0% found this document useful (0 votes)
424 views

Inspection Report For Raw Mill's Internal Parts.: Objective

An inspection report of a raw mill's internal parts found that a 1.5m section of a dam ring segment had fallen down, rubber seals on rollers were worn out, the nozzle ring showed excessive wear, and there was oil leakage at a roller hub. The report recommended installing the fallen dam ring segment, installing new rubber seals, repairing the worn nozzle ring, and addressing the oil leakage at the roller hub.

Uploaded by

Mahmoud Hanafy
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
424 views

Inspection Report For Raw Mill's Internal Parts.: Objective

An inspection report of a raw mill's internal parts found that a 1.5m section of a dam ring segment had fallen down, rubber seals on rollers were worn out, the nozzle ring showed excessive wear, and there was oil leakage at a roller hub. The report recommended installing the fallen dam ring segment, installing new rubber seals, repairing the worn nozzle ring, and addressing the oil leakage at the roller hub.

Uploaded by

Mahmoud Hanafy
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

PM Department

Mahmoud Hanafy
22, December,2017

Objective:
Inspection report for raw mill’s internal parts.
Findings:
1- Part of the modified dam ring segment has fallen down (approximately 1.5 m long).

2- Rubber seals for rollers are worn out.

Page 1|3
PM Department

3- Excessive Wear in the Nozzle ring.

4- Oil leakage at the roller hub.

Page 2|3
PM Department

Recommendations:
1- Install the fallen 1.5 dam ring segment.
2- Install new rubber seals.
3- Repair the worn-out nozzle ring.

Page 3|3