Notice of Completion (Steel Parking)

The document is a notice of completion from Sta. Maria Industrial Park Corporation for the renovation and upgrading of the Ramcar Steel Parking project located on Marathon Street in Diliman, Quezon City. It states that construction was completed as of January 31, 2016. The scope of work included fabrication and erection of structural steel, repainting of the existing parking steel area, addition of a third floor level with structural steel and painting works, and additional installation of angle bars. The notice certifies that workmanship is guaranteed for any defects for 3 months from the completion date.

Uploaded by

Froilan Espinosa
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
55 views1 page

Notice of Completion (Steel Parking)

The document is a notice of completion from Sta. Maria Industrial Park Corporation for the renovation and upgrading of the Ramcar Steel Parking project located on Marathon Street in Diliman, Quezon City. It states that construction was completed as of January 31, 2016. The scope of work included fabrication and erection of structural steel, repainting of the existing parking steel area, addition of a third floor level with structural steel and painting works, and additional installation of angle bars. The notice certifies that workmanship is guaranteed for any defects for 3 months from the completion date.

Uploaded by

Froilan Espinosa
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 1

STA.

MARIA INDUSTRIAL PARK CORPORATION


BRGY. BULAC, STA. MARIA, BULACAN
Telefax : (044) 641-0868

NOTICE OF COMPLETION

PROJECT : RENOVATION & UPGRADING OF RAMCAR STEEL PARKING


LOCATION : Marathon Street, Diliman Quezon City

Dear Sir / Ma’am,


We are hereby pleased to inform you that construction of said project has been
completed as of January 31, 2016
Scope of Work:
No. Description
A. FABRICATION & ERECTION OF STRUCTURAL STEEL

1. Site Works

2. Earth Works

3. Civil Works

4. Structural & Steel Works

5. Painting Works

B. REPAINTING OF EXISTING PARKING STEEL AREA

C. ADDITIONAL THIRD FLOOR LEVEL

1. Structural Steel Works

2. Painting Works

D. ADDITIONAL WORKS
Installation of Angle Bar 1/8”x1”x1” for steel panel @ driveway (grid A-B), ramp up
1.
& down (2nd level)

This is to certify that workmanship is guaranteed for any defect on period of 3 months
from date of completion.

Thank You Very Much.

Froilan F. Espinosa
Sta. Maria Industrial Park Corp.

Conformed:

______________________________ ____________
Signature over Printed Name Date