0% found this document useful (0 votes)
71 views

MOS For Below Grade Surfaces of Conc. Footing

This document provides a method of statement for applying damp proofing to below grade surfaces of concrete footings, foundations, and an underground proposed masonry wall. It involves preparing the surfaces, applying a primer coat and two coats of an emulsified asphalt damp proofing at a rate of 1.33 liters per square meter with drying time between coats, following manufacturer precautions.

Uploaded by

Mostafa Elkadi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
71 views

MOS For Below Grade Surfaces of Conc. Footing

This document provides a method of statement for applying damp proofing to below grade surfaces of concrete footings, foundations, and an underground proposed masonry wall. It involves preparing the surfaces, applying a primer coat and two coats of an emulsified asphalt damp proofing at a rate of 1.33 liters per square meter with drying time between coats, following manufacturer precautions.

Uploaded by

Mostafa Elkadi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 2

METHOD OF STATEMENT

FOR BELOW GRADE SURFACES


OF CONCRETE FOOTING &
UNDERGROUND PROPOSED
MASONRY WALL

METHOD OF STATEMENT
FOR BELOW GRADE SURFACES
OF CONCRETE FOOTING &
UNDERGROUND PROPOSED
MASONRY WALL

Summary: This Method of Statement includes applied emulsified asphalt


damp proofing applied on:

I. Below grade surface of concrete footings foundation and columns.


II. Exterior below grade surface of concrete foundation walls.
III. Backside of concrete and masonry retaining walls below grade.

1. Preparation
A. Protection of other work: mask and protect adjoining exposed
surfaces from being stained, spotted or coated with damp

MOS for Below Grade Surfaces of Concrete Footing & Underground Proposed Masonry Wall
Page 1 of 2
proofing. Prevent damp proofing materials from entering and
clogging weep holes and drain.
Clean substrates of projections using electric grinder and chisel (if
required) and substances detrimental to work, fill voids, with subject
to approved materials. Ensure that, the first coat is allowed to dry.
B. Follow the prime material manufacturers recommendations.

2. Material for Application

Aquashield BX Ref. Transmittal # C-0130

Application of Damp Proofing Materials

1. Prepare porous surfaces by priming with Aquashield diluted


50:50 with water. Using brush, allow to dry 24 hours before
application of first coating.
2. First coat of the damp proof will be applied on the surface of
the concrete structures by brush in the rate of 1.33 lit./m2 and
secured for 24 hours to dry.
3. second coat will be applied on the first coat surface by the
1.33 lit./m2 and then be secured for 24 hours.

4. Protection and Safety Precautions:

A. Contractor will take necessary health and safety precautions.


B. Follow the manufacturers recommendation regarding handling
and storage.
C. Material delivery notifications shall be submitted for each
package.