0% found this document useful (0 votes)
303 views

Insp Checklist - Piping Alignment

This document is a checklist for inspecting the final alignment of a pump and driver at a Saudi Aramco facility. It lists acceptance criteria for general requirements like ensuring there is no soft foot and the equipment can turn freely. Data on the alignment must be recorded. Dowels must be provided to fasten the pump and drive components to the baseplate. Pipes and conduits must be attached and strain checks performed according to manufacturer procedures. The alignment must be within tolerances both before and after attaching pipes and conduits. Reference documents include standards on centrifugal pumps and machinery installation. The contractor, Saudi Aramco representatives, and QC personnel must sign off that the work passes inspection.

Uploaded by

esutjiadi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
303 views

Insp Checklist - Piping Alignment

This document is a checklist for inspecting the final alignment of a pump and driver at a Saudi Aramco facility. It lists acceptance criteria for general requirements like ensuring there is no soft foot and the equipment can turn freely. Data on the alignment must be recorded. Dowels must be provided to fasten the pump and drive components to the baseplate. Pipes and conduits must be attached and strain checks performed according to manufacturer procedures. The alignment must be within tolerances both before and after attaching pipes and conduits. Reference documents include standards on centrifugal pumps and machinery installation. The contractor, Saudi Aramco representatives, and QC personnel must sign off that the work passes inspection.

Uploaded by

esutjiadi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

SAUDI ARAMCO ID/PID - 2/19/05 - REV 0 (Standards Cutoff - August 2004)

SAIC NUMBER DATE APPROVED QR NUMBER


SAUDI ARAMCO INSPECTION CHECKLIST
Final Alignment of Pump & Driver SAIC-G-2022 25-May-05 MECH-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.

LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.

SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?

SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.

A. General Requirements

Soft foot check is done with piping disconnected on each equipment foot. API 686,
A1 Note: Maximum permissible movement is 0.05 millimeter (2 mils) at each Chapter 7,
foot, or as specified by Manufacturer. Para. 5.4.4.1
API 686,
A2 Fixed and movable equipment shall be free to turn. Chapter 7,
Para. 5.4.4.1
Data of alignment are recorded in SATR-G-2004 or approved equivalent
A3 Contractor QP
alignment form.
Provisions are made for doweling the pump and drive components to the
31-SAMMS-004,
A4 baseplate. Note: Dowels are furnished by the Vendor, but installed in the
Para. 3.3.21
field at the time of final alignment.
For all pumps, 3 mm (1/8 in) thick stainless steel shim packs shall be 31-SAMMS-004,
A5
furnished. Para. 3.3.4
API 686,
The maximum allowable number of shims under any equipment support
A6 Chapter 7,
foot is five.
Para. 5.4.2.1
API 686,
Alignment is within the Manufacturer's tolerances before pipes and
A7 Chapter 7,
conduit attached.
Para. 5.4.5
API 686,
Pipe strain checks have been made in accordance with the
A8 Chapter 7,
manufacturer's procedures.
Para. 5.4.5
API 686,
Alignment is within the Manufacturer's tolerances after pipes and conduit
A9 Chapter 7,
attached.
Para. 5.4.5
REMARKS:

REFERENCE DOCUMENTS:
1. 31-SAMSS-004, Centrifugal Pumps, (30 September, 2003)
2. API 686, Recommended Practice for Machinery Installation and Installation Design, (First Edition, April 1996)

Contractor / Third-Party Saudi Aramco


Construction Representative* PMT Representative
Work is Complete and Ready for Inspection: T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Inspector PID Representative


Performed Inspection Work / Rework May Proceed T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Supervisor Proponent and Others


Quality Record Approved: T&I Witnessed QC Record Reviewed Work Verified
Name, Organization,
Name, Sign and Date:
Initials and Date:

*Person Responsible for Completion of Quality Work / Test Y = YES N = NO F = FAILED