This document outlines the submission schedule and requirements for an architectural design project at Amity School of Architecture and Planning. It includes 6 stages of submission: 1) library/site analysis due August 5th, 2) case study due August 12th, 3) time problem I due August 17th, 4) concept and area program due August 24th, 5) preliminary design development in two parts due September 7th and 28th, and 6) final submission with model due October 19th and 26th. Each submission must include specific deliverables such as site analyses, case study details, plans, sections, and models.

Uploaded by

adityagoel314
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
33 views

V Sem - Major Design

This document outlines the submission schedule and requirements for an architectural design project at Amity School of Architecture and Planning. It includes 6 stages of submission: 1) library/site analysis due August 5th, 2) case study due August 12th, 3) time problem I due August 17th, 4) concept and area program due August 24th, 5) preliminary design development in two parts due September 7th and 28th, and 6) final submission with model due October 19th and 26th. Each submission must include specific deliverables such as site analyses, case study details, plans, sections, and models.

Uploaded by

adityagoel314
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 3

AMITY SCHOOL OF ARCHITECTURE AND PLANNING

Semester : V Session : JUL-NOV 2015


ARCHITECTURAL DESIGN
Total : marks
Project Brief :

Submission Schedule :

1. Library/Lit. Study and Site Analysis:


Date of Submission: 05-08-2015.

• Location, distances from important nodal points

• Site in relation to the surrounding

• Accessibility

• Topography, surface drainage

• Vegetation type and pattern

• Soil type, moisture content, water table etc

• Climatic analysis: Solar radiation, ambient temperature, air temperature, relative


humidity, precipitation, wind movement, sky condition

• Imageability and visual analysis of natural and man made elements in and around the
site.

• area analysis with respect to area requirements

• understanding site requirements.

• Circulation pattern, movement network, parking

• Building services, other infrastructures

• Landscaping.

2. Case Study:
Date of Submission: 12-08-2015.
• Introduction

• Reason for being selected as case study


• Project detail

• Concept, design criteria

• Location, distances from important nodal points

• Access, orientation

• Site level zoning, built –open spaces, functional organization of spaces

• Building Orientation, Plan form

• Plan, elevation, sections

• Circulation pattern, movement network, parking

• Building services, other infrastructures

• Landscaping

• Roof form, building material, color and other special feature etc

• Inference

3. Time problem I Date of Submission: 17-08-2015

4. Concept & Area programme:


Date of Submission: 24-80-2015

• Concept with clear representations

• Formulation of Concept & area programme

• Bubble diagram

• Site plan & Zoning Plan

• Circulation & movement pattern


5. DESIGN DEVELOPMENT -Preliminary Submission:
Date of Submission: (DD I) 07-09-2015
• Single line/basic plan, elevation etc

: (DD II) 28-09-2015


• Site plan

• Plans, Sections, Elevations, 3D drawings and other related drawings

• Model

• Parking

• Services

6. Time problem II Date of Submission: as required.

6. Final Submission with model


Date of Submission:
Pre-final stage -19-10-2015