MSW Plant Project Brief REV01

This document provides a project brief for establishing a Municipal Solid Waste Segregation and Material Recovery Plant. The key requirements include obtaining necessary permits from the local Pollution Control Board and other authorities. The plant would process 150-300 tons per day of waste and produce compost, refuse derived fuel, and plastic scrap. It would require an investment of Rs. 380-560 lakhs and land of 8000-9000 square meters. The project guarantees a 330-day operating capacity per year and support after commissioning.

Uploaded by

rahul patel
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
53 views1 page

MSW Plant Project Brief REV01

This document provides a project brief for establishing a Municipal Solid Waste Segregation and Material Recovery Plant. The key requirements include obtaining necessary permits from the local Pollution Control Board and other authorities. The plant would process 150-300 tons per day of waste and produce compost, refuse derived fuel, and plastic scrap. It would require an investment of Rs. 380-560 lakhs and land of 8000-9000 square meters. The project guarantees a 330-day operating capacity per year and support after commissioning.

Uploaded by

rahul patel
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Project Brief Key government compliance required:

1. NOC from District PCB


2. DIC Registration
MSW Segregation & Material 3. NOC from gram panchayat/municipal
Recovery Plant corp/industrial estate
4. NOC from Labour Commissioner
Project Objective: 5. Compost mfg & Sale Licence,
To establish, operate and maintain profitable 6. RDF Sale NOC from PCB
Municipal Solid Waste (MSW) Segregation & NOC = No objection certificate, PCB = Pollution control
board, DIC = District Industries Centre
Material Recovery Plant using Pyrocrats state of
art machinery & technology. Manpower Requirement:

Level 1

Level 2

Level 3
Project Resource Requirement:
Raw Material 150TPD 300TPD 1 Plant Incharge
Capex (lac) 380 560 1 Foreman/Mechanic Incharge
Opex (lac) 27 32 1 Electrical Maintenance In charge
IRR (yr) 2.5 1.5 3 Production Incharge
3 Admin Employees
Land (m2) 8000 9000
1 RM Quality and Oil Sale Incharge
Shade (m2) 4500 6000 14 to 18 Unskilled Workers
Power (hp) 250 320
Lead time (months) 4 5 Project Guarantees:
Manpower 24 28 1. 330 day per annum plant capacity
Assumptions: Land & building are provided by Municipal 2. 100% achievement of plant capacity
Corporation, tipping fees of 500/mt from Municipal 3. 1 year machinery warranty
Corporation. Contact us for detailed financial calculations.
4. After sales support and guidance
Pyrocrat assures above project performance
Projects Scope of work: guarantees when the plant is operated as per the
guidelines mentioned in authorised product manual &
Pyrocrat
Investor

terms of agreement.
CMC

Key Finished Products Specifications:


Project Finance # Compost: pH 6.5 to 7.5, Total organic
Land, Building, Electricity carbon 12%w/w, Total Nitrogen
Machinery supply 0.8%w/w, total phosphates 0.4%w/w,
Installation & commissioning dark brown, earthy smell
Plant O&M Training Refuse Derived Fuel: Particle Size
Plant O&M 60mm, CV 2600 to 4500Kcal/Kg,
O&M Manpower Plastic Scrap: CV 3500 to 5000Kcal/kg
After Sales Guidance
www.MSWplant.com | [email protected]
Monthly tipping fees payment
CMC= city municipal corporation, O&M = Operation & For detailed information, you are requested to study the offer
Maintenance. # = Clean India Mission has provision for MSW and related documents in detail.
plant financing by CMC & Central government.