Quotation For Demolition of Sedimentation Basin

The document is a proposal from a contractor to Maynilad Water Services for demolition works of existing concrete launders at the La Mesa Water Treatment Plant 1 Improvement Works project located at La Mesa Dam in Novaliches, Quezon City. The contractor will provide manpower, tools, equipment and trucks to demolish the concrete launders over 12 days for a contract amount of PHP 12,345,960. The terms include scaffolding and electricity provided by the client, a fixed lump sum rate, and work commencing within 3 days of receiving notice to proceed and a 30% down payment.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
1K views

Quotation For Demolition of Sedimentation Basin

The document is a proposal from a contractor to Maynilad Water Services for demolition works of existing concrete launders at the La Mesa Water Treatment Plant 1 Improvement Works project located at La Mesa Dam in Novaliches, Quezon City. The contractor will provide manpower, tools, equipment and trucks to demolish the concrete launders over 12 days for a contract amount of PHP 12,345,960. The terms include scaffolding and electricity provided by the client, a fixed lump sum rate, and work commencing within 3 days of receiving notice to proceed and a 30% down payment.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Project : Design and Construction of La Mesa Water Treatment Plant 1 Improvement

Works
Location : La Mesa Dam, Novaliches, Quezon City
Client : Maynilad Water Services, Inc.
Subject : Demolition Works of Existing Concrete Launders

DEAR SIR,
In relation to the above mentioned subject project, I have the honor to submit our
proposal for the demolition works of existing concrete launders, supplying our Manpower,
tools, equipment, trucks for hauling and supervision for the satisfactory completion of the said
project as per on site discussion under the following terms and conditions:

BILL OF QUANTITIES FOR DEMOLITION WORK AT SEDIMENTATION BASIN

DURATION OF WORK: Twelve (12) days in one Sedimentation Basin.


CONTRACT AMOUNT: Twelve Million Three Hundred Forty Five Thousand Nine Hundred Sixty Pesos
( PHP 12,345,960.00 )
TERMS AND CONDITIONS:
1. Scaffoldings and electricity shall be provided by SCIC
2. Unit rate shall be fixed and lump sum, and shall not be adjusted for whatsoever
reasons, and shall be valid within the subcontract duration including extension of time
3. Unit rate shall be inclusive of consumables, tools, manpower and others as necessary
to complete demolition works.
4. Works will commence only within 3 days upon receipt of Notice to proceed and 30%
Down Payment for the total of.

Thank you very much for this wonderful opportunity and looking forward for positive response
on this matter.