Floor Loads: Project Date Apr-04 Description Seismic Analysis of Structure by Thomas S. CHKD

This document summarizes the seismic analysis of a structure. It includes: 1) Floor loads for the roof, second floor, and first floor. 2) Calculation of the seismic base shear of 6575 kN using equations from EBCS 8 standards. 3) Distribution of the 327.65 kN base shear to each floor based on floor weight and height, with 10.08 kN assigned to the roof floor.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
16 views

Floor Loads: Project Date Apr-04 Description Seismic Analysis of Structure by Thomas S. CHKD

This document summarizes the seismic analysis of a structure. It includes: 1) Floor loads for the roof, second floor, and first floor. 2) Calculation of the seismic base shear of 6575 kN using equations from EBCS 8 standards. 3) Distribution of the 327.65 kN base shear to each floor based on floor weight and height, with 10.08 kN assigned to the roof floor.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 10

Project EEPCO District Office Addis Ababa Date Apr-04

Description Seismic Analysis of Structure By Thomas S.


Chkd

FLOOR LOADS
ROOF FLOOR
WR 519 KN
X - BAR 16.99 m
Y - BAR 7.55 m
SECOND FLOOR
W10 3015
X - BAR 17.45 TOTAL LOAD FOR
Y - BAR 6.28 SEISMIC BASE SHEAR
FIRST FLOOR = 6575.00 KN
W9 3041
X - BAR 17.56
Y - BAR 5.71

-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
NATIONAL CONSULTANTS TEL. 510544 FAX 514933
Project EEPCO District Office Addis Ababa Date Apr-04
Description Seismic Analysis of Structure By Thomas S.
Chkd

CALCULATE SEISMIC BASE SHEAR

Fb =
Sd(T1)W [EBCS 8 - 2.3.3.2.2]

W= 6575.00 KN
Sd(T1) = a b g [EBCS 8 - 1.4.2.2]
a = a oI [EBCS 8 - 1.4.2.2]
I = 1.0 [EBCS 8 - TABLE 2.4]
ao= 0.05 [EBCS 8 - TABLE 1.1]

a = 0.05

b = 1.2S <= 2.5 [EBCS 8 - 1.4.2.2]


T2/3
S= 1.2 [EBCS 8 - TABLE 1.2]
C
T= 1H3/4
[EBCS 8 - 2.3.3.2.2]
H= 10.56 m
C1 = 0.075

T = 0.44

b = 2.49 use 2.49

g = goKDKRKw <= 0.7 [EBCS 8 - 3.3.2.1]


go = 0.2
KD = 2
KR = 1
Kw = 1

g = 0.4 use 0.4

Sd(T1) = 0.0498333

Fb = 327.654 KN

-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
NATIONAL CONSULTANTS TEL. 510544 FAX 514933
Project EEPCO District Office Addis Ababa Date Apr-04
Description Seismic Analysis of Structure By Thomas S.
Chkd

* For Distribution of base shear to upper floor in accordance with:- EBCS 8, 2.3.3.2.3

Fb =
Fb + 0.07T1 Fb Equation 2.6

-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
NATIONAL CONSULTANTS TEL. 510544 FAX 514933
Project EEPCO District Office Addis Ababa Date Apr-04
Description Seismic Analysis of Structure By Thomas S.
Chkd

DISTRIBUTE BASE SHEAR TO THE FLOORS

ROOF - FLOOR 10.56

( F bt ) W i hi
Fi = n
W j hj
j=1

Ft =0. 07 T 1 Fb
T 1= 0.44 sec
Fb= 327.65 KN

= 10.08

W i= 519
hi = 10.56
W1 = 3041
h1 = 3.52
W2 = 3015
hhi =
2
= 7.04
W3 = 3041
h3 = 3.52
W4 = 3015
h4= 7.04
Wr = 519
hr = 10.56

= n KN
W j h j= 37410.56
j=1

56.60

-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
NATIONAL CONSULTANTS TEL. 510544 FAX 514933
Project EEPCO District Office Addis Ababa Date Apr-04
Description Seismic Analysis of Structure By Thomas S.
Chkd

DISTRIBUTE BASE SHEAR TO THE FLOORS


2nd FLOOR

( F b F t ) W i hi
Fi = n 7.04
W jh j
j=1

Ft =0. 07 T 1 Fb
sec
KN

T 1= 0.44
Fb= 327.65

= 10.08

W i= 519
hi = 7.04
W1 = 3041
h1 = 3.52
W2 = 3015
hhi =
2
= 7.04
W3 = 3041
h3 = 3.52
W4 = 3015
h4= 7.04
= Wr = 519 KN
hr = 10.56

n
W j h j= #REF!
j=1

#REF!

-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
NATIONAL CONSULTANTS TEL. 510544 FAX 514933
Project EEPCO District Office Addis Ababa Date Apr-04
Description Seismic Analysis of Structure By Thomas S.
Chkd

DISTRIBUTE BASE SHEAR TO THE FLOORS


1st FLOOR

( F b F t ) W i hi
Fi = n
W jh j
j=1

Ft =0. 07 T 1 Fb 3.52

sec
KN

T 1= 0.44
Fb= 327.65

= 10.08

W i= 519
hi = 3.52
W1 = 3041
h1 = 3.52
W2 = 3015
hh=
2
=
i
7.04
= W3 = 3041
h3 = 3.52
W4 = 3015
h4= 7.04
Wr = 519
hr = 10.56

n
W j h j=
j=1

#REF!

-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
NATIONAL CONSULTANTS TEL. 510544 FAX 514933
Project EEPCO District Office Addis Ababa Date Apr-04
Description Seismic Analysis of Structure By Thomas S.
Chkd

DISTRIBUTE BASE SHEAR TO THE FLOORS


2nd FLOOR

( F b F t ) W i hi
Fi = n 7.04
W jh j
j=1

Ft =0. 07 T 1 Fb
sec
KN

T 1= 0.44
327.65
Fb=
= 10.08

W i= 519
hi = 7.04
W1 = 3041
h1 = 3.52
W2 = 3015
hhi =
2
= 7.04
W3 = 3041
h3 = 3.52
W4 = 3015
h4= 7.04
= Wr = 519 KN
hr = 10.56

n
W j h j= #REF!
j=1

#REF!

-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
NATIONAL CONSULTANTS TEL. 510544 FAX 514933
Project EEPCO District Office Addis Ababa Date Apr-04
Description Seismic Analysis of Structure By Thomas S.
Chkd

DISTRIBUTE BASE SHEAR TO THE FLOORS


2nd FLOOR

( F b F t ) W i hi
Fi = n 7.04
W jh j
j=1

Ft =0. 07 T 1 Fb
sec
KN

T 1= 0.44
327.65
Fb=
= 10.08

W i= 519
hi = 7.04
W1 = 3041
h1 = 3.52
W2 = 3015
hhi =
2
= 7.04
W3 = 3041
h3 = 3.52
W4 = 3015
h4= 7.04
= Wr = 519 KN
hr = 10.56

n
W j h j= #REF!
j=1

#REF!

-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
NATIONAL CONSULTANTS TEL. 510544 FAX 514933
Project EEPCO District Office Addis Ababa Date Apr-04
Description Seismic Analysis of Structure By Thomas S.
Chkd

DISTRIBUTE BASE SHEAR TO THE FLOORS


2nd FLOOR

( F b F t ) W i hi
Fi = n 7.04
W jh j
j=1

Ft =0. 07 T 1 Fb
sec
KN

T 1= 0.44
327.65
Fb=
= 10.08

W i= 519
hi = 7.04
W1 = 3041
h1 = 3.52
W2 = 3015
hhi =
2
= 7.04
W3 = 3041
h3 = 3.52
W4 = 3015
h4= 7.04
= Wr = 519 KN
hr = 10.56

n
W j h j= #REF!
j=1

#REF!

-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
NATIONAL CONSULTANTS TEL. 510544 FAX 514933
Project EEPCO District Office Addis Ababa Date Apr-04
Description Seismic Analysis of Structure By Thomas S.
Chkd

DISTRIBUTE BASE SHEAR TO THE FLOORS

ROOF - FLOOR 10.56

( F bt ) W i hi
Fi = n
W j hj
j=1

Ft =0. 07 T 1 Fb
T 1= 0.44 sec
Fb= 327.65 KN

= 10.08

W i= 519
hi = 10.56
W1 = 3041
h1 = 3.52
W2 = 3015
hhi =
2
= 7.04
W3 = 3041
h3 = 3.52
W4 = 3015
h4= 7.04
Wr = 519
hr = 10.56

= n KN
W j h j= 37410.56
j=1

56.60

-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
NATIONAL CONSULTANTS TEL. 510544 FAX 514933