0% found this document useful (0 votes)
37 views

2.0 Kos Kerja Kerja Am

This document outlines percentages of general cost items for construction projects. It provides average and range percentages for 13 cost items in 2008 and 2009, including items like contractor's all risk insurance (0.5-1.1%), performance bonds (0.2-1.2%), site offices (0.3-3%), surveying equipment (0.1-3%), and mobilization of equipment (0.3-4.6%). The total average percentage for general cost items for construction work is estimated to be 5-6%.

Uploaded by

RizalFaiz
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
37 views

2.0 Kos Kerja Kerja Am

This document outlines percentages of general cost items for construction projects. It provides average and range percentages for 13 cost items in 2008 and 2009, including items like contractor's all risk insurance (0.5-1.1%), performance bonds (0.2-1.2%), site offices (0.3-3%), surveying equipment (0.1-3%), and mobilization of equipment (0.3-4.6%). The total average percentage for general cost items for construction work is estimated to be 5-6%.

Uploaded by

RizalFaiz
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

2.

0 KOSKERJAKERJAAM

2.1 PERATUSANKOSKERJAAM(GENERALITEMS)KEATASKOSKERJAPEMBINAMengikutButiranTerperinci

*PURATA&JULAT
BIL KETERANGANKERJA UNIT PURATA&JULATHARGABAGITAHUN(%) KESELURUHAN(%)
2008 2009
Purata Julat Purata Julat Purata Julat

A ContractualRequirement
1 Contractor'sAllRisk 0.53 0.111.09 0.54 0.201.09 0.50 0.111.09

2 InsuranceOfWorks 0.40 0.080.90 0.34 0.140.90 0.40 0.080.90

3 PerformanceBond 0.62 0.201.23 0.60 0.201.23

4 Perkeso/SOCSO 0.18 0.030.45 0.18 0.100.27 0.20 0.030.45

5 PublicLiabilityInsurance 0.34 0.160.57 0.35 0.160.57 0.40 0.160.57

B Engineer/SO/PD'sRequirement
1 Establishment&RemovalOfSO'sSite 0.67 0.341.29 0.68 0.560.82 0.70 0.341.29
Office

2 Establishment,Maintenance&Removal 0.96 0.242.95 0.36 0.240.51 0.70 0.242.95


OfSO'sSiteOffice

3 MaintenanceOfSO'sSiteOffice 0.43 0.011.30 0.57 0.011.30 0.50 0.011.30

4 LaboratoryEquipment 0.15 0.15 0.15 0.15 0.20 0.20

5 Pre&PostSurvey 1.38 0.066.48 0.98 0.971.00 1.20 0.066.48

6 Preparation&SubmissionOf'AsBuilt 0.33 0.001.67 0.29 0.000.57 0.30 0.001.67


Drawings'

7 ProgressPhotographs 0.06 0.010.33 0.09 0.020.33 0.10 0.010.33

8 ProgressReport 0.13 0.020.33 0.16 0.080.33 0.20 0.020.33

9 ProjectSignboard 0.18 0.050.45 0.20 0.050.45

10 SettingOut 0.57 0.152.04 0.60 0.170.82 0.60 0.152.04

11 SurveyingEquipment 1.26 0.102.92 1.30 0.102.92

12 Testing&Sampling 0.14 0.120.16 0.14 0.120.16 0.20 0.120.16

13 WorkProgramme 0.07 0.010.13 0.10 0.10 0.10 0.010.13

*PurataKeseluruhan(%)(roundedup)yangditetapkan 5
2.0 KOSKERJAKERJAAM

2.1 PERATUSANKOSKERJAAM(GENERALITEMS)KEATASKOSKERJAPEMBINAMengikutButiranTerperinci

*PURATA&JULAT
BIL KETERANGANKERJA UNIT PURATA&JULATHARGABAGITAHUN(%) KESELURUHAN(%)
2008 2009
Purata Julat Purata Julat Purata Julat

C Contractor'sRequirement
1 Clearing&CleaningUpUponCompletion 0.2 0.050.39 0.16 0.070.33 0.20 0.050.39

2 Establishment,Maintenance&Removal 0.44 0.150.75 0.44 0.190.66 0.50 0.150.75


OfContractor'sOffice

3 Establishment,Maintenance&Removal 0.59 0.081.63 0.75 0.161.63 0.70 0.081.63


OfContractor'sOffice,Workmen
Accommodation,Storeetc

4 Establishment,Maintenance&Removal 0.34 0.150.61 0.40 0.150.61


OfWorkmen'sAccommodation

5 Moblization&DemobilizationOf 1.16 0.324.63 1.20 0.324.63


ConstructionPlant&Equipment

6 SiteAgent 1.01 0.231.79 1.79 1.79 1.40 0.231.79

7 TemporaryWorks 1.07 0.074.62 0.87 0.072.10 1.97 0.074.62

*PurataKeseluruhan(%)(roundedup)yangditetapkan 6