Pending Work MEP

The document lists pending HVAC and electrical work for multiple areas at the 516.25m level. It includes tasks for first fix, second fix, final fix, testing/commissioning, and handover. For HVAC, tasks include ductwork installation, fan coil unit installation, and various testing/commissioning procedures. For electrical work, tasks involve conduit installation, cable installation, distribution boards, lighting/power wiring, and commissioning tests. The document provides status updates on work completion for each task.

Uploaded by

HemantSharma
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
209 views

Pending Work MEP

The document lists pending HVAC and electrical work for multiple areas at the 516.25m level. It includes tasks for first fix, second fix, final fix, testing/commissioning, and handover. For HVAC, tasks include ductwork installation, fan coil unit installation, and various testing/commissioning procedures. For electrical work, tasks involve conduit installation, cable installation, distribution boards, lighting/power wiring, and commissioning tests. The document provides status updates on work completion for each task.

Uploaded by

HemantSharma
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 13

HVAC PENDING WORK AT 516.

25M LEVEL
TYPE AREA CODE
HVAC
FIRST FIX
HVAC
HVAC
HVAC
HVAC
HVAC
HVAC
HVAC
Second fix
HVAC
HVAC
HVAC
HVAC
HVAC
HVAC
HVAC
HVAC
FINAL FIX
HVAC
FEMALE LOCKER HVAC
ROOM HVAC
HVAC
HVAC
TESTING AND HVAC
PRE- HVAC
COMMISSIONIN
G HVAC
HVAC
HVAC
HVAC
HVAC
HVAC
HVAC
HVAC
COMMISSIONIN HVAC
G AND
HANDOVER
COMMISSIONIN
G AND
HANDOVER HVAC
HVAC
HVAC
HVAC
HVAC
HVAC PENDING WORK AT 516.25M LEVEL
DESCRIPTION WORKDONE
Duct hangers & Supports
Hot Water Pipe Hangers & Supports
Ducting Supply, Return, Fresh & Exhaust Air
Volume, Fire & Smoke Damper Fixing
Duct Risers
Duct Insulation
Hot Water Piping - High Level Horizontal
Hot Water Pipe Riser
Hot Water Pipe Pressure/ Leakage Testing
Hot Water Pipe Insulation
Fan Coil Unit (FCU) Installation
Duct Connection to FCU
Hot Water Pipe Connection to FCU
Bends, Droppers & Mouth Piece
Exhaust Fan Fixing
Ceiling Diffuser Fixing
Grille & Linear Fixing
Thermostat Fixing
Pre commissioning Hot water pumps
Water circulation in system and drain (Static)
Circulation of water with cleaning chemical
Pre commissioning FAHUs
Cleaning of all filters and strainers
Pre commissioning pressurization fans
Water circulation in system and drain (dynamic)
Refilling of water and witness by Engineer
Prelim. Adjusting and balancing of valves
Test and commission chilled water pumps
Test and commission heat exchangers
Test and commission FAHUs
Test and commission floor FCUs
AHU air balancing
Air balancing supply & return grilles
FCU water balancing
Balancing air from pressurization fans
Water balancing of FAHUs
Main System Valves adjustment
ELECTRICAL PENDING WORK AT 51
TYPE AREA CODE

FIRST FIX

Second fix

FINAL FIX

FEMALE LOCKER ROOM

TESTING AND PRE- COMMISSIONING

COMMISSIONING AND HANDOVER


COMMISSIONING AND HANDOVER
L PENDING WORK AT 516.25M LEVEL
WORKDONE
Embedded Conduits in Concrete

Marking on Block walls


Cutting & Chasing in block walls
Fix Conduits, GI Boxes in Block Walls
2nd Fix
Typical Floor
G.I. & PVC Surface Conduiting
Installation of Distribution Boards
Installation of Sub-Main Boards
Installation of Main LV Panel
Erect Cable Trays
Cable Trucking
Earthing System
LV Cabling
ELV Cabling
Main LV Cable Termination
Sub main Cable Termination
Wiring for Lighting & Small Power
Wiring for ELV System
Wiring for Fire Fighting System
Circuit Continuity Test
Ceiling Rose & Flexible Drops
Distribution Boards Dressing
Bus bar Installation
ELE Lightning Protection System
Basement
Transformer Installation
Generator Installation
ATS Panel Installation
LV Cabling from Transformer to LV Panel
Fixing Fire Alarm & Light Fittings
Fixing Switches, Sockets & Accessories
Circuit continuity test by bus riser
Continuity test LV wiring

Test and commission variable frequency drive


Lighting protection earth resistance test
Floor MDB, SMDB, MCC panel commissioning
Test and commission light fixtures
Test and commission ELV final fixtures
FIRE FIGHTING