0% found this document useful (0 votes)
223 views21 pages

Aesolutions Understanding Overpressure Scenarios and RAGAGEP

z

Uploaded by

edgardiaz5519
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
223 views21 pages

Aesolutions Understanding Overpressure Scenarios and RAGAGEP

z

Uploaded by

edgardiaz5519
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 21

Understanding Overpressure Scenarios

and RAGAGEP

71stAnnualInstrumentationandAutomationSymposiumfortheProcessIndustries
January2628,2016

RonNichols DaveGrattanP.E.,CFSE
SeniorPrincipleSpecialist ProcessSafetyEngineer
aeSolutions aeSolutions

Disclaimer
Thefollowingpaperisprovidedforeducationalpurposes.Whiletheauthorshaveattemptedtodescribe
thematerialcontainedhereinasaccuratelyaspossible,itmustbeunderstoodthatvariablesinanygiven
applicationorspecificationcanandwillaffectthechoiceoftheengineeringsolutionforthatscenario.All
necessaryfactorsmustbetakenintoconsiderationwhendesigninghazardmitigationforany
application.aeSolutionsandtheauthorsofthispapermakenowarrantyofanykindandshallnotbe
liableinanyeventforincidentalorconsequentialdamagesinconnectionwiththeapplicationofthis
document.

Introduction to Using RAGAGEP for Overpressure Risk Mitigation


ProcessHazardAnalysis(PHA)isakeytoolusedbythechemical,oil,andgasindustriestoassist
companiesinidentifying,implementingandmanagingthecriticalsafeguardsneededtoachievetheir
risktolerancecriteria.TheProcessHazardanalysisforsomesitesmayberegulatorydriven(e.g.,
Occupational,HealthandSafetyAdministrations(OSHAs)29CFR1910.119ProcessSafety
ManagementofHighlyHazardousChemicals(PSM),ortheUnitedStatesEnvironmentalProtection
Agencys(USEPAs)40CFR68ChemicalAccidentPreventionProvisions(RMP)).
DuringthePHAtheteamidentifiesconsequencesofconcernarisingfrompotentialprocessdeviations,
identifiesexistingsafeguards,orifLOPA(LayerofProtectionAnalysis)isrequired,theIndependent
ProtectionLayers(IPLs)availabletoreducethelikelihoodoftheconsequencetoatolerablerisklevel.If
theteamidentifiesagapbetweenthepotentialeventlikelihood,severityandtheminimumtargetset
bythecompany,theteamwillproposerecommendationstoclosethegap.
Anoverpressurescenariocanbeasignificantcontributortotheriskofafacility.Overpressureof
pressurevessels,piping,andotherequipmentcanresultinlossofcontainmentofflammableortoxic

2016aeSolutions GrattanandNichols Jan28,2016
TAMUInstrumentationSymposium Page1

materials.ThispaperwilldevelopguidanceincludingrelatedRAGAGEP(RecognizedandGenerally
AcceptedGoodEngineeringPractice)tohelpengineersanddesignersparticipateinthesafetylifecycle
formanagingtheriskofoverpressure.

Role of the Control Systems Engineer (CSE) in PHA/ LOPA


CSEpersonnelareanimportantpartofaPHA/LOPAteam.Specificallyrelatedtooverpressure
scenarios,theCSEwilloftenbeabletoprovideinputtothefollowingissues:

developoverpressurescenariosrelatedtofailureofautomaticcontrols
assistteamtounderstanddependencebetweenautomaticcontrols(forexclusionofdouble
jeopardy)
understandthetypesofpressurereliefhardwarethatisspecifiedorinstalled(e.g.pilot
operatedvs.conventionalrelief)
understandreliefvalvecodesandpractices
assisttheteamwithdevelopingalternategapclosuresolutions(e.g.,systemdesign(SIS),High
IntegrityPressureProtectiveSystem(HIPPS),criticalalarms,etc.)
IftheprocessengineeringrepresentativetothePHAhasnotspecificallyworkedinthedisciplineof
pressurereliefdesign,theCSErepresentative,ifknowledgeable,canfillinmostofthisknowledgegap.
TheCSEmayinheritrecommendationsoractionitemsrelatedtomitigatingoverpressuregaps,ormay
haveresponsibilityforthemaintenanceandongoingintegrityrelatedtooverpressuremitigation.Asolid
understandingoftheRAGAGEPrelatedtomanagingtheriskassociatedwithoverpressurescenariosis
requiredinallofthesecases.

Introduction to Codes and Recommended Practices related to Overpressure


ThefollowingRAGAGEPareusedtomanagetheriskassociatedwithoverpressure.

ASMEBoilerandPressureVesselCode,SectionVIIIPressureVessels
TheASMEBoilerandPressureVesselCode,SectionVIIIPressureVessels(ASMESectionVIII),is
consideredtheauthorityforminimumsafetyandperformancerequirementsofpressurereliefdevices.
Itiswidelyusedinindustryasareferenceandbasecode.ASMESectionVIIIhasbeencodifiedbymany
stateandlocalregulatoryauthorities,meaningitisrequiredbylaw[1].

APIStandard520,Sizing,Selection,andInstallationofPressurerelievingDevices,Parts1
(Sizing)and2(Installation)
APIStandard520,Sizing,Selection,andInstallationofPressurerelievingDevices(API520),supplements
thematerialandinformationinASMESectionVIII,andprovidesmorecompleteinformationon
relievingdevices,includingthedeterminationofreliefrequirements,disposalsystems,pipingand
installationpractices,thanwaspreviouslyavailablefrompublishedsources[1].


2016aeSolutions GrattanandNichols Jan28,2016
TAMUInstrumentationSymposium Page2

APIStandard521,PressurerelievingandDepressuringSystems
APIStandard521,PressurerelievingandDepressuringSystems(API521),Providesanadditionalsource
ofknowledgeandexperiencegainedbythepetroleumprocessingandrelatedindustries.Itrecommends
economicallysoundandsafepracticesforpressurerelief.Thissourceconsidersthecomplexdesignand
operationofmodernprocessingplantsandthevastamountofenergystored.Itsuggestanalysisguides
fordeterminingcapacityrequirementsanddesignconceptsfordischargeanddisposalsystems[1].

NFPA30,FlammableandCombustibleLiquidsCode
NFPA30,FlammableandCombustibleLiquidsCode,closelyparallelstheinformationinAPIStandard
2000,VentingAtmosphericandLowPressureStorageTanks[1].OSHAsStandard,29CFR1910.106,
FlammableLiquids,isitscodifiedcousin.

ANSI/ISA84.00.012004Parts1(IEC61511Mod),FunctionalSafety:SafetyInstrumented
SystemsfortheProcessIndustrySector
WhenASMESectionVIIIUG140isusedasthebasistoprotectavesselfromoverpressurebysystem
design(e.g.,SIS)thenthesafetylifecycleinANSI/ISA84.00.012004Parts1(IEC61511Mod),
FunctionalSafety:SafetyInstrumentedSystemsfortheProcessIndustrySector(S84)wouldbefollowed
fortheSISdesign,installation,maintenance,andtesting.

Using a Pressure Relief Device as a Safeguard or IPL in PHA/ LOPA


OnetypicalsafeguardorIPLthatisidentifiedduringaLOPAstudyisapressurereliefdevice.Thistype
ofIPLisidentifiedbytheteamtomanagetheriskofanoverpressureconsequencetoanacceptable
level.Apressurereliefdevice(i.e.,apressurereliefvalveorrupturedisk)isusedasaconsequence
mitigationsystemtoprotectagainsthazardsofoverpressureresultinginlossofcontainmentdueto
ruptureorleakandpotentialexposuretoatoxicrelease,fireorexplosion.Therelianceonthepressure
reliefvalve(PRV)(agenericterm)asasafeguarddependsonitsproperdesignforthepotential
overpressureevent,installation,andmaintenance.
Oneoftherequirementsin29CFR1910.119[2]istheemployershallcompleteacompilationof
writtenprocesssafetyinformationbeforeconductinganyprocesshazardanalysisrequiredbythe
standard.Twocategoriescalledoutasprocesssafetyinformation(PSI)inthestandardare:1)relief
devicedesignbasisandcalculationsshallbedocumented,and2)bedesignedinaccordancewith
RAGAGEP.
Thispaperdoesnotrecommendthattheteamperformadetailedreviewofthepressurereliefdesign
calculationsduringthePHA.AnunderlyingassumptionofaPHAistheengineeringcalculationsare
correct(unlesstheteamhasknowledgetheyarenot).Alsobecausetheteamtimetoreviewaprocess
nodeduringaPHAsessionmustbemanagedefficiently,anauditofthePSIisnotfeasible.However,
PHArecommendationsareroutinelycapturedtoaddressPSIdeficienciesidentified;suchastheneedto
updateP&IDs,updateofoperatingprocedures,updateofsafeoperatinglimits,orthereviewofaPRV


2016aeSolutions GrattanandNichols Jan28,2016
TAMUInstrumentationSymposium Page3

designbasisandtheassociatedsizingcalculationtoconfirmitprovidesoverpressureprotectionfora
PHA/LOPAscenariotowhichitiscredited(inadherencetoRAGAGEP).
ThefollowingarerecommendedquestionstoraisewiththePHAteamwhenperformingthestudyto
assessthehealthofthepressurereliefmanagementsystem.Thesourcesofinformationavailableto
answerthesequestionsaretypicallytheP&IDs,teammemberknowledgeandexperienceand
observationsmadeduringthewalkaroundtouroftheprocessarea.Notethatthesequestionsfocuson
pressurereliefforpressurevesselsandnotforlowpressureoratmospherictanks,thoughsimilar
questionsmaybedevelopedforthose.Althoughpressurereliefdevicesareusedtoprotectpressure
vesselsandpiping,theprovisionofpressurereliefonpipingisalsonotcoveredinthispaperas
requirementsforpipingoverpressureprotectionaregenerallymorespecificforthematerialbeing
handledandwouldbedrivenbyapplicationofthecorrectRAGAGEPforthatindustry(e.g.,Cl2Institute
guidanceonthermalexpansionpressurereliefofliquidchlorinetrappedinpipe).

PRV/ Overpressure RAGAGEP Deviation Questions for PHA


ThefollowingpotentialdeviationsrelatedtooverpressurebasedonRAGAGEPwillbeaddressedindetail
inthissection.
1. Isapressurereliefdevicerequired?
2. Isoverpressureprotectionavailablethroughaconnectedvesselthathasapressurerelief
device?
3. IsthepressurereliefdevicesetpointbelowtheMAWP?
4. IsthevesselnozzleorinletpipetothePRVasmallerareathantheinletofthePRV?
5. IsthePRVmountedbelowthenormalliquidlevelthatisnotadequatefornoncompressible
relief?
6. ArethereanyPSE/PRVcombinationsontheP&ID?
7. IsthereaPRVinstalledontheshellortubesideofaheatexchanger?
8. Istheopeninginthevesseldesignedtoprovideunobstructedflowbetweenthevesselandthe
pressurereliefdevice?
9. DoesthePRVventtoasafelocation?
10. Isthereliefpathkeptfreeofaccumulatedliquid?
11. Isthereacrediblecontingencyforhydraulicoverpressure?
12. Isdoublejeopardyclaimedforanoverpressurescenario?
WhatthePHAteamislookingforfromthesequestionsarepotentialdeviationsfromRAGAGEPfor
pressurereliefdesign(includingbasis),installationandmaintenance.Thequestionraisedmaybe:

AnsweredduringthemeetingiftheappropriatePSIcanbequicklyaccessed,asthereisalimited
timetosearchforinformationduringthemeetingsession,(rapidaccess);
Capturedasaparkinglotitemtoberesearchedandansweredoutsidethemeetingtimebut
beforetheendofthemeetingsessions(availablefromfieldorrecordreview);


2016aeSolutions GrattanandNichols Jan28,2016
TAMUInstrumentationSymposium Page4

MadeintoarecommendationtoverifythedesignmeetsRAGAGEPandifnottoinitiatethe
developmentofthePSIoradesignmodification(e.g.prolongedrecordsearch,workorderor
studyneeded).
Thefollowingdiscussionsofeachquestionbelowincludeareferencetotheapplicableandsupporting
RAGAGEP(s).Theinformationprovidedisintendedtobeusefultoafacilitatorinleadingahazard
analysis.Thecodifiedrequirementsarealsodetailedinatableattheendofthispaper.

1) Is a pressure relief device required?


ASMESectionVIIIrequiresthatpressurevesselsbeprotectedbyapressurereliefdevice.Inmostcasesit
iseasytoidentifyapressurevesselbyinspectionoftheP&ID.Insomecasesitisnot.
ThefollowingcriteriawillexcludeavesselasbeingconsideredanASMESectionVIIIpressurevessel:

Vesselratedforlessthan15psig(100kPa)
Vesseldiameterislessthan6(152mm)
SourceRAGAGEP:ASMESectionVIIIU1(h),U1(j)
LookateachpressurevesselidentifiedinthenodeandontheP&ID.LookforthePRVandwhereitvents
toduringthefieldtour.
Arethereanypressurevesselsnotprotectedbyapressurereliefdevice?If,soinquireperthenext
sectionbelow.

2) Is overpressure protection available through a connected vessel that has a pressure


relief device?
ASMESectionVIIIallowsavesselthatisopentoaconnectedvesseltobeprotectedbythatvesselsPRV.
Inthiscase,ensurethedesignbasiscontainedinthereliefvalvefolderincludestheconnectedvesselin
itsscope.
Doesthereliefdesignbasisincludetheconnectedvesselinitsscope?
SourceRAGAGEP:ASMESectionVIIIUG133(c),AppendixMM5

2.1) What if there is no path to a pressure relief (no pressure relief device)?
VerifyifthevesselinvolvedhasbeenevaluatedperASMESectionVIIIUG140tonotneedoverpressure
protection.Thiscouldbethecaseifthesystempressureisselflimiting(thesourceofpressurecannot
exceedtheMAWPofthepressurevessel)andthereisnocrediblefirecase(suchaswhenapressure
vesseliselevated).IfnodocumentationexiststosupportapplicationofASMESectionVIIIUG140,
proposearecommendationtoperformastudyandinitiatemodificationasneededtoprovideadequate
overpressureprotection.


2016aeSolutions GrattanandNichols Jan28,2016
TAMUInstrumentationSymposium Page5

AHIPPSmaybeusedinlieuofapressurereliefdevice.ThisisalsogovernedbyASMESectionVIIIUG
140,whichrequiresmakingthelikelihoodofanoverpressureofavesselprotectedbyaHIPPStobenon
credible.Consequencecriteriaisnottakenintoconsideration.Mitigatingtononcredibleimpliestheuse
ofaSIL3HIPPSwhichisbestavailabletechnology.SISdocumentationshouldbereviewedtoconfirm
theHIPPSisdesignedandmaintainedtothislevelofintegrity.
UG140appliestonewprojectsornewpressurevessels.
WhenusingaHIPPSinlieuofaPRV(ornoPRVisrequired)informthevesselmanufacturerinwriting
(fillingoutmanufacturersdatasheetforUG140)andthevesselshouldbestampedforUG140etc.
SourceRAGAGEP:

ASMESectionVIIIUG140(formerlyCodeCase2211)
GuidancenoteforUG140isWRCbulletin498.AhowtoapplyguideforUG140.

2.2) What if the existing pressure relief device is not sized for a specific relief
contingency?
APHAteammayfindthatavesseloverpressurescenariobeingconsideredisnotprotectedbyan
existingpressurereliefdevice(butotherwisethevesselhasapressurereliefdevicethatisproperlysized
forotherscenarios,e.g.,afirecase).InthesecasesthePHAteamcould(ifmechanicalreliefprotection
forthespecificcontingencywereimpractical)recommendtheuseofaHIPPStomitigatetheriskof
overpressureforthespecificcontingency.
IfaHIPPSisusedtoeliminatearelievingscenario(butthevesselotherwisehasaPRV)youonlyneeda
riskbasisdocumented(LOPA)forthatscenario.ItisnotsubjecttoASMESectionVIIIUG140.
Aslongasthereisaproperlydesigned,installed,andmaintainedPRVonthevesselsizedforsome
scenario,UG140doesnotapply(thisallowslessthanSIL3foraHIPPS).API521istheapplicable
RAGAGEP.Thisisaninterpretationofcodeandshouldbeverifiedindependentlybyeachenduser.
API521supportstheuseofariskanalysisusingLOPAandallowstheconsequencetobetakeninto
considerationwhenmitigatingwithaHIPPS(ASMESectionVIIIdoesnot).Thisiswhythedesignbasisfor
theHIPPSmaybeSIL1or2.

2.3) Are there maintenance valves (or control valves) in the flow path between the vessel
and the pressure relief device or its downstream vent point?
Valves(manualorautomatic)intheflowpathwithapressurereliefdeviceshouldbereviewedcarefully
withthePHAteam.TheypotentiallycandefeatthesafeguardorIPL.
ASMESectionI(forfiredequipment,e.g.,boilers)doesnotallowvalvesinthereliefpath.
ASMESectionVIII(unfiredpressurevessels)allowsvalvesinthepathofareliefdevice,howeverthey
mustbemanagedopen.


2016aeSolutions GrattanandNichols Jan28,2016
TAMUInstrumentationSymposium Page6

DovalvesinflowpaththroughPRVonP&IDshowcarsealopen(CSO)orchainlockedopen(CLO)?
SourceRAGAGEP:ASMESectionVIIIUG135(d)(1),(d)(2)andAppendixM.

3) Is the pressure relief device setpoint below the MAWP?


TheP&IDshouldshowthedesignratingforavessel(i.e.,pressureandtemperature).Eitherthevessel
designpressureortheMAWP(MaximumAllowableWorkingPressure)maybeshown.Thedesign
pressureissetbytheprocessrequirements.TheMAWPiswhatthevesselisbuilttowithstandbythe
manufacturer.TheMAWPshouldbeequaltoorhigherthanthedesignpressure.Thesetpressureforat
leastonePRVonavesselshallnotexceedtheMAWPofthevessel.
IfthevesseldesignpressureisshownontheP&ID(butnottheMAWP),investigatetheMAWPbecause
thismaylowertheoverpressureratioifthevesselwasfabricatedwithahigherMAWP.
TheP&IDmayshowmultiplePRVsprotectingasinglevessel.ThePHAteamshouldunderstandwhy
therearemultiplePRVs.ArethePRVsprotectingthesamereliefcontingency,oraretheyprotecting
differentcontingencies.Inanycase,itiscommontostaggerthe(multiple)reliefvalvesetpointsto
ensureproperperformanceofeachreliefdevice(e.g.,toavoidchattering).
ComparesetpointofPRVwiththeMAWPofalltheequipmentitisprotectingagainsttheRAGAGEP
criteria.
SourceRAGAGEP:ASMESectionVIIIUG134(a)Whenasinglepressurereliefdeviceisused,theset
pressureshallnotexceedthemaximumallowableworkingpressureofthevessel.Whentherequired
capacityisprovidedinmorethanonepressurereliefdevice,onlyonepressurereliefdeviceneedbeset
atorbelowthemaximumallowableworkingpressure,andtheadditionalpressurereliefdevicesmaybe
settoopenatthehigherpressuresbutinnocaseatapressurehigherthan105%ofthemaximum
allowableworkingpressure,exceptasprovidedin(b)below[3].

4) Is the vessel nozzle or inlet pipe to the PRV a smaller area than the inlet of the PRV?
TheproperdesignofaPRVinstallationmustconsiderandlimitthepressuredropontheinletlinetoa
PRVandthebackpressuredevelopedonthedischargelineofaPRV,bothofwhichmayreducethe
capacityofthePRVandcauseperformanceissues(e.g.,chattering).DoestheP&IDshowanozzleor
pipewithasmallerdiameterthantheopeningofthePRVontheP&IDorobservedduringatour?
SourceRAGAGEP:ASMESectionVIIIUG135(b)(1)


2016aeSolutions GrattanandNichols Jan28,2016
TAMUInstrumentationSymposium Page7

5) Is the PRV mounted below the normal liquid level that is not adequate for non-
compressible relief?
ThePHAteammaybeawareofissuesrelatedtoaPRVinstallation,oritmightbecomeapparentduring
thetouroftheunit.Forexample,inonefacility,agroupofPRVswereinstalledbelowthecenterlineof
theflareheaderwherethePRVsdischargedto.
VerifywiththePHAteamifaPRVmountedbelowanormalliquidlevelisspecifiedaspercompressible
fluid.Potentialissuesthatshouldbeidentifiedbytheteaminclude;operatinglevelchanges,repurposed
vessel,inadequatenozzleselection(design),orbadinstallation,etc.
SourceRAGAGEP:ASMESectionVIIIUG135(a)

6) Are there PSE/PSV combinations on the P&ID?


IfaPSE(rupturedisk)isinstalledinserieswithaPRV,theremustbeawaytomonitorpressureinthe
interstitialspace.Iftherupturediskweretoleak,pressurecouldbuildupinthespacebetweenthePSE
andPRV,puttingbackpressureonthePSE,effectivelyraisingtheburstingpressureofthePSE.Atell
talepressureindicationshouldbeinstalledtomeasurepressureintheinterstitialspace.Inaddition,an
inherentlysaferdesignsolutionistoventtheinterstitialspacetotheflareheader(thuspreventing
buildupofpressure)atthesametimemonitoringforblownrupturedisk.
IsthereatelltaletomonitorthespacebetweentherupturediskandPRV?
Howisitmonitored:checklist,SOP,DCSalarm?
Ataminimumthetelltaleshouldbemonitoredbyperiodicoperatorroundstoinspectthereadout
(althoughthetelltalemaynotbeagauge,e.g.atrycock).DuringthePHAtheremaybeanopportunity
torecordandreviewtheprocedurethatdocumentsthemonitoringrequirementsoftheseindications,
e.g.howaredeviceinspectionsdocumented,frequencyofmonitoring,andrequirementforcorrective
action.
SourceRAGAGEP:ASMESectionVIIIUG127(b)(4):Thespacebetweenarupturediskdeviceanda
pressurereliefvalveshallbeprovidedwithapressuregage,atrycock,freevent,orsuitabletelltale
indicator.Thisarrangementpermitsdetectionofdiskruptureorleakage53.

7) Is there a PRV installed on the shell or tube side of a heat exchanger?


Inolderplantsitiscommontofindoneormoreheatexchangersnotprotectedforthetuberupture
contingency.Tuberupturemayoverpressuretheshellsideoftheexchanger,orpressuremaydevelop
ontheexchangerheads(fromtheshellside)andoverpressurethatway.Inanycase,alwaysverifyfrom
theP&IDdesignspecinformationfortheheatexchangertheratioofdesignpressureofhighsidetolow
side.Iftheratioexceeds1.3(10/13thsrule),thenlookforpressureprotection(aPRD)onthelowside.
Forexample,ifthepressureratingofthetubesideis375psig,andthepressureratingoftheshellsideis
100psig,theratiois3.75.Forthisexample,verifyaPRDdeviceisprotectingtheshellside.Iftheshell


2016aeSolutions GrattanandNichols Jan28,2016
TAMUInstrumentationSymposium Page8

sideisratedfor375psig,andthetubesideisratedfor100psig,thenlookforaPRDprotectingthetube
side(theexchangerheads).
Isthereapressurereliefdeviceprotectingtheshellortubeside?Ifpressurereliefisprovidedby
connectedequipment,isitdocumentedandisthepathtothatreliefmanagedopen?
SourceRAGAGEP:ASMESectionVIIIUG133(d)

8) Is the opening in the vessel designed to provide unobstructed flow between the
vessel and the pressure relief device?
Thisistheopencommunicationrule.ThepathbetweenavesselandthePRDprotectingitshallbe
open.Byopenitismeantthatnomanualvalvesorcontrolvalves,orotherprocessequipment(e.g.,
exchangers,filters,etc)thatcouldblockflow,reducefloworcreatebackpressuretoanunacceptable
degreebetweenthevesselanditsPRD.Thisisespeciallyimportanttolookforwhenavesselisbeing
protectedbyareliefvalvenotfitteddirectlytothevesselbutinsteadislocatedonanothervesselor
pipe.Forthecaseofmanualvalves,iftheyarelockedopen(CLO)thisisconsideredacceptableto
maintainopencommunication.Beaware,thatifclosureofthevalve(controlormanual)orpluggageof
thefilteristhecauseofhighpressure,butatthesametimeisolatesthevesselfromhighpressure,then
thisisnotanoverpressureconcernforthatvessel.
OpencommunicationinthepathofthePRVdischargetoitsdestination(e.g.,atmosphere,flareheader,
etc.)mustbeunobstructedaswell.
SourceRAGAGEP:ASMESectionVIIIUG135

9) Does the PRV vent to safe location?


AchallengeplacedonaPRDtopreventoverpressurewillcreateasecondscenarioforconsideration.
Wheredoestherelievedfluidventto?IfaPRVdischargestoflare,ataminimumtherecouldbea
potentialenvironmentalimpactcausebynonpermittedflaring.
Otheritemstoconsiderare:

Willdischargeraindownliquidtoanoccupiedarea?
Istherehistoryofinadequateliquidknockout(disengagement)priortoventing?
Isliquidoverfillcrediblebutnotpartofthereliefdesignordischargedesign?
CanthePRDdischargecreatehumanriskofexposuretoflammablevaporortoxicvaporin
occupiedareas?
WhatistheelevationofthePRDventdischargerelativetoelevatedworkingsurfaces?
WhatisthedirectionofthePRDdischarge(verticalorhorizontal)?
Isthedischargeaimedatanoccupiedarea,workingareas,steps,etc?
SourceRAGAGEP:API5216.3andASMESectionVIIIUG135


2016aeSolutions GrattanandNichols Jan28,2016
TAMUInstrumentationSymposium Page9

9.1 Are any toxic or flammable reliefs discharging inside a building?


SourceRAGAGEP:NFPA302.3.4.6.1,29CFR1910.106

10) Is the relief path kept free of accumulated liquid?


AretheretrapsinthepathofaPRVdischargetotheKOdrum/flareheader?InonefacilitythePRV
dischargeheaderwasrunundergroundandthenbackuptoflare.Accumulatedliquidonthedischarge
ofaPRVwillincreasebackpressureandreducerelievingcapacity.
SourceRAGAGEP:ASMESectionVIIIUG135(f)

11) Is there a credible contingency for hydraulic overpressure?


Inadditiontoahighleveldeviationinavessel,thePHAteamshouldreviewthepotentialfor
overpressurecausedbyhighlevelhydraulicoverpressure.ThisisespeciallyimportantasmanyPRV
studieswilldeemtheliquidoverfillcaseasnotcrediblebasedonfavorableOperatorresponseallowed
inAPI521.ThePHAteamshouldindependentlyverifythisisso.
Highpressuredevelopswhentheliquidratecannotflowoutofavesselfasterthanitisputin.Thiscould
resultinanoverpressureuptothesourcedeadheadpressure(i.e.pump,compressor,upstreamline
pressure,nitrogenheader,etc.)
SourceRAGAGEP:API5214.2.5and4.4.7

12) Is double-jeopardy claimed for an overpressure scenario?


Doublejeopardyisusedinpressurereliefvalvedesigntoexcludemultipleindependentfailuresasa
basisfordesign.DonotletaPHAteameasilyclaimdoublejeopardy.ThefolderforaspecificPRVmay
indicateascenarioisdoublejeopardy.ThePHAteamdoesnothavetoagreewiththatassessment.
Forhighseverityconsequencesthatresultfromdoublejeopardy,LOPAallowsaneasyandconservative
meanstoevaluatethescenario.
Failuresmayberelatedtoequipment,humanerror,orexternalevents.Followtheseguidelines[4]:

Anysinglefailureiscredible.
Twoormoresimultaneousfailuresarecredibleifrelatedbycommoncause.
Twoeventsinsequencearecredible(onelatentfailurefollowedbyanotherfailure).
Threeormoreeventsinsequencemaybecredible(iflatentfailuresarenotdetected).
SourceRAGAGEP:API5214.2.3


2016aeSolutions GrattanandNichols Jan28,2016
TAMUInstrumentationSymposium Page10

Taking Overpressure Scenarios to a Layer of Protection Analysis


Inaccordancewithacompanysriskanalysisprocedures,iftheconsequenceseverityishighenough,
overpressurescenariosidentifiedinaPHAmaybefurtherassessedinaLayerofProtectionAnalysis
(LOPA).LOPA,inconjunctionwiththePHA,hasbecomearoutinetoolusedbythechemical,oil,andgas
industriestoassistcompaniesinidentifying,implementingandmanagingthecriticalsafeguardsneeded
toachievetheirrisktolerancetargets.LOPAisusedtoidentifythenumberofIndependentProtection
Layers(IPLs)andtheirintegrityneededtoreducethelikelihoodtoanacceptablylowfrequencythatan
initiatingcausewillprogresstoanundesiredconsequence.LOPAquantifiesifthereisagapbetweenthe
existingMitigatedEventLikelihood(MEL)andtheTargetMitigatedEventLikelihood(TMEL)established
andisreflectiveofacompanysrisktolerancerequirements.IftheLOPAfindsagapwherethe
undesiredconsequenceismorefrequentthanthecompanysrisktargets(TMELs),theteamwillpropose
additionalIPLstoclosetheriskgaporsuggestdesignchangestoreducethecredibleconsequence
severity.

Pressure Relief Devices used as an IPL


IPLscanbecategorizedaspreventiveorconsequencemitigationsystems.Apressurereliefdeviceacts
asaconsequencemitigationIPLasitdoesnotpreventtheoverpressure,butitminimizesthe
consequencebycontrollinganddirectingthelossofcontainmenttoasafelocation(ascovered
earlier).IfthepressurereliefdeviceistobetreatedasanIPL,itmustmeetthefollowingcriteriafor
acceptanceasanIPLperCCPSRAGAGEP.
Specificity:TheIPLbyitselfcanpreventthecausefromprogressingtotheundesiredconsequence.
Verifythereliefdesignbasis(foundinthePRVfolder)includesthedeviationthatresultsinthis
overpressurecase.
Independence:ThisIPLisindependentfromtheinitiatingcauseandotherIPLsinthatLOPAscenario.
VerifythatcommonfailuresdonotdefeatthePRVprotection(e.g.,undesirablereactionputting
demandonPRVatsametimecreatesamaterialthatplugsthePRV).
Dependability:TheIPLcanbereliedontofunctionwithanexpectedprobabilitytosuccessfullyprevent
theundesiredconsequencewhenplacedindemand.RefertocompanyspecificIPLcredittablesfor
specificguidance.
Auditability:TheIPLcanbeandisroutinelytestedthroughtheprocesslifecycletomaintainits
dependability.ThisistypicallysupportedbytestingandinspectioninconformancewithAPIRP576,
InspectionofPressurerelievingDevices.AgoodquestiontoaskthePHAteamisHowoftenarePRVs
removedfromservicefortesting?
AccessSecurity:ChangestothePSVdesign(includinginletanddischargepiping)aremanagedunder
ManagementofChange(MOC).


2016aeSolutions GrattanandNichols Jan28,2016
TAMUInstrumentationSymposium Page11

Risk Reduction Credits for Overpressure Scenario


Thefollowingrangesofriskreductioncredit(1credit=1IPLcreditedwithaRiskReductionFactor(RRF)
of10)aretypicallyusedduringaLOPA,andarereportedintheliteratureasnoted.
OpenPipe:Typicallyconsideredaninherentlysafesolutionaslongastheventcapacityofthepipeis
sufficientforthescenarioandpluggageisnotcredible.Ofteninventoriedasapressurereliefstreamin
processsafetyinformation.
SinglePRV:Typically23credits,dependingonthedatacited[6].Choosethelowendifusingmanaged
blockvalvefittedbeneaththePRV.
MultiplePRVs(eachsizedforfullload):OneadditionalcreditbeyondasinglePRV[6].
MultiplePRVs(eachnotsizedforfullload):SameasasinglePRVcredit.
Plugging(orotherfouling)Service:Reductionofonecreditunlessdesignedout(byinstallation,PRV
type,etc.).Ifdesignedout,theinstallationshouldbemonitored(flushes,freezeprotection,telltale,
etc.).
RuptureDiskInstalledBeneathPRV:Arupturedisk(orburstingdisc)maybeinstalledbeneathaPRV
toprotectthePRVfromtheserviceconditions.Performancedataforastandalonerupturediskis
sparse.Thisislikelybecauselegacyinterpretationsoftheregulatorycodes(ASME,etc.)discouraged
theiruse,andthereforetheinstalledbasetogatherdatawaslean.Oneindustrysource[5]indicates
thataburstingdiaphragmisworthyof2credits.Inanycase,morerecentguidancefromCCPS[6]
gives2creditsforarupturediskintandemwithaPRV.
PilotoperatedPRV:Thepilotoperatedreliefvalveisparticularlyusefulforoperationclosetotheset
pressure.Positiveopeningandclosingactionsavoidthesimmeringandchatteringcharacteristicsof
conventionalandbalancedvalves.Productlossesarereduced,andmaintenancecoststorepair
damagedseatsareconsiderablylower[1].Thedisadvantageofapilotreliefvalveismorepartsthat
cangivetrouble[1].Specificmentionismadeofthepilotlineswhichmayplugorbecomecrimpedthus
makingthepilotreliefvalveinoperative.PERDdata[7]showapilotoperatedreliefvalvetobeless
reliablethanaconventionalspringloadedreliefvalve,byanorderofmagnitudehigherPFD(probability
tofailondemand).ItmaybeusefultoraisetheseissueswiththePHAteamifrelevanttothecontextof
thestudy.Useof2creditsforapilotreliefvalveislikelyacceptablebecausethefailuredatareportedin
PERD,eventhoughhigherthanaconventionalreliefvalve,isstillgoodenoughfor2credits.
RestorationofaBlockValveFittedUnderaPRV:Restorationisdefinedastoreturnequipmenttoits
normalstatusforproductionmodeafterthecompletionofmaintenance,testing,calibration,etc.[8].A
PRVmayberemovedfromonlineserviceforbenchtestingandmaintenance.Itisnecessarythento
restorethePRVtoservicewhichwouldincludereopeningtheblockvalvesthatisolatethePRVfromthe
processandflareheader(ifprovided).Thereareseveraltoolsthatcanincreasethelikelihoodof
successfulrestorationactivities,suchasuseofrestorationprocedures,arobusttaggingsystem(e.g.
CLO/CSOprogram),andaculturethatpromotesuseofadministrativecontrols.Evenwhenthese


2016aeSolutions GrattanandNichols Jan28,2016
TAMUInstrumentationSymposium Page12

systemsareinplace,performanceofaPRV(orotherIPL)toprotectmaybelimitedbyhumanfactors.It
maybeusefultoraisetheseissueswiththePHAteamifrelevanttothecontextofthestudy.
UsinganSISinlieuofaPRV:TowhatlevelofreliabilityshouldtheSISbedesigned?T.A.Kletzsuggests,
Becauseoftheuncertaintiesinthefiguresanddifferencesinthemodeoffailure(areliefvalvethat
failstooperateatsetpressuremayopenatahigherpressure,butthisisnottrueofatrip),Isuggest
thatatripsystemusedinsteadofareliefvalveshouldhaveareliability10timesgreater[13].Ifa
standardcreditforasinglePRVof2isassumed,atripusedinsteadshouldbeworthyof3credits(SIL3).
Thisisonlyasuggestion.Someendusersmaychoosetoapplytheriskbasedapproachmentioned
earlier.

Overpressure IPL solutions other than PRV (and any concerns)


AsituationthatmayoccurinaPHA/LOPAiswhenthegapofahighhazardoverpressurescenario
cannotbeclosedbyaproperlydesignedandinstalledPRV.Inthiscasealternatesolutionstoclosethe
gaparenecessary.Aslongasindependenceismet,someoptionsinclude:

QuantitativeRiskAnalysis(sharpenthepenciltoverifyrisk)
LiningupSparePRVforextraIPLcredit(multiple100%PRVs)
Highpressurealarm(orhighlevelalarmforcontingencyofhydraulicoverpressure)
Interlockstoinitiateshutdownofequipmentorprocess
QRAcouldincludeconsequencemodellingbeperformedoutsidethePHAasarecommendationor
parkinglotitem.Dispersionmodelingsoftwarecouldbeusedtomodeltheeffectsoffire,explosion,or
toxiceffects.Probitmodelscouldbeusedtofurtherrefineprobabilityofimpacttopersonnel.QRA
couldalsoincludelikelihooddeterminationusingfaulttreeanalysisorhumanreliabilityanalysisfor
estimatingmoreprecise(lessconservative)initiatingcausefrequencies.
IfasmallgapexistsforanoverpressurescenariothePHA/LOPAteammaybetemptedtorecommend
liningupasparePRVtoservicetogainanextracredit(multiple100%PRVs).Thedrawbacksassociated
withthisaredocumentedin[9]andshouldbelookedatcarefully.
Highpressurealarmstypicallydonotgiveenoughoperatorresponsetime.Processsafetytimeto
overpressureshallbeestimatedbycalculation.Highlevelalarmresponsetimeismorelikelytobe
sufficientandshouldbeverifiedbycalculation.
Sometimestheonlysolutiontocloseahighpressuregapistoinitiateatripofequipmentortheprocess
toremovethesourceofoverpressure.Thisistypicallynotdesired,andthetripsystemshouldbe
designedwithreliabilityinmind.

Conclusion
ThispaperhaspresentedguidanceontheuseofRAGAGEPforoverpressurescenariosandtheir
associatedprotectivedevicesinthecontextofPHAandLOPA.Deviationquestionsrelatedto
overpressureandthegoverningRAGAGEPwerereviewed.ProtectivedevicesusedasIPLsinLOPAwere

2016aeSolutions GrattanandNichols Jan28,2016
TAMUInstrumentationSymposium Page13

reviewedforrequirementsandtypicalcredits.Gapclosuresolutionswerepresented.CSEpersonnel
shouldbecomefamiliarwiththisRAGAGEPandassociatedprotectivedevicestobeabletosupport
overpressureriskmitigationinthesafetylifecycle.

References
1. AppliedInstrumentationintheProcessIndustriesVolIIPracticalGuidelines2ndEdition,Gulf
PublishingCo.,Andrew,W.G.,andWilliams,H.B.(1980).
2. 29CFR1910.119ProcessSafetyManagementofHighlyHazardousChemicals.
3. ASMEBoilerandPressureVesselCodes,SectionVIII,PressureVessels.
4. Perry'sChemicalEngineers'Handbook,EighthEdition.McGrawHill,2008.
5. NPRD95(NonelectronicPartsReliabilityData)RiAC,1995.
6. CCPS.GuidelinesforInitiatingEventsandIndependentProtectionLayersinLayerofProtection
Analysis.CenterforChemicalProcessSafety,AmericanInstituteofChemicalEngineers,NewYork,
NY,2015.
7. CCPS.GuidelinesforProcessEquipmentReliabilityDatawithDataTables.CenterforChemical
ProcessSafety,AmericanInstituteofChemicalEngineers,NewYork,NY,1989.
8. NUREG/CR1278.HandbookofHumanReliabilityAnalysiswithEmphasisonNuclearPowerPlant
ApplicationsFinalReport,SwainandGuttmann,August1983.
9. UsingReliefValvesinParallel,MaryKayO'ConnorProcessSafetyCenter,InternationalSymposium,
BeyondRegulatoryCompliance,MakingSafetySecondNature,October2628,2010,JamesR.
LawrenceSr.
10. APISTD521.PressureRelievingandDepressuringSystems.AmericanPetroleumInstitute.
11. 29CFR1910.106.FlammableLiquids.
12. NFPA30.FlammableandCombustibleLiquidsCode.
13. DispellingChemicalEngineeringMyths3rdEd.,TaylorandFrancisPublishing,TrevorA.Kletz,1996.


2016aeSolutions GrattanandNichols Jan28,2016
TAMUInstrumentationSymposium Page14

Table1ofRAGAGEPExcerpts

RAGAGEP[3][10][11][12] Extract
ASMESectionVIIIU1(h) ExcludedfromASMEVIIIif(h)(1)vesselshavinganinternalorexternalpressurenotexceeding15psi(100
kPa)(i)vesselshavinganinsidediameter,width,height,orcrosssectiondiagonalnotexceeding6in.(152
mm),withnolimitationonlengthofvesselorpressure;
ASMESectionVIIIU1(j) ExemptedfromInspectionifU1(j)Pressurethatdonotexceedthefollowingvolumeandpressurelimits
maybeexemptedfrominspectionbyInspectors,(j)(1)5cuft(0.14m3)involumeand250psi(1.7MPa)
designpressure;orU1(j)(2)3cuft(0.08m3)involumeand350psi(2.4MPa)designpressure;U1(j)(3)1
cuft(0.04m3)involumeand600psi(4.1MPa)designpressure.
Note:Theexclusionofreliefdeviceforthesevesselsshouldbeverifiedperlocaljurisdiction.
ASMESectionVIIIUG133(c), (c)Vesselsconnectedtogetherbyasystemofadequatepipingnotcontainingvalveswhichcanisolateany
AppendixMM5 vessel,andthosecontainingvalvesincompliancewithAppendixM,M5,maybeconsideredasoneunitin
figuringtherequiredrelievingcapacityofpressurereliefdevicestobefurnishedIsthereaconnectedvessel
thatmayprovidepressurerelief
ASMESectionVIIIUG140 (a)Apressurevesseldoesnotrequireapressurereliefdeviceifthepressureisselflimiting(e.g.,the
maximumdischargepressureofapumporcompressor),andthispressureislessthanorequaltotheMAWP
ofthevesselatthecoincidenttemperatureandthefollowingconditionsaremet:
(1)Thedecisiontolimitthepressurebysystemdesignistheresponsibilityoftheuser.Theusershall
requestthattheManufacturersdatareportstatethatoverpressureprotectionisprovidedbysystem
designperUG140(a).
(2)Theusershallconductadetailedanalysistoidentifyandexamineallpotentialoverpressure
scenarios.TheCausesofOverpressuredescribedinANSI/APIStandard521,PressureRelievingand
DepressuringSystems,shallbeconsidered.Otherstandardsorrecommendedpracticesthataremore
appropriatetothespecificapplicationmayalsobeconsidered.Amultidisciplinaryteamexperiencedin
methodssuchashazardsandoperabilityanalysis(Hazop);failuremodes,effects,andcriticalityanalysis
(FMECA);whatifanalysis;orotherequivalentmethodologyshallestablishthattherearenosourcesof
pressurethatcanexceedtheMAWPatthecoincidenttemperature.
(3)Theresultsoftheanalysisshallbedocumentedandsignedbytheindividualinresponsiblechargeof


2016aeSolutions GrattanandNichols Jan28,2016
TAMUInstrumentationSymposium Page15

RAGAGEP[3][10][11][12] Extract
themanagementoftheoperationofthevessel.Thisdocumentationshallincludeasaminimumthe
following:
a.
a. detailedprocessandinstrumentflowdiagrams(P&IDs),showingallpertinentelementsofthesystem
associatedwiththevessel
b. adescriptionofalloperatingandupsetscenarios,includingscenariosinvolvingfireandthosethat
resultfromoperatorerror,andequipmentand/orinstrumentationmalfunctions
c. ananalysisshowingthemaximumcoincidentpressureandtemperaturethatcanresultfromeachof
thescenarioslistedinitemUG140(a)(3)(b)abovedoesnotexceedtheMAWPatthattemperature
(b)Ifthepressureisnotselflimiting,apressurevesselmaybeprotectedfromoverpressurebysystemdesign
orbyacombinationofoverpressurebysystemdesignandpressurereliefdevices,ifthefollowingconditions
aremet.TherulesbelowareNOTintendedtoallowfornormaloperationabovetheMAWPatthecoincident
temperature.
(1)Thevesselisnotexclusivelyinair,water,orsteamserviceunlesstheseservicesarecriticalto
preventingthereleaseoffluidsthatmayresultinsafetyorenvironmentalconcerns.
(2)Thedecisiontolimittheoverpressurebysystemdesignistheresponsibilityoftheuser.Theusershall
requestthattheManufacturersdatareportstatethatoverpressureprotectionisprovidedbysystem
designperUG140(b)ifnopressurereliefdeviceistobeinstalled.Ifnopressurereliefdeviceistobe
installed,acceptanceofthejurisdictionmayberequired.
(3)Theusershallconductadetailedanalysistoidentifyandexamineallscenariosthatcouldresultinan
overpressureconditionandmagnitudeoftheoverpressure.TheCausesofOverpressureasdescribed
inANSI/APIStandard521,PressureRelievingandDepressuringSystems,shallbeconsidered.Other
standardsorrecommendedpracticesthataremoreappropriatetothespecificapplicationmayalsobe
considered.Amultidisciplinaryteamexperiencedinmethodssuchashazardsandoperabilityanalysis
(Hazop);failuremodes,effects,andcriticalityanalysis(FMECA);whatifanalysis;orotherequivalent
methodologyshallconducttheanalysis.
(4)Theoverpressurescenarioshallbereadilyapparentsothatoperatorsorprotectiveinstrumentation
willtakecorrectiveactiontopreventoperationabovetheMAWPatthecoincidenttemperature.


2016aeSolutions GrattanandNichols Jan28,2016
TAMUInstrumentationSymposium Page16

RAGAGEP[3][10][11][12] Extract
(5)Thereshallbenocredibleoverpressurescenarioinwhichthepressureexceeds116%oftheMAWP
timestheratiooftheallowablestressvalueatthetemperatureoftheoverpressurescenariotothe
allowablestressvalueatthedesigntemperature.Theoverpressurelimitshallnotexceedthetest
pressure.CredibleeventsorscenarioanalysisasdescribedinWRCBulletin498Guidanceonthe
ApplicationofCodeCase2211OverpressureProtectionbySystemsDesignshallbeconsidered.
(6)Theresultsoftheanalysisshallbedocumentedandsignedbytheindividualinresponsiblechargeof
themanagementoftheoperationofthevessel.Thisdocumentationshallincludeasaminimumthe
following:
(a)detailedprocessandinstrumentflowdiagrams(P&IDs),showingallpertinentelementsofthe
systemassociatedwiththevessel
(b)adescriptionofalloperatingandupsetscenarios,includingthoseinvolvingfireandthosethat
resultfromoperatorerror,andequipmentand/orinstrumentationmalfunctions
(c)adetaileddescriptionofanysafetycriticalinstrumentationusedtolimitthesystempressure,
includingtheidentificationofalltrulyindependentredundanciesandareliabilityevaluation
(qualitativeorquantitative)oftheoverallsafetysystem
(d)ananalysisshowingthemaximumpressurethatcanresultfromeachofthescenarios
ASMESectionVIIIUG135 There shall be no intervening stop valves betweenvessel anditspressure relief deviceor devices, orbetween the
(d)(1),(d)(2)andAppendixM pressure reliefdeviceordevicesandthepointitdischarge,except:(1)when thesestopvalvesaresoconstructedor
positively controlled that theclosing o f t h e m a x i m u m n umberofblockvalves possible at one time will not
reduce thepressurerelievingcapacityprovidedbytheunaffectedpressurereliefdevicesbelowtherequiredrelieving
capacityor(2)underconditionssetforthinAppendixM.
ASMESectionVIIIUG135(b) (b)(1)Theopeningthroughallpipe,fittings,andnonreclosingpressurereliefdevices(ifinstalled)betweena
(1) pressurevesselanditspressurereliefvalveshallhaveatleasttheareaofthepressurereliefvalveinlet.The
characteristicsofthisupstreamsystemshallbesuchthatthepressuredropwillnotreducetherelieving
capacitybelowthatrequiredoradverselyaffecttheproperoperationofthepressurereliefvalve.
ASMESectionVIIIUG135(a) (a)Pressurereliefdevicesintendedforreliefofcompressiblefluidsshallbeconnectedtothevesselinthe
vaporspaceaboveanycontainedliquidortopipingconnectedtothevaporspaceinthevesselwhichistobe
protected.Pressurereliefdevicesintendedforreliefofliquidsshallbeconnectedbelowtheliquidlevel
Alternativeconnectionlocationsarepermitted,dependingonthepotentialvesseloverpressurescenariosand
thetypeofreliefdeviceselected,providedtherequirementsofUG125(a)(2)andUG125(c)aremet.

2016aeSolutions GrattanandNichols Jan28,2016
TAMUInstrumentationSymposium Page17

RAGAGEP[3][10][11][12] Extract
ASMESectionVIIIUG127(b) (4) thespacebetweenarupturediskdeviceanda pressurereliefvalve shall be provided with a pressuregage,a
(4) try cock,freevent,orsuitabletelltaleindicator.Thisarrangement permits detectionofdiskrupture or leakage.
API5216.3 6.3Atmosphericdischarge.Thedecisiontodischargehydrocarbonsorotherflammableorhazardous
vaporstotheatmosphererequirescarefulattentiontoensurethatdisposalcanbeaccomplishedwithout
creatingapotentialhazardorcausingotherproblems,suchastheformationofflammablemixturesatgrade
leveloronelevatedstructures,exposureofpersonneltotoxicvaporsorcorrosivechemicals,ignitionofrelief
streamsatthepointofemission,excessivenoiselevelsandairpollution
ASMESectionVIIIUG135(f) (f) Dischargelinesfrompressurereliefdevicesshallbedesignedtofacilitateshallbefittedwithdrains
topreventliquidformlodgingonthedischargeofthepressurereliefdeviceandsuchlinesshalllead
toasafeplaceofdischarge.
29CFR1910.106(b)(4)(ii) "Vents."Ventsfortanksinsideofbuildingsshallbeasprovidedinsubparagraphs(2)(iv),(v),(vi)(b),and(3)(iv)
ofthisparagraph,exceptthatemergencyventingbytheuseofweakroofseamsontanksshallnotbe
permitted.Ventsshalldischargevaporsoutsidethebuildings.
NFPA302.3.4.6.1 2.3.4.6.1 Ventsfor tanks inside tank buildings shallbedesigned to ensure that vapors are
not released inside thebuilding.
ASMESectionVIIIUG133(d) (d) Heat exchangers andsimilarvesselsshall be protectedwith a pressure relief device of sufficient capacityto
avoid overpressure in case of an internal failure.
ASMESectionVIIIU1(h) ExcludedfromASMEVIIIif(h)(1)vesselshavinganinternalorexternalpressurenotexceeding15psi(100
kPa)(i)vesselshavinganinsidediameter,width,height,orcrosssectiondiagonalnotexceeding6in.(152
mm),withnolimitationonlengthofvesselorpressure;
ASMESectionVIIIU1(j) ExemptedfromInspectionifU1(j)Pressurethatdonotexceedthefollowingvolumeandpressurelimits
maybeexemptedfrominspectionbyInspectors,(j)(1)5cuft(0.14m3)involumeand250psi(1.7MPa)
designpressure;orU1(j)(2)3cuft(0.08m3)involumeand350psi(2.4MPa)designpressure;U1(j)(3)1
cuft(0.04m3)involumeand600psi(4.1MPa)designpressure.
Note:Theexclusionofreliefdeviceforthesevesselsshouldbeverifiedperlocaljurisdiction.
ASMESectionVIIIUG133(c), (c)Vesselsconnectedtogetherbyasystemofadequatepipingnotcontainingvalveswhichcanisolateany
AppendixMM5 vessel,andthosecontainingvalvesincompliancewithAppendixM,M5,maybeconsideredasoneunitin
figuringtherequiredrelievingcapacityofpressurereliefdevicestobefurnishedIsthereaconnectedvessel
thatmayprovidepressurerelief


2016aeSolutions GrattanandNichols Jan28,2016
TAMUInstrumentationSymposium Page18

ASMESectionVIIIUG140 (a)Apressurevesseldoesnotrequireapressurereliefdeviceifthepressureisselflimiting(e.g.,the
maximumdischargepressureofapumporcompressor),andthispressureislessthanorequaltotheMAWP
ofthevesselatthecoincidenttemperatureandthefollowingconditionsaremet:
(1)Thedecisiontolimitthepressurebysystemdesignistheresponsibilityoftheuser.Theusershall
requestthattheManufacturersdatareportstatethatoverpressureprotectionisprovidedbysystem
designperUG140(a).
(2)Theusershallconductadetailedanalysistoidentifyandexamineallpotentialoverpressure
scenarios.TheCausesofOverpressuredescribedinANSI/APIStandard521,PressureRelievingand
DepressuringSystems,shallbeconsidered.Otherstandardsorrecommendedpracticesthataremore
appropriatetothespecificapplicationmayalsobeconsidered.Amultidisciplinaryteamexperiencedin
methodssuchashazardsandoperabilityanalysis(Hazop);failuremodes,effects,andcriticalityanalysis
(FMECA);whatifanalysis;orotherequivalentmethodologyshallestablishthattherearenosources
ofpressurethatcanexceedtheMAWPatthecoincidenttemperature.
(3)Theresultsoftheanalysisshallbedocumentedandsignedbytheindividualinresponsiblechargeof
themanagementoftheoperationofthevessel.Thisdocumentationshallincludeasaminimumthe
following:
b.
a. detailedprocessandinstrumentflowdiagrams(P&IDs),showingallpertinentelementsofthe
systemassociatedwiththevessel
b. adescriptionofalloperatingandupsetscenarios,includingscenariosinvolvingfireandthosethat
resultfromoperatorerror,andequipmentand/orinstrumentationmalfunctions
c. ananalysisshowingthemaximumcoincidentpressureandtemperaturethatcanresultfromeachof
thescenarioslistedinitemUG140(a)(3)(b)abovedoesnotexceedtheMAWPatthattemperature
(b)Ifthepressureisnotselflimiting,apressurevesselmaybeprotectedfromoverpressurebysystem
designorbyacombinationofoverpressurebysystemdesignandpressurereliefdevices,ifthefollowing
conditionsaremet.TherulesbelowareNOTintendedtoallowfornormaloperationabovetheMAWPatthe
coincidenttemperature.
(1)Thevesselisnotexclusivelyinair,water,orsteamserviceunlesstheseservicesarecriticalto
preventingthereleaseoffluidsthatmayresultinsafetyorenvironmentalconcerns.
(2)Thedecisiontolimittheoverpressurebysystemdesignistheresponsibilityoftheuser.Theuser
shallrequestthattheManufacturersdatareportstatethatoverpressureprotectionisprovidedby


2016aeSolutions GrattanandNichols Jan28,2016
TAMUInstrumentationSymposium Page19

systemdesignperUG140(b)ifnopressurereliefdeviceistobeinstalled.Ifnopressurereliefdeviceis
tobeinstalled,acceptanceofthejurisdictionmayberequired.
(3)Theusershallconductadetailedanalysistoidentifyandexamineallscenariosthatcouldresultinan
overpressureconditionandmagnitudeoftheoverpressure.TheCausesofOverpressureas
describedinANSI/APIStandard521,PressureRelievingandDepressuringSystems,shallbeconsidered.
Otherstandardsorrecommendedpracticesthataremoreappropriatetothespecificapplicationmay
alsobeconsidered.Amultidisciplinaryteamexperiencedinmethodssuchashazardsandoperability
analysis(Hazop);failuremodes,effects,andcriticalityanalysis(FMECA);whatifanalysis;orother
equivalentmethodologyshallconducttheanalysis.
(4)Theoverpressurescenarioshallbereadilyapparentsothatoperatorsorprotectiveinstrumentation
willtakecorrectiveactiontopreventoperationabovetheMAWPatthecoincidenttemperature.
(5)Thereshallbenocredibleoverpressurescenarioinwhichthepressureexceeds116%oftheMAWP
timestheratiooftheallowablestressvalueatthetemperatureoftheoverpressurescenariotothe
allowablestressvalueatthedesigntemperature.Theoverpressurelimitshallnotexceedthetest
pressure.CredibleeventsorscenarioanalysisasdescribedinWRCBulletin498Guidanceonthe
ApplicationofCodeCase2211OverpressureProtectionbySystemsDesignshallbeconsidered.
(6)Theresultsoftheanalysisshallbedocumentedandsignedbytheindividualinresponsiblechargeof
themanagementoftheoperationofthevessel.Thisdocumentationshallincludeasaminimumthe
following:
(a)detailedprocessandinstrumentflowdiagrams(P&IDs),showingallpertinentelementsofthe
systemassociatedwiththevessel
(b)adescriptionofalloperatingandupsetscenarios,includingthoseinvolvingfireandthosethat
resultfromoperatorerror,andequipmentand/orinstrumentationmalfunctions
(c)adetaileddescriptionofanysafetycriticalinstrumentationusedtolimitthesystempressure,
includingtheidentificationofalltrulyindependentredundanciesandareliabilityevaluation
(qualitativeorquantitative)oftheoverallsafetysystem
(d)ananalysisshowingthemaximumpressurethatcanresultfromeachofthescenarios
ASMESectionVIIIUG135 There shall be no intervening stop valves betweenvessel anditspressure relief deviceor devices, orbetween the
(d)(1),(d)(2)andAppendixM pressure reliefdeviceordevicesandthepointitdischarge,except:(1)when thesestopvalvesaresoconstructedor
positively controlled that theclosing o f t h e m a x i m u m n umberofblockvalves possible at one time will not


2016aeSolutions GrattanandNichols Jan28,2016
TAMUInstrumentationSymposium Page20

reduce thepressurerelievingcapacityprovidedbytheunaffectedpressurereliefdevicesbelowtherequired
relievingcapacityor(2)underconditionssetforthinAppendixM.
ASMESectionVIIIUG135(b) (b)(1)Theopeningthroughallpipe,fittings,andnonreclosingpressurereliefdevices(ifinstalled)betweena
(1) pressurevesselanditspressurereliefvalveshallhaveatleasttheareaofthepressurereliefvalveinlet.The
characteristicsofthisupstreamsystemshallbesuchthatthepressuredropwillnotreducetherelieving
capacitybelowthatrequiredoradverselyaffecttheproperoperationofthepressurereliefvalve.
ASMESectionVIIIUG135(a) (a)Pressurereliefdevicesintendedforreliefofcompressiblefluidsshallbeconnectedtothevesselinthe
vaporspaceaboveanycontainedliquidortopipingconnectedtothevaporspaceinthevesselwhichistobe
protected.Pressurereliefdevicesintendedforreliefofliquidsshallbeconnectedbelowtheliquidlevel
Alternativeconnectionlocationsarepermitted,dependingonthepotentialvesseloverpressurescenarios
andthetypeofreliefdeviceselected,providedtherequirementsofUG125(a)(2)andUG125(c)aremet.
ASMESectionVIIIUG127(b) (4) thespacebetweenarupturediskdeviceanda pressurereliefvalve shall be provided with a pressuregage,
(4) atry cock,freevent,orsuitabletelltaleindicator.Thisarrangement permits detectionofdiskrupture or leakage.
API5216.3 6.3Atmosphericdischarge.Thedecisiontodischargehydrocarbonsorotherflammableorhazardous
vaporstotheatmosphererequirescarefulattentiontoensurethatdisposalcanbeaccomplishedwithout
creatingapotentialhazardorcausingotherproblems,suchastheformationofflammablemixturesatgrade
leveloronelevatedstructures,exposureofpersonneltotoxicvaporsorcorrosivechemicals,ignitionofrelief
streamsatthepointofemission,excessivenoiselevelsandairpollution
ASMESectionVIIIUG135(f) (f) Dischargelinesfrompressurereliefdevicesshallbedesignedtofacilitateshallbefittedwithdrains
topreventliquidformlodgingonthedischargeofthepressurereliefdeviceandsuchlinesshalllead
toasafeplaceofdischarge.
29CFR1910.106(b)(4)(ii) "Vents."Ventsfortanksinsideofbuildingsshallbeasprovidedinsubparagraphs(2)(iv),(v),(vi)(b),and
(3)(iv)ofthisparagraph,exceptthatemergencyventingbytheuseofweakroofseamsontanksshallnotbe
permitted.Ventsshalldischargevaporsoutsidethebuildings.
NFPA302.3.4.6.1 2.3.4.6.1 Ventsfor tanks inside tank buildings shallbedesigned to ensure that vapors are
not released inside thebuilding.
ASMESectionVIIIUG133(d) (d) Heat exchangers andsimilarvesselsshall be protectedwith a pressure relief device of sufficient capacityto
avoid overpressure in case of an internal failure.