API 5L Inspection Report
API 5L Inspection Report
2013 Page 1 of 11
1
CUSTOMER DATA MI DATA
1.0 ATTENDEES
APPROVAL
DOCUMENT NO. REVISION TITLE
STATUS
MI-1220-01 07Jul2008
Ref SOP 1220
INSPECTION REPORT 1
(continuation page)
Page 2 of 6
SUMMARY REPORT
th
API 5L-2012 45 Edition Specification for Line Pipe Yes
13YFS92-A 30/05/2013 Purchase order Yes
HL-ITP-13YFS92-A-FBE 0 Inspection and test plan Yes
HL-ITP-13YFS92-A-IL 0 Inspection and test plan Yes
ITP
ITP ACTIVITY DESCRIPTION ITEMS RESULTS CLAUSE
LINE NO.
6.1.1 During this visit, MI inspector reviewed raw material test certificates and found it acceptable.
SUMMARY REPORT
b. MI inspector performed the visual inspection for welding seam and surface at random, no defects were
found.
c. MI inspector randomly checked the dimension of length, OD, Wall thickness, ovality and bevel angle,
found the results were acceptable as per PO and API 5L. The inspect pipe tracing No is 1167480,
1165780, 1167140, 1167360.
d. MI inspector verified the marking on the pipe surface, and label on the pipes, found the information were
acceptable.
b. Checked the expiration date and lot No for the coating material, and recorded it, the results were
acceptable.
c. Witnessed the pipe temperature prior to coat FBE, the results in accordance with manufacturer’s
recommendations (not exceed 260℃).
MI-1220-01 07Jul2008
Ref SOP 1220
INSPECTION REPORT 1
(continuation page)
Page 4 of 6
SUMMARY REPORT
a. Witnessed the adhesion inspection on the pipe’s end surface for one point, found the method and
results were acceptable accordance with the requirement AS 3862 Appendix J of rating ≤2.
6.3 Photos
MI-1220-01 07Jul2008
Ref SOP 1220
INSPECTION REPORT 1
(continuation page)
Page 5 of 6
SUMMARY REPORT
MI-1220-01 07Jul2008
Ref SOP 1220
INSPECTION REPORT 1
(continuation page)
Page 6 of 6
SUMMARY REPORT
MI-1220-01 07Jul2008
Ref SOP 1220
INSPECTION REPORT 1
(continuation page)
Page 7 of 6
SUMMARY REPORT
MI-1220-01 07Jul2008
Ref SOP 1220
INSPECTION REPORT 1
(continuation page)
Page 8 of 6
SUMMARY REPORT
MI-1220-01 07Jul2008
Ref SOP 1220
INSPECTION REPORT 1
(continuation page)
Page 9 of 6
SUMMARY REPORT
MI-1220-01 07Jul2008
Ref SOP 1220
INSPECTION REPORT 1
(continuation page)
Page 10 of 6
SUMMARY REPORT
Pipe No Results (µm) Pipe No Results (µm)
1166070 558, 570, 683, 725, 655, 672 1166790 728, 584, 519, 600, 560, 652
1167600 468, 513, 626, 616, 549, 631 1166480 538, 543, 471, 496, 416, 502,
1166440 980, 904, 815, 914, 728, 798 1167250 662, 778, 681, 689, 522, 521, 738
1167100 715, 797, 735, 697, 729, 540, 824 1167530 913, 701, 868, 869, 1030, 611, 849
1166390 848, 740, 991, 887, 813, 755, 730 1165270 736, 642, 848, 1080, 688, 897, 927
1166990 493, 660, 631, 810, 794, 722, 643 1166160 718, 614, 657, 655, 669, 563, 598
1165330 823, 772, 779, 621, 674, 641, 749 1167610 617, 700, 685, 635, 600, 581, 671
1167740 956, 882, 1030, 892, 920 938, 908
6.6 Photos
MI-1220-01 07Jul2008
Ref SOP 1220
INSPECTION REPORT 1
(continuation page)
Page 11 of 6
SUMMARY REPORT
MI-1220-01 07Jul2008
Ref SOP 1220
INSPECTION REPORT 1
(continuation page)
Page 12 of 6
SUMMARY REPORT
MI-1220-01 07Jul2008
Ref SOP 1220
INSPECTION REPORT 1
(continuation page)
Page 13 of 6
SUMMARY REPORT
Internal coating were found on the external surface Clean the surface
(Atomization)
SUMMARY REPORT
When MI inspector arrived at the coating mill, 267 pieces of OD323.9mm x WT6.4mm external and
internal coated pipes were stacked orderly at the storage. Every three pipes are fastened together
into one bundle with packaging belt. And every pipe is evenly tied up with six safety ropes and
capped at both ends.
Total 267 joints OD323.9mmxWT6.4mm pipes (overall length 3155.36m) were loaded into 7
containers as scheduled. The coating applicator utilized frame crane with nylon belts to lift the
pipes, every lift carrying 2 bundles of 6 pipes. Before loading the pipes, 9 poly woods were laid at
internal bottom and both sides of the container against any sliding, scratching and other damage
probability. The top of container was covered with tarpaulins and supported with 20 beams.
Below is the detailed storage info of 7 containers, for more details see the pictures attached.
2.0 Photographs
MI-1220-01 07Jul2008
Ref SOP 1220
INSPECTION REPORT 1
(continuation page)
Page 15 of 6
SUMMARY REPORT
Pipes stacked at the storage yard Safety ropes and nylon belts on pipes
MI-1220-01 07Jul2008
Ref SOP 1220
INSPECTION REPORT 1
(continuation page)
Page 16 of 6
SUMMARY REPORT
Loading pipes to the container Workers passing the steel beams for top-supporting
Workers tying up the waterproof tarpaulin The outcome after everything done
3.0 NON-CONFORMANCES
N/A
MI-1220-01 07Jul2008
Ref SOP 1220