Gc3 - The Health and Assessor's Marking Sheet Safety Practical Application

This document outlines a health and safety practical assessment for a student, including an assessor's marking sheet evaluating the student's observation sheets and report on identified hazards, control measures, and timelines for corrections at an inspected worksite. The student identified hazards such as improper electrical cable management, lack of crane supervision, blocked emergency exits, unsafe material storage, smoking in prohibited areas, and workers exposed to heat without protections. Control measures and timelines were proposed to address each hazard.

Uploaded by

pilakkad
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
73 views

Gc3 - The Health and Assessor's Marking Sheet Safety Practical Application

This document outlines a health and safety practical assessment for a student, including an assessor's marking sheet evaluating the student's observation sheets and report on identified hazards, control measures, and timelines for corrections at an inspected worksite. The student identified hazards such as improper electrical cable management, lack of crane supervision, blocked emergency exits, unsafe material storage, smoking in prohibited areas, and workers exposed to heat without protections. Control measures and timelines were proposed to address each hazard.

Uploaded by

pilakkad
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 26

GC3 THE HEALTH AND Assessors marking sheet

SAFETY PRACTICAL APPLICATION

Date of practical application Name of assessor

Course provider Course provider Safetycatch Safety Training and Consulting


822
number name Pvt. Ltd.

Student number Student name

NEBOSH
Maximum
Assessors moderated
marks
Criteria available
marks awarded marks
(if different)

1 Completion of observation sheets

1.1 Range and outline of hazards and consequences 15

Identification of suitable control measures and


1.2 timescales
15

2 Report - Introduction and Executive Summary

Introduction providing an overview of the chosen


2.1 area
5

2.2 Executive summary 5

3 Report - Main findings of the inspection

3.1 Quality of interpretation of findings 15

Identification of possible breaches of legislation


3.2 and/or standards
5

3.3 Persuasiveness / conciseness / technical content 10

4 Report - Conclusions and Recommendations

Clear and concise conclusions which are clearly


4.1 related to report findings and are effective in 15
convincing management to take action

Recommendations which present realistic actions to


4.2 improve health and safety in the chosen area
15

TOTAL MARKS 100


Outcome: PASS (60% or more) REFER (less than 60%)

Date assessed ____ / ____ / ____

Assessors signature ______________________

Date received by course provider ____ / ____ / ____

Date received by NEBOSH


(if applicable) _____ / _____ / _____

Assessors additional comments on the practical application:

ASSESSED BY (name in block letters) _________________________________________________

The mark sheet must be retained by the Course Provider and sent to NEBOSH only if requested. A copy
of the mark sheet can be given to candidates if requested.

NEBOSH USE ONLY

NEBOSH Moderators comments:

GC3 The Health and Safety Practical Application

Candidate and course provider declarations:


For completion by the candidate:

I declare that the work submitted for this practical application assessment ie. the completed observation sheets
and the report to management, is my own work. I recognise that contravention of this statement constitutes
malpractice and may result in my being subject to the penalties set out in the NEBOSH Malpractice policy.

Name (Print) _________________________________

Signature _________________________________

Date _________________________________

For completion by a course provider representative (eg internal practical assessor):

I declare that the work marked is identical to that received from the candidate. I recognise that contravention of
this statement constitutes malpractice and may result in my being subject to the penalties set out in the NEBOSH
Malpractice policy.

Name (Print) _________________________________

Signature _________________________________

Date _________________________________

For completion by the course providers internal practical assessor:

I declare that I have marked this work and am both qualified and approved by NEBOSH to do so. I recognise
that contravention of this statement constitutes malpractice and may result in my being subject to the penalties
set out in the NEBOSH Malpractice policy.

Name (Print) _________________________________

Signature _________________________________

Date _________________________________

NB: This declaration must be completed in full, submitted and retained with the
candidates script. If this declaration is not submitted the candidates result may be
declared void.

GC3 THE HEALTH AND Candidates observation


SAFETY PRACTICAL APPLICATION sheet

Sheet number of _____


Student name ______________________________________ Student number __________________
Place inspected _____________________________________ Date of inspection ___ / _____ / _____

Obs Observations Control measures Timescale


No. Hazards and consequences Immediate and longer term
actions
1 During the Inspection Welding Immediate: Immediate
cables and grinding cables are To make proper insulation and
lying over the ground without re-route the cables from
proper layout and insulations. walkways.
These causes chance of 1 week
electrical shock, slips, trip, falls, Long term:
corrosion of cables and electrical Rearrange the workplace
fire. activities to reduce risk.
2 weeks
Reconstruct the wirings again
through proper standards.
2 It was noticed that hydra crane Immediate: Immediadt
was operating without Stop the work immediately. e
supervision near loading area.
Chances of injury or death due to Long term:
hit. Demolition of high structures Provision of planning and
or low objects by striking the arm supervision Every Day
of the crane.
Implement and appoint
banksmen system to all types of
cranes.
1 week
3 I have seen that there are Immediate: Immediate
several empty plastic drums Remove all the drums away
were kept on the way of fire exit from the fire exit.
of North-east Area. So the
evacuation becomes difficult in Long term: 1 week
the case of emergency situation. Provision of special space for
Workers might trip and fall. this type of storage and provide
Tripical Fall proper sign board and fencing
around the storage area.

Give advice to the 1 week


housekeeping department about
the situation and its
consequences.
Monthly
Periodically inspect the work
place to ensure effective
performance of housekeeping
department.
5 I have see that two workers are Immediate: Immediate
smoking and using pan masala Stop them with proper warning
in the corner of raw material
storage area. So there is a Long term:
chances of getting ignition of Give proper instruction and
flammable materials can cause information about the
fire and explosion. consequence of fire and the 3 Days
ignition chances.

Provide no smoking signage all


over the area. 1 week

Implement surveillance camera


in every corners 3 weeks

Implement and developing no 2 weeks


smoking policy
6 I observed that structural workers Immediate: Immediate
are working on the right side of Provide adequate clothing to
the roof top exposed to a very protect from heat stress, heat
hot weather condition. This may stroke, burn.
damage to the thermoregulatory
mechanism of the body. It also Long term:
causes dehydration, muscle Provide frequent breaks and job Every day
cramp, heat exhaustion, heat rotation to the workers
stress, heat stroke, burns and
skin cancer. Give clean drinking water facility
must be given to the workers at Every day
the near area
7 I observed that improper loading Immediate: Immediate
of materials to heavy vehicles in Unload the material to ground
crushing department cause slowly and carefully.
material flung in the area of
hopper. So falling of objects can Supervision should be provided Immediate
cause injuries or death and also
damage to properties nearby. Long term: 1 week
Make sure the load is balanced
and secured by enclosed side
rails

Construct the control room with 2 months


concrete to withstand possible
crushing
8 It was noticed that the moving Immediate:
parts of concrete truck mixer Stop the work Immediate
(CIFA MK25) is not provided with
adequate guards. contact with Securing procedure so that all Immediate
moving parts lead to abrasion, persons are removed from the
entanglement, trapping and area.
crushing of hand when
entrapped Long term:
Provide fixed guards and 1 week
interlocking guards to the
rotating parts

Assign a supervisor to check the Everyday


machines in frequent intervals

Conduct a proper training on 2 week


machine guarding
9 It was noticed that an excavation Immediate:
cavity for concrete works located Barricade around the excavation Immediate
near the rest rooms of the cavity.
workers is having no barricades
or edge protection. This can be Long term:
lead to serious injuries, fractures Give separate pathway to go to 1 week
to workers due to fall from height restrooms.
into the excavation cavity.
Provide hoardings and flashing 1 week
beacons highlighting the hazard.

Use proper sloping and shoring 2 weeks


in the excavation cavity.
10 It was observed that Oxygen Immediate: Immediate
cylinders and acetylene cylinders Cylinder trolleys should be
used in welding and cutting provided with restraining straps. 1 week
operation is not provided by any
conventional means of transport. Long term:
Rolling, throwing down of Give instructions and 3weeks
cylinders can lead to sudden information regarding to lifting
release of pressured gas may techniques
cause explosion. Getting Injuries 1 day
from flying parts. Also Manual Provide mechanical assistance
handling injuries such as back such as hoists for cylinder of
pain, disc injury, sprains , strains greater size.
etc
11 It was noticed that the young Immediate:
workers are working in a stop the work Immediate
complex machine without
adequate supervision. The young Report to the concerned Immediate
workers are more enthusiastic authority
and eager to show willingness to
any type of work. They are not Long term: Everyday
familiar with the hazard. They Provide adequate supervision
dont have experience so they 1 month
can easily undergo injury or Carry out risk assessment
danger their life or others life. specifically with young person in 1 week
mind.

Prohibit young person from


carrying out work in complicated
machineries
12 It was found that Most of the Immediate:
hand held tools using by the Give frequent Job break and Immediate
workers are not ergonomically rotation.
designed. So it can cause back
injuries, muscular sprains and Long term:
strains , carpel tunnel syndrome, Provide ergonomically designed 2 days
tennis elbow, occupational stress hand held tools.
etc
Give extra training to increase 2 weeks
competence and skill for
workers working in dangerous
conditions.
13 It was found that the noise level Immediate:
of concrete-breaker is above Stop the work immediately Immediate
105db. So there is a chances
that the workers exposed may Long term:
have hearing difficulties like Provide ear protection 1 week
reducing in hearing, tinnitus and equipments like ear plug and
psychological effects like stress, ear muff to the workers.
increased blood pressure, etc
Replace the noise producing 3 weeks
machine with a less noise
producing one.
4 weeks
Provide proper acoustic
enclosure to the machine
14 In my inspection noticed that the Immediate:
underground storage area where Implement and fix tube lights in Immediate
scaffold parts are kept is not the area.
having enough level of
illumination. This reduces the Long term:
visibility of the area and lead to Provide proper instruction and Weekly
workers strike with sharp objects, information.
trip hazard and fall hazard goes
to head injury, broken bones etc. Inspect and maintain the area Monthly
periodically.
15 It was observed that a worker is Immediate:
carrying cement bag of 50 Work should be stopped. Immediate
kilograms repeatedly, from
storage area near the entrance Use 2 or more workers carry the Immediate
of ground floor of the building to heavy load. This will share the
the second floor of the building bulk load to be taken and
without use of manual handling minimise the work effort.
aids. Heavy load lifting can
cause back pain, muscle strains, Long term:
hernias and other Provide frequent rest and job Daily
musculoskeletal disorders. rotation to workers.

Give handling aids like trolleys,


pallet truck and hoist. Also use 1 month
mechanical aids.

Train the workers to practice 2 week


safe lifting technique.
16 I observed that fire hose reel not Immediate:
connected to the fire hydrant and Connect the fire hose reel to the
there is no fire extinguishers fire hydrant Immediate
were available in the first floor of
the building where cutting and Give 2 DCP type fire
grinding works are carried out extinguishers to the floor. Immediate
and many combustible
substances are present in that Long term:
place. If fire occurs, not able to Carry out a fire risk assessment 1 week
suppress the fire and leads to in that area.
serious fire accident, property
loss, burns, personal injury and Provide training to the workers 2 weeks
fatality. how to use the fire extinguishers
and fire evacuation procedures.

Implement fire plan and display 1 week


evacuation procedure and
routes in that area.
Once in 3
Properly inspect and maintain months
the extinguishers
17 It is found that a worker is fixing Immediate:
the roof sheets of canteen area Use full body safety harness
of contractors and workers in the with double lanyard to prevent Immediate
site by standing on the truss fall from height.
about 10 meter height without
any protection and working Use Mobile elevated working Immediate
platform. This can lead to severe platform.
head injury, fracture, spinal injury
due to fall from height. Long term:
provide training to workers 1 week
about safe system of work to
carry out while working at height
including correct use of safety
harness and personnel 2 weeks
protective equipments

provide adequate safety nets 1 week


and fall arrest systems give
adequate supervision to the
workers

18 It was found that a worker was Immediate:


exposed to the dust particles Stop the cutting operation Immediate
occurring from the cutting of quickly.
asbestos plain sheet into
different shape and size to build Long term: 2 week
a temporary refuge near the work Replace all asbestos sheets by
area of the building. Inhalation of aluminium roofing sheet.
small amount of asbestos dust 3 weeks
for long period may cause Provide adequate training to the
various occupational diseases workers related the hazards of
like asbestosis and lung cancer. inhale the asbestos dust.
19 It was seen that Bricks have Immediate:
been stacked on the sides of the Provide adequate warning signs
road near the unloading bay on including flickering lights for Immediate
north-east corner of the front night shift.
building causing block for entry
and exit of vehicles and Long term:
pedestrians. There for Take away the bricks from the 1 day
disturbance in movement of area.
workers and contractors within
the area and it can cause Provide designated area for 1 week
collision between vehicles stacking materials.
And pedestrians.
Change the work layout with 6 months
designated walkway.
20 I have seen that a person is Immediate:
working with hand drill machine Provide a new hand drill Immediate
with a broken handle and kinked machine to the worker
cable in the basement area. It
can causes electrocution so Provide proper robust gloves Immediate
cardiac arrest extreme, muscle and other PPEs
contraction and ventricular
fibrillation occur. The broken Long term:
handle may cause the hand arm Provide frequent job rotation Every day
vibration syndrome such as
vibration white finger, nerve Implement pre use check
damages, muscle weakening, etc system and formal visual Every day
inspection before use

Conduct portable appliance 3 months


tests for the equipment to
identify internal issues.
21 23. It was found that a worker Immediate:
repairing an electric portable Immediately stop the repair
grinder at ground floor area for work. Immediate
floor tile laying in wet floor
condition without removing the Isolate the power supply with immediate
electrical power supply which using Lock Out- Tag Out system
may lead to electrocution, (LOTO) in the main power
muscle contractions,ventricular switch and warn the worker.
fibrillations and burn injuries.
Long term: 2 days
Clean the wet floor properly
1 week
Provide a safe system of work
and follow work permit system.
1 weeks
Training should be given to
workers about the electrical
hazards and maintenance work
hazards.
22 It was observed that a worker is Immediate:
working on the unprotected edge Stop the work. Immediate
of a scaffolding platform without
guard rails and safety harness in Long term:
the third floor which may lead to Scaffold erection by the 1 week
head injury, bone fracture or competent persons and provide
even death due to fall from means of access and egress.
height.
Provide working platform with
proper guard rails like top rail, 1 week
mid rail, and toe board.

Provide safety harness to 1 week


workers and fix safety net under
working platform.

Provide adequate training and 2 weeks.


supervision.

23 It was noticed that welding work Immediate:


is carried out near the fuel Stop the work. Immediate
storage area. Chances of ignition
of fuels which can cause fire and Long term:
explosion. Implement work permit system 1 week
and Isolate the welding area.

Provide fire watcher and fire Every days


extinguisher near to the hot
work area.

Provide adequate supervision. Every days


24 It was seen that a worker is Immediate:
doing arc welding in the foam Provide all the required Immediate
line fabrication pipeline without personnel protective
using eye protection, face shield equipments to workers.
or respiratory equipment. It can
cause worker to inhale the Long term:
dangerous fumes coming from Give training to the workers 2 weeks
the welding arc and lead to regarding the proper usage and
occupational asthma. Long term storage of the PPEs and
exposure of worker to UV rays hazards of working without
may lead to arc eye, even loss of using them. Daily
vision. inspection
Monitoring, supervision and
Enforce them if they are not
using
PPE ensure they are using them
properly.
25 It was noticed that the first aid Immediate:
box placed in the fire department Cylinder trolleys should be
was with inadequate supplies. So provided with restraining straps. Immediate
Workers unable to receive first
aid treatment in case of Long term: 1 week
emergencies. Give instructions and
information regarding to lifting
techniques 3 weeks
Provide mechanical assistance
such as hoists for cylinder of
greater size. 1 day

Immediate:
Provide fully stocked first-aid kit Monthly
in the first aid box such that it is
fully functional in case of an
emergency.
Annually
Long term:
Conduct periodic checks and
make sure there are adequate
supplies.
Analyze the consequences of
accident that can happen and
provide supplies accordingly.
26 I have observed that they have Monitor and maintain the Continues
maintained a good spill kit for all conditions.
the vehicles
27 Toilet and washroom facilities are Monitor and inspect periodically Continues
cleanly maintained.
28 It was noticed that a well Monitor and maintain the Continues
ventilated restroom and eating hygienic conditions of the
area are provided to workers in restroom.
good hygiene conditions which
increases the worker morale and
reduces the stress of job and it is
situated in the backside of the
construction site.

UNIT GC3 THE HEALTH AND Candidate report template


SAFETY PRACTICAL APPLICATION

Student number_________________________________

Location_______________________________________ Date of review / /

Inspection report of lulu convention centre project

INTRODUCTION
This report is generated on the basis of health and safety inspection conducted at
the construction site of Lulu Convention centre cochin on 4th October
2017. The project occupies a construction area of approximately 568000
square metres which includes the convention centre and a grand hotel.
The hotel will have 200 guest rooms, restaurant, grand club, conference
hall. The convention centre will have convention halls, services areas
and basement parking facility for 375 vehicles.

The construction site consist of around 450 employees include engineers,


supervisors, safety officer, workers like masons, welders, grinders, gas
cutters, fitter, fabricator, rigger, helper, electricians, painters, plumbers
etc. There are number of activities being carried out including
mechanical, electrical works, steel works, excavation works, civil works
and hot work such as welding, grinding, cutting etc. Workers usually
work for general shift, sometimes it will be extend up to night. Machines
used are welding machine, driller, cement mixer, cranes, MEWP, trucks,
power tools etc. Normally the site is working in general shift but in
emergency project time this construction work is expected to complete
by April 2019. The purpose of the inspection is to identify the issues in
terms of health and safety and to recommend approximate remedies to
solve those issues.

EXECUTIVE SUMMARY

I am having completed the inspection of lulu convention centre construction project.


Management have taken the required measures to ensure the welfare of
the workers like provision of good welfare facilities and hygiene rest
rooms. Even though there are some good practices in the company; in
my inspection I found that there were number of issues in terms of
health and safety, some more significant than others, the issues could
be resolved given time. The management took a good and proactive
approach to health and safety matters. My visit has shown that a number
of hazard present and some are controlled by management hereby
describe the main areas of concern.

Fire hazard can occur due to the lack of extinguishers in some areas the use of
unwanted substance like cigarettes smoking in the work area could
result on serious harm. Also welding work is carried out near the fuel
storage area may cause fire and explosion therefore implement the safe
system of work with permit system and update the fire plan accordingly
and ensure safety in the event of fire.

There are so many issues surrounding with carrying out of work at height and these
need to be addressed. So use of mobile elevated working platform
increase the safety of work.

Electrical hazard existing in the work area can be avoided by safe system of work
such as isolate power supply when repairing work.

Some hazards due to the lifting of materials can be eliminated by manual aids and
mechanical aids and trained workers for safe lifting operations.

Lack of some personnel protective equipments and improper usage can skipping by
purchasing and providing suitable Personnel protective equipments to
the workers and by enforcing them to use it.

Most of this identified nonconformances can be resolved without much cost


implications, while resolution of few items would incur bit of time and
effort, of course some money. Timely implementation of these corrective
measures will ensure a safe work place, which are free from accidents,
also freedom from penalties and prosecution. This can in turn increase
employee morale and productivity.

Main findings of the inspection

The major hazard of the construction site and the control measures to be taken are
described below.

1. Electrical hazard
The after effects of an electrical accident are very severe so care must be given
while carrying out work in electrical installations. It was noticed that a
worker is repairing a portable electric grinder at ground floor without
switching off main power switch which may lead to electrocution and
injuries and one of the worker working with a damaged cable of a
electrical drill, where there is a chance of contact with live wires and
leading to electrocution and muscle contraction.

According to section 6A (2) of Factories Act 1948 amended in 1986 it is the


responsibility of the employer to maintain safe plant and system to the
workers. According to the C167- Safety and Health in Construction
Convention, 1988 (No. 167) Article 20, provision to protect workers from
any dangers due to electricity should be provided by the employer.
Therefore it is a clear breach of national and international laws.

Control measures that should be implemented include providing job rotation; provide
a new hand drill machine to the worker, daily cleaning of the water in the
electrical site. conduct Portable Applying Test for the equipment to
identify internal issues. And training to workers regarding the hazards of
the electricity should be given.

For the control measures to be implemented 40000 INR is required for the purchase
of new hand drill machine. Provision of training to workers regarding
Safe System of Work while doing electrical work requires 96 man hours
and training class should be conducted by the health and safety officer.

This unsafe condition of electrical equipments has a high risk of accident and that
can lead to increase in insurance premium. By following these
recommendations the company can have a better reputation.

2. Fire hazard

Fire hazard is the most significant hazard is identified during the inspection. It
observed that fire hose reel was not connected to the fire hydrant and
also there was no fire extinguishers were available in the first floor of the
building where cutting and grinding works are carried out. Other hazard
observed that welding work is carried out near the fuel storage area.
Chance of ignition of fuels which can cause fire and explosion. Also
noticed that two workers smoking near the raw material storage area.
Materials contact with igniting small buds may create huge fire and
explosion.

According to Indian Factories Act 1948 Section 41(b) and 40 it is required to give
adequate equipment and facilities for extinguishing fire and it is also a
violation of C167- Safety and Health in Construction Convention, 1988
(No. 167) Article 24 regarding the provisions taken by employer to avoid
risk of fire and regarding storage of flammable materials are violated.
Therefore the present conditions existing in the company is the naked
violation of the national and international laws.

Purchasing of additional fire extinguishers, conducting fire risk assessments,


providing fire watcher, having a strong no smoking policy and providing
surveillance cameras are the major control measures suggested to
reduce the fire risk. Implement permit system, fire plan and display
evacuation procedure and routes in overall area. Workers should be
provided training sections in the fire hazards and proper usage of fire
extinguishers.

The total cost for purchasing of fire extinguisher and safety net will cost around
50000 INR. Installation of surveillance camera around the site will cost
90000 INR. Fire risk assessment should be carried out by the line
manager and safety officer. For giving training and working for the
achievement of control measures 140 man hours.

Since fire hazard is having high potential to cause damage to life and property, it can
cause high financial loss. Continuation of this conditions will increases
accidents and further increases the insurance premium that should be
paid by the company. Present situation is also a direct breach of national
and international laws and it can lead to huge fine for the company.
Therefore the measures should be implemented as soon as possible.
3. Manual handling

Manual Handling is an important hazard in the work site. Manual handling hazards
occurs due to improper using of Safe lifting techniques and lifting of
overloaded materials. As per the observation, the workers are mainly
lifting cement bags and gas cylinder alone in bad postures like
stretching, twisting without using any the mechanical aids. Prolonged
bad posture can lead to Hernia, back pain and other musculoskeletal
disorders.

Lifting without using proper mechanical aids and lifting techniques will lead to the
violation of section 23 in Indian Factories Act 1948 as amended in 1986.

Mechanical aids like trolleys, pallet trucks and install hoists should be used for the
handling of heavy weights. Enforce the workers to carry the same load
with more people to reduce the lifting effort. Frequent Job rotation and
breaks should be given at proper intervals.

For purchasing of the trolleys and installing hoist, it will cost 810000 INR is required.
Training of worker about the safe lifting techniques will require 96 man
hours and it should be carried out by safety officer within two weeks.

The present condition can lead to direct and indirect costs to the company. It may be
affects the reputation of the company since national and international
laws are violated. In order to avoid the enforcement actions taken by the
government bodies like fines, prosecution of management person and
this can lead to loss of future business and clients, in order to prevent
this recommendation should be implemented in the construction site.

4.Personal Protective Equipment

Improper usage of personnel protective equipments and lack of personal protective


equipments shows the inefficiency of the management. Workers are
doing arc welding

without using eye protection and respirators. This can lead to arc eye, even loss of
vision, and inhalation of dangerous fumes from welding leads to
occupational asthma.
According to Indian Factories Act 1948 as amended in 1986 section 37 and 38
explains about the protection of eyes and precaution against dangerous
fumes, gases etc. The present condition of the work site is a breach of
the factories act. And the inadequacy of proper personnel protective
equipments is the direct violation of Article 20 of C167- Safety and
Health in Construction Convention, 1988 (No. 167).

According to the observations it is mandatory to provide adequate Personnel


protective equipments to the workers. Provide all the required personnel
protective equipments to workers and proper storage areas. Monitoring
supervision and training should be provided to enforce its usage.

For the purchasing of the required personnel protective equipment will cost 40000
INR. To provide training to workers regarding the proper usage of the
personnel protective equipments and 144 man hours is required.

By providing the recommended personnel protective equipments to the workers the


ill health effects and injuries can be minimized to the lowest level. Moral
of workers can be increased by providing these personal protective
equipments. Loss due to accidents and penalties due to legal breaches
can be avoided by implementing the suggested recommendations

5. Work at height

Work carried out at height is possessing high hazard rate in the construction site.
While considering the findings there are workers standing in the truss
area and working in the scaffold without proper guard rails, edge
protection and safety harness. These unsafe acts will lead to severe
injury and increases accident rate. Which reduce the production of
company and even employee may loss his life. There for immediate
actions should be taken to minimise the hazards. In case of an accident
this amount is very much meagre compared to the cost of accident.

As per section 32 B under factories act 1948 states that when any person has to
work at height from where he is likely to fall, provision shall be made, so
far as is reasonably practicable, by fencing or otherwise to ensure the
safety of the person. As per C167- Safety and Health in Construction
Convention, 1989 (No. 167) Article 17, it explains about the preventive
measures that should be provided to carrying work at height including
roof work. So it is a direct breach of the National and International laws.

Provision of Safe system of work can used in the work at height is controls measures
recommended for these problems Mobile elevated working platform can
be provided where there is no other safe means of access and provide
working platform with proper guard rails like top rail, mid rail, and toe
board. Safety harness should be provided, safety nets to minimize
consequences of fall and training should be given to workers regarding
the safe working procedures. Scaffoldings should be erected by
competent persons.

The control measures cost will approximately 150000 INR for the purchasing of
safety harnesses, safety nets and making of working platform with
proper guard rails like top rail, mid rail, and toe board. It also requires
170 man hours for the training and for the

completion of the remedial actions. By providing the control measures worth the
price, the company can avoid huge loss due to medical cost, sick pay,
compensation to injured worker, loss of production

CONCLUSION

It was nice to see the management responsibility about several factors like provision
of spill kits for all vehicles, clean and tidy washrooms and toilets and well
maintained hygienic rest room and eating area. Also a number of issues
which need to be

addressed urgently to avoid serious accidents and compensation claim following the
hazards.

Fire hazard is the most prioritised hazard should be controlled Welding work near the
flammable storage area and lack of fire extinguisher increases the
severity of the hazard. Training to workers related to fire fighting
procedures and extinguishers, implement no smoking policy, purchasing
of additional fire extinguishers are the control measures recommended.

Workers are exposing to high risk while working at height so it is a significant hazard,
since they are working near the unprotected edges of scaffolds, top of
roofs without any fall arresters or personnel protection. Scaffold erecting
properly and use of full body harness and following of a safe system of
work are the control measures recommended. Mobile elevated working
platform should be used to work at height to a certain places.

Electrical hazard may cause higher intensity of harm to people and equipments. If
any contact with live wires to human body to cause burn, shock and
even fatality may occur. Workers repairing electric grinder without
isolating power supply and using damaged cable of electric drill. Isolate
the power supply with using Lock Out- Tag Out system (LOTO) in the
main power switch provide instructions about electrical safety and
conduct portable appliance tests for the equipment to identify internal
issues are the proper control measures.

Workers are lifting heavy cement bag and gas cylinders without using of Safe lifting
techniques. Repetitive and prolonged actions will leads to back pain,
muscle strain and hernias. Provide mechanical aids, installing the hoist
and give frequent rest to workers are the recommended control
measures. Training should be given to workers for the practice of safe
lifting techniques.

There lack of personnel protective equipment provided to the workers, they exposed
to the hazardous substance in the work site. Welder without eye
protection and respirator is exposed to ultraviolet radiation and inhalation
of toxic fumes. Working without personnel protective equipment in
hazardous situation will lead to occupational

diseases. Purchase suitable personal protective equipments are the control measure
to minimise risk.

These recommendations helpful to reduce direct and indirect cost formed by any
incident. These findings show the legal breaches of the national and
international laws. So that providing safe place of work, safe tools and
equipments, safe system of work and give adequate instruction,
information, training, supervision and implement national and
international standards full fill the social requirement of health and
safety. Therefore it will increase the moral duty of employee and improve
the Positive Safety culture of the organisation is that clear link between
safety culture and health and safety performance thereby increases the
quality and rate of production.

RECOMMENDATIONS include as a table in the following format:

Recommendation Likely resource implications Priority Target

Purchase and fix DCP fire Cost for 15 numbers of High 1 week
extinguisher in DCP fire
the area extinguishers
50000 INR

Surveillance cameras
installation Cost for 10 cameras are Medium 3 weeks
90000 INR

Purchase full body safety Cost of 60 safety harness High 1 week


harness and and 10
sufficient safety number of
net with safety nets
adequate are 55000
specifications INR

Mobile Elevated working High 1 week

platforms taken
for rent It will cost around for 1

MEWP 70000 INR

Provision of working High 1 week


platform and
25000 INR for the platform
Guardrails on
and guardrails
scaffold

Purchase of portable Cost around 40000 INR High 1 week


electrical drill in for 8 electrical
the areas. drill

Training provide to workers 96 Hours required for Medium 2 weeks


about electrical giving
safety and instructions
hazards

Provide hoist to carry heavy 81000 INR and Medium 3 weeks


load materials management
time. For
installing of
hoist and
fixing labour
technician
cost /
expenses

Purchase essential safety Cost for 50 numbers High 1 Week


goggles for eye safety goggles
protection 10000 INR

Purchase required number It will cost about 20000 High 1 week


of respiratory INR for 60
equipments to respirators
protect from
inhalation of
hazardous
gases.