Total Total: PK#97 Parcel 23 S PK#97 Parcel 23 September-17 Monthly Update

This document provides a summary of project activities and timelines for a construction project with Turner International as the project manager, EMAAR MISR as the client, and Al Marasem International as the main contractor. It outlines 3 key groups of activities with start and finish dates and budgets. Group 1 activities were from December 2016 to December 2017. Group 2 activities are scheduled to finish in March 2018. Group 3 activities are scheduled to finish in May 2018, within the overall project completion date.

Uploaded by

Mohamed Moataz
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
58 views

Total Total: PK#97 Parcel 23 S PK#97 Parcel 23 September-17 Monthly Update

This document provides a summary of project activities and timelines for a construction project with Turner International as the project manager, EMAAR MISR as the client, and Al Marasem International as the main contractor. It outlines 3 key groups of activities with start and finish dates and budgets. Group 1 activities were from December 2016 to December 2017. Group 2 activities are scheduled to finish in March 2018. Group 3 activities are scheduled to finish in May 2018, within the overall project completion date.

Uploaded by

Mohamed Moataz
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Project Manager : Turner International Client : EMAAR MISR Main Contractor : Al Marasem International

Activity ID Activity Name Start Finish rformance BL Project BL Project Total Earned Value 2017 2018 2019
% Start Finish Float Cost S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M
Complete -2 -1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 1 17 18 19 20 21 22 2 24 2 26 27 2 9
Total 10-Oct-16 A 22-May-18 31.11% 13-Nov-16 22-May-18 0 6,783,660 Total, 22-May-18

PK#97 Parcel 23 S
September-17 Monthly Update 10-Oct-16 A 22-May-18 31.11% 13-Nov-16 22-May-18 0 6,783,660 PK#97 Parcel 23 September

Key dates 13-Nov-16 A 22-May-18 0% 13-Nov-16 22-May-18 -163 0 Key dates, 22-May-18
General 13-Nov-16 A 13-Dec-16 A 0% 13-Nov-16 13-Dec-16 0 Project
General,
Commencement
13-Dec-16 A Date
Contractual Milestones
Mileston 30-Dec-17 22-May-18 0% 30-Dec-17 22-May-18 -163 0 Contractual Milestones, 22-
MVP97HSG1001 Group 1 Hardscape works handing over 30-Dec-17* 0% 30-Dec-17 -158 0 Group 1 Hardscape works handing over
MVP97HSG2002 Group 2 Hardscape works handing over 20-Mar-18* 0% 20-Mar-18 -160 0 Group 2 Hardscape works handin
MVP97HSG3003 Group 3 Hardscape works handing over 22-May-18* 0% 22-May-18 -163 0 Group 3 Hardscape works h
Engineering 13-Nov-16 A 06-Nov-17 0% 24-Nov-16 06-Nov-17 169 0 Engineering, 06-Nov-17
Procurement 10-Oct-16 A 18-Jan-18 0% 27-Nov-16 18-Jan-18 106 0 Play EquipmentOutdoor / Site Furniture
Procurement, 18-Jan-18
Construction 06-Dec-16 A 22-May-18 31.11% 29-Dec-16 22-May-18 0 6,783,660 Construction, 22-May-18
Group 1 06-Dec-16 A 30-Dec-17 61.74% 29-Dec-16 30-Dec-17 123 4,000,323 Group 1, 30-Dec-17
Hardscape 06-Dec-16 A 30-Dec-17 58.81% 29-Dec-16 30-Dec-17 123 3,536,605 Hardscape, 30-Dec-17
Sleeves 11-Jan-17 A 13-Apr-17 A 100% 21-Jan-17 23-Feb-17 354,251 Sleeves, 13-Apr-17 A
Retaining Walls 29-Dec-16 A 27-Aug-17 A 100% 29-Dec-16 26-Sep-17 947,160 Retaining Walls, 27-Aug-17 A
Walkway 09-Jan-17 A 22-Oct-17 97.24% 25-Feb-17 25-Oct-17 -134 1,128,282 Walkway, 22-Oct-17
Buildings Ramps
Ramp 06-Dec-16 A 14-Nov-17 65.14% 28-Jan-17 14-Nov-17 -120 550,691 Buildings Ramps, 14-Nov-17
Planters 26-Feb-17 A 10-Jun-17 A 100% 26-Feb-17 26-Aug-17 40,567 Planters, 10-Jun-17 A
Play Ground (PG#01)
(PG 04-Jan-17 A 11-Dec-17 20.44% 26-Feb-17 11-Dec-17 139 118,719 Play Ground (PG#01), 11-Dec-17
Furnishing 10-Sep-17 A 30-Dec-17 19.03% 31-Oct-17 30-Dec-17 -158 396,935 Furnishing, 30-Dec-17
Shade Structure a
at Open Space (Shade#01) 30-Jan-17 A 15-Nov-17 99.68% 14-Mar-17 05-Nov-17 -120 463,718 Shade Structure at Open Space (Shade#01), 15
Group 2 09-Jan-17 A 20-Mar-18 50.6% 31-Jan-17 20-Mar-18 54 2,239,224 Group 2, 20-Mar-18
Hardscape 09-Jan-17 A 05-Feb-18 54.31% 31-Jan-17 05-Feb-18 91 1,368,292 Hardscape, 05-Feb-18
Sleeves 08-Apr-17 A 11-Oct-17 58.3% 31-Jan-17 07-Mar-17 191 206,536 Sleeves, 11-Oct-17
Retaining Walls "4" 09-Jan-17 A 07-Dec-17 98.03% 31-Jan-17 10-Dec-17 -73 495,116 Retaining Walls "4", 07-Dec-17
Walkway 05-Apr-17 A 09-Jan-18 54.32% 14-Mar-17 09-Jan-18 -160 552,546 Walkway, 09-Jan-18
Buildings Ramps
Ramp 08-Jun-17 A 05-Feb-18 15.92% 27-Jul-17 05-Feb-18 -152 59,146 Buildings Ramps, 05-Feb-18
Planters 17-Apr-17 A 10-Jun-17 A 100% 31-May-17 11-Oct-17 40,567 Planters, 10-Jun-17 A
Furnishing 11-Sep-17 A 06-Dec-17 6.23% 25-Nov-17 30-Dec-17 -71 14,382 Furnishing, 06-Dec-17
Guard Room 25-Jan-17 A 06-Mar-18 59.55% 25-Feb-17 06-Mar-18 66 154,824 Guard Room, 06-Mar-18
Linear Park Entry Arbor (Arbor #02) 18-Apr-17 A 14-Feb-18 57.5% 19-Mar-17 14-Feb-18 83 67,567 Linear Park Entry Arbor (Arbor #02),
Parcel Entrance Arbor
A (Arbor #01) 14-Mar-17 A 11-Mar-18 97.26% 14-Mar-17 11-Mar-18 62 293,577 Parcel Entrance Arbor (Arbor #01),
Shade Structure a
at Open Space (Shade#02) 01-Feb-17 A 18-Feb-18 64.91% 19-Mar-17 18-Feb-18 -152 301,977 Shade Structure at Open Space (Shad
Fountain at Centeral
Cente Park 16-Aug-17 A 20-Mar-18 6.96% 15-Aug-17 20-Mar-18 -160 52,987 Fountain at Centeral Park, 20-Mar
Group 3 17-Apr-17 A 22-May-18 4.99% 15-May-17 22-May-18 0 544,114 Group 3, 22-May-18
Hardscape 17-Apr-17 A 22-May-18 5.25% 15-May-17 22-May-18 0 502,831 Hardscape, 22-May-18
Sleeves 30-Sep-17 21-Oct-17 0% 30-Sep-17 21-Oct-17 -159 0 Sleeves, 21-Oct-17
Retaining Walls at under crossing 28-May-17 A 18-Feb-18 26.72% 15-May-17 18-Feb-18 80 396,092 Retaining Walls at under crossing, 18
Multi Purpose Courtyard
C 28-Oct-17 24-Feb-18 0% 28-Oct-17 24-Feb-18 -108 0 Multi Purpose Courtyard, 24-Feb-18
Play Ground (PG#02)
(PG 15-Nov-17 25-Feb-18 0% 15-Nov-17 25-Feb-18 -115 0 Play Ground (PG#02), 25-Feb-18
Pond Retaining wall 30-Sep-17 13-Mar-18 0% 30-Sep-17 13-Mar-18 -103 0 Pond Retaining wall, 13-Mar-18
Walkway 25-Oct-17 07-Jan-18 0% 25-Oct-17 07-Jan-18 -163 0 Walkway, 07-Jan-18
Buildings Ramps
Ramp 03-Jul-17 A 08-Mar-18 16.92% 02-Aug-17 08-Mar-18 -108 66,172 Buildings Ramps, 08-Mar-18
Exposed Aggregate
Aggre 18-Feb-18 25-Apr-18 0% 18-Feb-18 25-Apr-18 -140 0 Exposed Aggregate, 25-Apr-18
Planters 17-Apr-17 A 10-Jun-17 A 100% 25-Nov-17 23-Jan-18 40,567 Planters, 10-Jun-17 A
Furnishing 22-Apr-18 22-May-18 0% 22-Apr-18 22-May-18 -163 0 Furnishing, 22-May-18
Shade Structure (2)
(2 At Wadi (Shade#04-05-06) 01-Jul-17 A 27-Mar-18 0.44% 08-Jul-17 27-Mar-18 -115 3,894 Shade Structure (2) At Wadi (Sha
Shade Structure (1)
(1 At Wadi (Shade#03) 25-Apr-17 A 12-Mar-18 8.52% 15-May-17 12-Mar-18 -108 37,389 Shade Structure (1) At Wadi (Shad

Data Date: 30-Sep-17 MIVIDA Project PK 53 TASK filter: All Activities


Base Line Project Finish :13-Nov-17
Parcel 23 Monthly report as of 30-September-2017 1 of 1