Technical Guide Resource Efficient Scotland 2014
Technical Guide Resource Efficient Scotland 2014
System Procurement
Guide
September 2014
Contents
Introduction 4
BMS Overview 5
7 APPENDICES 38
Appendix 1 – Glossary of Terms 38
Appendix 2 – British Standard BS EN 15232 Guide 40
Appendix 3 – Low Energy Control Strategy 42
Appendix 4 – Sample Controls Specification for a Typical School 50
Appendix 5 – Typical Measurement and Verification Plan 52
Appendix 6 – Maintenance Specification 54
Introduction
A Building Management System (BMS) is a computer-based control system that
manages and controls the mechanical and electrical services of a single building, up to
an entire portfolio of buildings. Successful implementation and operation of a BMS allows
building performance to be optimised and substantial energy savings to be achieved.
This document is primarily written for those with responsibility for energy, management
of energy, decision makers and managers or estate / facility engineers with limited
knowledge of BMS. It is designed to assist organisations through the process of
procuring BMS and support services thus helping to ensure the following:
The requirements of the BMS project are fully defined relative to management
and operational needs.
The organisation understands the drivers for change.
Clients understand what sort of performance parameters need to be considered
and specified.
A robust investment business case can be developed.
Key technical characteristic of BMS are understood so that it is possible to liaise
confidently with suppliers and contractors.
Procurement processes cover the factors and issues that are particular to BMS as
well as the other commercial considerations when letting contracts.
Innovation is sought in the tenders by suppliers and service providers.
The performance of BMS service can be monitored and verified to ensure that
optimised savings are being delivered.
Adequate provision is made for the day to day management of the BMS.
Different contract and procurement approaches can be assessed; for example full
optimised management including on site management options.
The organisation understands its own resource, competencies and constraints
with regards to BMS operation and management capability.
A flowchart outlining the key steps in specifying and procuring a BMS project is provided.
In the electronic version of this guide, this flowchart links to the relevant sections within
the main body of the document. A glossary of terms are detailed in Appendix 1.
Building Management System Procurement
Guide | 5
BMS Overview
Providing facilities to maintain a comfortable environment in all buildings requires some
form of mechanical and electrical services, such as boilers, heating and ventilation plant.
These have to be controlled by some means in order to ensure that, for example, sufficient
heating is provided to maintain comfortable conditions in the occupied space. In some
buildings, services are controlled by manual switches, time clocks and thermostats which
provide “on” and “off” signals in order to operate the building services as required. In
many buildings, however, BMS is used to ensure that variable signal responses are provided
in an efficient and flexible manner to match a gradually changing environment.
Reductions of 10 to 30% in heating energy consumption can be realised for BMS that
have been well designed, maintained to specification requirements and optimally
operated / managed as compared with poorly performing systems1
1
Potential impact of controls on the thermal energy savings for non-residential buildings relative to BSEN 15232
Reference Standard C
Building Management System Procurement Guide | 6
To obtain the full benefits and features of a BMS, it should be a centralised system with all
the sites connected to a front end supervisor (this can then be accessed if required by
multiple users via a web-browser). There are a number of well-established communication
protocols employed for BMS, each with specialist uses including BACnet, LonWorks, MBus,
Modbus and KNX2. The BMS should be able to manage these protocols concurrently,
creating a seamless joined-up approach to operating the full complement of the building
services. More details are provided within Section 5.2 of this guide document.
The following BMS Procurement Flow Diagram guides the reader through ten key
decision making stages or steps from boundary definition through business case
development, determining a suitable commercial approach, development of performance
specification and evaluation of solutions. It is recognised that individual organisations will
have various skill sets and needs and will benefit from this guide document accordingly.
The aim of the flow diagram is to assist different organisations in interfacing with different
stages in a way that meets their particular needs. There is some explanation regarding each
of the individual stages or steps within the edit boxes adjacent to the flow diagram.
The BMS Procurement Flow Diagram is configured to allow the user efficient access to
relevant sections and resources by clicking on links. At the end of each section within the
document, you can return, ‘Back to the flow diagramme’ to allow you to continue your
research.
2
BACnet – developed specifically for buildings: focusing on HVAC, fire control panels, security and access. BACnet
was developed by AHSREA (American Society of Heating, Refrigeration and Air conditioning Engineers) and is the
most widely used both in the UK and internationally. LonWorks – similar to BACnet. Meters-Bus (MBus) – MBus
was developed specifically for remote reading of meters. Modbus – used to enable communication between
devices such as an automation station and chillers. KNX – lighting systems, shading (automated blinds), room
climate, security and BMS.
Building Management System Procurement Guide | 7
There is a uniform BMS focusing on 1 or 2 There is a disparate range of systems of varying age,
systems. condition and functionality.
Does the system meet the design criteria? Determine the breakdown of coverage for each
system based on number of sites, % of energy
consumption and costs or CO2 emissions.
No
Yes Carry out an assessment of potential systems and select the preferred solution
Step 5 A specification for the BMS installation or upgrade is developed. It should include the system
design requirements including the hardware, software and functionality as well as performance
requirements such as target Key Performance Indicators. This specification can then be used to
assess the merits of suppliers’ proposals.
Define potential savings along with operational and investment budget costs and payback period
Step 6 It is likely that cost savings achieved through improved energy efficiency will form a significant part of the
financial justification for any BMS project. Therefore, reliably forecasting such efficiency gains and hence
cost savings forms an important element in developing the business case.
The first key step in planning a BMS installation is to develop definition of the requirements
for the system. By constructing a clear picture of requirements you put yourself in the best
possible position to correctly define the design and specification of the system to meet the
particular needs of your organisation. This will help you to control tendering exercises and
encourage suppliers to propose systems that are not over-specified and therefore incurring
needless costs.
In cases where an existing BMS is being replaced or upgraded, it will be possible to call on
the experience and lessons learned from the original system to help to fully define your
requirements. Where an entirely new BMS is to be deployed or your experience is limited, it
may be prudent to consult with independent specialists and / or colleagues from similar
organisations.
In order to define the requirements that will dictate your BMS specification, it is necessary
to determine the functionality of the system, together with how it will be managed and
operated and by whom. This section explores these aspects in more detail and covers the
following steps:
This section also explores the Management and Operation of a BMS together with the
requirements of different types of system users.
Building Management System Procurement Guide | 9
Annual energy expenditure – typically, BMS installations cost from around £10,000
upwards, therefore in order to be cost effective there may be a need to set a
minimum cost threshold for the energy use controlled.
Annual energy consumption of the site, building or portfolio.
Annual CO2 emissions of the site, building or portfolio.
Type of buildings or facilities; some buildings may have a greater potential for
savings or would benefit from greater central management, for instance, the
flexibility of programming offered by a BMS would suit buildings that have irregular
or infrequent occupancy patterns.
System standardisation; where an organisation has exposure to a particular BMS or
multiple BMS it is likely to be cost effective to standardise on preferable one BMS,
providing the system(s) meets the design criteria (See Section 1.2).
Age, condition, reliability of existing systems, e.g. prioritising sites where the
existing system is unserviceable or redundant.
BMS rationalisation of systems – standardising to a limited number of systems
(ideally one or two) to optimise management and performance.
From this level of analysis it should be possible to identify and prioritise sites to be included
in the BMS upgrade programme based on potential energy and cost savings as well as BMS
resilience including vulnerability to existing system obsolescence. Some sites may need to
be omitted from an upgrade programme if there is uncertainty over their long term future
or where the organisation has no direct control over their use, for example a Public Finance
Initiative (PFI) site or leased sites etc.
The higher the level of specified automatic control with a system design then the greater
the potential benefits of the system, although such systems will incur greater costs and
potentially higher exposure to maintenance reliability issues. To act as a guide for BMS
design, there is a European and British Standard (BSEN15232) which provides a structured
classification of building automation and control technologies. The Standard identifies four
classes (A, B, C and D) of control systems and details of their potential energy saving
impact for a range of buildings. Full details of these classifications with potential savings are
provided in Appendix 2.
Building Management System Procurement Guide | 10
BMSs are very flexible and can be designed to meet the specific requirements of an
organisation. Functionality ranges from basic level of heating, ventilation and air
conditioning (HVAC) control with no energy monitoring activities through to a high level of
energy performance with energy monitoring, room level automation, scheduled
maintenance and change logging etc. Review of the requirements of the system should be
made as part of the development of the BMS strategy, which should also consider the
following functionality criteria:
Software package – flexible, able to meet a wide range of applications and able to
provide a wide range of energy analysis and maintenance functions
Network capabilities using local area networks, wide area networks and standard
browser technology to utilise the organisation’s IT networks
Supports multi-users with appropriate levels of access
Supports open protocol technologies commonly used for BMS applications including
BACnet, MODbus and KNX
Gateways to communicate with third party equipment
Manufacturer committed to on-going support and development of product
Commitment to backward compatibility to support existing BMS equipment
These issues are discussed in more detail in the Technical Overview – Section 5 and details
of low energy control strategies are also included within Appendix 3.
In addition, you may wish to consider whether the organisation wants to use a system
supplied and installed through an extensive well established network of Approved Partners.
This will ensure that the organisation is not restricted to using one, or a limited number of
contractors, or alternatively a manufacturer who predominately markets their products
directly to the end user. It is recommended that an organisation should try to standardise
on a limited number of systems (one or two) in the interest of in-house knowledge and
expertise, availability of spares and access to trusted third party support.
Where it is found that there are a range of different manufacturer’s BMSs installed, it is
recommended that the systems are rationalised. Organisations with a multitude of systems
Building Management System Procurement Guide | 11
find it difficult to manage their BMSs effectively as the operator needs training on the use of
each system which often requires the support of a number of specialist BMS contractors. In
addition, multiple systems require a wider range of spares and it is difficult to implement a
uniform controls or reporting approach where an organisation has multiple systems. For
organisations where a particular BMS or BMSs is predominant this may be a key selection
factor, provided that the system meets the design criteria (Section 1.2) as it is more
expensive to carry out a full system replacement than upgrade and enhance.
Outsourcing to a service bureau, who will supervise efficient operation from a remote
supervisor, deal with occupant requests and organise maintenance.
More details concerning how systems can be managed are covered in Section 3 Step 8 of
this guide and day-to-day user issues are covered in Section 6.
When considering system design requirements, it is vital that the preferred approach to
operation and management has been defined beforehand. There are a range of potential
users for the system including facilities management (FM), estates departments,
maintenance staff and end users. Following the decision on the approach to management
and operation of the system, consideration needs to be given to the appropriate level of
access and tools for each user. For an end user this may range from a local BMS supervisor
workstation or access to a specific site (or department) through a web browser, local Liquid
Crystal Display (LCD) operator console, or even a simple localised time extension switch.
Each individual user’s access can be set up to meet their specific requirements so that, for
example, they can only get access to their specific site or department. User levels can be
set to meet their level of responsibility and competency so that only designated users have
the authority to adjust set-points and time schedules etc.
This section looks at the construction of a business case for implementation of BMS. It is
likely that this would take place in conjunction with the definition of requirements outlined
in Section 1 as well as consideration of technical aspects discussed in Section 5.
This section explores these aspects in more detail covering the following steps:
Table 2.1.1 below provides guidance on some of the main aspects that normally need to be evaluated as part of system design criteria.
Aspects Comments
How many BMSs or control This will be determined by the findings of Step 3.
Assess the current BMS
What is the age, condition, Characterising the status of the existing system’s components will enable you to determine which
infrastructure.
functionality and capability items will be retained and which upgraded or replaced.
of the existing BMS(s)?
Communication systems Defining the existing communications infrastructure will enable potential suppliers determine the
with existing equipment. level of compatibility with their systems and thus determine where communication network
modifications or enhancements are required.
Is there adequate Increasing the level of monitoring and control – and potentially adding zones will improve the
Review the operation,
and
control of the site’s
monitoring and control flexibility of the BMS but will add to capital costs. Ask questions such as:
relative to buildings and
Do the existing BMS arrangements contribute to complaints over comfort problems?
plant equipment.
zones?
Are vacant areas being heated needlessly?
Do heating and cooling systems run at the same time in competition with each other?
monitoring
What sort of variable flow The existing control systems may use valves or dampers to vary flow rates. Upgrading these
controls are currently in systems to use variable speed drive controllers may provide significant energy savings as well as
place? more refined control of comfort. Focus on plant with larger electric motors or those with demand
flows that are subject to high levels of variability.
Building Management System Procurement Guide | 14
Do boilers or other plant Effective sequence control helps key plant to run at the highest efficiency levels as well as
require sequence control? reducing needless wear and tear on equipment.
What alarm capabilities does Does the existing BMS allow problems with plant and equipment to remain undetected for long
the existing BMS have? periods?
High flexibility when determining and setting alarms is important to prevent important alarms
being ignored due to high frequency of other alarm functions.
Modern BMSs can rapidly alert users to problems through emails or text messages.
How many and what type of Consider how the existing system is operated and by whom and then determine if these
the
user have access to the arrangements function appropriately. BMS replacement or upgrade may offer the opportunity to
existing BMS and will this change the profile of system users. Depending on your strategy, this may involve increasing the
future control strategy
with
need to change in the future number of users to, say, reduce the burden on a single BMS operator; or reducing the number of
or at least have the system users so that unregulated local control is replaced by centralised control by users with appropriate
flexibility to change? training and authority.
Compatibility
Does the existing BMS Modern BMSs have the capability and flexibility of producing a variety of management reports on
system support useful and building and plant performance using logged data on plant operation and environmental
Analysis and reporting
adequate management conditions. Consider the type of reporting that would be of value to your organisation, including:
reporting and what is likely
Exception reporting noting events that require further investigation. Monitoring and profiling
requirements
Management resources Training and support functions may be critical in determining the most appropriate BMS for your
Operation
needs.
System training and support requirements
Remote on line access with hierarchy and security
Access and authority flexibility
How susceptible or There will always be some system failures and when these occur they need to be identified quickly
responsive does the system and the consequence of a failure should be minimised in terms of operation and safety
Resilience
This specification document may be passed to potential installers in order to help them
construct proposals. In developing their proposals, suppliers are also likely to conduct visits
and undertake surveys of candidate sites and hold meetings with key staff concerned with
the operation of the existing BMS as well as decision makers within the organisation.
Suppliers’ proposals will set out how their systems would address the requirements of the
specification together with the anticipated level of performance against KPIs. Assessment of
the proposals using a scoring system will allow the selection of a limited number of suppliers
who most completely meet the specification. This approach should be facilitated by using
some form of evaluation tool that will help to rank the decision making by evaluating the
importance of various design and performance criteria. An example of this is provided in
Table 2.2.1 below whereby the importance or weighting is highlighted by the colour coding
of each aspect and the individual aspects are each scored as shown below:
Management
Compatibility
Maintenance
with existing
Analysis and
and Control
Capabilities
Monitoring
Operation
Resources
Resilience
Reporting
Network
Strategy
systems
Control
System
Future
and
System 1 4 4 3 4 4 3 4 3
System 2 4 3 4 2 3 3 3 3
3
In order for such performance targets to be meaningful within the performance
specifications it is necessary to define dependant variables such as space temperature pre-
sets, hours of occupancy etc.
Building Management System Procurement Guide | 17
Figure 2.3.1 shows a week of half hourly gas consumption, green is when building is occupied, amber is when
building is being pre-heated for occupancy and red is when building is neither occupied or being pre-heated
and is therefore potential wasted consumption.
The condition and efficacy of the existing plant and controls can also be established via a number of
routes including;
Estimations of energy savings can be derived applying rules of thumb (such as those
outlined in Table 2.3.1 below) in order to develop determine the likely extent of savings in
each building.
Building Management System Procurement Guide | 19
Table 2.3.1 Rules of thumb for % fuel saving through various BMS control improvements³
Measure Typical Saving – heating fuel
Align optimised operating times with requirements 8-10% per 1 hour
reduction/day
Review room temperature set-point 10% per 1°C reduction
Effective Weather compensation 5%
Effective boiler sequencing 5%
Effective programming of holidays Up to 10%
Extending heating plant shutdown period/turning off on Up to 10%
warm days
Note ³ CIBSE indicate energy cost savings between 10% and 20% by use of BEMS in their
1998 Energy Efficiency in Buildings Guide. As a rule of thumb, a retrofit BEMS can yield a
10% direct fuel cost saving against a reasonably well maintained conventional control
system when properly designed, installed and commissioned.
Application of rules of thumb is most effective against a comprehensive and consistent BMS
strategy incorporating low energy control strategies and defined comfort thresholds and
limits, for instance only providing space heating up to a pre-set room temperature which is
specified and limited within for example a controlled range of 19°C to 20°C.
Establishing and outlining the key drivers for change including cost savings, resource
management, improved working environment, compliance issues etc.
Cost / Benefit analysis - either through simple payback or preferably through more
detailed financial analysis such as project Net Present Value (NPV) including
sensitivity analysis of different capital investment ranges, variation of year on year
savings and variation of operating or maintenance costs etc.
Risk assessments including performance confidence, disruption risks and enabling
risks etc.
Review of other avoided costs such as manpower savings and maintenance of
existing systems etc.
Consideration of how operation and environment will be improved and other non-
financial benefits.
Procurement and funding recommendations.
Commercial considerations in terms of how a supply contract will be set up.
Management considerations of how the system will be managed including training,
accountability, reporting etc.
Building Management System Procurement Guide | 20
There is no reason why the private sector cannot adopt a similar business case development
approach when developing a BMS investment business case.
Table 2.4.1 Key criteria within a resource efficiency capital investment business case
The Strategic The Economic The The Financial The
Case Case Commercial Case Management
Case Case
What is the What sort of How do we What will it How will the BMS
problem? Why BMS do we want to buy it? cost? What will system be
do we need to want to buy? it save? managed?
invest in a
new BMS?
Once the business case for a BMS upgrade has been developed, consideration needs to be
given to commercial and funding solutions. System maintenance is essential if the full
benefits of a modern BMS are to be realised and this is therefore included in this section as
part of commercial considerations.
Funding and commercial arrangements are often linked together in one solution
arrangement when clients are looking to source external funding.
• Procurement
This section explores these aspects in more detail covering Step 8 Evaluation of Commercial
and Funding Options.
3.1 Procurement
The form of procurement chosen will depend on the type of organisation, the scope of works
and whether the BMS installation is a specific programme or part of a wider construction
project. Options can range from a traditional procurement where design and supply is
separated from construction, to design and build where a single contractor takes
responsibility for design, supply and installation.
For design and supply contracts it is essential that a well-written client’s brief is prepared to
ensure a satisfactory controls solution.
A sample controls specification has been provided in Appendix 0. Key elements of the
specification are:
Mechanical and electrical installation requirements
Low energy design description of operations
Schedule of rates for both installation and maintenance, so that once the contract is
let there is no need to go out to tender on future phases of works for the agreed
contract period.
3.2.1 Loans
Salix
Salix finance in Scotland is funded by the Scottish Government to support energy efficiency
savings within parts of the public sector. It has recently expanded its Salix Energy Efficiency
Loans scheme (SEELS) offer to all of the Scottish public sector which is subject to the Public
Bodies Duties Guidance. It should be noted however there are still governance and
accounting issues associated with acceptance of Salix finance within the NHS in Scotland.
The Salix scheme allows eligible public sector organisations to apply for an interest free loan
to finance up to 100% of the costs of compliant energy saving projects. The project funding
criteria allows for up to an 8 year payback and up to a cost of £200 per tonne of CO 2 over
the lifetime of the project. A BMS upgrade should be capable of meeting these criteria if
specified properly. The loans are paid back over a 4 to 8 year period. For further details
contact https://salixfinance.co.uk/loans/scotland-loans.
Through the Carbon Trust Implementation Services partnership with Siemens they have
made a fund of £550m Energy Efficiency Financing available. The funding is available to all
types of organisations who have been trading for 36 months and are seeking to reduce their
own energy use. The loan option is designed to pay for itself as finance payments are
calculated so that they can be offset by the anticipated energy savings. For further details
contact Carbon Trust – it’s recommended that organisations check and satisfy themselves
that individual projects are eligible. Also the scheme may change subject to conditions out
with of Resource Efficiency Scotland control and organisations should therefore check if it is
still fully operational.
It should be noted that “Guaranteed savings” type contracts, require some form of
“measurement and verification plan (M&V plan)” (refer to Appendix 5) which will require
knowledge of the system to be measured and its variables) and will form part of any
“guaranteed savings” commercial contract. A number of organisations offer EnPC’s including
equipment manufacturers and Energy Services Companies (ESCo's): these include utility
companies together with some large FM and construction companies.
If clients or contractors do not wish to enter into a “guaranteed savings” type contract, it is
possible that a more straightforward “shared savings” contract can be set up whereby
Building Management System Procurement Guide | 23
“documented” savings are shared between the client and the BMS or service provider
contractor.
As with “guaranteed savings” type contracts, this will require some form of “measurement
and verification plan (M&V plan)” (refer to Appendix 5) which will require knowledge of the
system and its variables and will form part of any “shared savings” commercial contract.
Once the savings have been determined by adopting the correct M&V format then a portion
of these savings can be distributed to the contractor in lieu of standard contract type fees as
agreed within the “shared savings” contract. Contract durations need to be agreed
(normally a minimum of 2 to 3 years) along with commercial agreements based on a level
of shared savings, performance reconciliation reviews and management of financial
arrangements for example is the ‘banking’ of savings allowed from one year to the next.
There are a number of options for inclusion of maintenance within a BMS commercial
arrangement including the following:
Using in - house staff – for larger organisations with extensive or sophisticated
systems, such as acute hospitals or universities, often maintenance is carried out
by in-house technical staff. These staff may undertake the day-to–day
maintenance activities and carry out initial investigation and repairs whilst calling
on special BMS contractors for more complex work.
Maintenance contractors – there are a number of organisations that provide
maintenance contracts, these include the following:
o Control System’s manufacturer – most manufacturers offer a maintenance
service for their own equipment.
o Systems Integrators – these range from small local companies to larger
national organisations with regional offices and number of who are able to
offer a 24 hour bureau service. A number of these companies are licensed
to work with a number of manufacturer’s systems.
o Mechanical & Electrical (M & E) companies – a number of M & E contractors
operate a specialist BMS maintenance division which is often an
autonomous company.
o FM Contractors – a number of FM contractors undertake BMS maintenance
either using their own in-house specialist team, or by sub-contracting to a
BMS maintenance contractor.
Building Management System Procurement Guide | 24
There are several specific BMS maintenance contracts options including the following:
Standard Service
Fully comprehensive service
Bureau Service
Enhanced energy performance service
Whichever option is chosen it is important that the contract is carefully specified and should
include the following elements:
Software upgrades
Data-back-up and archiving
Periodic visits checking of sensors, actuators, valves and dampers
Arrangements for emergency call outs
Performance standard for the building control system
Change logging
With a fully comprehensive service contract the client benefits from greater certainty over
maintenance costs with the risks being borne by the contractor. However without the
correct performance contract in place and a pro-active overview of contractor management
by the client, there is a risk that the contractor may not undertake costly replacements.
Further benefits and savings may however be realised by an enhanced Energy Performance
Service which is also covered in Section 4 of this guide.
Building Management System Procurement Guide | 25
This section outlines some areas of innovation that you may wish to seek from potential
suppliers as part of the tendering process. The ability and willingness of suppliers to
respond to such innovation – and offer further innovation themselves – may indicate their
suitability as a long term partner in the successful operation of the BMS.
This section explores these aspects in more detail covering the following Steps:
Step 9 Development of Performance Specification
Step 10 Innovation and Performance Enhancement
Predominantly, this section covers typical system performance requirements and therefore
represents the types of system performance criteria which a user organisation needs to
consider within a BMS specification and evaluation process.
Building Management System Procurement Guide | 27
Note that more details are provided within Section 5 and Section 6 of the BMS Specification
Manual.
The following is a brief summary of control and operating strategy for BMSs (Refer also to
Appendices 3 & 4):
A control strategy which recognises the specific relevant building and environment
issues such as the importance of humidity, temperature and ventilation control.
Develop a standard repertoire of control strategies for common plant.
Develop standard alarm strategies.
Develop a standard list of data points which should be monitored within each control
strategy.
In addition to control strategy, other BMS specification and evaluation requirements should
include a combination of some or all of the following:
Many of the added value support services require a contract that allows for a performance
based contract whereby the supplier or contractor is more responsible for the performance
of complete systems. This could for example include aspects such as full parameter
management, full maintenance provision, share of savings programmes etc. (Refer also to
Section 3 of this guide document). Some examples of the types of innovative services on
offer include the following.
Building Management System Procurement Guide | 28
A number of BMS manufacturers and service providers have a “Bureau” service which
enables them to monitor their client’s BMSs remotely and instantly 24 hours a day, 365
days per year. Through remote alarm monitoring the Bureau can respond and address site
issues promptly, often before the client is aware that there has been a problem. Diagnosing
problems remotely ensures that the maintenance engineer has the correct components to
address the fault when attending site to respond to a breakdown and eliminates
unnecessary or abortive visits. Also, the engineer’s time on site is reduced as they are able
to go straight to a pre-diagnosed problem. The Bureau Service provider may also offer the
option for an enhanced “Energy Performance Service” (although these may also be offered
by smaller contractors who do not operate a bureau service).
Often Bureau Services have the facility to monitor automated metering reading (AMR) data
and provide a range of management reports including consumption profiles (refer to Figure
4.2.1 below), benchmarking and exception reports etc. Such analysis and reporting services
are normally underpinned by an interactive web based software package with agreed
authority access levels to provide multiple site and hierarchical access levels as required.
Figure 4.2.1 Example of a typical half hourly weekly gas consumption report
Where remote corrective actions have not been effective then clients may wish to consider
the contractor offering onsite assessment to try to determine an improved methodology to
achieve enhanced control performance. This will entail a site intervention by a controls
expert to review the existing system and control parameters with the energy team / on site
FM providers on a regular basis.
Building Management System Procurement Guide | 29
The site intervention (this could be at a central BMS location although may require plant
room inspection) should include the following:
Reviewing the suitability of the existing controls system or philosophy for the site.
Identification of present parameter sets relative to building activity including for
example:
Temperature pre-sets (refer to Appendix 4 for a typical time schedule control
matrix).
Optimiser settings.
Day timer settings.
Summer / winter / holiday settings.
Compensation ramp review.
Heating / cooling conflicts.
Anomaly log for example unusual flow, room, OAT or valve status e.t.c..
System “change “logs and reporting of same and so on.
In discussion with onsite energy or estate teams, managed parameter changes can be
agreed and implemented during this site intervention, the impact of which should be closely
monitored by the contractor to evaluate the real cost and CO2 impact of the changes
implemented and these should be verified by the client. The contractor may also be able to
provide support to monitor any impact of the changes on other “Environmental”
performance levels (for example space temperature levels). In addition, the contractor or
service provider may be able to support the management of any “user kick back” along with
integration into a “behavioural change” programme, or help with the overall development of
onsite environmental policy and building user manuals etc. This would represent a move
towards a partnering approach as opposed to traditional client / sub-contractor
relationships.
Whichever option for operation and management is selected it is vital that there is clear
ownership of the control system with unambiguous responsibility for its operation. Where
an outsourced service bureau is used they must be adequately managed and supported by
the client organisation to ensure that the desired performance criteria are met. The service
bureau contractor should report on a regular basis, typically monthly, on key performance
indices including:
Without this client organisation support and supervision, the BMS service provider may not
be sufficiently motivated or indeed authorised to implement energy saving strategies, or
have the authority to enforce the organisations heating and cooling guidelines and decline
unreasonable requests from occupants etc.
A recent anecdote by an Energy Manager within the Scottish Public Sector summarised this
by stating that “through experience, I have found that generally there is a tendency for FM
engineers to adjust set-points in response to complaints rather than having the authority or
motivation to challenge the requested changes”.
Building Management System Procurement Guide | 30
It is essential that relevant staff, based within the buildings, are trained in the use of the
BMS. Even in buildings where local staff do not to have permission to adjust settings, they
should be able to monitor the condition and performance of the equipment controlled by the
system.
All reputable BMS service providers should encourage training as it is in their interest that
the system works well especially if linked to a contract performance element. All staff with
access to the BMS should develop experience in using it to manage the building on a routine
basis. For example most BMS have alarms set and staff should know what to do when these
alarms are triggered.
Any contract designed to optimise performance should include regular awareness refreshers
for BMS users likely to be co-ordinated with the three main heating seasons, that is, for
winter, autumn/spring and summer conditions. This awareness should as minimum,
incorporate aspects such as:
It is generally recommended that any “partnership contract” with BMS service providers
should include regular performance reviews. It may also be possible to link performance
reviews with staff trainings session refreshers etc.
Knowledge of the key technical aspects of BMS will help you define the design and
specification of your systems with respect to your system requirements.
This section provides a brief outline of such aspects including an overview of a typical BMS,
some of its features together with some key considerations when selecting a BMS which are
as follows:
• Overview – what a BMS looks like, some key features
• BMS communications
• Interfacing with third party equipment – open protocols
• User interfaces for local users
• System selection
• Security
5.1 Overview
The purpose of a BMS is to maintain the desired internal environmental conditions by
operating and controlling heating, ventilation and air-conditioning (HVAC) plant along with
other building services plant to optimal efficiency.
A BMS comprises microprocessor controllers, known as outstations, which are linked via a
communication network to a centralised PC computer or server, often called a “head-end” or
“front-end” supervisor which is the user interface.
The outstations are generally located within the plant rooms and carry out the control of the
equipment, with each outstation programmed to meet the specific requirements of the
installation. For example, for a simple heating system it will operate and control the boilers,
pumps and associated control valves by monitoring temperature sensors to meet the
desired set-points. The outstation provides data on parameter levels and plant status to the
“head-end” supervisor as discussed below.
To obtain the full benefits and features, the BMS will need to be a centralised system with
all the connected sites to a “head-end” supervisor (this may then be accessed if required by
multiple users via a web-browser as discussed below).
A modern BMS is navigated via dynamic schematic graphic slides which display live values
of key parameters for the control and operation of each system. This includes plant status,
faults, set-points and corresponding sensor readings. A typical graphic is shown below in
Figure 5.1.1 below. They allow the operator to easily assess the operation of a system, for
example allowing comparison of temperatures against set point, condition of plant and
identification of faults.
Building Management System Procurement Guide | 32
The BMS also carries out alarm handling, prioritisation of alarms and relaying critical and
non-critical alarms to the “monitoring person(s)”. This ensures that any critical alarm is
responded to at the earliest opportunity. These alarms can also be transmitted via SMS
and email on modern communication systems.
A further feature of a modern BMS is data logging. This allows a system’s performance to be
monitored and analysed over time for diagnostic purposes, ensuring that any deviation from
the norm can be identified and remedial actions taken at the earliest opportunity. This
would tend not be apparent with a discrete control system. For example, data logging a
Variable Temperature (VT) circuit, when a VT sensor reading significantly exceeds the set-
point value with the VT control valve closed, indicates that it is likely that the control valve
is faulty and has not closed correctly (see Figure 5.1.2 below). Obviously early intervention
and resolution will minimise any consequential overheating and energy wastage.
Building Management System Procurement Guide | 33
60
VT flow
temperature
40 Calculated VT circuit
setpoint
20 VT control valve
position (%)
0
07:00
15:15
07:45
08:30
09:15
10:00
10:45
11:30
12:15
13:00
13:45
14:30
16:00
16:45
17:30
For a single site, BMS devices are traditionally linked by a dedicated Local Area Network
(LAN). With newer installations however the use of Transmission Control Protocol/Internet
Protocol (TCP/IP) is now well established utilising the client’s IT network to connect
outstations distributed across a site together with remote sites to the “head-end”
supervisor. The modern IT networks facilitate multi-user access through a web browser.
Outstations distributed across a site together with remote sites can be connected to the
central BMS PC or server through these existing IT networks. It should be noted that
historically remote sites have been linked via modems which required a dedicated phone
line and tended to be slow and somewhat unreliable – there may however, occasionally be
an off IT grid site that may still require a modem for communications.
A key benefit for remote access is that it reduces and may eliminate unnecessary or
abortive breakdown calls. On notification of a fault a service engineer can interrogate the
site remotely via the internet, diagnose the fault and where possible address the problem
remotely.
A typical BMS network schematic, also referred to as system architecture is shown in Figure
5.2.1 below.
Building Management System Procurement Guide | 34
“Open” protocols allow the BMS and third party equipment to exchange data which
improves control and management of the plant so that they can be fully integrated with the
other site building services. For example, through an open protocol interface, a heat pump
system with its own integral controls can provide the BMS with a wide range of parameter
data on the plant operation, control, condition, fault alarms etc. This would mean that the
heat pump temperature set points, time schedules and holiday settings can all be adjusted
through the BMS.
Building Management System Procurement Guide | 35
A modern state of the art BMS will support the industry recognised “Open” protocol
communication standards each of which tend to have specific applications. These include:
BACnet – developed specifically for buildings: focusing on HVAC, fire control panels,
security and access. BACnet was developed by AHSREA (American Society of
Heating, Refrigeration and Air conditioning Engineers) is recognised as the most
widely used both in the UK and internationally.
LonWorks – similar to BACnet.
M-Bus – Meter bus developed specifically for remote reading of meters.
Modbus – used to enable communication between devices such as an automation
station and chillers.
KNX – lighting systems, shading (automated blinds), room climate, security and
BMS.
The BMS can manage these protocols at the same time, creating a seamless joined-up
approach to managing the buildings services allowing the sites to operate at improved
efficiencies.
For large sites it may be appropriate to have a full BMS either as a dedicated workstation
terminal or allowing access via a web browser over the network. For smaller sites, such as
primary schools, LCD operator display units may be more appropriate.
Most manufacturers supply user friendly LCD operator display units which have schematic
displays similar to the BMS graphics. These are typically mounted on the control panel
within the plant room but could, if required, be mounted in a more accessible area such as
the site manager’s office. These allow the user to carry out key functions such as:
Where there is a degree of local control, the responsibility for management of the BMS
should not necessarily be viewed as a purely technical activity. There is also a role for
someone with particular interest in financial control or environmental issues to verify that
appropriate settings are being maintained as detailed in the next Section of this guide
document.
Building Management System Procurement Guide | 36
The threats can be malicious with intent to cause commercial harm, damage reputation or
business disruption. Non malicious threats typically involve careless staff, visitors or
contractors who may cause unintended significant damage, for example, by plugging in
infected removable media into the BMS terminal.
These risks can be addressed by implementing the correct procedures such as management
using an appropriate ‘firewall’ to ensure remote access is secure. It is essential that the IT
department is consulted to ensure that the BMS upgrade meets with the organisation’s
security requirements.
For efficient BMS management, it is essential to define the responsibilities between the
client’s estates or energy personnel, the site end-users and the BMS service provider.
This section provides a brief outline of such aspects including considering BMS on-site
ownership relative to other on-site responsibilities and also including other remote support
functions.
For the effective management of an efficient BMS system it is essential to define the
responsibilities between the client’s estates or energy personnel, the site end-users, and the
BMS service provider. The level of support required from the BMS service provider will
depend on a number of issues including the type and size of organisation and the resources
available. Some sites may have in-house technical staff that carry out day-to-day
maintenance activities and undertake initial investigation and repairs, whilst calling on BMS
or controls service providers for more complex work. Other organisations with limited in-
house technical resource will be more reliant on external contractors.
Whichever approach is taken it is essential that the organisation has a member of staff who
takes ownership of the BMS. This person should have a good operational knowledge of
the BMS and the organisation’s control objectives. It is preferable that the BMS lead has a
good understanding of building services and is able to interpret the BMS data and make
objective assessments on the system performance. It is therefore necessary for the
appropriate levels of training to be provided for the tasks being undertaken.
The BMS lead is also in a position to manage the internal expectations of staff and ensure
the organisation’s comfort and other environmental guidelines are being adhered to. In
many cases there is no direct incentive for the BMS contractor to ensure that the system is
operating to its greatest efficiency, and also they may not have the authority to challenge
demands that have an adverse effect on the energy performance of the site. Having an
informed client to challenge and motivate the BMS contractor, whilst managing staff
expectations can therefore have a dramatic impact on the efficiency performance of
the system.
Experience also shows that for the efficient BMS operation, it is essential that the end-user
takes ownership of their individual sites at a site level. Sites where client’s anecdote that
“the heating is operated by central office” often perform very poorly. It is therefore
recommended that individual sites are encouraged to take ownership and responsibility for
the efficient operation of their control systems. This approach should complement the
central office staff and BMS service providers who may not have the resources to give the
desired regular attention to each individual site.
Ideally this “site ownership” should be a shared responsibility and not just left to the
maintenance or estates type staff. For example, some schools have appointed a member of
their teaching staff, bursar, or business manager to assist or take overall responsibility for
the role, usually because they have a particular interest in financial control, environmental
or sustainability issues as well as operational issues.
Building Management System Procurement Guide | 38
7 APPENDICES
Term Definition
Communication protocol A system of rules for data exchange within or between computers
and digital devices.
Compensation ramp Heating systems may be fitted with weather compensation controls
that allow the temperature of the hot generated by the boiler
house to be adjusted according to the outside air temperature.
This both conserves energy and avoids the discomfort of high
radiant heat from a hot radiator in spring and autumn. The
compensation ramp or slope determines the boiler house output
temperature, frequently set to 80°C at an external temperature of
0°C and falling to 20°C at an outside temperature of 20°C.
Front end supervisor / Head end The principal user interface for a BMS which centralises all control
supervisor and monitoring functionality covered by the BMS across the estate.
Changes to control settings can be implemented and data accessed
via the front end supervisor which may reside on a dedicated
centralised PC or accessed via many devices via a web-browser.
The front end supervisor may be navigated via graphic screen
which display system schematics together with live values of key
parameters for the control and operation of each system (including
plant status, faults, set-points and corresponding sensor readings).
Heating Ventilation and Air Mechanical and electrical systems which provide a comfortable
Conditioning (HVAC) internal environment within a building. In some buildings, the
different elements of the system may all be separate - each with
their own control system. In other applications however HVAC
systems may be combined and integrated under one control
system.
Key Performance Indicators A type of performance measurement that may be used to evaluate
(KPIs) the progress towards targets.
Local Area Networks (LANs) A computer network that interconnects several computers within a
limited area such as a school or office building.
Net Present Value (NPV) The sum of a series of cash flows (both income and expenditure)
Building Management System Procurement Guide | 39
Open protocol Communication protocols that have been made readily available to
users (frequently via the developer's website).
Outstations Outstations are generally located within the plant rooms and
carryout the control of the local equipment. Each outstation is
programmed to meet the specific requirements of the installation.
For example, an outstation will control the boilers, pumps and
associated control valves of a heating system by monitoring
temperature sensors to meet the desired set-points. The
outstation provides monitoring data on parameter levels and plant
status to the front-end supervisor, which may also be used to
adjust the parameters controlled by the outstation.
Wide Area Networks (WANs) A computer network that covers a broad geographical area often
using the telecommunications network. A WAN can include several
LANs.
Building Management System Procurement Guide | 40
The following Graph 0.1 compares the thermal energy saving that can be anticipated for a
range of building types against class C which is used as the standard reference.
4
BSEN 15232 was developed from research carried out to support the European Energy
Performance Directive (EPBD). The standard has undertaken extensive modelling of
different types of buildings such as offices, hospitals, schools, lecture theatres and retail
buildings to calculate the impact of the different classes of control.
Building Management System Procurement Guide | 41
Graph 0.1 Potential impact of controls on the thermal energy savings for non-residential buildings relative to
BSEN 15232 Reference Standard C which is represented at O%.
40%
30%
20%
10%
0%
Offices Schools Hospitals
-10%
-20%
-30%
-40%
-50%
-60%
The BMS control system should be designed to maximise the efficiency of the heating,
ventilation and air-conditioning plant serving each building. The description of operations
should be considered indicative and should be further developed to meet the specific
requirements of the site.
Plant operation
The plant is to be operated by hand/off/auto switches located on the control panel fascia. In
auto mode the heating plant is to be operated by the BMS under demand from individual
zone optimised time schedules.
The boilers are to operate in sequence with the duty boiler being rotated on a weekly basis.
Fault status for each boiler is to be monitored on the BMS raising an alarm and activating
the next boiler in sequence.
The heating circulation pump-set are to operate on a duty/standby basis with the duty
pump rotated on a weekly basis. A differential pressure switch installed across the pump set
is to provide a flow status on the BMS and facilitates auto-changeover in the event of the
duty pump failing.
Where applicable the flue dilution fan operates when there is demand from the heating plant
and/or HWS heater. A differential pressure switch placed across the fan is to provide an air
flow status on the BMS, providing a critical alarm in the event of air flow failure and
automatic shutdown of the plant by hardwired interlock.
Pressurisation unit – in the event of a fault on the pressurisation unit the heating plant will
be shut down by hardwired interlock; fault status will be monitored by the BMS and a high-
level alarm raised.
Emergency plant room safety circuit – in the event of an emergency knock-off button or
thermal link being activated the gas valve and mechanical plant will be shut down by
hardwire interlock; fault status will be monitored by the BMS and a high-level alarm raised.
Fire alarm – in the event of the fire alarm being activated the gas valve and mechanical
plant will be shut down by hardwire interlock; fault status will be monitored by the BMS and
a high-level alarm raised.
Building Management System Procurement Guide | 43
Control
i) Boiler start-up – the boiler is demand lead, and is to be enabled on demand from
the individual zone optimiser time schedules.
ii) Optimisation – each heated zone (VT circuit, CT circuit or isolated sub-zone) is to
have an individual optimiser. The BMS will monitor the ambient temperature and
space temperatures for each zone to determine the optimum start and stop times.
Where a zone serves more than one floor a room temperature sensor should be
installed on each level in a representative location away from any external influence
(heat source, solar gain, etc.). Each optimiser will generate a heating demand for
the boiler plant and its associated zone pumps. Unless otherwise stated the
optimiser will be set to match the zone’s core occupancy hours with a optimiser and
room temperature set-points set at 19°C. An optimiser boost will allow the zone
temperature to be met efficiently.
iii) High outside air temperature interlock – When the external temperature reaches or
exceeds 16°C (operator adjustable) or the zone temperature is above 23°C
(operator adjustable) the associated zone heating plant is to shut down.
v) Boiler sequencing
Condensing boilers - sequence the boilers to maintain a compensated common
boiler flow temperature initially set up as shown in the table below. In addition the
BMS also monitors the boiler return temperature. Facility should be provided for
space temperature influence of the compensated temperature set-point.
0 80
20 50*
*Where boilers serve HWS calorifiers the minimum flow temperature should be
65°C
0 80
20 20
Negative room trim: For every 1ºC that the minimum space temperature falls
below the space temperature set-point the VT flow set-point will be increased
by 3ºC. This is subject to a maximum set-point of 80ºC.
Positive room trim: For every 1ºC that the minimum space temperature rises
above the space temperature set-point the VT flow set-point will be reduced
by 3ºC. This is subject to a minimum set-point of 20ºC.
viii) CT circuit – The CT pumps are to operate under demand from the AHU and
reheat/fan coil unit valves; demand being defined as a valve open by 25% or
more for 5 minutes.
Stage 1 – activate circulation pumps when the outside air temperature falls to
1ºC, and disable once OAT rises to 3ºC.
Stage 2 – activate heating system should the primary circuit pipe work
temperature detect a temperature below 10°C. Open all AHU heat coil and
zone heating valves to allow heated water to flow. Disable once the return
temperature rises to 20ºC.
Stage 3 (fabric protection) - should the space temperature in any zone fall
below 12°C the associated heating plant should be operated to raise the
temperature by 1°C.
x) Dry Cycling control (For boilers with an output of 200kW or greater)| – the BMS is to
monitor the flow and return temperatures for each boiler and calculates heat
transfer rates and establishes a load profile for each boiler. Firing of the boiler is to
Building Management System Procurement Guide | 45
be inhibited for light load conditions or dry cycling (firing of the boiler due to
standing loses).
Plant Operation
HWS Heater
The HWS hot water heater is to operate by a dedicated BMS time schedule. Fault status is
to be monitored on the BMS raising an alarm. A differential pressure switch is to be
installed across the HWS secondary pump provides a flow status on the BMS (alternatively a
current transformer may be used to prove pump status).
The time schedule will be set to meet the requirements of the site and should be set such
that the hot water is utilised during the day so that there is minimal overnight HWS storage.
Residential sites will require 24/7 provision. For schools sites only with HWS calorifiers it
may be appropriate to heat the system up for two or 3 discrete periods of the day to match
consumption requirements. This will avoid the heating plant running continuously.
HWS Calorifier
Primary HWS pumps are to operate in sequence on a duty standby basis with the duty
pump rotated on a weekly basis. A differential pressure switch installed across the pump set
to provide a flow status on the BMS and facilitates auto-changeover in the event of the duty
pump failing. The de-stratification pump is enabled independently.
Control
HWS Heaters - operate under its integral controls and is set to maintain a HWS flow
temperature set-point of 60°C. The BMS is to monitor the flow temperatures and raise
alarms should the flow temperature exceed 65°C or fall below 55°C (after a predetermined
period, initially set to 30 minutes). The BMS is to monitor and logs the HWS return
temperature.
HWS calorifiers – the BMS is to modulate the HWS diverting valve to maintain the HWS set-
point of 60°C. A hi-limit thermostat fitted to the calorifier de-energise the HWS valve
actuator activate spring safe function and close the valve in the event of detecting a HWS
temperature of 70°C.
Plate heat exchange – the unit operates under its integral controls.
Building Management System Procurement Guide | 46
Plant Operation
The ventilation plant is operated by hand/off/auto switches located on the control panel
fascia. In auto mode the plant is to be operated by individual system optimised time
schedules for air handling units (AHUs) plant or time schedules for fan only applications.
All fans motors above 2kW should be fitted with and VSD which is to be controlled by either
temperature and/or CO2 control.
Differential pressure switches are to be installed across the supply and extract fans to
provide air flow status’s on the BMS. A differential pressure switch is to be installed across
the fresh air filters to provide a filter dirty status on the BMS.
Control
Temperature control
Frost control – the BMS will modulate the frost coil valve to maintain an off-frost coil
temperature monitored by a duct sensor downstream. A capillary thermostat clipped to the
downstream face of the frost coil is to shut down the AHU supply fan by hardwired interlock.
The frost coil should be fitted with a spring-open actuator such that in the event of the frost
thermostat being activated a hardwire interlock de-energises the actuator, with the spring
mechanism opening the valve to allow flow through the coil. Activation of the frost coil stat
is monitored on the BMS raising an alarm.
0 21
20 15
The heat reclaim unit; either recuperator or mixing dampers are to be modulated to provide
free heating or cooling determined by comparing the fresh air and return air temperatures.
(Where humidity is being controlled enthalpy control shall be used).
AHUs serving dedicated areas such as theatres, meeting room etc. – CO2 Control and
Occupancy Control
Where VSDs are fitted, room or duct mounted CO2 sensors are to be installed and
monitored by the BMS to modulate the supply and extract fan VSDs to maintain satisfactory
air quality initial as detailed below:
600ppm 50%
1,000ppm 100%
Plant operation
The plant is operated by hand/off/auto switches located on the control panel fascia. In auto
mode the chilled water plant is to be operated under demand from AHU and fan coil units.
Demand being defined as a cooling valve being open by 25% or more for 5 minutes,
The chillers are to operate in sequence, with the duty chiller being rotated on a weekly
basis. Fault status for each chiller is to be monitored on the BMS raising an alarm and
activating the next chiller in sequence.
The chilled water circulation pump set operate on a duty/standby basis with the duty pump
rotated on a weekly basis. A differential pressure switch installed across the pump set is to
provide a flow status on the BMS and facilitates auto-changeover in the event of the duty
pump failing.
Control
i) Low outside air temperature interlock – When the external temperature falls to 12°C
(operator adjustable) the chilled water plant is to shut down.
10 9
25 6
For new installations the chillers should be controlled by a 0 – 10V signal or via
BAC-net or equivalent.
The BMS is to operate the heat pump and air conditioning units under individual time
schedules.
Presence detection sensors (microwave) within each room shall switch off the units should
no occupancy be detected for a period of 10 minutes (user adjustable). The BMS
Contractor will be responsible for the provision of any necessary interface to achieve remote
enable of the units.
A temperature sensor within each room will provided an alarm should the temperature fall
below 18°C or exceed 25°C (when the unit has been enabled to operate).
Low ambient shutdown: the air-conditioning units are to be inhibited from operating when
the ambient temperature falls below 12°C (user adjustable). This applies to units providing
cooling only.
Where there is an installation with an extensive number of heat pumps installed an interface
controller will be installed to allow communication to be carried out via BAC-net or
equivalent communications protocol compatible with the Siemen’s PXM controllers or
proposed systems controller.
Building Management System Procurement Guide | 49
Storage heaters are to be enabled by the BMS under demand from individual optimised
zone time schedules.
Contactor will be installed to facilitate BMS operation, and space temperature sensors will
be installed in each zone.
The optimiser will determine the required charging period to meet the requirements of the
zone. The optimiser will be self-learning so that it can adapt to the requirements of the
heating zone.
Each heating zone is to be provided with a plant extension switch on the control panel fascia
or mimic panel located in an area accessible to staff only.
The switches enable each zone to be extended for a 2-hour period (adjustable on the BMS).
The switch will be a spring return unit, a one shot operation. If operated during the normal
day the extension period will be added to the normal time schedule. If operated outside
normal hours the plant will operate immediately. Status of the switches shall be indicated
on the graphics.
Time extension switches should be provided for the HWS plant and ventilation plant.
A plant Auto/Manual (Hand) switch will be provided on the control panel. Maintenance staff
is to be instructed to use this switch only in a critical situation should they need to operate
any plant in hand and although hi-level alarm will be raised on the BMS, contact the
maintenance section.
Outside Air Temperature Sensors: Preferably, the sensor should come complete with an in-
built radiation shield to a minimum accuracy level of PT100. It’s highly recommended that
the sensor is positioned on a north facing wall away from the effects of direct sunlight.
Building Management System Procurement Guide | 50
Project:
Version:
Date:
Prepared
By:
Introduction
The purpose of this plan is to enable measurement and later verification of energy savings
due to the interventions discussed, whilst adjusting for changes in "Static Factors" and
"Energy Drivers" between pre-installation and post-installation measurement periods.
1.1 Savings to Quantify
Natural Gas
Grid Electricity
1.3 Climate Data
Half hourly gas consumption has been plotted against Heating Degree Days (refer to section
3.1) for each day from 1st January 2012 to 31st December 2012 inclusive.
5,000
4,000
(kWh)
Proposed Interventions
The intervention set has not been finalised, but the following interventions have been
considered in this plan:
Intervention Description
I1 Energy and Behavioural Management
The Energy Drivers & Static Factors that affect the demand on each system are presented in
the following table.
I1: Management and Climate (degree days - kWh /dd) Environmental Standards (Temp
Behavioural Pre- set)
Usage of Intermittent Spaces
(none teaching space (hours/yr)
Occupancy Density (average
pupil/m2)
I2: Data Management Climate (degree days kWh /dd) Environmental Standards (Temp
Pre- set)
Usage of Intermittent Spaces
(none teaching space (hours/yr)
Occupancy Density (average
pupil/m2).
I3: BMS / Controls Climate (degree days kWh /dd) Environmental Standards (Temp
Intervention Pre- set)
Usage of Intermittent Spaces
(none teaching space (hours/yr)
Occupancy Density (average
pupil/m2).
System Management – remote vs
local.
Building Management System Procurement Guide | 54
I1, I2 & I3 - Whole Facility – Single Gas Meter MPRN XXXXXXXXXX. Aspects are low
cost, low precision & accuracy.
I1, I2, I3 Main Gas Meter Profile Gas Consumption – Base Line (12mths) and Reporting
MPRN XXXXXXXXX Period (6months plus) – normalised for climate
I1, I2 & I3 - Gas saving for reduced demand on DHW & Heating circuits is
calculated by:
Measurement of gas usage during baseline, normalised for HDD over same period –
Measurement of gas usage during reporting, normalised for HDD over same period
and adjusted for reduced reporting period
Add permanent meters or temporary electrical loggers to Pool Pumps, AHU supply
and AHU Extract drives – Optional Requirement
Add permanent heat or “strap on“ heat meters to individual heating circuits, e.g.
radiator (VT), AHU (CT), Under Floor, DHW feed – Optional Requirement.
Add additional humidistat to AHU extract – Optional Requirement.
Install temperature loggers (£60+VAT each) to check environmental standards –
Optional