86% found this document useful (7 votes)
6K views

Borehole Completion Report

This borehole completion report provides details on the drilling of a new borehole including location information, geology, water levels encountered, initial testing results, drilling costs, and signatures from the driller and inspector declaring the information is true and correct. It documents details such as the farm name and number, borehole number, total depth, casing used, water strike levels, yield from airlift and pump tests, and itemized costs for drilling, casing, and testing.

Uploaded by

imdeen
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
86% found this document useful (7 votes)
6K views

Borehole Completion Report

This borehole completion report provides details on the drilling of a new borehole including location information, geology, water levels encountered, initial testing results, drilling costs, and signatures from the driller and inspector declaring the information is true and correct. It documents details such as the farm name and number, borehole number, total depth, casing used, water strike levels, yield from airlift and pump tests, and itemized costs for drilling, casing, and testing.

Uploaded by

imdeen
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

APPENDIX 1 - page 1

BOREHOLE COMPLETION REPORT


Please indicate at reverse side the position of the borehole and draw a casing plan.

APPLICANT: BOREHOLE NUMBER: WW


FARM: NUMBER: TOPO & WELL NUMBER:
DISTRICT: LATITUDE:
DATE COMMENCED: LONGITUDE:
DATE COMPLETED: COLLAR HEIGHT: m
GEOLOGY TOTAL DEPTH FROM SURFACE: m
From to in (m) DESCRIPTION DIAMETER OF BOREHOLE
.....mm from.. to
..mm from.. to
..mm from.. to
FIRST WATER STRIKE ...m
SECOND WATER STRIKE ...m
THIRD WATER STRIKE ...m
WATER LEVEL ...m
YIELD m/h ....
APPARENT QUALITY OF WATER
TDS WHEN DRILLED ...

INITIAL CAPACITY TEST


AIRLIFT YEILD
PUMP YIELD
YIELD IN m/h: ...
DATE: ...
DURATION: ...

DRILLING COSTS
ITEM N$
m drilled N$ per m
Testing of borehole:
CASING
Plain length m
N$ per m

Perforated length m
N$ per m
TOTAL COST
State whether the borehole is
successful Casing left in borehole
unsuccessful Casing recovered
DECLARATION BY DRILLER AND DRILLING INSPECTOR
I, the driller declare that the information supplied I, the drilling inspector, declare that the
Above is true and correct information supplied above is true and correct
Signature: Signature:

Rank Rank
Place Date Place Date

You might also like