The document provides an update on various areas of a building project. It notes that wall cut outs need to be provided for the Dosing Room and Pump Room. The fireman staircase requires FRD openings to be repaired. Bulkhead top sheet fixing is pending for the platform double height area. Main duct connectivity is pending for ECS North due to dripping rain water from a plumbing shaft. Cleaning is required for the TVS Shaft South/North. Provision for makeup water supply is needed for CHW/CDW pipes. A permanent water drainage system is needed for the Ancillary Building.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
49 views
SLM
The document provides an update on various areas of a building project. It notes that wall cut outs need to be provided for the Dosing Room and Pump Room. The fireman staircase requires FRD openings to be repaired. Bulkhead top sheet fixing is pending for the platform double height area. Main duct connectivity is pending for ECS North due to dripping rain water from a plumbing shaft. Cleaning is required for the TVS Shaft South/North. Provision for makeup water supply is needed for CHW/CDW pipes. A permanent water drainage system is needed for the Ancillary Building.