0% found this document useful (0 votes)
1K views

02 Boq Ground Floor Super Structure

The document is a bill of quantities for construction work that includes estimates for concrete work, reinforcement, formwork, masonry work, floor finishes, painting, and doors and windows. It provides itemized descriptions, units, quantities, rates, and total amounts for each part of the super structure of the building. The total estimated cost for the super structure is over 2.3 million and the overall total cost of the construction project is estimated to be nearly 3 million.

Uploaded by

kavish malaka
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
1K views

02 Boq Ground Floor Super Structure

The document is a bill of quantities for construction work that includes estimates for concrete work, reinforcement, formwork, masonry work, floor finishes, painting, and doors and windows. It provides itemized descriptions, units, quantities, rates, and total amounts for each part of the super structure of the building. The total estimated cost for the super structure is over 2.3 million and the overall total cost of the construction project is estimated to be nearly 3 million.

Uploaded by

kavish malaka
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 4

C - SUPER STRUCTURE Page-05

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

C-1 CONCRETING WORK


1.-1 1:2:4 (3/4") column shaft up to slab Cube 1.13 35435.00 40041.55

1.-2 1:2:4 (3/4") RCC beam Cube 1.80 35435.00 63783.00

1.-3 1:2:4 (3/4") slab (Not exceeding 0'-5" ) Cube 7.14 35435.00 253005.90

1.-4 1:2:4(3/4") concreting work for stair case Item 1.00 35000.00 35000.00

Total Carried to summary 391830.45

C-2 REINFORCEMENT ORK


2.-1 in 9"x9" column sharfts Kg 160 135.00 21600.00
2.-2 beam in floor slabs Kg 600 135.00 81,000.00
2.-3 Slab Kg 1400 135.00 189,000.00

Total Carried to summary 291,600.00

C-3 FORMWORK
3.-1 For sides of columns Sqrs 5.61 8,049.00 45154.89
3.-2 For side of beams Sqrs 7.21 8,049.00 58033.29
3.-3 For sides and soffit of slab Sqrs 17.13 8,049.00 137879.37

Total Carried to summary 241067.55

C-4 MASONARY WORK


4.-1 Brick work for walls Sqrs 18.15 16000.00 290400.00
4.-2 5/8" thick masonry cement plaster finish smooth
with lime putty in all internal walls including reveals Sqrs 22.3 7200.00 160560.00
4.-3 5/8" thick masonry cement plaster finish smooth
with lime putty in soffit of slab Sqrs 17.13 7200.00 123336.00

Total Carried to summary 574296.00

C-5 FLOOR FINISHES


5.-1 16"x12" non-slip floor tiles to complete with the bedding
& finished with cement grout to match the colour
including skirting at only main building area
Sqrs 7.26 24875.00 180592.50
5.-2 2" Thick cement Rendering for rooms floor area
3 Sqrs 8.6 11665.00 100435.65
Total Carried to summary 281028.15

Page -06
ITEM DESCRIPTION UNIT QTY RATE AMOUNT

C-6 PAINTING
6.-1 Applying two coat of filler and tow coat of emulsion
paint on all internal surfaces of the wall Sqrs 11.15 4900.00 54635.00

6.-2 Applying two coat of filler and tow coat of emulsion


paint to slab soffit Sqrs 17.13 4900.00 83937.00

6.-3 Applying one coat of filler and tow coat of wether gurd
paint to all external walls Sqrs 11.15 5400.00 60210.00

Total Carried to summary 198782.00

C-7 DOOR AND WINDOWS

7.-1 8'x4' Panel door Item 1 84000.00 84000.00


7.-2 8'X7' Foldering Door Item 1 36600.00 36600.00
7.-3 3'x7' Wooden Door Item 2 19500.00 39000.00
7.-4 2'6"x 7' Panel door Item 1 22600.00 22600.00
7.-5 5'-6"x6'-10" French windows Item 2 34650.00 69300.00
7.-6 8'-0"x4'-0" casement window Item 1 30400.00 30400.00
7.-7 8'-0"x 8'6" Windows Item 1 52000.00 52000.00
7.-8 3'-7"x 6'-10" Fitglass Panel Item 1 18400.00 18400.00
7.-9 2'-0"x 3'-0" glazed fanlight Item 1 5200.00 5200.00

Total Carried to summary 357500.00


SUMMARY OF BOQ
C SUPER STRUCTURE
C-1 CONCRETING WORK 391,830.45
C-2 REINFORCEMENT ORK 291,600.00
C-3 FORMWORK 241,067.55
C-4 MASONARY WORK 574,296.00
C-5 FLOOR FINISHES 281,028.15
C-6 PAINTING 198,782.00
C-7 DOOR AND WINDOWS 332,500.00

Total Of Ground Floor - Super Structure 2,311,104.15

Sub structure total 633,804.92

Super structure total 2,311,104.15

TOTAL COST FOR THE CONSTRUCTION 2,944,909.07