0% found this document useful (0 votes)
46 views1 page

Description Unit Quantity Rate (RM) Amount (RM) Material Cost

The document provides a bill of quantities and cost breakdown for building materials and labor. It lists various construction materials like brick, cement mortar, reinforcement mesh, concrete, and steel bars along with their unit rates and costs. The total material cost is calculated to be RM2456.52 with a 5% wastage added. Labor is estimated at 6% of material cost which is RM186.26. The overall total cost of the project is RM3445.73.

Uploaded by

eunice19970315
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
46 views1 page

Description Unit Quantity Rate (RM) Amount (RM) Material Cost

The document provides a bill of quantities and cost breakdown for building materials and labor. It lists various construction materials like brick, cement mortar, reinforcement mesh, concrete, and steel bars along with their unit rates and costs. The total material cost is calculated to be RM2456.52 with a 5% wastage added. Labor is estimated at 6% of material cost which is RM186.26. The overall total cost of the project is RM3445.73.

Uploaded by

eunice19970315
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Description Unit Quantity Rate(RM) Amount(RM)

Material cost:
Common brick pcs 3890 0.39 1517.1
Cement mortar (1:3) m3 1 11.8 11.8
Masonry reinforcement mesh at every m2 14 6.34 88.76
forth course
Damp proof course m 12 10.8 129.6
Vibrated reinforced concrete (Grade 30) m3 1 331 331
for stiffeners
Formwork to sides of stiffeners m2 14 30.3 424.2
10mm diameter mild steel bar reinforcement kg 177 3.4 601.8
in stiffeners

Wastage @ 5% 155.21

Labour cost:
6% of material cost 186.26

Total Cost 3445.73