0% found this document useful (0 votes)
82 views

New Formate For Review

This document provides production details for multiple part numbers, including cycle times, machine specifications, operators, and quality control parameters. It lists the main stages of production such as drawing, vibro-finishing, rust protection, and packaging. Production details include part-specific information like operation type, die height, and inspection criteria. Quality control involves visual and dimensional inspections with specific acceptance criteria.

Uploaded by

dharmesh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
82 views

New Formate For Review

This document provides production details for multiple part numbers, including cycle times, machine specifications, operators, and quality control parameters. It lists the main stages of production such as drawing, vibro-finishing, rust protection, and packaging. Production details include part-specific information like operation type, die height, and inspection criteria. Quality control involves visual and dimensional inspections with specific acceptance criteria.

Uploaded by

dharmesh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 12

Updation Date 17.02.

2017 M022
3
Stages Cycle Time M/C M/P Perameter

(1)OPERATION TYPE:
SPM=22 250T 1-Operator
Progressive SemiAuto(F)
Nos(11*2) -SEYI & 1-Helper
(2)Shut Height : 349.9 mm
M020
Updation Date 17.02.2017 lower
4
Muffler
M020 CHILD PARTS
5
Stages Cycle Time M/C M/P Perameter
Pcs/Min :32 (1)Operation Type : Semi-Auto
L: 110T- 1-Operator (2)Die Height : 324.7 mm
Progressive
M: AIDA & 1-Helper (3)Pitch Setting Feeder:
U: 66.90mm

100% Visual
Inspection

Pakaging
Updation Date 03.02.2017 M020 AIR
7 EXCTRACTOR
Stages Cycle Time M/C M/P Perameter
Pcs/Min :07
L: AIDA:1 1-Operator (1)Operation Type : Manual
Compound
M: 10T & 1-Helper (2)Die Height : 340 mm
U:

120-130/
Oiling 2-Helper Rust Guard P201
40Sec

Visual+ 100 1st: 100Nos in PVC bag and


Weighting+ Nos/2.5- 1 Helper than
Pakaging 3Min 2ed: (100*3)3 PVC bag in Box
Updation Date 03.02.2017 HONDA
M0119 FLANGE

Stages Cycle Time M/C M/P Perameter


(1)Operation Type : Semi-Auto
110T- 1-Operator (2)Die Height : 324.7 mm
Progressive Pcs/Min :35
AIDA & 1-Helper (3)Pitch Setting Feeder:
66.90mm

(1)Total Cycle Time: 35+15=50


Min
Vibro- 50 Min/
2-Helper (2)Compound: Glidol DX1
Finishing 1000 Nos
(3)Max No. of Qty.: 1000 Nos
(4) Water:Chemical Ratio: 97:3

Rust guard
2-Helper
P201

Oiling

Gauge
checking
16Nos / Min 1 Helper
100% From
Side & Lug

Visual
Inspection

Packing
Updation Date 03.02.2017 BAJAJ
M0169 FLANGE

Stages Cycle Time M/C M/P Perameter

Pcs/Min :25 (1)Operation Type : SemiAuto


L: 250T- 1-Operator (F)
Progressive
M: SEW & 1-Helper (2)Die Height : 723.5 mm
U: (3)Pitch Setting Feeder: 74mm

(1)Total Cycle Time: 34 Min


(2)M/c Time : 25 Min
(3)Loading Time: 1.5-2 Min
Vibro- 40 Min/ 1
1-Operator (4)Unloading Time: 6-7 Min
Finishing Lot
(5)Compound: Glidol DX1
(6)Max No. of Qty.: 200-250
Nos

Rust guard 6-7 Min/


P201 200-250 No

2-Helper

3-4 Min/
Oiling 200-250 Exxsol + Ferrocot
Nos

(1) 2400/5(ok)-15 Nos


(line mark,Dent markl)
Visual 1 min/13-14
1 Helper (2) 50 Nos Rework
Inspection Nos
(due to without vibro & Rust)
etc…

Packing
Updation Date:12.02.2017 BASE
M0201 FOOT
Stages Cycle Time M/C M/P Perameter

(1)Operation Type : SemiAuto


Pcs/Min :
(F)
32
110T- (2)Die Height : 335.8 mm
Progressive L: 1-Operator
AIDA (3)Pitch Setting Feeder: 59.80
M:
mm
U:
(4) Air Spray Provisson on Press

Filing/ SPM=16(F)
1-Operator
papering SPM=20(P)

Pcs/ty:45/lo
Vibro- (1)Total Cycle Time: 45
t
Finishing + 2-Helper Min(Auto)
Auto in c&c
Dryer (3)Max No. of Qty.: 2000-2100
vibrator

651/12 (ok)=08 Nos (not ok)


Dimple dent on w/p and Cut out
Visual 1 Min/20- 2-
Remarks: Some Time
Inspection 22 Nos Inspector
Vibrofinish are not done
Properly So Rework is Apply

Pakaging
Updation Date:13.02.2017 M0135 HONDA
M0158 SUPPORT
Stages Cycle Time M/C M/P Perameter
(1)Operation Type : SemiAuto
Pcs/Min :
(F)
25
250T 1-Operator (2)Die Height : 712.5 mm
Progressive L:
SEW 1-Helper (3)Pitch Setting Feeder:
M:
42.70 mm(Actual:43)
U:

Pcs/Min :
13
80T (1)Operation Type : Manual
Hole Piercing L: 1-Operator
SEYI (2)Die Height : 277.6 mm
M:
U:
Pcs/Min :
50
1 mm Profile
L: 1-Helper
Gauge
M:
U:

(1)Slot pokating Filling :


Pcs/Min : 8
-14 Nos /Minute (for 1 Side)
L:
100% Filing 4 Nos -There Are 2 Side available
M:
(2min = 14 Nos)
U:
(2)Outer filing=12Nos/Minute

Pcs/ Min:32
200-
Vibro- 250Nos
vibro
Finishing L:2 Min
M: 25 Min
U:5 Min
1-Operator
+
2 Min/ 200- 1-Helper
250Nos
Rust Guard
L:
P201
M:
U:

Exxsol TM 80 &
1-1.20 Min /
Oiling Exxsol TM 80 + Ferrocote
200-250Nos
5856
100% Visual
1 Min/7 Nos
Inspection
1-Helper
14 Nos /
Punching Due to hole Missing
Minute
Pakaging
Updation Date:16.01.2017
M0008 Seal

Stages Cycle Time M/C M/P Perameter

Pcs/Min :
(1)Operation Type : SemiAuto(F)
13
250T 1-Operator (2)Die Height : 378 mm
Draw L:
SEYI 1-Helper (3)HOS: 3.90-3.94Kg/cm2
M:
(4)Pitch Setting Feeder: 260mm
U:

Pcs/Min :
12
(1)Operation Type : Manual
SEMIDRAW L: 160T 1-Operator
(2)Die Height : 441.7 mm
M:
U:
Pcs/Min : 8
(1)Operation Type : Manual
L: 1-Operator
STAMPING 80T (2)Die Height : 308.9 mm
M: 1-Helper
(3)Storage: Chute Available
U:

Pcs/Min : 8
L: 100T- Manual
BENDING 1-Operator
M: Godrej -there is No Any Detail Available
U:

Pcs/Min:02 (1)RPM: 250


L: (2)Tail stock Pressure: 35-40
Facing CNC 1-Operator
M: kg/cm2
U: (3)Feed: 0.12 mm/Rev

Pcs/Min:12
L: 110T- 1-Operator (1)Operation Type : Manual
SIZING
M: Aida 1-Helper (2)Die Height : 293.7mm
U:

100% OD
1 Min/18 Nos 1-Helper
CHECKING

3-4 Min/ Exxsol TM 80 &


Oiling 1-Helper
70-80 Nos Exxsol TM 80 + Ferrocote 5856

100% Visual
1 Min/16 Nos 1-Helper
Inspection
Pakaging
Updation Date:16.02.2017
M0211PIPE BUSH

Stages Cycle Time M/C M/P Perameter


(1)Operation Type : Manual
(2)Die Height : 363 mm
Pcs/Min : 250T 1-Operator
Progressive (3)HOS: 3.93 Kg/cm3
9 SEYI 1-Helper
(4)Storage: Trolly in Proper
Way

30 Min/ Lot (1)M/c Time: 20 Min


Vibro- -150-200 (2)Loading Time: 2-3 Min
vibro 1-Operator
Finishing Qty (3)Unloading Time: 6-7 Min

3 -3.5 Min/
Rust Guard-
150-200 Tank 1-Helper
P201
Nos (1)Operation Type : Manual
(2)Die Height : 444.8 mm
(3)Crusion Pressure: 2.17
Kg/cm2
(4)Balancer Press:
Round Pcs/Min: 160T
1-Operator 3.70Kg/cm2
Forming 9 SEYI
(5)Clutch Pressure:5.02
kg/cm2
(6)HOS: 3.66 Kg/cm2
(7)Storage: Trolly in Proper
Way
(1)Operation Type : Manual
(2)Die Height : 347 mm
Sizing & (3)Crusion Pressure: 2.0
Pcs/Min: 110T 1-Operator
Tuf drawn Kg/cm2
11 AIDA 1-Helper
oiling 100% (4)Balancer Pressure: N.A
(5)Clutch Pressure: 4.5-5 Mpa
(6) Oil: Tufdraw 1730R

(1)RPM: 350
(2)Chuck Press:10 kg/cm2
Chemfering 2 Nos/30 s (3)Gauge Pressure :36 Kg/cm2
CNC 1-Operator
-CNC 1 Nos /40 s
(4)Tail stock Pressure: N.A
(5)Feed:

(1) Loading Time: 50 sec


75-80
Oiling Tank- 1-Helper (2)Dipping Time: 20Sec
Nos/100Sec
(3) Unloading Time: 30 Sec

100% ID Remarks:
5 Nos /
Gauge Visual 1-Helper
Minute
Cheaking
Height Remarks:
1 Nos / 3 Sec 1-Helper
Checking

100% Visual 07 Nos /


Inspection Minute
Pakaging