%
New File 638369 Northern Beaches Busway Proposal Draft
for Discussion rev2.pdf100%
New File 376354
PetchemsProjectDevelopment_Infographics_A4_Chemicals_Sprint_0817_Step2.pdf
100%
New File 423936 SBPC M&E Audit Schedule.mpp100%
New Dir 5 C:\AdvisianActive\02 Commercial\Advisian New Energy
Future (renewables)\
New File 1.8 m
1_NEFElectricVehiclesChapter1_TL_A4_Inf_Glo_0615_A4Web.pdf100%
New File 1.7 m
2_NEFElectricVehiclesChapter1_IG_A3_Inf_Glo_0615.pdf100%
New File 1.2 m
3_NEFElectricVehiclesChapter2_TL_A4_Inf_Glo_0616_A4Web.pdf100%
New File 1.0 m
4_NEFElectricVehiclesChapter2_IG_A3_Inf_Glo_0816.pdf100%
New File 5.4 m Advisian New Energy Future.zip100%
New Dir 6 C:\AdvisianActive\02
Commercial\Advisian_Infra_Water_Power_Solar\
New File 2666 302020-00447 - Track 4A SIPP FPTA.lnk100%

New File 3.1 m Global Renewable Capability_Solar.pdf100%

New File 1.4 m Power Brochure.pdf100%


New File 1.8 m Social Infrastructure Brochure.pdf100%
New File 9.5 m The New Energy Future.pdf100%
New File 1.9 m Water Brochure.pdf100%
New Dir 10 C:\AdvisianActive\02 Commercial\Bangaladesh RFP\
New File 124416 01a Cover Letter_IFC.doc100%
New File 117237 01a Cover Letter_IFC_Siva.docx100%
New File 74513 15092017_IFC Summit Meghnaghat Cover
Letter.pdf100%
New File 2.1 m 15092017_IFC Summit Meghnaghat Techno-
Commercial Proposal.pdf100%
New File 20158 IFC_Hours Estimate.xlsx100%
New File 19937 IFC_Hours Estimate_rev1.xlsx100%
New File 835414 Summit M2 IE TOR_draft - Summit v1.pdf
100%
New File 4.8 m Summit Meghnaghat Techno-Commercial
Proposal_Rev1.docx100%
New File 4.7 m Summit Meghnaghat Techno-Commercial
Proposal_Rev3.docx100%
New File 4.7 m Summit Meghnaghat Techno-Commercial
Proposal_Rev4.docx100%
New Dir 6 C:\AdvisianActive\02 Commercial\CSP Business Case\
New File 20536 CSP Budget.xlsx100%
New File 20539 CSP Budget_rev1.xlsx100%
New File 14.5 m CSP Business Case.pdf100%
New File 21.1 m CSP Business Case.pptx100%
New File 6.3 m CSP Business Case_mini.pdf100%
New File 63669 Org Chart.pptx100%
New Dir 10 C:\AdvisianActive\02 Commercial\Dragon Capital
(Vietnam Solar)\
New File 5.9 m 1. DC_brochure.pdf100%
New File 1.1 m 2. Energy.briefing_DC.pdf100%
New File 7.0 m 20170912_Proposal for Project Mangosteen
FS_For Submission_with appendices.pdf100%
New File 628994 3. Project_Mangosteen_teaser.pdf100%
New File 122751 3.1 RFP_DC_Mangosteen.pdf100%
New File 613727 4. Project_Honeydew_teaser.pdf100%
New File 124616 4.1 RFP_DC_Honeydew.pdf100%
New File 2.6 m 5. VN_ADB_energy-road-map.pdf100%
New File 2.2 m 5.1 VN_ADB_Power-sector-reforms.pdf100%
New File 308368 6. Questionnaires.pdf100%
New Dir 30 C:\AdvisianActive\02 Commercial\Edra 2000MW LTA\
New File 162 ~$chno-Commercial Proposal.docx100%
New File 111616 01a Cover Letter_CIMB.doc100%
New File 248832 01a Cover Letter_Edra.doc100%
New File 6.9 m 20170518 Advisian Proposal_LTA Edra.pptx
100%
New File 6.6 m Advisian IE Edra.pptx 0% 100%
New File 6.6 m Advisian IE Edra_edited copy.pptx100%
New File 9.0 m Advisian Transaction Services Team
Experience.pptx100%
New File 24557 CRM Data Entry Power.docx100%
New File 282225 CSOC - Melaka 020517.docx100%
New File 135168 CSOC Approval by Dennis F and Steve P.msg
100%
New File 357675 Edra CSOC and CRF.zip100%
New File 1.0 m Edra FPTEA Clarifications_24May.pdf100%
New File 6.2 m Edra FPTEA Clarifications_24May.pptx100%

New File 8.5 m Edra LTA Techno-Commercial Proposal.docx


100%
New File 8.5 m Edra LTA Techno-Commercial
Proposal_rev2.docx100%
New File 8.6 m Edra LTA Techno-Commercial
Proposal_Rev3_11052017.docx100%
New File 8.5 m Edra LTA Techno-Commercial
Proposal_Rev4_11052017.docx100%
New File 8.8 m Edra LTA Techno-Commercial
Proposal_Rev5_17052017.docx100%
New File 8.8 m Edra LTA Techno-Commercial
Proposal_Rev6_18052017.docx100%
New File 8.9 m Edra LTA Techno-Commercial
Proposal_Rev8.docx100%
New File 3.0 m Edra LTA Techno-Commercial
Proposal_Rev8.pdf100%
New File 20156 Edra LTA_Proposal Budget_Neoh.xlsx100%
New File 11514 Expenses.xlsx100%
New File 72395 Figures.pptx100%
New File 71680 H-Class Machine Experience 0616.doc100%
New File 2.6 m Independent Engineer Certs.xlsx100%
New File 77460 Org Chart.pptx100%
New File 644644 Project Melaka - Finance Parties'
Technical & Environmental Advisors RFP (24 April 2017).pdf100%
New File 62736 RCF_PN-017.pdf100%
New File 169713 RCF_PN-017.xlsx100%
New Dir 1 C:\AdvisianActive\02 Commercial\Edra 2000MW
LTA\302020-P-I&E-PN-017-C-IEG\
New File 45056 Thumbs.db100%
New Dir 2 C:\AdvisianActive\02 Commercial\Edra 2000MW
LTA\302020-P-I&E-PN-017-C-IEG\0.01 Tender Documents\
New File 644644 Project Melaka - Finance Parties'
Technical & Environmental Advisors RFP (24 April 2017).pdf100%
New File 222208 Thumbs.db100%
New Dir 1 C:\AdvisianActive\02 Commercial\Edra 2000MW
LTA\302020-P-I&E-PN-017-C-IEG\0.02 Correspondence\
New File 871936 01 Request.msg100%
New Dir 14 C:\AdvisianActive\02 Commercial\Edra 2000MW
LTA\302020-P-I&E-PN-017-C-IEG\0.03 Proposal\
New File 162 ~$170116 KEV Proposal_Neoh.docx100%
New File 162 ~$ipod Beta Training Proposal.doc100%
New File 104448 01a Cover Letter_CIMB.doc100%
New File 111616 01a Cover Letter_Edra.doc100%
New File 86687 01b WPSSB to Advisian_Form 13 dated
02.12.2015 [Name Change].pdf100%
New File 86687 Apndx A - CCM.pdf100%
New File 721786 Apndx B - WPI_BOE 2017.pdf100%
New File 74029 Apndx C - Experience.docx100%
New File 353172 Apndx D - SOW from the RFP.pdf100%
New File 467502 Apndx F - Contract T&C.pdf100%
New File 467502 Apndx F Contract T&C.pdf100%
New File 8.8 m Edra LTA Techno-Commercial
Proposal_rev2.docx100%
New File 8.9 m Edra LTA Techno-Commercial
Proposal_Rev7_18052017.docx100%
New File 117760 Thumbs.db100%
New Dir 9 C:\AdvisianActive\02 Commercial\Edra 2000MW
LTA\302020-P-I&E-PN-017-C-IEG\0.03 Proposal\Apndx A - Company Profile\
New File 162 ~$mpany Profile.docx100%
New File 731657 Att 1 - MOF.pdf100%
New File 86687 Att 2 - ROC.pdf100%
New File 564781 Att 3 - Form 9 [Name Change].pdf100%
New File 906682 Att 4 - Form 24.pdf100%
New File 84974 Att 5 - Form 49.pdf100%
New File 92980 Company Profile.docx100%
New File 2.2 m Company Profile.pdf100%
New File 117760 Thumbs.db100%
New Dir 5 C:\AdvisianActive\02 Commercial\Edra 2000MW
LTA\302020-P-I&E-PN-017-C-IEG\0.03 Proposal\Apndx C - Experience\
New File 385024 i) Transaction Services Team
Experience.doc100%
New File 230400 ii) H-Class Machine Experience.doc100%
New File 70929 iii) Advisian MY Due Diligence
Experience.docx100%
New File 74259 iv) Advisian MY Experience.docx100%
New File 33280 Thumbs.db100%
New Dir 26 C:\AdvisianActive\02 Commercial\Edra 2000MW
LTA\302020-P-I&E-PN-017-C-IEG\0.03 Proposal\Apndx D - CVs\
New File 162 ~$ Technical Schedule T3 - CV [Foo
Hah].docx100%
New File 162 ~$ Zi Neoh_CV.docx100%
New File 162 ~$uce Miller.doc100%
New File 1.1 m Adam Aspinall_CV.docx100%
New File 112238 Adam Aspinall_CV.pdf100%
New File 108747 Ahmad Danial_CV.pdf100%
New File 595623 Andy Zheng_CV.pdf100%
New File 68608 Diana Gao_CV.pdf100%
New File 1.1 m Foo Hah CV_May '17.docx100%
New File 98300 Foo Hah_CV.pdf100%
New File 1.2 m Francesco Ricciardi_CV.docx100%
New File 161865 Francesco Ricciardi_CV.pdf100%
New File 1.0 m Leong Yoke Heng CV_May'17.docx100%
New File 91161 Leong Yoke Heng_CV.pdf100%
New File 93248 Llewellyn Owens_CV.pdf100%
New File 1.0 m Saravanan Supaiyah CV.docx100%
New File 160250 Saravanan Supaiyah_CV.pdf100%
New File 118489 Siva Sreedharan_CV.pdf100%
New File 87372 Sudhakar Surapaneni_CV.pdf100%
New File 1.0 m Teresa Tam_CV.docx100%
New File 102570 Teresa Tam_CV.pdf100%
New File 1.0 m Terrel LaRoche_CV.docx100%
New File 91639 Terrel LaRoche_CV.pdf100%
New File 121856 Thumbs.db100%
New File 1.1 m Zi Neoh_CV.docx100%
New File 119281 Zi Neoh_CV.pdf100%
New Dir 10 C:\AdvisianActive\02 Commercial\Edra 2000MW
LTA\302020-P-I&E-PN-017-C-IEG\0.03 Proposal\Apndx D - CVs\Native\
New File 1.1 m Adam Aspinall_CV.docx100%
New File 1.0 m Ahmad Danial_CV.docx100%
New File 1.0 m Diana Gao_CV.docx100%
New File 1.1 m Foo Hah_CV.docx100%
New File 1.2 m Francesco Ricciardi_CV.docx100%
New File 1.0 m Leong Yoke Heng_CV.docx100%
New File 1.0 m Saravanan Supaiyah_CV.docx100%
New File 1.0 m Teresa Tam_CV.docx100%
New File 1.0 m Terrel LaRoche_CV.docx100%
New File 1.1 m Zi Neoh_CV.docx100%
New Dir 0 C:\AdvisianActive\02 Commercial\Edra 2000MW
LTA\302020-P-I&E-PN-017-C-IEG\0.04 CVs\
New Dir 4 C:\AdvisianActive\02 Commercial\Edra 2000MW
LTA\302020-P-I&E-PN-017-C-IEG\0.05 Risk Classification Form\
New File 24688 CRM Data_PN-017.docx100%
New File 161794 Project Melaka_BNB.pdf100%
New File 94692 RCF_PN-017.xlsx100%
New File 315392 Thumbs.db100%
New Dir 3 C:\AdvisianActive\02 Commercial\Edra 2000MW LTA\Edra
CSOC and CRF\
New File 282225 CSOC - Melaka 020517.docx100%
New File 135168 CSOC Approval by Dennis F and Steve P.msg
100%
New File 62736 RCF_PN-017.pdf100%
New Dir 4 C:\AdvisianActive\02 Commercial\Edra 2000MW LTA\reply
from Edra\
New File 14818 IE rev1.1 - Response from Advisian
INTERNAL.xlsx100%
New File 14156 IE rev1.1 - Response from Advisian.xlsx
100%
New File 14797 IE rev1.1 - Response from
Advisian_Neoh_01Aug.xlsx100%
New File 14729 IE rev1.2_Advisian.xlsx100%
New Dir 2 C:\AdvisianActive\02 Commercial\Edra Solar TA\
New File 26177 Edra PV_Budget.xlsx100%
New File 24.6 m Edra Solar TA Techno-Commercial
Proposal_Draft_Neoh.docx100%
New Dir 7 C:\AdvisianActive\02 Commercial\Edra Solar TA Case
Study\
New File 86052 Appendix 1 - 11 HQ-Project-102017-
0008.docx100%
New File 25889 Appendix 1 - Letter of
Acknowledgement.pdf100%
New File 40914 Appendix 5.docx100%
New File 21208 Edra Case Study PV_Budget.xlsx100%
New File 1.7 m Edra Proposal 20171020_Internal
Review_Commercial_Neoh.docx100%
New File 4.2 m Edra Proposal 20171020_Internal
Review_JE_Neoh.docx100%
New File 663578 Request For Proposal - HQ-PROJECT-102017-
0008.pdf100%
New Dir 1 C:\AdvisianActive\02 Commercial\Edra Solar TA Case
Study\Clarifications\
New File 35012 Commercial Clarification Questionnaire No
2 Advisian_Neoh.docx100%
New Dir 7 C:\AdvisianActive\02 Commercial\Jimah M&E Audit\
New File 76959 1-8 HQ-JIMAH-062017-0018.docx100%
New File 1.5 m Financial Proposal_JEV.docx100%
New File 382976 Jimah M&E Audit Schedule_v2.mpp100%
New File 20312 Jimah M&E_Budget.xlsx100%
New File 48255 Org Chart.pptx100%
New File 3.5 m Technical Proposal_JEV.docx100%
New File 1.0 m The Approach.pptx100%
New Dir 11 C:\AdvisianActive\02 Commercial\Jimah M&E Audit\03
Technical Proposal\
New File 162 ~$chnical Proposal.docx100%
New File 246784 01 Cover Letter_New JEV.doc100%
New File 721786 Apndx B BOE 2017.pdf100%
New File 484864 Apndx C Exhibit 2 - Compliance to SOW.doc
100%
New File 559104 Apndx E Exhibit 4 - Past Experience.doc
100%
New File 504320 Apndx F Exhibit 5 - Compliance to T&C.doc
100%
New File 474624 Apndx G Exhibit 6 - Checklist.doc100%
New File 493568 Apndx H Exhibit 7 - Unpriced
Commercial.doc100%
New File 3.6 m Technical Proposal_JEV.docx100%
New File 1.3 m Technical Proposal_JEV.pdf100%
New File 552448 Thumbs.db100%
New Dir 9 C:\AdvisianActive\02 Commercial\Jimah M&E Audit\03
Technical Proposal\Apndx A Company Profile\
New File 162 ~$mpany Profile.docx100%
New File 731657 Att 1 - MOF.pdf100%
New File 86687 Att 2 - ROC.pdf100%
New File 564781 Att 3 - Form 9 [Name Change].pdf100%
New File 906682 Att 4 - Form 24.pdf100%
New File 84974 Att 5 - Form 49.pdf100%
New File 92980 T1 - Company Profile.docx100%
New File 2.3 m T1 - Company Profile.pdf100%
New File 210432 Thumbs.db100%
New Dir 8 C:\AdvisianActive\02 Commercial\Jimah M&E Audit\03
Technical Proposal\Apndx D Exhbt 3\
New File 1.8 m 01 Exhibit 3 - Foo Hah.doc100%
New File 967168 02 Exhibit 3 - Neoh.doc100%
New File 2.0 m 03 Exhibit 3 - Siva.doc100%
New File 2.1 m 04 Exhibit 3 - Mukesh Shukla.doc100%
New File 578560 05 Exhibit 3 - Emily Lim.doc100%
New File 1.1 m 06 Exhibit 3 - Siow Phei Fang.doc100%
New File 496128 Exhibit 3 - Key Personnel [TEMPLATE].doc
100%
New File 147968 Thumbs.db100%
New Dir 16 C:\AdvisianActive\02 Commercial\John Keels TA Bid\
New File 18.4 m 20170907 Advisian Proposal_Technical
Advisor_Neoh.pptx100%
New File 23.0 m 20170912 Advisian Proposal_Technical
Advisor- Neoh.pptx100%
New File 8.2 m 20170914 Advisian Proposal_Technical
Advisor_Final.pdf100%
New File 19.6 m 20170914 Advisian Proposal_Technical
Advisor_Final.pptx100%
New File 3.9 m 20170914 JKL Sri Lanka_Technical
Advisor_Proposal.pdf100%
New File 2.8 m Appendices - JKH TA Proposal.zip100%
New File 395388 Appendix A - Master List GT and Class
Experience.pdf100%
New File 103635 Appendix B - PV Experience List - Apr
2017.pdf100%
New File 179709 Appendix C - Wind Experience List - Apr
2017.pdf100%
New File 2.4 m Appendix D - Detailed CVs.pdf100%
New File 201370 CSP and Hybrid Experience List - Apr
2017.pdf100%
New File 21019 JKH_Hours Estimate.xlsx100%
New File 20550 JKH_Hours Estimate_rev1.xlsx100%
New File 996469 Renewables Experience List - Apr 2017.pdf
100%
New File 606408 Request for Proposal for the Provision of
Technical Advisory Services_31 08 2017.pdf100%
New File 34738 SCOPE OF WORK.docx100%
New Dir 15 C:\AdvisianActive\02 Commercial\KEV Business Review\
New File 6.0 m Advisian KEV Business Review
Proposal_Final_22June17.pdf100%
New File 516907 CVs.pdf100%
New File 726552 CVs_Updated.pdf100%
New File 20104 KEV BR_Budget.xlsx100%
New File 20848 KEV BR_Budget_rev2.xlsx100%
New File 14.6 m KEV Business Review Proposal_Final.pdf
100%
New File 23.8 m KEV Business Review Proposal_Final.pptx
100%
New File 5.7 m KEV Business Review
Proposal_Revised_07Aug2017.pdf100%
New File 14.7 m KEV Business Review
Proposal_Revised_Final.pdf100%
New File 23.9 m KEV Business Review
Proposal_Revised_Final.pptx100%
New File 1.5 m Kick Off Meeting with KEV.pptx100%
New File 948889 Kick Off Meeting with KEV_30Oct.pdf100%
New File 1.4 m Malaysia Terms of Engagement - Review
Services, Due Dilligence, Reliance.docx100%
New File 255405 medium_fuel_oil.jpg100%
New File 63981 Org Chart.pptx100%
New Dir 16 C:\AdvisianActive\02 Commercial\KEV Proposal\
New File 595527 05 Technical Schedule T3 - CV [R
Ellis].docx100%
New File 7.2 m 20170116 KEV Proposal_Neoh.docx100%
New File 18761 20170119 KEV_Budget.xlsx100%
New File 18794 20170124 KEV_Budget.xlsx100%
New File 19727 Advisian KEV Pricing.xlsx100%
New File 2.9 m Advisian M&E Audit - Serudong Power.doc
100%
New File 63944 Advisian Serudong Org Chart.pptx100%
New File 18579 Advisian Serudong Pricing_r1.xlsx100%
New File 8.3 m Advisian_KEV Clarification
Meeting_060217.pptx100%
New File 4.2 m Advisian_WP_KEV Proposal Soft Copy.zip
100%
New File 429336 KEV Site Visit.pdf100%
New File 366587 KEV_Proposal Submission_Transmittal.pdf
100%
New File 78078 Serudong M&E Audit.pod.xml100%
New File 169865 Technical Schedule T3 - Neoh.docx100%
New File 182573 Technical Schedule T4.docx100%
New File 1.2 m Technical Schedule T4_Advisian.docx100%
New Dir 5 C:\AdvisianActive\02 Commercial\Malakoff Masinloc
Proposal\
New File 8.3 m 20170814_Masinloc Due Diligence_Final for
Submission Malakoff.pptx100%
New File 529907 2017-09-20 Term of Reference Technical
Advisor V1.pdf100%
New File 3.9 m 20170929_Masinloc DD Proposal_Final.pdf
100%
New File 8.2 m 20170929_Masinloc Due Diligence_Final for
Submission Malakoff - clean copy.pptx100%
New File 8.2 m 20170929_Masinloc Due
Diligence_TrackChanges.pptx100%
New Dir 2 C:\AdvisianActive\02 Commercial\Malakoff Masinloc
Proposal\ref\
New File 8.2 m 20170814_Masinloc Due Diligence_Final for
Submission.pptx100%
New File 4.9 m 20170830_Masinloc Due Diligence_Proposal
Addendum.pptx100%
New Dir 2 C:\AdvisianActive\02 Commercial\Meralco DD Proposal\
New File 16.4 m 20170315 Advisian WorleyParsons
Proposal_Technical Due Diligence.pptx100%
New File 16.3 m 20170411 Advisian WorleyParsons
Proposal_Technical Due Diligence (2).pptx100%
New Dir 7 C:\AdvisianActive\02 Commercial\Sepangar Bay M&E
Audit\
New File 18539 20170314_Sepangar Bay_Budget_Neoh.xlsx
100%
New File 105386 M&E Audit Invitation_Advisian.pdf100%
New File 48207 Org Chart.pptx100%
New File 423936 SBPC M&E Audit Schedule.mpp100%
New File 378368 SBPC M&E Audit Schedule_v2.mpp100%
New File 420569 Sepangar - ME Letter TOR.pdf100%
New File 8.4 m Techno-Commercial Proposal.docx100%
New Dir 1 C:\AdvisianActive\02 Commercial\Sepangar Bay M&E
Audit\goby\
New File 8.5 m Technical Proposal_TNBJ.docx100%
New Dir 10 C:\AdvisianActive\02 Commercial\Serudong Proposal\
New File 162 ~$161220 Serundong Proposal_Neoh.docx100%

New File 6.8 m 20161220 Serundong Proposal_Neoh.docx100%

New File 18238 20161220 Serundong_Budget_Neoh.xlsx100%


New File 18268 20170125_Serundong_Budget_Neoh.xlsx100%
New File 2.9 m Advisian M&E Audit - Serudong Power.doc
100%
New File 63944 Advisian Serudong Org Chart.pptx100%
New File 18579 Advisian Serudong Pricing_r1.xlsx100%
New File 2.5 m Advisian_Serudong Clarification
Meeting_250117.pdf100%
New File 9.4 m Advisian_Serudong Clarification
Meeting_250117.pptx100%
New File 78078 Serudong M&E Audit.pod.xml100%
New Dir 7 C:\AdvisianActive\02 Commercial\SESB\
New File 12.8 m 20170616 SESB Proposal_Technical_Neoh
Final.pdf100%
New File 27.9 m 20170616 SESB Proposal_Technical_Neoh
Final.pptx100%
New File 6.6 m 20170616_SESB Proposal_Commercial.pptx
0% 100%
New File 64849 Org Chart.pptx100%
New File 24319 SESB_Budget.xlsx100%
New File 15909 TNBJ M&E Audit Work Budget_26May.xlsx100%

New File 54296 Training Framework.pptx100%


New Dir 2 C:\AdvisianActive\02 Commercial\SESB\From Jeff\
New File 8.5 m 20170608_Technical Proposal.docx100%
New File 240631 Appendix A - Referece ARENA .pdf100%
New Dir 5 C:\AdvisianActive\02 Commercial\SESB\RFP\
New File 8.5 m 20170226_Technical Proposal_v3.docx100%
New File 139264 Attachments for RFP Study of SESB.doc100%

New File 179095 RFP Study of SESB.pdf100%


New File 348706 Standard Consultancy Agreement.pdf100%
New File 366588 TOR Study of SESB Final.pdf100%
New Dir 2 C:\AdvisianActive\02 Commercial\SESB\superceded\
New File 6.6 m SESB Proposal_Commercial.pptx 0% 100%
New File 27.4 m SESB Proposal_Technical.pptx100%
New Dir 2 C:\AdvisianActive\02 Commercial\Shell Equis DD\
New File 19.6 m Shell Due Diligence Proposal - FINAL.docx
100%
New File 11.6 m Shell Renewable Portfolio Due Diligence -
Advisian Proposal_Final_22082017.pdf100%
New Dir 6 C:\AdvisianActive\02 Commercial\SIPP IE Proposal\
New File 4.1 m 20160927 SIPP IE Proposal.pdf100%
New File 7.0 m 20170518 Advisian Proposal_LTA SIPP.pptx
100%
New File 1.2 m 20170518 Advisian Revised Offer_LTA
SIPP.pdf100%
New File 679834 Annex A - Team Detailed CV.pdf100%
New File 77055 Org Chart.pptx100%
New File 11905 SIPP PRICING.xlsx100%
New Dir 4 C:\AdvisianActive\02 Commercial\SK ENS Dominican
Republic FS Proposal\
New File 481461 Regas CTRs_with Neoh inputs..xlsx100%
New File 2.8 m SK ENS - FS For 600MW CCGT Project
Dominican Republic.pptx100%
New File 2.8 m SK ENS - FS For 600MW CCGT Project
Dominican Republic_15May.pptx100%
New File 2.8 m SK ENS - FS For 600MW CCGT Project
Dominican Republic_18May_rev2.pptx100%
New Dir 1 C:\AdvisianActive\02 Commercial\TNB DGS Proposal\
New File 1.5 m 20161122 TNB DGS Proposal.pdf100%
New Dir 12 C:\AdvisianActive\02 Commercial\TNB M&E Audit\
New File 23717 20170227 TNB_RC Audit_Budget.xlsx100%
New File 15254 Fee Schedule_Neoh.xlsx100%
New File 15285 Fee Schedule_Neoh_v2.xlsx100%
New File 1.2 m ITB - TNB_Regulatory Compliance Audit.pdf
100%
New File 77690 Manpower Chart.pdf100%
New File 74248 Microsoft Project - TNB M&E Audit
Schedule_r3.pdf100%
New File 317952 TNB M&E Audit Schedule.mpp100%
New File 222442 TNB M&E Audit Schedule.pdf100%
New File 428032 TNB M&E Audit Schedule_final.mpp100%
New File 562688 TNB M&E Audit Schedule_r1.mpp100%
New File 97307 TNB M&E Audit Schedule_r1.pdf100%
New File 69337 TNB M&E Audit Schedule_r2.pdf100%
New Dir 0 C:\AdvisianActive\02 Commercial\TNB M&E Audit\302020-
P-I&E-PN-012-C-IEG\
New Dir 4 C:\AdvisianActive\02 Commercial\TNB M&E Audit\302020-
P-I&E-PN-012-C-IEG\0.01 Tender Documents\
New File 713086 Conditions of Contract.pdf100%
New File 1.7 m ITB - TNB_Regulatory Compliance Audit.pdf
100%
New File 448010 Sec 1 - TOR_TNB_Regulatory Compliance
Audit.pdf100%
New File 126464 Thumbs.db100%
New Dir 5 C:\AdvisianActive\02 Commercial\TNB M&E Audit\302020-
P-I&E-PN-012-C-IEG\0.02 Correspondence\
New File 150016 01 Request.msg100%
New File 87040 02 Tender Bulletin.msg100%
New File 217757 Letter Collect ITB.pdf100%
New File 267811 Letter of Invitation to Bid.pdf100%
New File 25088 Thumbs.db100%
New Dir 5 C:\AdvisianActive\02 Commercial\TNB M&E Audit\302020-
P-I&E-PN-012-C-IEG\0.03 Proposal\
New File 162 ~$170116 KEV Proposal_Neoh.docx100%
New File 162 ~$chnical Proposal.docx100%
New File 162 ~$ipod Beta Training Proposal.doc100%
New File 162 ~$nancial Proposal.docx100%
New File 117760 Thumbs.db100%
New Dir 3 C:\AdvisianActive\02 Commercial\TNB M&E Audit\302020-
P-I&E-PN-012-C-IEG\0.03 Proposal\01 for Reference Only\
New File 65293 Org Chart.pptx100%
New File 65775 Org Chart_v1.pptx100%
New File 31232 Thumbs.db100%
New Dir 0 C:\AdvisianActive\02 Commercial\TNB M&E Audit\302020-
P-I&E-PN-012-C-IEG\0.03 Proposal\01 for Reference Only\Go-Bys\
New Dir 18 C:\AdvisianActive\02 Commercial\TNB M&E Audit\302020-
P-I&E-PN-012-C-IEG\0.03 Proposal\01 for Reference Only\Go-Bys\0.3 Proposal TNB
Audit FINAL\
New File 162 ~$2020-FY13-007-PRP-0001-TECHNICAL_R2.doc
100%
New File 4.6 m 102020-FY13-007-PRP-0001-TECHNICAL
R2_FINAL.pdf100%
New File 11.5 m 102020-FY13-007-PRP-0001-TECHNICAL.doc
100%
New File 11.5 m 102020-FY13-007-PRP-0001-TECHNICAL_R1.doc
100%
New File 11.7 m 102020-FY13-007-PRP-0001-TECHNICAL_R2.doc
100%
New File 57593 102020-FY13-007-Schedule.xlsx100%
New File 88576 102020-FY13-007-Schedule_rev2.xls100%
New File 50176 102020-FY13-007-Schedule_rev3.xls100%
New File 64217 102020-FY13-007-WP OrgChart.pptx100%
New File 346546 Appendix 1-TOR.pdf100%
New File 18573 DECLARATION BY THE TENDERER.docx100%
New File 16958 LIST OF PERSONNEL.docx100%
New File 36352 Technical Schedule T2- Experience and
Capability of Consultant.doc100%
New File 42496 Technical Schedule T3- Curriculum
Vitae.doc100%
New File 32768 Technical Schedule T4- Methodology and
Work Program.doc100%
New File 60416 Thumbs.db100%
New File 43331 TOC-Technical.docx100%
New File 54769 WPS Organisation Chart_16Jan13-R1.xlsx
100%
New Dir 14 C:\AdvisianActive\02 Commercial\TNB M&E Audit\302020-
P-I&E-PN-012-C-IEG\0.03 Proposal\01 for Reference Only\Go-Bys\0.3 Proposal TNB
Audit FINAL\Co Info\
New File 325562 BEM Cert_Electrical.pdf100%
New File 329880 BEM Cert_Mechanical.pdf100%
New File 324579 BEM Cert_WPI_31Dec2013.pdf100%
New File 330385 FORM 13-WPI.pdf100%
New File 46802 Form 32A_Daud Abas.pdf100%
New File 46320 Form 32A_Mohd Ishak.pdf100%
New File 367200 ISO Cert.pdf100%
New File 311677 MOF_WPI 26Aug2013.pdf100%
New File 77380 Sijil Setem_Daud Abas.pdf100%
New File 77885 Sijil Setem_Mohd Ishak.pdf100%
New File 20489 STMT-WPI.pdf100%
New File 92672 Thumbs.db100%
New File 788711 TNB_WPI AUG 2013.pdf100%
New File 853726 YE2011-WPI.pdf100%
New Dir 3 C:\AdvisianActive\02 Commercial\TNB M&E Audit\302020-
P-I&E-PN-012-C-IEG\0.03 Proposal\01 for Reference Only\Go-Bys\0.3 Proposal TNB
Audit FINAL\Costings\
New File 55296 Cost Estimation.xls100%
New File 123392 Overall Cost Estimation.xls100%
New File 28683 TNB State Distribution Offices.pdf100%
New Dir 2 C:\AdvisianActive\02 Commercial\TNB M&E Audit\302020-
P-I&E-PN-012-C-IEG\0.03 Proposal\01 for Reference Only\Go-Bys\0.3 Proposal TNB
Audit FINAL\Costings\Car rental\
New File 15360 Thumbs.db100%
New File 24620 WS quote_15June12.pdf100%
New Dir 10 C:\AdvisianActive\02 Commercial\TNB M&E Audit\302020-
P-I&E-PN-012-C-IEG\0.03 Proposal\01 for Reference Only\Go-Bys\0.3 Proposal TNB
Audit FINAL\Costings\Flights\
New File 353953 AS-Langkawi.docx100%
New File 215630 JB.docx100%
New File 206173 Kelantan(K_Bharu).docx100%
New File 218166 Kerteh.docx100%
New File 183417 Langkawi.docx100%
New File 178020 Penang.docx100%
New File 100364 Perlis.docx100%
New File 133545 Perth to KL.JPG100%
New File 187251 Terengganu.docx100%
New File 17920 Thumbs.db100%
New Dir 15 C:\AdvisianActive\02 Commercial\TNB M&E Audit\302020-
P-I&E-PN-012-C-IEG\0.03 Proposal\01 for Reference Only\Go-Bys\0.3 Proposal TNB
Audit FINAL\Costings\Hotels\
New File 140555 JB.pdf100%
New File 87684 Kedah.pdf100%
New File 67073 Kelantan.pdf100%
New File 70883 Kota Bharu.pdf100%
New File 199530 Langkawi.pdf100%
New File 152189 Melaka.pdf100%
New File 90126 Negeri Sembilan.pdf100%
New File 112917 Pahang.pdf100%
New File 242924 Penang.pdf100%
New File 110850 Perak.pdf100%
New File 90185 Perlis_Alor Star.pdf100%
New File 156514 Putrajaya.pdf100%
New File 205196 Selangor.pdf100%
New File 98175 Terengganu.pdf100%
New File 138240 Thumbs.db100%
New Dir 12 C:\AdvisianActive\02 Commercial\TNB M&E Audit\302020-
P-I&E-PN-012-C-IEG\0.03 Proposal\01 for Reference Only\Go-Bys\0.3 Proposal TNB
Audit FINAL\Financial Proposal\
New File 1.1 m 102020-FY13-007-0001-Financial
Proposal_B&W.pdf100%
New File 12.1 m 102020-FY13-007-0001-Financial-
R1_FINAL.pdf100%
New File 1.1 m 102020-FY13-007-PRP-0001-FINANCIAL.doc
100%
New File 1.1 m 102020-FY13-007-PRP-0001-FINANCIAL-R1.doc
100%
New File 94889 Appendix 1- WP Org Chart.pdf100%
New File 159232 Appendix 1-Letter of Undertaking.doc100%

New File 107008 Form of Agreement.doc100%


New File 435712 GENERAL CONDITIONS.doc100%
New File 120320 Separator-Attachment 1.PPT100%
New File 48640 Thumbs.db100%
New File 39271 TOC-Financial.docx100%
New File 71208 WPS Organisation Chart_16Jan13-R1.xlsx
100%
New Dir 1 C:\AdvisianActive\02 Commercial\TNB M&E Audit\302020-
P-I&E-PN-012-C-IEG\0.03 Proposal\01 for Reference Only\Go-Bys\0.3 Proposal TNB
Audit FINAL\Financial Proposal\Technical Proposal minus CV\
New File 1.4 m 102020-FY13-007-PRP-0001-TECHNICAL_R2.doc
100%
New Dir 3 C:\AdvisianActive\02 Commercial\TNB M&E Audit\302020-
P-I&E-PN-012-C-IEG\0.03 Proposal\01 for Reference Only\Go-Bys\0.3 Proposal TNB
Audit FINAL\KPMG Input\
New File 162 ~$MG proposal TNB 2012 ME audit w
WorleyParson (Financial).doc100%
New File 1.6 m KPMG Proposal TNB 2012 ME Audit w
WorleyParson (Financial).doc100%
New File 3.9 m KPMG proposal TNB 2012 ME audit w
WorleyParson (Technical).doc100%
New Dir 6 C:\AdvisianActive\02 Commercial\TNB M&E Audit\302020-
P-I&E-PN-012-C-IEG\0.03 Proposal\01 for Reference Only\KPMG Inputs\
New File 572733 Cover letters.pdf100%
New File 3.6 m KPMG's power sector credentials.pptx100%

New File 70612 Scope of work Financial Performance.pptx


100%
New File 48640 Thumbs.db100%
New File 46698 TNB TNIAD0106288_23.01.17.docx100%
New File 44656 TNB TNIAD0106288_24.01.17.docx100%
New Dir 8 C:\AdvisianActive\02 Commercial\TNB M&E Audit\302020-
P-I&E-PN-012-C-IEG\0.03 Proposal\02 Address_Cover_Spine\
New File 1014272 A3Cover Tech_Landscape.ppt100%
New File 1018368 A4Cover Comm.PPT100%
New File 215552 Address [DO NOT USE].doc100%
New File 45056 Address.doc100%
New File 1014272 SPINE 40MM.PPT100%
New File 134656 Thumbs.db100%
New File 159232 Transmittal_Comm_002.doc100%
New File 154624 Transmittal_Tech_001.doc100%
New Dir 13 C:\AdvisianActive\02 Commercial\TNB M&E Audit\302020-
P-I&E-PN-012-C-IEG\0.03 Proposal\03 Technical Proposal\
New File 343040 03 Cover Letter_Tech.doc100%
New File 864351 03 Cover Letter_Tech.pdf100%
New File 86687 03a WPSSB to Advisian_Form 13 dated
02.12.2015 [Name Change].pdf100%
New File 7.2 m 20170209 TNB M&E Audit.docx100%
New File 8.5 m 20170226_Technical Proposal_v3.docx100%
New File 681331 27022017085851.pdf100%
New File 220999 27022017090100.pdf100%
New File 95285 Advisian CRF-0043-COR-EN A Rev 1.xlsx100%

New File 721786 Apndx B - WPI_BOE 2017.pdf100%


New File 467502 Apndx F Contract T&C.pdf100%
New File 102344 CRF-0043_173.xlsx100%
New File 117248 Letter of Undertaking_v1.doc100%
New File 17525 TNB RC AUDIT Cover letter v2.docx100%
New Dir 7 C:\AdvisianActive\02 Commercial\TNB M&E Audit\302020-
P-I&E-PN-012-C-IEG\0.03 Proposal\03 Technical Proposal\Apndx A T1 Company Profile\
New File 162 ~$chnical Schedule T1 - Company
Profile.docx100%
New File 734565 Att 1 - MOF.pdf100%
New File 86687 Att 2 - CCM.pdf100%
New File 906682 Att 3 - Form 24.pdf100%
New File 148787 Technical Schedule T1 - Company
Profile.docx100%
New File 96389 Technical Schedule T1 - Company
Profile_new.docx100%
New File 118272 Thumbs.db100%
New Dir 6 C:\AdvisianActive\02 Commercial\TNB M&E Audit\302020-
P-I&E-PN-012-C-IEG\0.03 Proposal\03 Technical Proposal\Apndx C T2 Experience\
New File 162 ~$chnical Schedule T2 - Experience.docx
100%
New File 80724 Technical Schedule T2 - Experience.docx
100%
New File 102190 Technical Schedule T2 - Experience.pdf
100%
New File 80726 Technical Schedule T2 -
Experience_new.docx100%
New File 455092 Technical Schedule T2 -
Experience_new.pdf100%
New File 13824 Thumbs.db100%
New Dir 4 C:\AdvisianActive\02 Commercial\TNB M&E Audit\302020-
P-I&E-PN-012-C-IEG\0.03 Proposal\03 Technical Proposal\Apndx D T3 CVs\
New File 162 ~$ Technical Schedule T3 - CV [Neoh].docx
100%
New File 279552 Divider_Attachments.ppt100%
New File 605314 Technical Schedule T3 - CV
[TEMPLATE].docx100%
New File 31744 Thumbs.db100%
New Dir 20 C:\AdvisianActive\02 Commercial\TNB M&E Audit\302020-
P-I&E-PN-012-C-IEG\0.03 Proposal\03 Technical Proposal\Apndx D T3 CVs\CVs\
New File 162 ~$ Zi Neoh_CV.docx100%
New File 162 ~$uce Miller.doc100%
New File 1.1 m 01 Foo Hah_CV.docx100%
New File 118489 02 Siva Sreedharan_CV.pdf100%
New File 87372 03 Sudhakar Surapaneni_CV.pdf100%
New File 1.1 m 03 Zi Neoh_CV.docx100%
New File 1.0 m 05 Robert Ellis CV.docx100%
New File 1.1 m Adam Aspinall.docx100%
New File 1.0 m Advisian New CV template.docx100%
New File 1.6 m Bruce Miller.doc100%
New File 1.0 m Frank Sutton CV 20170224.docx100%
New File 326656 Gabriel S C Rocha.doc100%
New File 1.0 m Kevin Gan.docx100%
New File 116743 KPMG Team CVs.pptx100%
New File 1.5 m Mohamad Baihaki.docx100%
New File 1.0 m Mukesh Shukla.docx100%
New File 38033 Mukesh Shuklaxxx.docx100%
New File 28436 R Ellis_CV [Original].docx100%
New File 208128 Teresa Tam.pdf100%
New File 76800 Thumbs.db100%
New Dir 3 C:\AdvisianActive\02 Commercial\TNB M&E Audit\302020-
P-I&E-PN-012-C-IEG\0.03 Proposal\03 Technical Proposal\Apndx D T3 CVs\Not complete\
New File 100888 Technical Schedule T3 - CV [Adam
Aspinall].docx100%
New File 101343 Technical Schedule T3 - CV [Gabriel].docx
100%
New File 15360 Thumbs.db100%
New Dir 12 C:\AdvisianActive\02 Commercial\TNB M&E Audit\302020-
P-I&E-PN-012-C-IEG\0.03 Proposal\03 Technical Proposal\Apndx D T3 CVs\PRINTED\
New File 162 ~$ Technical Schedule T3 - CV [Siva
Sreedharan].docx100%
New File 93136 01 Technical Schedule T3 - CV [Foo
Hah].docx100%
New File 139261 02 Technical Schedule T3 - CV [Siva
Sreedharan].docx100%
New File 95616 03 Technical Schedule T3 - CV [Neoh].docx
100%
New File 83071 Technical Schedule T3 - CV [Teresa].docx
100%
New File 79588 Technical Schedule T3 - CV [Bob
Ellis].docx100%
New File 103669 Technical Schedule T3 - CV [Bruce
Miller].docx100%
New File 624845 Technical Schedule T3 - CV [Kevin].docx
100%
New File 79210 Technical Schedule T3 - CV [Mukesh
Shukla].docx100%
New File 84069 Technical Schedule T3 - CV Alan Yau.docx
100%
New File 84821 Technical Schedule T3 - CV Emily
Choo.docx100%
New File 98808 Technical Schedule T3 - CV Frank
Sutton.docx100%
New Dir 5 C:\AdvisianActive\02 Commercial\TNB M&E Audit\302020-
P-I&E-PN-012-C-IEG\0.03 Proposal\03 Technical Proposal\Apndx E T4 Methodology\
New File 162 ~$chnical Schedule T4 - Methodology.docx
100%
New File 162 ~$chnical Schedule T4 -
Methodology_New.docx100%
New File 1.3 m Technical Schedule T4 - Methodology.docx
100%
New File 1.6 m Technical Schedule T4 -
Methodology_New.docx100%
New File 20992 Thumbs.db100%
New Dir 5 C:\AdvisianActive\02 Commercial\TNB M&E Audit\302020-
P-I&E-PN-012-C-IEG\0.03 Proposal\03 Technical Proposal\Financial Audited Account\
New File 11776 Thumbs.db100%
New File 3.8 m WPS AUDITED ACCOUNT FY2012.pdf100%
New File 1.0 m WPS AUDITED ACCOUNT FY2013.pdf100%
New File 1.0 m WPS AUDITED ACCOUNT FY2014.pdf100%
New File 1.6 m WPS AUDITED ACCOUNT FY2015.pdf100%
New Dir 6 C:\AdvisianActive\02 Commercial\TNB M&E Audit\302020-
P-I&E-PN-012-C-IEG\0.03 Proposal\Financial Proposal\
New File 343040 03 Cover Letter_Financial.doc100%
New File 853095 03 Cover Letter_Financial.pdf100%
New File 713086 Conditions of Contract.pdf100%
New File 6.7 m Financial Proposal_v1.docx100%
New File 134656 Form of Agreement.doc100%
New File 9728 Thumbs.db100%
New Dir 5 C:\AdvisianActive\02 Commercial\TNB M&E Audit\302020-
P-I&E-PN-012-C-IEG\0.03 Proposal\SUPERCEDED\
New File 9.1 m 20170226_Technical Proposal_v1.docx100%
New File 8.4 m 20170226_Technical Proposal_v2.docx100%
New File 6.9 m Financial Proposal.docx100%
New File 103936 Letter of Undertaking.doc100%
New File 8.9 m Technical Proposal.docx100%
New Dir 1 C:\AdvisianActive\02 Commercial\TNB M&E Audit\302020-
P-I&E-PN-012-C-IEG\0.03 Proposal\SUPERCEDED\NOT USED\
New File 8.6 m Technical Proposal.docx100%
New Dir 0 C:\AdvisianActive\02 Commercial\TNB M&E Audit\302020-
P-I&E-PN-012-C-IEG\0.04 CVs\
New Dir 7 C:\AdvisianActive\02 Commercial\TNB M&E Audit\302020-
P-I&E-PN-012-C-IEG\0.05 Risk Classification Form\
New File 432609 23012017101416.pdf100%
New File 445398 CRF-0043_173.pdf100%
New File 103440 CRF-0043_173.xlsx100%
New File 111821 NPIS Rev.41 TNB Needle Ph1.docx100%
New File 1009889 NPIS Rev.41 TNB Needle Ph1.pdf100%
New File 967767 NPIS Rev.41 TNB Needle Ph1_Rev.1.pdf100%

New File 203264 Thumbs.db100%


New Dir 2 C:\AdvisianActive\02 Commercial\TNB M&E Audit\Old
Proposal\
New File 451596 102020-FY13-007-PRP-0001-FINANCIAL-R1.pdf
100%
New File 1.2 m 102020-FY13-007-PRP-0001-TECHNICAL_R2.pdf
100%
New Dir 0 C:\AdvisianActive\02 Commercial\TNB M&E Audit\Old
Proposal\0.0 Pursuit Documentation\
New Dir 7 C:\AdvisianActive\02 Commercial\TNB M&E Audit\Old
Proposal\0.0 Pursuit Documentation\0.1 Tender Document\
New File 92950 Extracted Tender Doc #T1126012 for
Finance.pdf100%
New File 301281 Invitation letter WORLEY_10Dec12.pdf100%

New File 4.3 m Tender Doc #T1126012.doc100%


New File 1.5 m Tender Doc #T1126012.pdf100%
New File 29184 Thumbs.db100%
New File 40196 TOR.docx100%
New File 346546 TOR.pdf100%
New Dir 2 C:\AdvisianActive\02 Commercial\TNB M&E Audit\Old
Proposal\0.0 Pursuit Documentation\0.2 Correspondence\
New File 63488 Tech & Financial envelope_inside.doc100%

New File 25600 TNB Bid Envelope_A4size_outside.doc100%


New Dir 1 C:\AdvisianActive\02 Commercial\TNB M&E Audit\Old
Proposal\0.0 Pursuit Documentation\0.2 Correspondence\Email\
New File 79113 TNB invitation_10Dec12.pdf100%
New Dir 3 C:\AdvisianActive\02 Commercial\TNB M&E Audit\Old
Proposal\0.0 Pursuit Documentation\0.2 Correspondence\Incoming\
New File 252325 KPMG Proposal TNB 2012 ME Audit w
WorleyParson (Cover Letter).pdf100%
New File 22528 Thumbs.db100%
New File 19094 TNB letter of extn.pdf100%
New Dir 4 C:\AdvisianActive\02 Commercial\TNB M&E Audit\Old
Proposal\0.0 Pursuit Documentation\0.2 Correspondence\Outgoing\
New File 55471 102020-FY13-007-007-LET-0001_ACK.pdf100%

New File 173056 102020-FY13-007-LET-0001.doc100%


New File 193536 102020-FY13-007-LET-0002.doc100%
New File 59540 102020-FY13-007-LET-0002.pdf100%
New Dir 1 C:\AdvisianActive\02 Commercial\TNB M&E Audit\Old
Proposal\0.0 Pursuit Documentation\0.2 Correspondence\Outgoing\Attachments to LET-
0002\
New File 1.3 m Certificates.pdf100%
New Dir 17 C:\AdvisianActive\02 Commercial\TNB M&E Audit\Old
Proposal\0.0 Pursuit Documentation\0.3 Proposal TNB Audit FINAL\
New File 4.6 m 102020-FY13-007-PRP-0001-TECHNICAL
R2_FINAL.pdf100%
New File 11.5 m 102020-FY13-007-PRP-0001-TECHNICAL.doc
100%
New File 11.5 m 102020-FY13-007-PRP-0001-TECHNICAL_R1.doc
100%
New File 11.7 m 102020-FY13-007-PRP-0001-TECHNICAL_R2.doc
100%
New File 57593 102020-FY13-007-Schedule.xlsx100%
New File 88576 102020-FY13-007-Schedule_rev2.xls100%
New File 50176 102020-FY13-007-Schedule_rev3.xls100%
New File 64217 102020-FY13-007-WP OrgChart.pptx100%
New File 346546 Appendix 1-TOR.pdf100%
New File 18573 DECLARATION BY THE TENDERER.docx100%
New File 16958 LIST OF PERSONNEL.docx100%
New File 36352 Technical Schedule T2- Experience and
Capability of Consultant.doc100%
New File 42496 Technical Schedule T3- Curriculum
Vitae.doc100%
New File 32768 Technical Schedule T4- Methodology and
Work Program.doc100%
New File 49664 Thumbs.db100%
New File 43331 TOC-Technical.docx100%
New File 54769 WPS Organisation Chart_16Jan13-R1.xlsx
100%
New Dir 14 C:\AdvisianActive\02 Commercial\TNB M&E Audit\Old
Proposal\0.0 Pursuit Documentation\0.3 Proposal TNB Audit FINAL\Co Info\
New File 325562 BEM Cert_Electrical.pdf100%
New File 329880 BEM Cert_Mechanical.pdf100%
New File 324579 BEM Cert_WPI_31Dec2013.pdf100%
New File 330385 FORM 13-WPI.pdf100%
New File 46802 Form 32A_Daud Abas.pdf100%
New File 46320 Form 32A_Mohd Ishak.pdf100%
New File 367200 ISO Cert.pdf100%
New File 311677 MOF_WPI 26Aug2013.pdf100%
New File 77380 Sijil Setem_Daud Abas.pdf100%
New File 77885 Sijil Setem_Mohd Ishak.pdf100%
New File 20489 STMT-WPI.pdf100%
New File 92672 Thumbs.db100%
New File 788711 TNB_WPI AUG 2013.pdf100%
New File 853726 YE2011-WPI.pdf100%
New Dir 3 C:\AdvisianActive\02 Commercial\TNB M&E Audit\Old
Proposal\0.0 Pursuit Documentation\0.3 Proposal TNB Audit FINAL\Costings\
New File 55296 Cost Estimation.xls100%
New File 123392 Overall Cost Estimation.xls100%
New File 28683 TNB State Distribution Offices.pdf100%
New Dir 2 C:\AdvisianActive\02 Commercial\TNB M&E Audit\Old
Proposal\0.0 Pursuit Documentation\0.3 Proposal TNB Audit FINAL\Costings\Car
rental\
New File 15360 Thumbs.db100%
New File 24620 WS quote_15June12.pdf100%
New Dir 10 C:\AdvisianActive\02 Commercial\TNB M&E Audit\Old
Proposal\0.0 Pursuit Documentation\0.3 Proposal TNB Audit FINAL\Costings\Flights\
New File 353953 AS-Langkawi.docx100%
New File 215630 JB.docx100%
New File 206173 Kelantan(K_Bharu).docx100%
New File 218166 Kerteh.docx100%
New File 183417 Langkawi.docx100%
New File 178020 Penang.docx100%
New File 100364 Perlis.docx100%
New File 133545 Perth to KL.JPG100%
New File 187251 Terengganu.docx100%
New File 17920 Thumbs.db100%
New Dir 15 C:\AdvisianActive\02 Commercial\TNB M&E Audit\Old
Proposal\0.0 Pursuit Documentation\0.3 Proposal TNB Audit FINAL\Costings\Hotels\
New File 140555 JB.pdf100%
New File 87684 Kedah.pdf100%
New File 67073 Kelantan.pdf100%
New File 70883 Kota Bharu.pdf100%
New File 199530 Langkawi.pdf100%
New File 152189 Melaka.pdf100%
New File 90126 Negeri Sembilan.pdf100%
New File 112917 Pahang.pdf100%
New File 242924 Penang.pdf100%
New File 110850 Perak.pdf100%
New File 90185 Perlis_Alor Star.pdf100%
New File 156514 Putrajaya.pdf100%
New File 205196 Selangor.pdf100%
New File 98175 Terengganu.pdf100%
New File 138240 Thumbs.db100%
New Dir 12 C:\AdvisianActive\02 Commercial\TNB M&E Audit\Old
Proposal\0.0 Pursuit Documentation\0.3 Proposal TNB Audit FINAL\Financial Proposal\
New File 1.1 m 102020-FY13-007-0001-Financial
Proposal_B&W.pdf100%
New File 12.1 m 102020-FY13-007-0001-Financial-
R1_FINAL.pdf100%
New File 1.1 m 102020-FY13-007-PRP-0001-FINANCIAL.doc
100%
New File 1.1 m 102020-FY13-007-PRP-0001-FINANCIAL-R1.doc
100%
New File 94889 Appendix 1- WP Org Chart.pdf100%
New File 159232 Appendix 1-Letter of Undertaking.doc100%

New File 107008 Form of Agreement.doc100%


New File 435712 GENERAL CONDITIONS.doc100%
New File 120320 Separator-Attachment 1.PPT100%
New File 48640 Thumbs.db100%
New File 39271 TOC-Financial.docx100%
New File 71208 WPS Organisation Chart_16Jan13-R1.xlsx
100%
New Dir 1 C:\AdvisianActive\02 Commercial\TNB M&E Audit\Old
Proposal\0.0 Pursuit Documentation\0.3 Proposal TNB Audit FINAL\Financial
Proposal\Technical Proposal minus CV\
New File 1.4 m 102020-FY13-007-PRP-0001-TECHNICAL_R2.doc
100%
New Dir 3 C:\AdvisianActive\02 Commercial\TNB M&E Audit\Old
Proposal\0.0 Pursuit Documentation\0.3 Proposal TNB Audit FINAL\KPMG Input\
New File 162 ~$MG proposal TNB 2012 ME audit w
WorleyParson (Financial).doc100%
New File 1.6 m KPMG Proposal TNB 2012 ME Audit w
WorleyParson (Financial).doc100%
New File 3.9 m KPMG proposal TNB 2012 ME audit w
WorleyParson (Technical).doc100%
New Dir 1 C:\AdvisianActive\02 Commercial\TNB M&E Audit\Old
Proposal\0.0 Pursuit Documentation\0.4 CVs\
New File 48128 Technical Schedule T3 - CV template.doc
100%
New Dir 12 C:\AdvisianActive\02 Commercial\TNB M&E Audit\Old
Proposal\0.0 Pursuit Documentation\0.4 CVs\Formatted CVs\
New File 113664 Technical Schedule T3 - Aloot.doc100%
New File 43342 Technical Schedule T3 - Barrie Cook.docx
100%
New File 286720 Technical Schedule T3 - Biasizzo.doc100%

New File 519168 Technical Schedule T3 - Biswajit.doc100%

New File 350720 Technical Schedule T3 - Chee.doc100%


New File 97280 Technical Schedule T3 - Darling.doc100%
New File 22812 Technical Schedule T3 - Ildeu Alves
Leao.docx100%
New File 60416 Technical Schedule T3 - Miller.doc100%
New File 47616 Technical Schedule T3 - Neoh.doc100%
New File 478208 Technical Schedule T3 - Nitin Panhale.doc
100%
New File 1.0 m Technical Schedule T3 - Robertson.doc100%

New File 5.9 m Technical Schedule T3 - Wirges.doc100%


New Dir 4 C:\AdvisianActive\02 Commercial\TNB M&E Audit\Old
Proposal\0.0 Pursuit Documentation\0.4 CVs\Local CVs\
New File 162 ~$chnical Schedule T3 - Azri.doc100%
New File 1.6 m Technical Schedule T3 - Azri.doc100%
New File 46080 Technical Schedule T3 - George.doc100%
New File 48640 Technical Schedule T3 - MFMN.doc100%
New Dir 8 C:\AdvisianActive\02 Commercial\TNB M&E Audit\Old
Proposal\0.0 Pursuit Documentation\0.4 CVs\Unformatted\
New File 182272 Aloot_King 2013.doc100%
New File 312832 Biasizzo_Charles 2013.doc100%
New File 63452 Cook Barrie.pdf100%
New File 141824 Darling_Chris 2013.doc100%
New File 86016 ILDEU ALVES LEAO.doc100%
New File 84992 Miller_Bruce 2013.doc100%
New File 1.4 m Nitin.head.jpg100%
New File 1.7 m Wirges_Graeme 2013.doc100%
New Dir 7 C:\AdvisianActive\02 Commercial\TNB M&E Audit\Old
Proposal\0.0 Pursuit Documentation\0.5 Risk Assessment & PIF\
New File 177664 FY13-007-Bid No Bid Form.doc100%
New File 88605 FY13-007-Bid.pdf100%
New File 176128 FY13-007-PIF.doc100%
New File 113744 FY13-007-PIF.pdf100%
New File 167473 FY13-007-RCF.pdf100%
New File 113152 FY13-007-RCF.xls100%
New File 57856 Thumbs.db100%
New Dir 7 C:\AdvisianActive\02 Commercial\TNBJ M&E Audit\
New File 18583 20170315_TNBJ M&E_Budget_Neoh.xlsx100%
New File 25012 20170315_TNBJ M&E_Budget_Neoh_v2.xlsx100%

New File 25917 20170315_TNBJ M&E_Budget_Neoh_v3.xlsx100%

New File 48396 Org Chart.pptx100%


New File 8.4 m Technical Proposal_TNBJ.docx100%
New File 378368 TNBJ M&E Audit Schedule.mpp100%
New File 397312 TNBJ M&E Audit Schedule_v2.mpp100%
New Dir 1 C:\AdvisianActive\02 Commercial\TNBJ M&E
Audit\302020-P-I&E-PN-015-C-IEG\
New File 45056 Thumbs.db100%
New Dir 10 C:\AdvisianActive\02 Commercial\TNBJ M&E
Audit\302020-P-I&E-PN-015-C-IEG\0.01 Tender Documents\
New File 1.5 m aal52304100%
New File 614883 Conditions of Contract T&C.pdf100%
New File 223210 Invitation Letter.pdf100%
New File 2.3 m ITB_Financial Proposal.pdf100%
New File 1.8 m ITB_Technical.pdf100%
New File 42703 Tender Bond Format.docx100%
New File 618192 Tender Bond Format.pdf100%
New File 25622 The Agreement.docx100%
New File 68428 The Agreement.pdf100%
New File 197120 Thumbs.db100%
New Dir 0 C:\AdvisianActive\02 Commercial\TNBJ M&E
Audit\302020-P-I&E-PN-015-C-IEG\0.02 Correspondence\
New Dir 3 C:\AdvisianActive\02 Commercial\TNBJ M&E
Audit\302020-P-I&E-PN-015-C-IEG\0.03 Proposal\
New File 162 ~$170116 KEV Proposal_Neoh.docx100%
New File 162 ~$ipod Beta Training Proposal.doc100%
New File 117760 Thumbs.db100%
New Dir 2 C:\AdvisianActive\02 Commercial\TNBJ M&E
Audit\302020-P-I&E-PN-015-C-IEG\0.03 Proposal\01 for Reference Only\
New File 65831 Org Chart.pptx100%
New File 31232 Thumbs.db100%
New Dir 0 C:\AdvisianActive\02 Commercial\TNBJ M&E
Audit\302020-P-I&E-PN-015-C-IEG\0.03 Proposal\01 for Reference Only\Go-Bys\
New Dir 18 C:\AdvisianActive\02 Commercial\TNBJ M&E
Audit\302020-P-I&E-PN-015-C-IEG\0.03 Proposal\01 for Reference Only\Go-Bys\0.3
Proposal TNB Audit FINAL\
New File 162 ~$2020-FY13-007-PRP-0001-TECHNICAL_R2.doc
100%
New File 4.6 m 102020-FY13-007-PRP-0001-TECHNICAL
R2_FINAL.pdf100%
New File 11.5 m 102020-FY13-007-PRP-0001-TECHNICAL.doc
0% 100%
New File 11.5 m 102020-FY13-007-PRP-0001-TECHNICAL_R1.doc
0% 100%
New File 11.7 m 102020-FY13-007-PRP-0001-TECHNICAL_R2.doc
100%
New File 57593 102020-FY13-007-Schedule.xlsx100%
New File 88576 102020-FY13-007-Schedule_rev2.xls100%
New File 50176 102020-FY13-007-Schedule_rev3.xls100%
New File 64217 102020-FY13-007-WP OrgChart.pptx100%
New File 346546 Appendix 1-TOR.pdf100%
New File 18573 DECLARATION BY THE TENDERER.docx100%
New File 16958 LIST OF PERSONNEL.docx100%
New File 36352 Technical Schedule T2- Experience and
Capability of Consultant.doc100%
New File 42496 Technical Schedule T3- Curriculum
Vitae.doc100%
New File 32768 Technical Schedule T4- Methodology and
Work Program.doc100%
New File 60416 Thumbs.db100%
New File 43331 TOC-Technical.docx100%
New File 54769 WPS Organisation Chart_16Jan13-R1.xlsx
100%
New Dir 14 C:\AdvisianActive\02 Commercial\TNBJ M&E
Audit\302020-P-I&E-PN-015-C-IEG\0.03 Proposal\01 for Reference Only\Go-Bys\0.3
Proposal TNB Audit FINAL\Co Info\
New File 325562 BEM Cert_Electrical.pdf100%
New File 329880 BEM Cert_Mechanical.pdf100%
New File 324579 BEM Cert_WPI_31Dec2013.pdf100%
New File 330385 FORM 13-WPI.pdf100%
New File 46802 Form 32A_Daud Abas.pdf100%
New File 46320 Form 32A_Mohd Ishak.pdf100%
New File 367200 ISO Cert.pdf100%
New File 311677 MOF_WPI 26Aug2013.pdf100%
New File 77380 Sijil Setem_Daud Abas.pdf100%
New File 77885 Sijil Setem_Mohd Ishak.pdf100%
New File 20489 STMT-WPI.pdf100%
New File 92672 Thumbs.db100%
New File 788711 TNB_WPI AUG 2013.pdf100%
New File 853726 YE2011-WPI.pdf100%
New Dir 3 C:\AdvisianActive\02 Commercial\TNBJ M&E
Audit\302020-P-I&E-PN-015-C-IEG\0.03 Proposal\01 for Reference Only\Go-Bys\0.3
Proposal TNB Audit FINAL\Costings\
New File 55296 Cost Estimation.xls100%
New File 123392 Overall Cost Estimation.xls100%
New File 28683 TNB State Distribution Offices.pdf100%
New Dir 2 C:\AdvisianActive\02 Commercial\TNBJ M&E
Audit\302020-P-I&E-PN-015-C-IEG\0.03 Proposal\01 for Reference Only\Go-Bys\0.3
Proposal TNB Audit FINAL\Costings\Car rental\
New File 15360 Thumbs.db100%
New File 24620 WS quote_15June12.pdf100%
New Dir 10 C:\AdvisianActive\02 Commercial\TNBJ M&E
Audit\302020-P-I&E-PN-015-C-IEG\0.03 Proposal\01 for Reference Only\Go-Bys\0.3
Proposal TNB Audit FINAL\Costings\Flights\
New File 353953 AS-Langkawi.docx100%
New File 215630 JB.docx100%
New File 206173 Kelantan(K_Bharu).docx100%
New File 218166 Kerteh.docx100%
New File 183417 Langkawi.docx100%
New File 178020 Penang.docx100%
New File 100364 Perlis.docx100%
New File 133545 Perth to KL.JPG100%
New File 187251 Terengganu.docx100%
New File 17920 Thumbs.db100%
New Dir 15 C:\AdvisianActive\02 Commercial\TNBJ M&E
Audit\302020-P-I&E-PN-015-C-IEG\0.03 Proposal\01 for Reference Only\Go-Bys\0.3
Proposal TNB Audit FINAL\Costings\Hotels\
New File 140555 JB.pdf100%
New File 87684 Kedah.pdf100%
New File 67073 Kelantan.pdf100%
New File 70883 Kota Bharu.pdf100%
New File 199530 Langkawi.pdf100%
New File 152189 Melaka.pdf100%
New File 90126 Negeri Sembilan.pdf100%
New File 112917 Pahang.pdf100%
New File 242924 Penang.pdf100%
New File 110850 Perak.pdf100%
New File 90185 Perlis_Alor Star.pdf100%
New File 156514 Putrajaya.pdf100%
New File 205196 Selangor.pdf100%
New File 98175 Terengganu.pdf100%
New File 138240 Thumbs.db100%
New Dir 12 C:\AdvisianActive\02 Commercial\TNBJ M&E
Audit\302020-P-I&E-PN-015-C-IEG\0.03 Proposal\01 for Reference Only\Go-Bys\0.3
Proposal TNB Audit FINAL\Financial Proposal\
New File 1.1 m 102020-FY13-007-0001-Financial
Proposal_B&W.pdf100%
New File 12.1 m 102020-FY13-007-0001-Financial-
R1_FINAL.pdf 0% 100%
New File 1.1 m 102020-FY13-007-PRP-0001-FINANCIAL.doc
100%
New File 1.1 m 102020-FY13-007-PRP-0001-FINANCIAL-R1.doc
100%
New File 94889 Appendix 1- WP Org Chart.pdf100%
New File 159232 Appendix 1-Letter of Undertaking.doc100%

New File 107008 Form of Agreement.doc100%


New File 435712 GENERAL CONDITIONS.doc100%
New File 120320 Separator-Attachment 1.PPT100%
New File 48640 Thumbs.db100%
New File 39271 TOC-Financial.docx100%
New File 71208 WPS Organisation Chart_16Jan13-R1.xlsx
100%
New Dir 1 C:\AdvisianActive\02 Commercial\TNBJ M&E
Audit\302020-P-I&E-PN-015-C-IEG\0.03 Proposal\01 for Reference Only\Go-Bys\0.3
Proposal TNB Audit FINAL\Financial Proposal\Technical Proposal minus CV\
New File 1.4 m 102020-FY13-007-PRP-0001-TECHNICAL_R2.doc
100%
New Dir 3 C:\AdvisianActive\02 Commercial\TNBJ M&E
Audit\302020-P-I&E-PN-015-C-IEG\0.03 Proposal\01 for Reference Only\Go-Bys\0.3
Proposal TNB Audit FINAL\KPMG Input\
New File 162 ~$MG proposal TNB 2012 ME audit w
WorleyParson (Financial).doc100%
New File 1.6 m KPMG Proposal TNB 2012 ME Audit w
WorleyParson (Financial).doc100%
New File 3.9 m KPMG proposal TNB 2012 ME audit w
WorleyParson (Technical).doc100%
New Dir 8 C:\AdvisianActive\02 Commercial\TNBJ M&E
Audit\302020-P-I&E-PN-015-C-IEG\0.03 Proposal\01 for Reference Only\Go-Bys\Old
Proposal Ref\
New File 4.6 m 102020-FY13-013-PRP-0001-R2.doc100%
New File 3.9 m Appendix 1 - TOR.pdf100%
New File 240222 HSBC Bid Bond.pdf100%
New File 311733 HSBC letter.pdf100%
New File 212758 KWSP-MAY and JUNE13.pdf100%
New File 22.8 m OLD - TNBJ Tender Invitation_21May13.pdf
0% 100%
New File 64075 SOCSO-MAY and JUNE13-0001.pdf100%
New File 184832 Thumbs.db100%
New Dir 3 C:\AdvisianActive\02 Commercial\TNBJ M&E
Audit\302020-P-I&E-PN-015-C-IEG\0.03 Proposal\01 for Reference Only\Go-Bys\Old
Proposal Ref\Final Proposal Technical & Financial\
New File 2.7 m Financial Proposal.pdf100%
New File 8.8 m Technical Proposal.pdf100%
New File 108544 Thumbs.db100%
New Dir 10 C:\AdvisianActive\02 Commercial\TNBJ M&E
Audit\302020-P-I&E-PN-015-C-IEG\0.03 Proposal\02 Address_Cover_Spine\
New File 1014272 A3Cover Tech_Landscape.ppt100%
New File 1033728 A4Cover Comm.PPT100%
New File 215552 Address [DO NOT USE].doc100%
New File 45056 Address.doc100%
New File 1014272 SPINE 40MM.PPT100%
New File 134656 Thumbs.db100%
New File 159232 Transmittal_Comm_002.doc100%
New File 359933 Transmittal_Comm_002.pdf100%
New File 154624 Transmittal_Tech_001.doc100%
New File 351040 Transmittal_Tech_001.pdf100%
New Dir 8 C:\AdvisianActive\02 Commercial\TNBJ M&E
Audit\302020-P-I&E-PN-015-C-IEG\0.03 Proposal\03 Technical Proposal\
New File 162 ~$chnical Proposal.docx100%
New File 721786 Apndx B - WPI_BOE 2017.pdf100%
New File 467502 Apndx F Contract T&C.pdf100%
New File 117248 Letter of Undertaking.doc100%
New File 8.5 m Technical Proposal.docx 0% 100%
New File 64512 Thumbs.db100%
New File 17525 TNB RC AUDIT Cover letter v2.docx100%
New File 86687 WPSSB to Advisian_Form 13 dated
02.12.2015 [Name Change].pdf100%
New Dir 9 C:\AdvisianActive\02 Commercial\TNBJ M&E
Audit\302020-P-I&E-PN-015-C-IEG\0.03 Proposal\03 Technical Proposal\Apndx A T1
Company Profile\
New File 162 ~$chnical Schedule T1 - Company
Profile.docx100%
New File 734565 Att 1 - MOF.pdf100%
New File 86687 Att 2 - ROC.pdf100%
New File 16522 Att 3 - TNB Vendor Certificate_Advisian
2017.pdf100%
New File 564781 Att 4 - Form 9 [Name Change.pdf100%
New File 906682 Att 5 - Form 24.pdf100%
New File 84974 Att 6 - Form 49.pdf100%
New File 92536 Technical Schedule T1 - Company
Profile_new.docx100%
New File 154624 Thumbs.db100%
New Dir 6 C:\AdvisianActive\02 Commercial\TNBJ M&E
Audit\302020-P-I&E-PN-015-C-IEG\0.03 Proposal\03 Technical Proposal\Apndx C T2
Experience\
New File 162 ~$chnical Schedule T2 - Experience.docx
100%
New File 80724 Technical Schedule T2 - Experience.docx
100%
New File 102190 Technical Schedule T2 - Experience.pdf
100%
New File 80726 Technical Schedule T2 -
Experience_new.docx100%
New File 455092 Technical Schedule T2 -
Experience_new.pdf100%
New File 13824 Thumbs.db100%
New Dir 4 C:\AdvisianActive\02 Commercial\TNBJ M&E
Audit\302020-P-I&E-PN-015-C-IEG\0.03 Proposal\03 Technical Proposal\Apndx D T3 CVs\
New File 162 ~$ Technical Schedule T3 - CV [Neoh].docx
100%
New File 279552 Divider_Attachments.ppt100%
New File 605314 Technical Schedule T3 - CV
[TEMPLATE].docx100%
New File 31744 Thumbs.db100%
New Dir 20 C:\AdvisianActive\02 Commercial\TNBJ M&E
Audit\302020-P-I&E-PN-015-C-IEG\0.03 Proposal\03 Technical Proposal\Apndx D T3
CVs\CVs\
New File 162 ~$ Zi Neoh_CV.docx100%
New File 162 ~$uce Miller.doc100%
New File 1.1 m 01 Foo Hah_CV.docx100%
New File 118489 02 Siva Sreedharan_CV.pdf100%
New File 87372 03 Sudhakar Surapaneni_CV.pdf100%
New File 1.1 m 03 Zi Neoh_CV.docx100%
New File 1.0 m 05 Robert Ellis CV.docx100%
New File 1.1 m Adam Aspinall.docx100%
New File 1.0 m Advisian New CV template.docx 0% 100%
New File 1.6 m Bruce Miller.doc100%
New File 1.0 m Frank Sutton CV 20170224.docx100%
New File 326656 Gabriel S C Rocha.doc100%
New File 1.0 m Kevin Gan.docx100%
New File 116743 KPMG Team CVs.pptx100%
New File 1.5 m Mohamad Baihaki.docx100%
New File 1.0 m Mukesh Shukla.docx100%
New File 38033 Mukesh Shuklaxxx.docx100%
New File 28436 R Ellis_CV [Original].docx100%
New File 208128 Teresa Tam.pdf100%
New File 76800 Thumbs.db100%
New Dir 3 C:\AdvisianActive\02 Commercial\TNBJ M&E
Audit\302020-P-I&E-PN-015-C-IEG\0.03 Proposal\03 Technical Proposal\Apndx D T3
CVs\Not complete\
New File 100888 Technical Schedule T3 - CV [Adam
Aspinall].docx100%
New File 101343 Technical Schedule T3 - CV [Gabriel].docx
100%
New File 15360 Thumbs.db100%
New Dir 12 C:\AdvisianActive\02 Commercial\TNBJ M&E
Audit\302020-P-I&E-PN-015-C-IEG\0.03 Proposal\03 Technical Proposal\Apndx D T3
CVs\PRINTED\
New File 162 ~$ Technical Schedule T3 - CV [Siva
Sreedharan].docx100%
New File 93136 01 Technical Schedule T3 - CV [Foo
Hah].docx100%
New File 139261 02 Technical Schedule T3 - CV [Siva
Sreedharan].docx100%
New File 95616 03 Technical Schedule T3 - CV [Neoh].docx
100%
New File 83071 Technical Schedule T3 - CV [Teresa].docx
100%
New File 79588 Technical Schedule T3 - CV [Bob
Ellis].docx100%
New File 103669 Technical Schedule T3 - CV [Bruce
Miller].docx100%
New File 624845 Technical Schedule T3 - CV [Kevin].docx
100%
New File 79210 Technical Schedule T3 - CV [Mukesh
Shukla].docx 0% 100%
New File 84069 Technical Schedule T3 - CV Alan Yau.docx
100%
New File 84821 Technical Schedule T3 - CV Emily
Choo.docx100%
New File 98808 Technical Schedule T3 - CV Frank
Sutton.docx100%
New Dir 5 C:\AdvisianActive\02 Commercial\TNBJ M&E
Audit\302020-P-I&E-PN-015-C-IEG\0.03 Proposal\03 Technical Proposal\Apndx E T4
Methodology\
New File 162 ~$chnical Schedule T4 - Methodology.docx
100%
New File 162 ~$chnical Schedule T4 -
Methodology_New.docx100%
New File 1.3 m Technical Schedule T4 - Methodology.docx
100%
New File 1.6 m Technical Schedule T4 -
Methodology_New.docx100%
New File 20992 Thumbs.db100%
New Dir 2 C:\AdvisianActive\02 Commercial\TNBJ M&E
Audit\302020-P-I&E-PN-015-C-IEG\0.03 Proposal\03 Technical Proposal\KWSP & SOCSO\
New File 745836 Advisian_EPF-0001.pdf100%
New File 18402 Advisian-SOCSO.pdf100%
New Dir 6 C:\AdvisianActive\02 Commercial\TNBJ M&E
Audit\302020-P-I&E-PN-015-C-IEG\0.03 Proposal\04 Financial Proposal\
New File 344576 01 Cover Letter_Financial.doc100%
New File 86687 01a WPSSB to Advisian_Form 13 dated
02.12.2015 [Name Change].pdf100%
New File 6.7 m 02 Financial Proposal.docx100%
New File 614883 Conditions of Contract T&C.pdf100%
New File 50862 Form of Agreement.docx100%
New File 24576 Thumbs.db100%
New Dir 0 C:\AdvisianActive\02 Commercial\TNBJ M&E
Audit\302020-P-I&E-PN-015-C-IEG\0.03 Proposal\04 Financial Proposal\Mandatory Docs\
New Dir 3 C:\AdvisianActive\02 Commercial\TNBJ M&E
Audit\302020-P-I&E-PN-015-C-IEG\0.03 Proposal\04 Financial Proposal\Mandatory
Docs\01 Bank Statements\
New File 100268 01 Dec 16 WPS Advisian.pdf100%
New File 95999 02 Jan 17 WPS Advisian.pdf100%
New File 92889 03 Feb 17 WPS Advisian.pdf100%
New Dir 3 C:\AdvisianActive\02 Commercial\TNBJ M&E
Audit\302020-P-I&E-PN-015-C-IEG\0.03 Proposal\04 Financial Proposal\Mandatory
Docs\02 Financial Report\
New File 1.0 m FY2014.pdf 0% 100%
New File 1.6 m FY2015.pdf100%
New File 37.5 m FY2016.pdf100%
New Dir 0 C:\AdvisianActive\02 Commercial\TNBJ M&E
Audit\302020-P-I&E-PN-015-C-IEG\0.04 CVs\
New Dir 1 C:\AdvisianActive\02 Commercial\TNBJ M&E
Audit\302020-P-I&E-PN-015-C-IEG\0.05 Risk Classification Form\
New File 203264 Thumbs.db100%
New Dir 13 C:\AdvisianActive\02 Commercial\WP India\
New File 782487 GDC Commercial Standard Presentation
(1).pdf100%
New File 782487 GDC Commercial Standard Presentation.pdf
100%
New File 337964 IN Power Engineering Organization -
Mumbai.pptx100%
New File 36315 Leverage GDC.DOCX100%
New File 254978 Master Experience List -CFPP.PDF100%
New File 202386 Mumbai - POWER Eng Discipline Capability
Matrix - R1_May2017.xlsx100%
New File 361675 Power Generation Team Profile.docx100%
New File 1.8 m Power Network - Electrical.pdf100%
New File 1001144 POWER RESUME.rar100%
New File 1.3 m WP India -Power Projects Experience
Sep17.pdf100%
New File 504661 WP India -Power_Achievements - Sep17.pdf
100%
New File 1.1 m WP India -Power_Capabilites - Sep17.pdf
100%
New File 583542 WP Mumbai Power System Studies.pdf100%
New Dir 24 C:\AdvisianActive\03 Templates\
New File 165 ~$Advisian Timesaver Template.pptx100%
New File 19.7 m 2017.10 Project Ocean - Advisian Final
Report_Advisian format_vFF.pptx100%
New File 36.4 m Advisian Client Engagement Pack.pptx100%

New File 277481 Advisian Presentation Standard.potx100%


New File 151636 Advisian Presentation Widescreen.potx100%

New File 145971 Advisian Proposal A4 Landscape.potx 0%


100%
New File 345408 Advisian Proposal A4 Portrait.potx100%
New File 177476 Advisian Proposal US Letter
Landscape.potx100%
New File 119883 Advisian Proposal US letter Portrait.potx
100%
New File 11.6 m Advisian Timesaver Template.pptx100%
New File 1.0 m Agenda Advisian.dotx100%
New File 53456 CH-GM3 (version 1.2).xlsb100%
New File 49.1 m doingnothingisnotanoption-slideshare-
final-161129034426.pptx100%
New File 15988 Excel Template.xltx100%
New File 1.5 m flevy__148.ppt100%
New File 1.0 m MOM Advisian.dotx100%
New File 2.0 m PPT_Dark_Advisian.potx100%
New File 2.0 m PPT_Light_Advisian.potx 0% 100%
New File 2.8 m Proposal Advisian.dotm100%
New File 2.8 m Report Advisian.dotm100%
New File 3.4 m sdr-smart-city-smart-utility.pdf100%
New File 27582 Simplified levelized tariff
06Jan2016.xlsx100%
New File 7.9 m Timesaver tool_2017.pptx100%
New File 6.9 m transactivenetworks-inthenzretailcontext-
161222235032.pptx 0% 100%
New Dir 0 C:\AdvisianActive\03 Templates\Market Study and
Forecast\
New Dir 3 C:\AdvisianActive\03 Templates\Market Study and
Forecast\CCGT models from Neoh\
New File 5.3 m Annex 3.4.1 & 3.4.2 Financial Forms, Data
Book and Model.xlsm100%
New File 3.8 m Track 4A - TNB FM - EC (with macro).xlsm
100%
New File 90370 Track 4A - TNB FM User Manual - EC.docx
100%
New Dir 1 C:\AdvisianActive\03 Templates\Market Study and
Forecast\Indonesia\
New File 920733
EGP_Indonesia_Updated_market_report_rev2_29032016.pdf100%
New Dir 1 C:\AdvisianActive\03 Templates\Market Study and
Forecast\Malaysia\
New File 2.2 m EGP_Malaysia_Final_report_29082014.pdf
100%
New Dir 1 C:\AdvisianActive\03 Templates\Market Study and
Forecast\Philippines\
New File 8.0 m Philippines market report June 2014.pdf
100%
New Dir 1 C:\AdvisianActive\03 Templates\Market Study and
Forecast\Thailand\
New File 1.5 m
Blackstone_Thailand_Market_report_26092014.pdf100%
New Dir 1 C:\AdvisianActive\03 Templates\Market Study and
Forecast\Vietnam\
New File 1.2 m EGP Vietnam Final Report_17062016.pdf100%

New Dir 15 C:\AdvisianActive\03 Templates\MC Reports\


New File 3.8 m
BAIN_REPORT_The_global_diamond_report_2013.pdf100%
New File 1.1 m BCG - Media_in_NYC_2012.pdf100%
New File 860454 BCG_Economic Impact of Emissions
Standards in California report.pdf100%
New File 860454 BCG_Role of Technology in Small and
Medium Enterprise Growth.pdf100%
New File 421076 bcg-detailedpresentation.pdf100%
New File 1.3 m Ethan M. Rasiel The McKinsey Way Using
the Techniques of the Worlds Top Strategic Consultants to Help You and Your
Business.pdf100%
New File 335354 Examples-of-Strategy-Consulting-Firm-
Client-Presentations.pdf100%
New File 1.4 m McKinsey - 5776-capturing-the-full-
electricity-efficiency-potentia.pdf100%
New File 3.1 m McKinsey -
MGI_UK_From_austerity_to_prosperity_full_report.pdf100%
New File 862253 Mckinsey
18_A_Board_perspective_on_enterprise_risk_management.pdf100%
New File 466343 McKinsey From-compliance-to-value-
creation.pdf100%
New File 3.2 m McKinseyStudy.pdf100%
New File 221632 mckinsey-usps-future-bus-model2.pdf100%
New File 895257 PWC Enterprise Risk Management.pdf100%
New File 1.0 m THE MCKINSEY APPROACH TO PROBLEM
SOLVING.pdf100%
New Dir 10 C:\AdvisianActive\04 Career Development Plans\
New File 171413 Being a Consultant.pdf100%
New File 26660 Billings PBS Scoring Graphs.xlsx100%
New File 3.4 m Career Development Manual.docx100%
New File 1022837 Career Development Manual.pdf100%
New File 742217 CompetencyFramework Dec16.pptx100%
New File 42496 Consultant Career Plan.xls100%
New File 21246 KPI Template.xlsx100%
New File 53952 Promotion form Snr Consultant to
Associate (Accomplished).xlsx100%
New File 49152 Senior Consultant Career Plan.xls100%
New File 45568 Senior Consultant to Associate Promotion
Recommendation Form.xls100%
New Dir 27 C:\AdvisianActive\05 Capabilities Presentation
Slides\
New File 17.5 m 20170222 Presentation to SEDA_v3.pptx100%

New File 1.7 m Advisian Lenders Engineer Experience.pdf


100%
New File 12.2 m Advisian_LTA
Meeting_EDRA_21042017_Final_V1.0.pptx100%
New File 1.1 m Biomass Capability and Experience.pdf100%

New File 334415 Case Study - South Australian


Blackout.pdf100%
New File 1.7 m
CorporateBrochure_Bro_210mmx210mm_APAC_0516-Rev0-LoRes.pdf100%
New File 5.4 m
CustomerSuccessStorySouthernSeawaterA4_Fly_Inf_0913.pdf100%
New File 1.0 m Fossil Power flier.pdf100%
New File 1.1 m FSRU and FSU LNG Capabilities_Feb2016.pdf
100%
New File 20.3 m FSRU and FSU LNG
Capabilities_Feb2016.pptx100%
New File 905190 Gas Turbine Capability.pdf100%
New File 4.0 m Lenders Engineer.pptx100%
New File 1.1 m LNG Project Experience_current for
profile 25apr17.docx100%
New File 243560 LNG Project Experience_current for
profile 25apr17.pdf100%
New File 7.2 m
LNGRegasification_Bro_A4_Hyd_Glo_0317_RevG.pdf100%
New File 9.0 m Malaysian ITA & IE PPA Scope.pptx 0%
100%
New File 9.0 m Malaysian ITA & IE PPA Scope_v2.pptx 0%
100%
New File 3.8 m Meeting with SBPC.pptx100%
New File 5.2 m Power from LNG_Edra 25 Sept.pdf100%
New File 10.1 m Power from LNG_Edra 25 Sept.pptx100%
New File 12.7 m Presentation to TNB - new Energy_v1.pptx
100%
New File 757325 Resource and Industry Power Capability-
ver4-web.pdf100%
New File 49662 Waste to Energy-Apr2017.pdf100%
New File 596514 Water Capabilities.pdf100%
New File 2.4 m Water Capabilities.pptx100%
New File 12.3 m Water Management for Sustainable
Business_Cap_A4_IE_GL_HiRes.pdf100%
New File 179709 Wind Experience List - Apr 2017.pdf100%
New Dir 2 C:\AdvisianActive\05 Capabilities Presentation
Slides\Gas to Power\
New File 20.3 m FSRU and FSU LNG
Capabilities_Feb2016.pptx100%
New File 7.2 m
LNGRegasification_Bro_A4_Hyd_Glo_0317_RevG.pdf100%
New Dir 4 C:\AdvisianActive\05 Capabilities Presentation
Slides\Lenders Engineer\
New File 1.7 m Advisian Lenders Engineer Experience.pdf
100%
New File 1.0 m Advisian Power Due Diligence Offering and
Expertise.pdf100%
New File 2.2 m Finance Project Finance and PPP PRINT.PDF
100%
New File 2.3 m Technical and Commercial Due Dilligence
PRINT.PDF100%
New Dir 4 C:\AdvisianActive\05 Capabilities Presentation
Slides\Lenders Engineer\Reduced Size\
New File 1.5 m Advisian Lenders Engineer Experience.pdf
100%
New File 854427 Advisian Power Due Diligence Offering and
Expertise.pdf100%
New File 630119 Finance Project Finance and PPP PRINT.pdf
100%
New File 415242 Technical and Commercial Due Dilligence
PRINT.pdf100%
New Dir 20 C:\AdvisianActive\05 Capabilities Presentation
Slides\Renewables Brochures\
New File 1.1 m
Bolero146MWPVPlant_CS_A4_Inf_Glo_0117_Rev0.pdf100%
New File 200895 CSP and Hybrid Experience List - Apr
2017.pdf100%
New File 469216 CSP Hybrid Systems flier.pdf100%
New File 1.4 m Due Diligence for Large
Solar_CS_A4_0816.pdf100%
New File 4.0 m Edra - LNG Credentials.zip100%
New File 7.0 m Edra - Renewables Credentials.zip100%
New File 208987 Energy Storage Experience List - Apr
2017.pdf100%
New File 1.4 m Energy Storage Systems flier.pdf100%
New File 1.4 m Indicative Project Team Structure.pdf100%

New File 3.0 m Indicative Project Team Structure.pptx


100%
New File 218121 Maria-Elena Hybrid Solar and
Heat_CS_A4_0816.pdf100%
New File 1.4 m Microgrid Systems.pdf100%
New File 728602 New Energy Experience List - Aug 2017.pdf
100%
New File 109749 PV Experience List - Apr 2017.pdf100%
New File 665937 PV Power Systems__Global flier.pdf100%
New File 1.0 m Renewable
Energy_Bro_Ltr_GLO_1016_Rev03_(i-web) resized.pdf100%
New File 9.4 m Renewable
Energy_Bro_Ltr_GLO_1016_Rev03_(i-web).pdf100%
New File 1.9 m Renewable
Energy_Bro_Ltr_GLO_1016_Rev03_SS-PRINT.pdf100%
New File 661998 Renewables Experience List - Apr 2017.pdf
100%
New File 233041 Solar Dawn.pdf100%
New Dir 3 C:\AdvisianActive\05 Capabilities Presentation
Slides\Renewables Brochures\Edra - LNG Credentials\
New File 1.1 m FSRU and FSU LNG Capabilities_Feb2016.pdf
100%
New File 243560 LNG Project Experience_current for
profile 25apr17.pdf100%
New File 2.8 m
LNGRegasification_Bro_A4_Hyd_Glo_0317_RevG.pdf100%
New Dir 2 C:\AdvisianActive\05 Capabilities Presentation
Slides\Renewables Brochures\Edra - Renewables Credentials\
New File 1.0 m Advisian Renewable Energy Credentials.pdf
100%
New File 1.4 m Indicative Project Team
Structure_Edra.pdf100%
New Dir 1 C:\AdvisianActive\05 Capabilities Presentation
Slides\Renewables Brochures\Edra - Renewables Credentials\01 Experience List\
New File 728602 New Energy Experience List - Aug 2017.pdf
100%
New Dir 4 C:\AdvisianActive\05 Capabilities Presentation
Slides\Renewables Brochures\Edra - Renewables Credentials\02 CSP, Smart Grid,
Battery Storage & PV Fliers\
New File 469216 CSP Hybrid Systems flier.pdf100%
New File 388664 Energy Storage Systems flier.pdf100%
New File 947705 Microgrid Systems.pdf100%
New File 665937 PV Power Systems__Global flier.pdf100%
New Dir 7 C:\AdvisianActive\05 Capabilities Presentation
Slides\Renewables Brochures\Edra - Renewables Credentials\03 CV_Technical PM for
SEA Region\
New File 264291 CV_Pi Hua Tan.pdf100%
New File 124964 Eoghan Quinn_CV.pdf100%
New File 140623 Gilein Steensma_CV.pdf100%
New File 173111 Marco Antonio Gomez_CV.pdf100%
New File 143003 Miller_Bruce_CV.pdf100%
New File 187397 Paul Ebert_CV.pdf100%
New File 136143 RodTouzelCVGeneral.pdf100%
New Dir 3 C:\AdvisianActive\05 Capabilities Presentation
Slides\Renewables Brochures\Edra - Renewables Credentials\04 Case Studies\
New File 232680
Bolero146MWPVPlant_CS_A4_Inf_Glo_0117_Rev0.pdf100%
New File 254548 Due Diligence for Large
Solar_CS_A4_0816.pdf100%
New File 218121 Maria-Elena Hybrid Solar and
Heat_CS_A4_0816.pdf100%
New Dir 1 C:\AdvisianActive\05 Capabilities Presentation
Slides\Renewables Brochures\Wind Farm Brochures\
New File 1.0 m Offshore Wind Brochure_Rev5.pdf100%
New Dir 8 C:\AdvisianActive\06 Misc\
New File 229560 ADVISIAN SSM.pdf100%
New File 721786 Apndx B WPI_BOE 2017.pdf100%
New File 86687 Att 2 - CCM.pdf100%
New File 18158 FEPA Project Descriptions.docx100%
New File 29050 Medical Claim Form Template.xlsx100%
New File 731657 MOF.pdf100%
New File 81920 Probationary Review Form 10 -
Template_neoh.doc100%
New File 117760 SPG Advisian TNB Vendor.xls100%
New Dir 39 C:\AdvisianActive\07 Library\
New File 2.1 m 05_The_sun_shines_bright_on_CSP.pdf100%
New File 1.7 m 1July2014-
Review_of_Vesting_Contract_Level_Revised_Draft_Report_.pdf100%
New File 68393 4,NERC GADS DATA (GTCC).pdf100%
New File 1.6 m 9HX173281 SSP_LTA Final DD_2014.02.12.pdf
100%
New File 8.8 m 9HX298971 Paiton 10 FS Draft Report 23 -
Nov 15 1200MW R4.pdf100%
New File 1.4 m AEMC-Overview-28-September-2017.PDF100%
New File 2.9 m An Introduction to Coal Quality.pdf100%
New File 339115 Arbitration and Dispute Resolution in the
Electricity Industry.pdf100%
New File 889317
ASEAN_Guideline_on_Renewable_Energy_Supp.pdf100%
New File 889312 ASEAN-Best-Practice-Policy-Guidelines-RE-
Support-Mechanisms-1.pdf100%
New File 2.6 m Assessment of the Role of LNG within the
Phillipines Market.pdf100%
New File 1.1 m B&V - NREL- cost - report.pdf100%
New File 655527 CCGT KEMA REVIEW_RMC_Calcs.pdf100%
New File 171081 Copy_of
2010_Only_Generating_Unit_Statistical_Brochure_ All_ Units_ Reporting.zip100%
New File 2.5 m DD-Getting-the-Most-Out-of-Due-
Diligence.pdf100%
New File 707759 Effect_of_surface_moisture_in_coal
(1).pdf100%
New File 1.7 m EMA - Review of Vesting Price Technical
Parameters - Draft report.pdf100%
New File 29483 EPC Contractor Bid Evaluation
Criteria.xlsx100%
New File 1.8 m

Final_Inception_Report_Economic_Costs_of_Natural_Gas_for_Myanar_Domestic_Market.pdf
100%
New File 376949 Fuel-Gas-Blending-Paper.pdf100%
New File 55482 GADS 2011-2015 Statistics.xlsx100%
New File 3.4 m GE Maintenance Intervals.pdf100%
New File 6.9 m
IRENA_Leveraging_for_Onshore_Wind_2017.pdf100%
New File 8.0 m
IRENA_Leveraging_for_Solar_PV_2017_summary.pdf100%
New File 1.2 m Leader Solar 29MW FM.xlsm100%
New File 1.9 m Mapping the Economics of US Coal Power
and Rise of Renewables.pdf100%
New File 2.4 m McKinsey on Finance Number 61.pdf100%
New File 481492 Minchener_coal quality.pdf100%
New File 1.9 m MITEI-WP-2016-01.pdf100%
New File 79360 NERC GADS Definitions.doc100%
New File 4.9 m Performance Analysis
DL_2011_RARPR_FINAL.pdf100%
New File 952031 Poyry - running-on-empty-brochure.pdf100%

New File 1.5 m Project Alpha - Review of Base Case


Financial Model.pdf100%
New File 4.1 m Project Alpha Tech DD.pdf100%
New File 1.5 m Project Alpha_Financial DD and TDD
Report_2016 12 07.pdf100%
New File 2.3 m RE_Technologies_Cost_Analysis-CSP.pdf100%

New File 2.9 m Roadmap-for-flexibility-services-to-2030-


Poyry-and-Imperial-College-London.pdf100%
New File 805424 Sample GKS Staffing Report.pdf100%
New File 285766 Session 2 Module 2 Coal Properties and
Effect on Cobustion.pdf100%
New Dir 4 C:\AdvisianActive\07 Library\AEMO System Framework
Study\
New File 127646 Infographic-1.pdf100%
New File 160687 Infographic-2.pdf100%
New File 1.9 m System-Security-Market-Frameworks-Review-
Final-Report.pdf100%
New File 572777 System-Security-Market-Frameworks-Review-
Final-Report-Information-Shee.pdf100%
New Dir 1 C:\AdvisianActive\07 Library\Burma\
New File 6.8 m Tanintharyi FS Report_FINAL_rev2 31 Oct
2013.doc100%
New Dir 1 C:\AdvisianActive\07 Library\CHP Rojana DD\
New File 2.6 m 20150923 Rojana Technical Due Diligence
Report_KTB_RJP_BV_Final.pdf100%
New Dir 3 C:\AdvisianActive\07 Library\Coal Fired Power Plants\
New File 3.0 m BLCP DD Draft Final Report(clean).doc100%

New File 6.3 m MD2 Final Due Diligence Report_Rev1.doc


100%
New File 187323 Mong Duand 2 report on project
fundamentals.pdf100%
New Dir 5 C:\AdvisianActive\07 Library\DNV GL Outlooks\
New File 8.8 m DNV GL Energy Transistion Outlook
2017_Exec summary_lowres single.pdf100%
New File 8.9 m DNV GL_ Energy Transition Outlook
2017_renewables_lowres single_0109.pdf100%
New File 3.4 m DNV GL_Energy Transistion Outlook
2017_oil gas_lowres single_3108_3.pdf100%
New File 38.7 m EA_DNVGL_ETO_FullBook_07_09.pdf100%
New File 5.6 m ETO2017_Renewables_Exec_Summary.pdf100%
New Dir 2 C:\AdvisianActive\07 Library\from Llewellyn\
New File 8.4 m Kennedy Energy Park - Due Diligence
Report Rev H.docm100%
New File 2.3 m Kennedy Energy Park - Red Flag report
FINAL.pptx100%
New Dir 23 C:\AdvisianActive\07 Library\From Siva\
New File 162 ~$PD Independent Engineer's Technical Due
Diligence Final Report 20160321_Client Issue _CBC_Reissued.docx100%
New File 142848 1,Program Intro, Economic
Benchmarking.doc100%
New File 39936 1,Rades, Project Data Sheet.xls100%
New File 418816 2,Program Guide, MARI.doc100%
New File 30208 2,Rades, Checklist, PPA Evaluation.xls
100%
New File 17408 3,Rades, Checklist, FSA Evaluation.xls
100%
New File 68393 4,NERC GADS DATA (GTCC).pdf100%
New File 17920 5,Rades KCAL converter.xls100%
New File 29184 6,Impact of Heat Rate Improvement.xls100%

New File 46317 Att C, Introduction to KPI's, final.docx


100%
New File 91909 Att D, Master List of Potential
KPI's.xlsx100%
New File 65448 Att E, Cascaded KPI's on an Org Chart
(sample).pdf100%
New File 162816 Copy of 106, Best Practices Matrix, Plant
Ops, Draft, Jan 11, 2011.xls100%
New File 147456 Copy of 107, Best Practices Matrix, Plant
Maint, Draft, Jan 11, 2011.xls100%
New File 22585 Copy of Lost Production Data Template, GM
Meeting.xlsx100%
New File 43008 Copy of Templates, MARI Data Collection
Forms.xls100%
New File 356110 EBITDA analysis.pptx100%
New File 114106 Financial
Model_Example_Advisian_Philippines.docx100%
New File 3.3 m GNPD Independent Engineer's Technical Due
Diligence Final Report 20160321_Client Issue _CBC_Reissued.docx100%
New File 13549 Navigant data and KPI analysis.xlsx100%
New File 198421 Project Jaguar_Evaluation of Indonesian
Coal Market and Coal Supply for GNPK Project_Final_14042015.docx100%
New File 4.5 m
WEF_Renewable_Infrastructure_Investment_Handbook.pdf100%
New File 22528 z7,Rades Fundamental Observations.xls100%

New Dir 1 C:\AdvisianActive\07 Library\Indah Water Report\


New File 3.4 m 20161212 Indah TDD_Final
Report_Client_Issue_Rev1.pdf100%
New Dir 75 C:\AdvisianActive\07 Library\Lantau Group\
New File 2.2 m Backup Material TLG_PH v2 _20171016.pptx
0% 100%
New File 1.0 m Backup Material TLG_TW v2_20171016.pptx
100%
New File 1.6 m calendar_2017.pdf100%
New File 151689 Cocktail_RSVP.pdf100%
New File 151704 Cocktail_RSVP_yes.pdf100%
New File 39369 EEIadvert.pdf100%
New File 244035 focus_china_may13.pdf100%
New File 2.7 m intro_tlg.pdf100%
New File 944311 peek_around_region.pdf100%
New File 1.2 m peek_around_region_june12.pdf100%
New File 1.9 m peek_cny2013.pdf100%
New File 1.0 m peek_james.pdf100%
New File 1.1 m peek_liutong_xiao.pdf100%
New File 1.0 m peek_lkd.pdf100%
New File 2.4 m peek_milan.pdf100%
New File 1.7 m peek_move.pdf100%
New File 1.3 m peek_neil_josh.pdf100%
New File 961719 peek_xinmin.pdf100%
New File 301502 pique_china.pdf100%
New File 630630 pique_china_chinese.pdf100%
New File 760763 pique_hk_to_texas.pdf100%
New File 138157 pique_ldc.pdf100%
New File 338139 pique_ppine_wesm.pdf100%
New File 387096 pique_single_buyer.pdf100%
New File 891059 pique_titanic.pdf100%
New File 540110 powergen_manu_mt.pdf100%
New File 488211 powergen_manu_sf.pdf100%
New File 1.0 m powergen_ppt_mt.pdf100%
New File 1.1 m powergen_ppt_sf.pdf100%
New File 657158 powergen_ppt_tp.pdf100%
New File 1.5 m ppt_aie16_lz.pdf100%
New File 785558 ppt_apex12.pdf100%
New File 584552 ppt_asian_power_markets.pdf100%
New File 610842 ppt_bday12.pdf100%
New File 3.0 m ppt_cost_trends.pdf100%
New File 3.7 m ppt_gug.pdf100%
New File 686371 ppt_interconnectivity13_ns.pdf100%
New File 982638 ppt_interconnectivity13_tp.pdf100%
New File 440963 ppt_lessons_from_electricity.pdf100%
New File 1.3 m ppt_LNG_congress13.pdf100%
New File 948871 ppt_malaysia_power_sector.pdf100%
New File 709492 ppt_mps_tp.pdf100%
New File 1.3 m ppt_natural_gas_revolution.pdf100%
New File 497574 ppt_overly_constrained_decision.pdf100%
New File 1.2 m ppt_pewp17_sf.pdf100%
New File 898600 ppt_pgen12_mtt.pdf100%
New File 1.0 m ppt_pgen12_sf.pdf100%
New File 1.8 m ppt_pgen16_lz.pdf100%
New File 1.3 m ppt_pgen16_sf.pdf100%
New File 2.1 m ppt_pgen16a_mt.pdf100%
New File 1.7 m ppt_pgen16b_mt.pdf100%
New File 1.4 m ppt_pgen16c_mt.pdf100%
New File 1.0 m ppt_pgen16r_sf.pdf100%
New File 1.3 m ppt_pgen16s_sf.pdf100%
New File 2.0 m ppt_pgene16_sf.pdf100%
New File 1.2 m ppt_pgenme13.pdf100%
New File 1.0 m ppt_psea17_sf.pdf100%
New File 1.1 m ppt_rec16_sf.pdf100%
New File 4.5 m ppt_remnin.pdf100%
New File 4.5 m ppt_renmin.pdf100%
New File 4.2 m ppt_roundtable12.pdf100%
New File 1.7 m ppt_sea16_sf.pdf100%
New File 462815 ppt_solar16_sf.pdf100%
New File 1.2 m ppt_solargrid16_sf.pdf100%
New File 787947 ppt_ugas_bali.pdf100%
New File 881369 renmin_chi.pdf100%
New File 768360 renmin_eng.pdf100%
New File 1.5 m tlg_calendar_thumb.pdf100%
New File 728956 tlgon_econreg_jan17.pdf100%
New File 739329 tlgon_econreg_jun17.pdf100%
New File 672232 tlgon_hk_feb17.pdf100%
New File 672230 tlgon_hk_jan17.pdf100%
New File 618280 tlgon_policy_nov16.pdf100%
New File 910641 tlgon_renmin_may17.pdf100%
New File 2.1 m tlgon_uhv_jun17.pdf100%
New Dir 14 C:\AdvisianActive\07 Library\Liberisation of
Electricity Market\
New File 3.3 m 2016-0608-Japan_s_Market_Reform-
Koyama.pdf100%
New File 1008217 5-Soh_Sai_Bor__EMA__FINAL.pdf100%
New File 2.7 m Deloitte - gx-er-energy-market-reform-in-
europe.pdf100%
New File 1.5 m Deloitte - gx-er-market-reform-
germany.pdf100%
New File 871369 Deloitte - gx-er-market-reform-uk.pdf100%

New File 958595 Deloitte - gx-er-merket-reform-france.pdf


100%
New File 1.6 m Deloitte - Power-Market-2025-Study.pdf
100%
New File 108206 Electricity_market_in_Singapore_2014.pdf
100%
New File 773376 EMA Introduction- NEMS_111010.pdf100%
New File 2.6 m Eugene_Toh_EMA.pdf100%
New File 1.5 m IEA - Lessons From Liberalised
Electricity Markets.pdf100%
New File 1.7 m KPMG -
2013PHInvestmentGuideInvestmentGuideTheEnergyReportPhilippines.pdf100%
New File 2.8 m KPMG - jp-en-new-era-energy.pdf100%
New File 340133 Lessons Learned From Electricity Market
Liberalization.pdf100%
New Dir 5 C:\AdvisianActive\07 Library\McKinsey Articles\
New File 567976 Battery-storage-The-next-disruptive-
technology-in-the-power-sector.pdf100%
New File 2.4 m Energy-2050-Insights-from-the-ground-
up.pdf100%
New File 2.6 m McKinsey on Sustainability and Resource
Productivity Issue 4.pdf100%
New File 1.9 m The circular economy Moving from theory
to practice.pdf100%
New File 1.2 m The-new-economics-of-energy-storage.pdf
100%
New Dir 6 C:\AdvisianActive\07 Library\Philippines\
New File 2.6 m FINAL Report - BUD 05jul07.doc100%
New File 3.4 m GNPD Independent Engineer's Technical Due
Diligence Report Draft R8 2015....docx100%
New File 9.5 m ORIX - TDD Final Report - Annexes -
4June.pdf100%
New File 1.0 m ORIX - TDD Final Report for Diesel Power
Plants - 5June13.docx100%
New File 889154 ORIX - TDD Final Report for Diesel Power
Plants - 5June13.pdf100%
New File 5.2 m Therma South Due Diligence Report Final
Report July 22, 2013. docx.docx100%
New Dir 3 C:\AdvisianActive\07 Library\Reliability Centered
Maintenance\
New File 3.7 m Chapter 11 - Reliability Centered
Maintenance.pdf100%
New File 3.7 m IntroductiontoAladonRCM3Brochure.pdf100%

New File 1.6 m RCM - Introduction and Basis.pdf100%


New Dir 1 C:\AdvisianActive\07 Library\Safety\
New File 936895 EEA Safety in Design Guide Draft 6.docx
100%
New Dir 3 C:\AdvisianActive\07 Library\Solar WInd\
New File 1.3 m 110560_Project Duke
Flyer_WF_DD_2011.09.22.doc100%
New File 1.1 m 110707_Project Phesi_DD_2012.09.20b.docx
100%
New File 1.1 m X187929_Leader PV BP_DD_2013.09.25.doc
100%
New Dir 9 C:\AdvisianActive\07 Library\Solar WInd\Proposal and
Agreements\
New File 626468 127000269 VTE_1.2MW-
SolarPP_LTA_20171002.docx100%
New File 223744
9HX177674_HGH_Wind_Farm_OE_Draft_2014.01.07_YP_Marked._comment_by_Medhi.doc
100%
New File 83323 9HX270558 SUPER TA
Agreement_draft20170627.docx100%
New File 709272 Poyry X345555 Leader 29MW
PV_ITA_20170314_Poyry_final.pdf100%
New File 2.5 m X341655 FKW and KR2 wind
farms_LTA_20170131.docx100%
New File 195113 X349048 HNM OE_Rev.C_20170606.docx100%
New File 8.4 m X353056 InfraCo_Solar Project in
Vietnam_DD_draft20170710.doc100%
New File 191853 X353254 EA Bin
Thuan_TA_Draft_20170626.docx100%
New File 382614 X353536_NWE_Romklao_LTA_20170705a.docx
100%
New Dir 1 C:\AdvisianActive\07 Library\Thailand\
New File 5.4 m PD Draft Design Concept Report_28 March
2013.doc100%
New Dir 0 C:\AdvisianActive\08 References\
New Dir 10 C:\AdvisianActive\09 FM Models\
New File 10.5 m Copy of Project J1
20160531.0_jaysatu.xlsm100%
New File 411167 Gas Engine v Gas Turbine_Levelized
tariff_141128_r2.xlsm100%
New File 10.2 m Project J1 201603129.0M_jaysatu.xlsm100%

New File 28044 Simplified levelized tariff


06Jan2016.xlsx100%
New File 317440 SIPP vs TNB tariff.msg100%
New File 407715 Test.xlsm 0% 100%
New File 410901 Test2.xlsm 0% 100%
New File 410958 Test3.xlsm100%
New File 411510 Test4.xlsm100%
New File 480629 Test5.xlsm100%
New Dir 3 C:\AdvisianActive\09 FM Models\Advisian\
New File 623796 20170410 Advisian Template Desal
model.xlsm 0% 100%
New File 322535 Business Case Model Template 20179293
1200 DRAFT2.xlsm100%
New File 231462 Training Presentation92.xlsx100%
New Dir 5 C:\AdvisianActive\09 FM Models\Advisian\Training\
New File 20919 Financial Model Training Excel
Example.xlsx100%
New File 1.9 m Financial Modelling REV B.pdf100%
New File 3.0 m Financial Modelling REV B.pptx 0% 100%

New File 495612 LNG Regasification Financial Model Ver 8


23APR17.xlsm100%
New File 1.0 m Technical Note for Financial Analysis -
DRAFT for DISCUSSION 1.docx100%
New Dir 5 C:\AdvisianActive\09 FM Models\Guides\
New File 350438 Achilles-Financial-Analysis-Model-For-
Suppliers-Demonstrate-Financial-Stability.pdf100%
New File 10.4 m Financial Analysis and Business
Evaluation.pdf100%
New File 1.4 m Financial Modelling Fundamentals.pdf100%

New File 89230 financialmodelingpresentation-


140409222222-phpapp01.pdf100%
New File 43.9 m Paul Pignataro Financial Modeling and
Valuation A Practical Guide to Investment Banking and Private Equity.pdf100%
New Dir 3 C:\AdvisianActive\09 FM Models\Simplified Levelised
Tariff Template\
New File 2.5 m Levelised tariffs.msg100%
New File 120832 SIPP levelized tariff calculation.msg100%

New File 124928 Template for levelized tariff


estimation.msg100%
New Dir 4 C:\AdvisianActive\10 Books\
New File 1.3 m Ethan M. Rasiel The McKinsey Way Using
the Techniques of the Worlds Top Strategic Consultants to Help You and Your
Business.pdf100%
New File 2.4 m McKinsey on Finance Number 61.pdf100%
New File 6.6 m Tim Koller, Marc Goedhart, David Wessels
Valuation Measuring and Managing the Value of Companies.pdf100%
New File 10782 Untitled.docx100%

------------------------------------------------------------------------------

Total Copied Skipped Mismatch FAILED Extras


Dirs : 1038 1038 0 0 0 0
Files : 7085 7085 0 0 0 0
Bytes : 14.384 g 14.384 g 0 0 0 0
Times : 0:48:46 0:04:50 0:00:00 0:00:36

Ended : Sat Nov 11 23:03:12 2017