Gauging Report: Epc-2 Flowline, Trunkline and Pipeline of Block A Gas Development Project Aceh

1) This document is a gauging report for the pipeline of Block A Gas Development Project in Aceh, Indonesia. 2) It provides details on the pipeline such as diameter, wall thickness, internal diameter, grade, and length. It also lists the compressor used and its specifications. 3) The report documents gauge plate measurements taken before and after a pigging run, including date, time, velocity, diameters, thicknesses, and materials. It was prepared by Medco E&P and reviewed by PT. KELSRI.

Uploaded by

HerruSetiawan
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
64 views

Gauging Report: Epc-2 Flowline, Trunkline and Pipeline of Block A Gas Development Project Aceh

1) This document is a gauging report for the pipeline of Block A Gas Development Project in Aceh, Indonesia. 2) It provides details on the pipeline such as diameter, wall thickness, internal diameter, grade, and length. It also lists the compressor used and its specifications. 3) The report documents gauge plate measurements taken before and after a pigging run, including date, time, velocity, diameters, thicknesses, and materials. It was prepared by Medco E&P and reviewed by PT. KELSRI.

Uploaded by

HerruSetiawan
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 4

EPC-2 FLOWLINE, TRUNKLINE AND PIPELINE OF BLOCK A GAS DEVELOPMENT PROJECT ACEH PT.

KEL

GAUGING REPORT
Line Dia : Report No : Date :
Joint No : From to
Section : From KP to KP

Piggging Direction from : (KP) to (KP)

OD (Inch) Wall Thick (mm) ID (mm) Grade Length (KM)

Min : Min :

Max : Max :
Compressor : Pressure Gauge : Serial No.

Make : Location : Model : Output


: Max.Pressure :

Gauge Plate Start End Avg. Velocity


(Km/Hr)
Dia (mm) Thk (mm) Material Date Time Date Time

Enclosure: Photograph Of Gauge Plate Before & After Run


Details of Gauge Plate Damages If Any:

Remarks :
Prepared by: Endorse by: Review by: PT. KELSRI
PT. Medco E&P Malaka PJIT
Prepare by, Approved QA/QC Manager
/ Coordinator

Name: Name: Name: Name: Date : Date


Date : Date :
JECT ACEH PT. KELSRI

port No : Date :

Volume (m3)

Range Calibration Due

Pressure (Bar or Kg/cm2)


Min Max
PT. KELSRI

Name: Date : Date :