The document appears to be a Gantt chart and schedule for a bridge construction project. It includes a list of items with descriptions and durations in days. The chart then shows the scheduled timing of each item across monthly periods and calculates the planned periodic and cumulative accomplishment percentages.

Uploaded by

nur
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
241 views

Pert CPM

The document appears to be a Gantt chart and schedule for a bridge construction project. It includes a list of items with descriptions and durations in days. The chart then shows the scheduled timing of each item across monthly periods and calculates the planned periodic and cumulative accomplishment percentages.

Uploaded by

nur
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 8

ITEMS duration (day)

103(2) 33 BRIDGE EXCAVATION 2 3


103(3) 47 FOUNDATION FILL 3 6
400(4) 5 PRECAST CONCRETE PILE (0.40mx0.40m) 3 4
400(17)e 29 CONCRETE PILE CAST IN DRILLED HOLES 1.6m. DIAM. 4 5
400(21)e 11 SPLICING OF R.C. PILES W/ EPOXY (40cmx40cm) 5 7
400(22)a 13 PILE INTEGRITY TESTING (SONIC) SOIL CONDITION 6 7
400(24) 4 PERMANENT CASING (1.6m DIAM.) 7 8
401b 20 REINFORCED CONCRETE RAILINGS (DOUBLE) 8 9
404a 41 REINFORCED STEEL BAR (GRADE 40) 9 17
405c 2 STRUCTURAL CONCRETE CLASS A, BRIDGE SUPERSTRUCTURE 9 11
405(5) 2 SEAL CONCRETE (DEPOSTED IN WATER) 11 14
406(1)c 1 PRESTRESSED STRUCTURAL CONCRETE MEMBER (GIRDER TYPE I 14 15
412 3 ELASTOMERIC BEARING PAD 15 18
505(5) 86 GROUTED RIPRAP CLASS A 17 20
603(3)a 6 METAL GUARDRAIL W/ CONCRETE POST 18 20

102(2) 1 ROADWAY EXCAVATION 8 10


104(1) 5 EMBANKMENT FROM BORROW 10 12
105(1) 1 SUBRADE PREPARATION 12 13
200 1 AGGREGATE SUBBASE COURSE (0.23m THK.) 13 16
311(1)a 2 PCC PAVEMENT PLAIN - 0.23m THK. 16 19
505(5)a 6 CROUTED RIPRAP CLASS A 19 20
spl-1 10 PAINTING WORKS 20 21
spl-2 CONSTRUCTION HEALTH & SAFETY
spl-3 RENTAL OF FIELD OFFICE/BANKHOUSE
spl-4 MOBILIZATION/DEMOBILIZATION 1 2
spl-5 329 RENTAL OF SERVICE VEHICLES
1 2 3 4 5 6 7 8 9##################################################################################################################
##########################################################################################################################################
GANTT CHART W/ S-CURVE
CALENDAR DA
DURATION
ITEMS DESCRIPTIONS IN DAYS MONTH-1 MONTH-2 MONTH-3 MONTH-4 MONT
1 -30 31 -60 61-90 91-120 121-1
103(2) BRIDGE EXCAVATION 10.03% 33
103(3) FOUNDATION FILL 14.29% 47
400(4) PRECAST CONCRETE PILE (0.40mx0.40m) 1.52% 5
400(17)e CONCRETE PILE CAST IN DRILLED HOLES 1.6m. DIAM. 8.81% 29
400(21)e SPLICING OF R.C. PILES W/ EPOXY (40cmx40cm) 3.34% 11
400(22)a PILE INTEGRITY TESTING (SONIC) SOIL CONDITION 3.95% 13
400(24) PERMANENT CASING (1.6m DIAM.) 1.22% 4
401b REINFORCED CONCRETE RAILINGS (DOUBLE) 6.08% 20
404a REINFORCED STEEL BAR (GRADE 40) 12.46% 41
405c STRUCTURAL CONCRETE CLASS A, BRIDGE SUPERSTRUCTURE 0.61% 2
405(5) SEAL CONCRETE (DEPOSTED IN WATER) 0.61% 2
406(1)c PRESTRESSED STRUCTURAL CONCRETE MEMBER (GIRDER TYPE IV) 0.30% 1
412 ELASTOMERIC BEARING PAD 0.91% 3
505(5) GROUTED RIPRAP CLASS A 26.14% 86
603(3)a METAL GUARDRAIL W/ CONCRETE POST 1.82% 6
102(2) ROADWAY EXCAVATION 0.30% 1
104(1) EMBANKMENT FROM BORROW 1.52% 5
105(1) SUBRADE PREPARATION 0.30% 1
200 AGGREGATE SUBBASE COURSE (0.23m THK.) 0.30% 1
311(1)a PCC PAVEMENT PLAIN - 0.23m THK. 0.61% 2
505(5)a CROUTED RIPRAP CLASS A 1.82% 6
spl-1 PAINTING WORKS 3.04% 10
spl-2 CONSTRUCTION HEALTH & SAFETY
spl-3 RENTAL OF FIELD OFFICE/BANKHOUSE
spl-4 MOBILIZATION/DEMOBILIZATION
spl-5 RENTAL OF SERVICE VEHICLES

SCHEDULED PERIODIC ACCOMPLISHMENT 9.12% 17.33% 14.59% 14.89% 12.4


SCHEDULED CUMULATIVE ACCOMPLISHMENT 9.12% 26.44% 41.03% 55.93% 68.3
ENDAR DAYS
MONTH-5 MONTH-6 MONTH-7 MONTH-8 MONTH-9 %
121-150 151-180 181-210 211-240 241-254
100%
95.45%
90.91%
86.36%
81.82%
77.27%
72.73%
68.18%
63.64%
59.09%
54.55%
50.00%
45.45%
40.91%
36.36%
31.82%
27.27%
22.73%
18.18%
13.64%
9.09%
4.55%
0.00%

12.46% 9.12% 9.12% 9.12% 4.26%


68.39% 77.51% 86.63% 95.74% 100.00%
PROJECT TITLE
LOCATION
CONTRACT ID NO.
DURATION
ITEM NOS. Descreption of Works ITEM COST% DAYS 1 2 3 4 5 6 7 8 9
100 CLEARING & GRUBBING
102 ROAD WAY EXCAVATION
104 ENBANKMENT
105 SUGRADE PREPARATION
201 AGGREGATE BASE COURSE
311 PORTLAND CEMENT CONC.
500 CROSS PIPE CULVERT 910
SPL-1 CONST. HEALTH & SAFETY

TOTAL PROJECT COSST


ACCOMPLISHMENT %