5.1 AASHTO and DPWH Design of Rigid Pavements
5.1 AASHTO and DPWH Design of Rigid Pavements
Time required to
drain the
base/subbase layer
Step 1 to 50% saturation.
1.25-1.20
Step 2
Reliability
Since ESAL values are dependent on growth rate
factors which may not be accurate reliability needs
to be measured.