0% found this document useful (0 votes)
226 views

Aconex PDF

Mr. Charles Edwards of Balmond Studio in Colombo initiated a workflow transmitting a method statement for review regarding the installation of a sewer diversion pumping line for the Keells City Waterfront Integrated Resort project. The document, titled "Method Statement for sewer diversion pumping line installation" revision 0 dated 24/06/2014, was attached for approval by Mr. Epa Kapila of Mechanical services consultant, with a note requesting he coordinate his response with Mr. Shiromal Fernando of CSE Consultants. The transmission was also sent to multiple parties involved in the project for awareness.
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
226 views

Aconex PDF

Mr. Charles Edwards of Balmond Studio in Colombo initiated a workflow transmitting a method statement for review regarding the installation of a sewer diversion pumping line for the Keells City Waterfront Integrated Resort project. The document, titled "Method Statement for sewer diversion pumping line installation" revision 0 dated 24/06/2014, was attached for approval by Mr. Epa Kapila of Mechanical services consultant, with a note requesting he coordinate his response with Mr. Shiromal Fernando of CSE Consultants. The transmission was also sent to multiple parties involved in the project for awareness.
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

6/27/2014 Aconex

Thread
Thread Mail No Type Subject From Recipients Status Date

BSC- Workflow (WF-000066) Method Statements HKN-MST- Mr Charles Mr Epa Kapila - N/A 24/06/2014
WTRAN- Transmittal ME-0002 Method Statement for sew er Edw ards - Balmond Mechanical
000080 diversion pumping line installation Studio - Colombo services consultant

Keells City Waterfront Integrated Resort


Naw aloka Construction Office, 2nd Floor
No.130, Glennie Street
Colombo
02 Sri Lanka

Workflow Transmittal BSC-WTRAN-000080


To Mr Epa Kapila - Mechanical services consultant
Cc (6) Mr Renato Bastos - Ado da Fonseca - Engenheiros Consultores, Lda
Mr Peter Mcdonald - Balmond Studio - Colombo
Janaka Ruw anpathirana - Balmond Studio - Colombo
Mr Shiromal Fernando - CSE Consultants
Mr Dilina Hettiarachchi - CSE Consultants
Mr Mohammed Harithkhan Vatharkhan - Mechanical services consultant
From Mr Charles Edw ards - Balmond Studio - Colombo
Sent Tuesday, 24 June 2014 10:54:26 AM BST (GMT +01:00)
Reason Issued for Review
Attribute 1 Project Wide
Attribute 2 CN-Construction
CU-Civil & Utilities
ME-Mechanical
Status N/A
Subject (WF-000066) Method Statements HKN-MST-ME-0002 Method Statement for sew er diversion pumping line
installation

Docum ent Attachm ents (1)

Update Register View Attachm ent Properties Actions Dow nload Files

Revision Date For


File Document No Revision Title Status
Date Review

HKN-MST-ME- 0 24/06/2014 Method Statement for sew er diversion pumping line For
0002 installation Approval

Workflow Initiated - Action Required


The attached documents are part of the "Method Statements HKN-MST-ME-0002 Method Statement for sew er diversion pumping line
installation" w orkflow .

Workflow Note
Method statement for review .

Directed at Kapila as Mechanical, can you coordinate your response as required w ith Shiromal please.

This mail was automatically generated.

https://uk1.aconex.co.uk/Logon 1/2
6/27/2014 Aconex

Refer To Mail No From From Organization Subject

https://uk1.aconex.co.uk/Logon 2/2

You might also like