1.0 Introduction:
This design note pertains design calculations for checking the adequacy of members of
main truss and launching nose during the stages of launching.Launching operation is
devided into stages for the movement of main truss and launching nose (LN)
50% design wind is considered during launching operation of truss and LN as launching is propos
calm wind condition.
Leeward frame:
Frame spacing ratio 6.55 / 11.35
Shielding factor for multiple frame
(table 29 IS:875 part 3)
Force coefficient Cf 1.7 x 0.7
Wind pressure 1.19 x 71
Wind load during operation to be considered 50% of the above load as the
launching operation will be done during moderate / calm wind condition.
The launching scheme is analysed and designed in STAADpro as givn in subsequent pages.
The design results for stage -7 are given below for maximum cantilever, the design is checked for
all the stages but only utilisation ratio in graphical from is produced for the design check of LN.
Members of main truss are checked for maximun cantilever which is a crical case. The design res
for main truss are not produced as they are not critical for the other stages.
Front Rear
Front Rear
Truss Position End End
End (m) End (m) (mm) (mm)
WIND LOADS)
062-2011
nt
rs etc. in staad input
es)
q.m
Nos. Total Area
1 75.065
1 51.664
8 53.2
13 91
2 20.32
291.249 m2
= 851.687 m2
= 0.3420
= 1.7
= 120.7 kg/m2
121 kg/m2
= 0.58
= 0.7
= 1.19
= 84.49 kg/m2
= 84 kg/m3
= 0.121 MT/m
= 0.097 MT/m
= 0.084 MT/m
= 0.060 MT/m
= 0.097 MT/m
= 0.084 MT/m
= 0.068 MT/m
= 0.059 MT/m
= 0.042 MT/m
= 0.068 MT/m
= 0.078 MT/m 0.03923
= 0.030 MT/m 0.01513
= 0.020 MT/m 0.00992
= 0.020 MT/m 0.00992
ecked for
k of LN.
esign results
Annexure - 1.
REACTIONS ON NODES(
T1 T2 T3 T4
114.749 65.629
131.737 75.852
107.484
125.561
31.869
51.161
40.916
59.753
65.007 89.446 131.737 125.561
34.447 56.471 60.047 31.869
Wind
S ON NODES(MT) direction Total Reaction
T5 T6/P1 T7 T8 T9/P2
wind ward
53.801 9.413 side
675.077
Lee ward
67.997 10.1 side
wind ward
68.297 15.175 side
675.046
675.046
Lee ward
83.215 16.454 side
wind ward
65.305 37.814 side
674.924
Lee ward
79.122 43.377 side
wind ward
66.344 27.845 6.558 side
674.921
79.965 34.079 6.903 Lee ward side
wind ward
61.416 50.916 15.713 side
674.924
Lee ward
71.733 69.756 17.423 side
wind ward
61.535 66.411 72.992 side
674.924
Lee ward
72.412 79.586 88.943 side
wind ward
57.873 63.937 154.742 side
674.922
Lee ward
68.619 74.869 171.852 side
wind ward
60.81 65.876 126.916 13.905 side
674.924
71.158 76.367 144.071 15.152 Lee ward side
wind ward
85.743 71.75 126.075 24.854
side
674.923
Lee ward
106.806 85.677 146.367 27.651 side
wind ward
34.24 65.041 102.209 106.933 side
674.926
Lee ward
49.765 75.349 114.784 126.605 side
wind ward
35.36 65.728 103.738 96.069 7.526 side
674.921
Lee ward
50.811 75.974 116.16 115.435 8.12 side
wind ward
145.17 144.982 side
634.137
Lee ward
171.859 172.126 side