Material Inspection Check-List

The document is a material inspection check-list for a construction project. It lists 8 activities to check that received materials meet specifications, such as verifying materials are undamaged, from approved suppliers, and stored properly. The checklist was completed, verified, and the materials are ready for inspection.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
1K views

Material Inspection Check-List

The document is a material inspection check-list for a construction project. It lists 8 activities to check that received materials meet specifications, such as verifying materials are undamaged, from approved suppliers, and stored properly. The checklist was completed, verified, and the materials are ready for inspection.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

MATERIAL INSPECTION CHECK-LIST

LOCATION: Contract No:

GRID REFERENCE:

DRAWING NO:

REFERENCE IRE NO:

REFERENCE ITP NO: Q11017-0100D-LPS-STA-PK2-QMS-ITP-00002

Accepted
S.No. Activities Remarks
YES NO
A. Material Checks
1 Ensure that the received materials are free from physical damage.
Verify that the delivered materials are matching with the delivery
2
note.
Check that the delivered materials are from the approved
3
manufacturer.
Ensure that the delivered materials are as per approved material
4 submittal approval and material data sheet
Verify the Packing list, bill of lading and Country of Origin Certificate
5
for the delivered material.
Ensure the availability of the Test certificates for the delivered
6
materials.
Verify that material delivered on site are new & bearing complete
7
identification as per specification and approved sample.
Ensure that delivered materials are stored in appropriate area as per
8
manufacturer recommendation.

REMARKS:

ALL ABOVE ACTIVITES CHECKED, VERIFIED AND READY FOR INSPECTION

ORGANIZATION L&P JV GSIC JV KEO


NAME
SIGNATURE
DATE
Doc No: Q11017-0100D-LPS-GEN-PKS-QMS-FRM-00003