0% found this document useful (0 votes)
38 views36 pages

12 FC

This document contains details of a 10.5 cubic meter dumper body including: 1) Core team members and plant/approval details. 2) Characteristics of sheets used including length, width, thickness and paint details. 3) Process details for operations like shearing, blanking, piercing, nibbling and folding. 4) Assembly details for floor, side boards and head board including dimensions of various parts.

Uploaded by

Sridharan Venkat
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
38 views36 pages

12 FC

This document contains details of a 10.5 cubic meter dumper body including: 1) Core team members and plant/approval details. 2) Characteristics of sheets used including length, width, thickness and paint details. 3) Process details for operations like shearing, blanking, piercing, nibbling and folding. 4) Assembly details for floor, side boards and head board including dimensions of various parts.

Uploaded by

Sridharan Venkat
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 36

Proto type Pre-launch Production Core team: K. Sridhar, N. Sridaran, V. Sridharan, l..Kamalakannan, M.

Karthikeyan,R

- - a Plant Approval / Date:

Part Name: 10.5 cum Other Approval / Date:

Drg. / Part No: A0Y07400PH31 / PH52 Key Contact Name: Mr. S.Sekar - VP

Drg. / Issue Level : # Key Contact Phone : 9940161963

Characteristics

Part / Process Process Name /


M/C Device No.
Number Operation Description
Sl.No Product Process

1 Sheets _

2 Sheet length _

3 Sheet width _

10 Incoming _ 4 Sheet thk _

5 Paint colour _
Part / Process Process Name /
10 Incoming M/C Device
_ No.
Number Operation Description
Sl.No Product Process

6 Paint supply viscosity _

7 Components & Trim items _

_
Shearing Shearing 1 Length x width x thk
_

Blanking Shearing 2 Length x width x thk _

Hole I.D _
Piercing Piercing tool 3
Distance of holes _

_
Nibbling Nibbling machine 4 Nibbling
_
20

_
Web length x flange height
Folding Press brake 5
Holle referance
_
Part / Process Process Name / M/C Device No.
Number Operation Description Web length x flange height
Folding Press brake Sl.No
5 Product Process
Holle referance

Notching Notching tool 7 Length x width _

Corner shearing _
Corner shearing 8 Length x width
tool

1 Floor length _

2 Floor width _

3 _

4 _

5 _

6 _
Floor 'X' member intermediate distance
7 _

8 _

9 _

Floor Assy Assy Fixture


30
Floor 'X' member intermediate distance

Part / Process Process Name / M/C Device No.


Number Operation Description
Sl.No Product Process

10 _
Floor Assy Assy Fixture
30

11 Floor long member length _

12 Floor long member width _

13 long member front tapper cutting dimension _

14 Rear hinge stiffner from backup plate inner _

15 Rear overhang _

16 Floor long member length _

15 Floor long member width _

16 Side plate to rear hinge center distance _

Reinforcement profile plate length from _


17
back up plate

18 Rear hinge inner center distance _

1 No of child parts _
Part / Process Process Name / M/C Device No.
Number Operation Description
Sl.No Product Process

1 Side board length _

2 Side board width _

Side board assy Assy Fixture 3 Top rail distance _

4 _

5 Centre stiffener intermediate distane _

6 _
40

7 Tarpaulin hook dist. From handle & Top rail _

8 _
Tarpaulin hook distance
9 _

1st ladder pipe dist. from side board bottom _


10

2nd ladder pipe dist. from 1st ladder pipe _


11

12 Handle dist. from front vr. stiffener _


Part / Process Process Name / M/C Device No.
Number Operation Description
Sl.No Product Process

1 Head board lower plate width x height _

2 Head board upper plate width x height _

3 Canopy plate _

Assy Fixture 4 Front 'Y' stiffener inner dist. at top _


50

5 Front 'Y' stiffener inner dist. at bottom _

7 Canopy Stiff. distance _

8 Wheel choke mtg brkt distance _

Tail door sheet width _


2

3 Tail door sheet height _

4 Tail door Horiz. & Vert. column _

Tail door setting & _


Assy Fixture 5 Tail door width
60

welding

Tail door height _


6
Part / Process Process
Tail Name /&
door setting
M/C Device
Assy No.
Fixture

60
Number Operation Description
welding
Sl.No Product Process

7 Tail door 'U' bend _

Tail door plate at bottom sq. tube _


8

1 Sub frame folded channel _

2 Length _

_
3 Cross bearer distance
_

_
Sub frame setting &
Assy Fixture
70

welding
4 Sub frame support plate-5nos. distance _

_
Sub frame setting &
Assy Fixture

70
Part / Process welding
Process Name / M/C Device No. 4 Sub frame support plate-5nos. distance
Number Operation Description
Sl.No Product Process

5 Sub frame Width _

6 Pivot length _

7 Prop to rear hinge centre distance _

8 Prop mtg brkt distance _

9 Front Body Guide Position _

1 sub assembly _

2 i) Lux level _
Shot blasting
80

Shot blasting
booth
3 ii) Blasting distance _

4 iii ) air pressure _

1 Polyester putty & Sealant application _

2 Emery dressing(Buffing) _

Painting booth &


90

primer Painting
spray gun
Part / Process Process Name / M/C Device No.
Number Operation Description
Sl.No Product Process

Primer paint _
3
Painting booth & i )Paint viscosity
90

primer Painting
spray gun
4 ii) Spraying distance _

5 iii ) Spraying air pressure _

6 Inspection _

1 Body interior length _

2 Body interior width _

3 Body interior height _


Cubing Assy Fixture
4 Front board board angle _

Tail door height from back up plate bottom _

Tail door setting _

Secondry lock brkt setting _


100

_
Part / Process Process Name / M/C Device No.
Number Operation Description
Sl.No Product Process

100

1 Rear cleat plate distance _

2 Middle cleat plate distance _

3 Front cleat plate distance _

Mounting Chassis frame 4 Pivot mtg brkt 2 dist. (LH/RH) _

5 Pivot mtg brkt 1 dist. _

6 Gap b/w Pivot top& bottom brkt _

7 cleat plate hole offset _

Polyester putty & Sealant application (If _


1
any)

2 Emery dressing (Buffing ) _

Painting booth &


110

Final Painting 3 Finish paint i )Paint viscosity _


spray gun

6 Inspection _

7 Coating thickness _
Part / Process Process Name / M/C Device No.
Number Operation Description
Sl.No Product Process

1 Electrical _

2 Wiring harness routing _


120

PDI - 3 Tipping operation _

4 Mudguard ,suppresor _

5 Reflecting , AL sticker _

1 Body cleaning _

2 Loose components packing _


130

Dispatch Hydra

3 Body loading _

Note1: All Dimension are in mm


Note 2: I - Inspector, O - Operator, C – Captain
Note 3: D – Reject the Lot & Inform Supplier For Necessary action
E – Stop & Segregate
F – Stop & Correct the Process.Raise INCR
G -- Stop & Segregate Move Rework Material for Non Conformance area
H – Hold the lot, Segregate / Reject, Inform Customer
Part / Process Process Name / M/C Device No.
Number Operation Description
Sl.No Product Process

R – Stop & Replace & Inform Supervisor for necessary action


Note 4 : FOA - First Off Approval , LOA - Last Off Approval , FIR - Final Inspection Report , DIR - Defect Intimation Report, INCR - Internal Non Conforman
Note 5 : During FOA, LOA stage 3 nos should be recorded in Inprocess check Sheet. Check 3 nos during Patrol Inspection and record 1 no in Inprocess ch

Prepared by: V. Sridharan Checked By : N. Sridharan


Date : 30.12.2017
* DIMENSIONS NOT LISTED ARE NOT CHECKED AS THEY ARE BEING CONTROLLED BY THE TOOLS. TOOLS ARE CERTIFIED BY TOOL ROOM / QUALITY .
· IN FINAL INSPECTION ONLY 5 REDINGS RECORDED.
AUTOMOTIVE COACHES & COMPONENTS LTD

CONTROL PLAN

Control Plan No : QA/CAB/CP/01


kannan, M. Karthikeyan,R. Selvakumar, V.Sundarajan, Mohan Rev No : 03

Date (Orig) : 03.07.2015 Rev Date : 20.12.2017

Customer Engg Approval / Date : Issue Date : 20.12.2017

Customer Quality Approval / Date :

Other Approval / Date :

istics Methods

Special chara. class Specification Evaluation Measurement Technique Error Proofing Maintenance SampleSize

_ Against Specified grade TC _ _ 1

_ As per PO Measuring tape _ _ 1

_ As per PO Measuring tape _ _ 1

_ As per PO Micrometer _ _ 1

_ Paint shade Master sample _ _ 1


Special chara. class Specification Evaluation Measurement Technique Error Proofing Maintenance SampleSize

_ 45±10 secs B4 Cup _ _ 1

_ As per IPS Measuring tape/Micrometer/vernier _ _ 1

_ As specified in drawing Measuring tape _ _ 1

_ No shearing burr Visual _ _ 1

_ As specified in drawing Measuring tape _ _ 1

_ As specified in drawing Vernier _ _ 1

_ As specified in drawing Measuring tape _ _ 1

_ As specified in drawing Template _ _ 1

_ No cutting burr Visual _ _ 1

_ As specified in drawing Measuring tape _ _ 1

_ No crack in bend line Visual _ _ 1

_ Squre / angle Visual _ _ 1


Special chara. class Specification Evaluation Measurement Technique Error Proofing Maintenance SampleSize

_ No tool mark Visual _ _ 1

_ As specified in drawing Measuring tape _ _ 1

_ As specified in drawing Measuring tape _ _ 1

_ 3368mm Measuring tape _ _ 1

_ 2328mm Measuring tape _ _ 1

_ 295mm Measuring tape _ _ 1

_ 722mm Measuring tape _ _ 1

_ 1150mm Measuring tape _ _ 1

_ 1566mm Measuring tape _ _ 1

_ 1983mm Measuring tape _ _ 1

_ 2400mm Measuring tape _ _ 1

_ 2831mm Measuring tape _ _ 1


Special chara. class Specification Evaluation Measurement Technique Error Proofing Maintenance SampleSize

_ 3262mm Measuring tape _ _ 1

_ 3420mm Measuring tape _ _ 1

_ 846mm Measuring tape _ _ 1

_ 17 mm \ 16° Measuring tape _ _ 1

_ 5 mm Measuring tape _ _ 1

_ 335 ± 1mm Measuring tape _ _ 1

_ 4365mm Measuring tape _ _ 1

_ 846mm Measuring tape _ _ 1

_ 1551 ± 1mm Measuring tape _ _ 1

_ 1150 mm Measuring tape _ _ 1

_ Measuring tape _ _ 1

_ 07 Nos. Measuring tape _ _ 1


Special chara. class Specification Evaluation Measurement Technique Error Proofing Maintenance SampleSize

_ 3827mm Measuring tape _ _ 1

_ 1479mm Measuring tape _ _ 1

_ 24mm Measuring tape _ _ 1

_ 619mm Measuring tape _ _ 1

_ 1816mm Measuring tape _ _ 1

_ 3010mm Measuring tape _ _ 1

_ 260 x 145mm TYP Measuring tape _ _ 1

_ 1060mm Measuring tape _ _ 1

_ 1210mm Measuring tape _ _ 1

_ 300mm Measuring tape _ _ 1

_ 400mm Measuring tape _ _ 1

_ 775mm Measuring tape _ _ 1


Special chara. class Specification Evaluation Measurement Technique Error Proofing Maintenance SampleSize

_ 2328 x 1500 x 4 mm Measuring tape _ _ All

_ 2328 x 356 x 4 mm Measuring tape _ _ All

_ 2328 x 279mm Measuring tape _ _ All

_ 270mm Measuring tape _ _ All

_ 686mm Measuring tape _ _ All

_ 740mm Measuring tape _ _ All

_ 175 x 233mm Visual _ _ All

_ 2236mm Measuring tape _ _ All

_ 1150mm Measuring tape _ _ All

_ 80 x 80 x 4mm thk 80 x 80 _ _
vernier & micro meter All
x 6mm thk

_ 2396mm Measuring tape _ _ All

_ 1310mm Measuring tape _ _ All


Special chara. class Specification Evaluation Measurement Technique Error Proofing Maintenance SampleSize

_ 1198 x 50mm Measuring tape _ _ All

_ 10mm Measuring tape _ _ All

_ 200 x 85 X5mm Measuring tape _ _ All

_ 3777mm Measuring tape _ _ All

_ 1112mm Measuring tape _ _ All

_ 1917mm Measuring tape _ _ All

_ 2627mm Measuring tape _ _ All

_ 3507mm Measuring tape _ _ All

_ 406mm Measuring tape _ _ All

_ 395mm Measuring tape _ _ All

_ 610mm Measuring tape _ _ All

_ 1160mm Measuring tape _ _ All


Special chara. class Specification Evaluation Measurement Technique Error Proofing Maintenance SampleSize

_ 1000mm Measuring tape _ _ All

_ 864 mm Measuring tape _ _ All

_ 3498 ±2 mm Measuring tape _ _ All

_ 166 x 125mm Measuring tape _ _ All

_ 490 x 96mm Measuring tape _ _ All

_ 1090 x 120 mm Measuring tape _ _ All

_ G 18 grid RA gauge _ _ All

_ 800 lux Lux meter _ _ 1

_ 1 feet Visual _ _ All

_ 6 bar Pr. Gauge _ _ All

_ Grinding marks, Hammer mark _ _


Visual All
putty & Joint sealant application

_ 180 Grade/320Grade Visual _ _ All


Special chara. class Specification Evaluation Measurement Technique Error Proofing Maintenance SampleSize

_ 20 - 22 sec Stop watch _ _ All

_ 9 to 12 inch Visual _ _ All

_ 30 to 50 PSI Pr. Gauge _ _ All

_ With out Paint defect Visual _ _ All

_ 3610mm Measuring tape _ _ All

_ 2328 mm Measuring tape _ _ All

_ 1288 mm Measuring tape _ _ All

_ 70° Measuring tape _ _ All

_ 47 mm Measuring tape _ _ All

_ No offset visual _ _ All

_ Measuring tape _ _ All

_ Measuring tape _ _ All


Special chara. class Specification Evaluation Measurement Technique Error Proofing Maintenance SampleSize

_ 165mm Measuring tape _ _ All

_ 1672mm Measuring tape _ _ All

_ 2415mm Measuring tape _ _ All

_ 2957 / 3142 mm Measuring tape _ _ All

_ 3607mm Inclinometer _ _ All

_ 5mm Inclinometer _ _ All

_ Mtg pin Poke yoke _ _ All

_ Grinding marks, Hammer mark _ _


Visual All
putty & Joint sealant application

_ 320 Grade Visual _ _ All

_ 20 - 22 sec Stop watch _ _ All

_ With out Paint defect Visual _ _ All

_ 60 - 80 microns Coating thickness gauge _ _ All


Special chara. class Specification Evaluation Measurement Technique Error Proofing Maintenance SampleSize

_ All electrical items should work Electrical test _ _ All

_ As per ESK Visual _ _ All

_ Free movement Power pack _ _ All

_ Full tight Spanner _ _ All

_ As per ESK Visual _ _ All

_ No dust Visual _ _ All

_ Covered by polythene cover Visual _ _ All

_ As per TPH _ _ All


Special chara. class Specification Evaluation Measurement Technique Error Proofing Maintenance SampleSize

Internal Non Conformance Report , IIR - Incoming Inspection Report


cord 1 no in Inprocess check Sheet.

: N. Sridharan
Rev Date : 20.12.2017

Issue Date : 20.12.2017

Methods

Reaction Plan / Corrective


Freq. Control Method Resp.
Action

Per lot

Per lot

Per lot

Per lot Incoming inp. Checklist D I

Per lot
Incoming inp. Checklist D I
Reaction Plan / Corrective
Freq. Control Method Resp.
Action

Per lot

Per lot

per hour

per hour

per hour

per hour I

per hour

per hour

First off/Inprocess insp.


per hour
report

per hour

per hour

per hour
Reaction Plan / Corrective
Freq. Control Method Resp.
Action

per hour

per hour

per hour

1no/Shift

1no/Shift

1no/Shift

1no/Shift

1no/Shift

1no/Shift

1no/Shift

1no/Shift

1no/Shift

First off/Inprocess insp.


report
Reaction Plan / Corrective
Freq. Control Method Resp.
Action

1no/Shift
First off/Inprocess insp.
report
1no/Shift

1no/Shift

1no/Shift

1no/Shift

1no/Shift

1no/Shift

1no/Shift

1no/Shift

1no/Shift

1no/Shift

1no/Shift
Reaction Plan / Corrective
Freq. Control Method Resp.
Action

1no/Shift

1no/Shift

1no/Shift

1no/Shift

1no/Shift

First off/Inprocess insp.


1no/Shift
report

1no/Shift

1no/Shift

1no/Shift

1no/Shift

1no/Shift

1no/Shift
Reaction Plan / Corrective
Freq. Control Method Resp.
Action

1no/Shift

1no/Shift

1no/Shift

First off/Inprocess insp.


1no/Shift
report

1no/Shift

1no/Shift

1no/Shift

1no/Shift

1no/Shift

1no/Shift

First off/Inprocess insp.


1no/Shift
report

1no/Shift
First off/Inprocess insp.
report Reaction Plan / Corrective
Freq. Control Method Resp.
Action

1no/Shift

1no/Shift

1no/Shift

1no/Shift

1no/Shift

1no/Shift

1no/Shift

1no/Shift

1no/Shift

1no/Shift
First off/Inprocess insp.
report
1no/Shift

1no/Shift
First off/Inprocess insp.
report
Reaction Plan / Corrective
Freq. Control Method Resp.
Action

1no/Shift

1no/Shift

1no/Shift

1no/Shift

1no/Shift

1no/Shift

100%

100%
Inspection Check list
100%

100%

1no/Shift

1no/Shift

Inspection Check list


Reaction Plan / Corrective
Freq. Control Method Resp.
Action

1no/Shift
Inspection Check list
1no/Shift

1no/Shift

1no/Shift

1no/Shift

1no/Shift

1no/Shift

1no/Shift

1no/Shift

1no/Shift

1no/Shift

First off/Inprocess insp.


1no/Shift
report
Reaction Plan / Corrective
Freq. Control Method Resp.
Action
First off/Inprocess insp.
report

1no/Shift

1no/Shift

1no/Shift

1no/Shift

1no/Shift

1no/Shift

1no/Shift

100%

100%

100% Inspection Check list

100%

100%
Reaction Plan / Corrective
Freq. Control Method Resp.
Action

100%

100%

100% Final insp. Checklist

100%

100%

100% visual

100% Packing list

100% As per TPH


Reaction Plan / Corrective
Freq. Control Method Resp.
Action

Approved By. N. Sridharan

You might also like