Checking For Sewerpipe at PH 2

The document discusses checking the capacity of existing sewer mains and pump sumps under Phase 1 and 2 of a construction project. It analyzes the pipe diameters, slopes, flow rates and pumping capacities to determine if they can adequately handle the projected populations.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
84 views

Checking For Sewerpipe at PH 2

The document discusses checking the capacity of existing sewer mains and pump sumps under Phase 1 and 2 of a construction project. It analyzes the pipe diameters, slopes, flow rates and pumping capacities to determine if they can adequately handle the projected populations.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 3

Checking for sewer main and pump sump constructed under Ph 2 along Jln Tun Hussien Onn

Highway and Taman


1) Catchment I + H (Taman Puteri sewer area)
PE = 10,082
Peak flow = 4.7 x (PE/1000)-0.11 x 225 x PE l/day
= 8,268,694.24 l/day
q= 5.74 m3/min
q= 0.10 m3/s

Existing sewer main,


size , d = 0.35 m ===> 14 inches
slope, s= 0.006

Use nomograph,
Vfull = 1.2 m/s ( 3.94 ft/s)
Qfull = 0.12 m3/s ( 4.23 ft3/s)

q/Q full = 0.80 (if q/Q full >= 1.08, the gradient and/or size of sewer is to be increased)

0.35 m dia. sewer at a gradient of 0.006 shall be able to cater for 10,082 PE

2) Catchment I + H + G + F + E (Tun Hussein Onn road area, sewer main)


PE = 16071
Peak flow = 4.7 x (PE/1000)-0.11 x 225 x PE l/day
= 12,521,563.44 l/day
q= 8.70 m3/min
q= 0.14 m3/s

Existing sewer main,


size , d = 0.45 m ===> 18 inches
slope, s= 0.003

Use nomograph,
Vfull = 0.98 m/s ( 3.21 ft/s)
Qfull = 0.16 m3/s ( 5.65 ft3/s)

q/Q full = 0.91


v/Vfull = 1.13
v = 1.11 m/s >0.8 m/s
<4 m/s

0.45 m dia. sewer at a gradient of 0.003 shall be able to cater for 16,071 PE

Check for Pump Sump capacity under Ph. 1


1) Check for PS1
PE = 1264 (Yan Min & Sample Park Ph 1 & 2)
1825 (Taman Terus)
3089

Qav = new PE x 225 l/day


= 695,025.00 l/day
= 8.04 l/sec

Page 1
Qfull = 4.7 x (PE/1000)-0.11 x 225 x PE
= 2,885,481.63 l/day
= 33.40 l/sec

Existing PS1, L = 3 m
W= 3 m
D= 0.5 m
Volume = 4.5 m3
= 4500 litres
Pumping rate = 16.8 l/sec

Pump cycle time at Qav ,

T = Volume/Qav + Volume/(pumping rate-Qav)


= 1,073.35 sec
= 17.89 mins

No. of start per hour = 60/T


= 3.35 times

2) Check for PS3


PE = 26249 PE
Qav = PE x 225 l/day
= 5,906,025.00 l/day
= 68.36 l/sec

Qfull = 4.7 x (PE/1000)-0.11 x 225 x PE


= 19,377,187.20 l/day
= 224.27 l/sec

Existing PS3, L = 5 m
W = 4 m
D = 0.4 m
Volume = 8 m3
= 8000 litres
Pumping rate = 103.1 l/sec

Pump cycle time at Qav ,


T = Volume/Qav + Volume/(pumping rate-Qav)
= 347.29 sec
= 5.79 mins

No. of start per hour = 60/T


= 10.37 times

3) Check for PS4


PE = 16071 PE

Qav = PE x 225 l/day


= 3,615,975.00 l/day
= 41.85 l/sec

Page 2
Qfull = 4.7 x (PE/1000)-0.11 x 225 x PE
= 12,521,563.44 l/day
= 144.93 l/sec

Existing PS3, L = 5 m
W = 4 m
D = 0.5 m
Volume = 10 m3
= 10000 litres
Pumping rate = 103.1 l/sec

Pump cycle time at Qav ,


T = Volume/Qav + Volume/(pumping rate-Qav)
= 402.21 sec
= 6.70 mins

No. of start per hour = 60/T


= 8.95 times

4) Checking for 250mm DICL pipe after PS1(gravity flow)


Qav = 8.04 l/sec ( 0.008 m3/min)
Qpeak = 33.4 l/sec ( 0.03 m3/min) =q

S = 0.005
Dia. of pipe= 250 mm ( 10 inches)

From nomograph,
Vfull = 0.89 m/s
Qfull = 0.044 m3/min

q/Qfull = 0.75 => v/Vfull = 1.08


v = Vfull x 1.08
= 0.96 m/s >0.8 m/s
< 4 m/s
===>OK