Pending Work MEP
Pending Work MEP
25M LEVEL
TYPE AREA CODE
HVAC
FIRST FIX
HVAC
HVAC
HVAC
HVAC
HVAC
HVAC
HVAC
Second fix
HVAC
HVAC
HVAC
HVAC
HVAC
HVAC
HVAC
HVAC
FINAL FIX
HVAC
FEMALE LOCKER HVAC
ROOM HVAC
HVAC
HVAC
TESTING AND HVAC
PRE- HVAC
COMMISSIONIN
G HVAC
HVAC
HVAC
HVAC
HVAC
HVAC
HVAC
HVAC
COMMISSIONIN HVAC
G AND
HANDOVER
COMMISSIONIN
G AND
HANDOVER HVAC
HVAC
HVAC
HVAC
HVAC
HVAC PENDING WORK AT 516.25M LEVEL
DESCRIPTION WORKDONE
Duct hangers & Supports
Hot Water Pipe Hangers & Supports
Ducting Supply, Return, Fresh & Exhaust Air
Volume, Fire & Smoke Damper Fixing
Duct Risers
Duct Insulation
Hot Water Piping - High Level Horizontal
Hot Water Pipe Riser
Hot Water Pipe Pressure/ Leakage Testing
Hot Water Pipe Insulation
Fan Coil Unit (FCU) Installation
Duct Connection to FCU
Hot Water Pipe Connection to FCU
Bends, Droppers & Mouth Piece
Exhaust Fan Fixing
Ceiling Diffuser Fixing
Grille & Linear Fixing
Thermostat Fixing
Pre commissioning Hot water pumps
Water circulation in system and drain (Static)
Circulation of water with cleaning chemical
Pre commissioning FAHUs
Cleaning of all filters and strainers
Pre commissioning pressurization fans
Water circulation in system and drain (dynamic)
Refilling of water and witness by Engineer
Prelim. Adjusting and balancing of valves
Test and commission chilled water pumps
Test and commission heat exchangers
Test and commission FAHUs
Test and commission floor FCUs
AHU air balancing
Air balancing supply & return grilles
FCU water balancing
Balancing air from pressurization fans
Water balancing of FAHUs
Main System Valves adjustment
ELECTRICAL PENDING WORK AT 51
TYPE AREA CODE
FIRST FIX
Second fix
FINAL FIX