API 572 Study Guide
API 572 Study Guide
Practice Questions
This following is a study aid that you can use to learn the details and content of API RP-572, Inspection of
Pressure Vessels. There will be about 15-25 questions from this document on the API 510 exam. We do
not spend time in class discussing this publication. So it is important that you become familiar with this
content in your personal study sessions. Note! The study guide does not at this time have any questions for
API 572 Appendix A. There will be some questions from Appendix A on the API exam.
The questions in this study aid are in the same order as API 572. An answer key will be provided in class.
It’s helpful to read a few pages of API 572 and then answer the questions associated with these pages. We
suggest that you do this study guide at least twice prior to the API exam.
1. Most pressure vessels are subjected to internal or external pressure that exceeds:
a) 5 psig.
b) 15 psig.
c) 25 psig.
d) 50 psig.
4. Shells constructed with multi-layers (a number of thin cylindrical sections) are normally used for
vessels having:
a) high design temperatures.
b) high design pressures.
c) exotic materials.
d) a small diameter.
6. What is the primary purpose for installing a lining on the inside of a vessel?
a) Resist corrosion
b) Improve heat transfer
c) Improve fluid flow by decreasing the friction inside the vessel
d) Minimized effort to clean vessel at future turnarounds
10. What is the most common feature of vessels that operate with a vacuum?
a) Internally braces
b) Stiffening rings
c) Refractory lining
d) Hemispherical heads
11. An optionally part of an exchanger that is used to protect the tubes at the inlet nozzle is called a(n):
a) baffle.
b) demister mat.
c) impingement plate.
d) strip lining.
12. What code is often used when constructing vessels that operate at high pressures?
a) ASME B&PV Code Section VIII Division 1.
b) ASME B&PV Code Section VIII Division 2
c) API/ASME Vessel Code.
d) TEMA
13. What codes are used when constructing a heat exchanger that is used in the petrochemical industry?
a) API 660, ASME Section VIII, TEMA
b) API 661, ASME Section VIII, TEMA
c) API 660, API 661, TEMA
d) API 660, API 661,. ASME Section VIII,
14. All vessel manufacturers that build vessels to ASME Section VIII must have:
a) an API 510 inspector on staff.
b) access to an AWS inspector.
c) a written quality-control manual.
d) a machine capable of making dished heads.
15. The vessel manufacturer stamps the vessel with the code symbol “U”. What is the meaning of a this
code stamp?
a) All applicable requirements of the ASME Code have been met
b) All requirements of the U-Section in the ASME Code have been met
c) Vessel has been hydrotested
d) Vessel has been radiographed
e) Vessel wall is of uniform thickness
17. An inspector should be familiar with any _____________________ that govern the inspection and
maintenance of pressure vessels.
21. List process conditions that that could change the corrosion rate.
1) ______________________________________________
2) ______________________________________________
3) ______________________________________________
4) ______________________________________________
5) ______________________________________________
28. Match up the corrosion mechanism with the applicable material. (SCC = stress corrosion cracking)
A) Chloride SCC _____ Alkaline systems
B) Polythionic SCC _____ Non-stress relieved carbon steel
C) Caustic SCC _____ Stainless steel
D) Amine SCC _____ Operating temperatures over 400 oF
E) Carbonate SCC _____ Sensitized stainless steel
29. When checking for cracks, which of the following inspection techniques is useful only for surface
or near-surface cracks?
a) Acoustic emission
b) Eddy current
c) Radiography
d) UT angle beam
30. What is a useful technique to use to evaluate the vessel cladding from outside surface of the vessel?
a) Acoustic emission
b) Eddy current
c) Profile radiography
d) UT thickness gauging
31. During an internal inspection, operating deposits are found in a specific section of the vessel. The
inspector must:
a) have all deposits removed.
b) determine the cause of the deposits.
c) determine if corrosion is occurring under the deposits.
d) record the volume of the deposits.
37. What NDE method checks for cracks by increasing the vessel pressure above its normal operating
pressure?
a) Acoustic emission
b) Eddy current
c) Guided wave UT
d) MFL
42. Which of the following can permeate steel (migrate through the steel)?
a) Atomic hydrogen
b) Atomic hydrogen and molecular hydrogen
c) Atomic hydrogen and atomic helium
d) Molecular hydrogen and helium
45. HTHA can occur in 1-¼ chrome steels at temperatures above __________ oF.
46. What publication provides safe operation limits for steels operating in hydrogen service?
a) ASME Section II
b) ASME Section VIII
c) API 579
d) API 941
e) API 2201
47. High temperature sulfidation can begin to occur at temperatures above __________ oF.
49. A partial buried vessel should be inspected for soil-to-air corrosion. To perform this inspection, the
soil should be excavated:
a) 1 to 2 inches.
b) 3 to 6 inches.
c) 6 to 12 inches.
d) 12 to 36 inches.
51. What is a common micro-organism in soils that can cause biological corrosion?
a) amoebas
b) chloride-reducing bacteria
c) sulfate-reducing bacteria
d) oxygen-reducing parasites
66. Which of the following deterioration mechanisms can be corrected by annealing the steel?
a) Decarburization
b) Dealloying
c) Temper embrittlement
d) HTHA
67. The most common method to check for freeze damage is by:
a) visual inspection.
b) eddy current examination.
c) digital UT.
d) angle beam UT.
69. Which of the following is NOT a potential result of an improper heat treatment?
a) High residual stresses
b) Increased density of material
c) Hard zones in material
d) Soft zones in materials
e) Increased material strength
f) Decreased material strength
g) Increased susceptibility to cracking
70. When setting the inspection interval for the internal inspection, an interval is selected so that at the
next inspection:
a) the wall thickness is not less than the minimum required thickness.
b) at least 0.100” of corrosion allowance remains.
c) at least 25% of the current corrosion allowance should still remain.
d) at least 50% of the current corrosion allowance should still remain.
71. One important factor in developing an inspection plan for the next inspection is to occasionally
check the:
a) Operating department’s equipment records.
b) Maintenance department’s equipment records.
c) Financial department’s equipment records.
d) Environmental department’s equipment records.
73. A vessel has a refractory lining. During the internal inspection, an small area of damaged refractory
is found. It is now important to:
a) replace the refractory with superior materials.
b) remove enough of the refractory to determine the condition of the base metal.
c) remove the damaged refractory plus 50% more to determine the base metal condition.
d) remove and replace all the refractory in the entire vessel.
75. When performing a PT examination inside an exchanger shell, what is one potential problem?
a) Residual penetrant can cause crevice corrosion
b) Residual penetrant can cause steel to become anodic
c) Vapors from the exam can displace air
d) It is more difficult to prepare the shell for the exam as compared to other NDE methods
82. What examination method is normally used to examine in-service anchor bolts?
a) Visual
b) UT
c) Eddy current
d) Hammer-testing
e) Acid etching
83. What is the best way to prevent external corrosion on structural steel?
a) Painting
b) Fireproofing
c) Galvanizing
d) Insulation
85. What is one important item to check during an External inspection of an exchanger?
a) Surface temperature at the inlet and outlets
b) The floating end of the exchanger is free to slide on it’s support
c) Determine the fluid flow rate through both the shell side and tube side of the exchanger
d) Measure the clearance between the shell and the ground
88. Which of the following would be most affected if a vessel foundation experiences excessive
settlement?
a) Stiffener rings
b) Relief devices
c) Nozzles with attached piping
d) Manways
e) Top head
90. Catalytic reformer vessels may have creep damage if the operating temperature is above _______ oF
91. The grooves on an existing ring-joint flange should be checked for ___________________.
94. Vessel grounding connections are primarily needed to provide a path for electrical current from:
a) a lighting strike or from a welding machine.
b) a lighting strike or from static electricity.
c) a welding machine or from an electrical short.
d) an electrical short or from static electricity.
95. The maximum permitted resistance-to-ground for a vessel grounding system is:
a) 0.5 ohms.
b) 5.0 ohms.
c) 10 ohms.
d) 25 ohms.
e) 50 ohms.
97. Where are two likely areas where paint failures occur?
a) Top heads and nozzles
b) Weld seams and nozzles
c) Top heads and moist crevices
d) Weld seams and moist crevices
e) Nozzles and moist crevices
98. What two on-stream NDE techniques may be able to locate moist insulation?
a) Real-time RT and Thermography
b) Real-time RT and MFL
c) Neutron back scatter and Thermography
d) Neutron back scatter and MFL
e) Neutron back scatter and Real-time RT
f) Thermography and MFL
100. The minimum number of TML’s required for a routine vessel is at least _______ thickness
reading(s) on each shell ring, and _______ thickness reading(s) on each head.
101. A vessel operates in a cyclic temperature service. The vessel support-to-vessel welds should be
checked using MT or PT to check for:
a) stress corrosion cracking.
b) fatigue cracking.
c) polytheonic cracking.
d) HTHA.
108. Why is wet fluorescent magnetic particle testing often used to detect certain types of cracking?
a) Easier to perform than other types of MT
b) Requires less effort to qualify the NDE examiner as compared to dry MT
c) More sensitive technique as compared to dry MT
d) Equipment to perform the exam is less expensive than what is needed for other MT exams
109. Tough question! The temperature of a hot-spot on a refractory lined vessel should be periodically
checked. Which of the following is NOT an acceptable method for checking the temperature?
a) Portable thermocouple
b) Thermography
c) Temperature indicating crayons.
d) Place your hand on surface for exactly 1 second. Calculate the vessel temperature based on
the depth of the 3rd degree burns on your hand.
110. A hot-spot has developed on a refractory lined carbon steel vessel. During the next internal
inspection the wall at the hot-spot should be metallurgically examined whenever the metal
temperature has exceeded:
a) 450 oF.
b) 750 oF.
c) 850 oF.
d) 1100 oF.
111. Normal vessel cleaning methods, like steam cleaning, usually are adequate to meet the inspector’s
needs for an internal inspection. Extra cleaning such as abrasive-grit or water blasting may be
required when inspecting for:
a) localized thin areas.
b) deep pitting.
c) stress corrosion cracking.
d) thermal fatigue cracking.
114. A vessel subject to wet hydrogen sulfide or cyanide environments is susceptible to.
a) cracks in the base metal.
b) cracks in the weld and heat affected zones.
c) localized thin areas (LTA’s).
d) extensive pitting.
115. If sludge settles on the bottom head of a vessel, what corrosion mechanism is likely to occur?
a) Stress corrosion cracking
b) Dealloying
c) Concentration cell corrosion
d) Sludgitization
116. If steam is injected into a vessel, a likely place for corrosion is on the:
a) inlet nozzle.
b) vessel wall opposite the nozzle.
c) vessel wall directly below the nozzle.
d) vessel’s anchor bolts. (once again proving it is difficult to come up with 3 wrong answers!)
117. When a reboiler is used with a tower (fractionating column), a common place for corrosion is:
a) the inlet to the reboiler.
b) top head of the tower.
c) at the tower where the hot process returns.
d) at the tower where the cold process returns.
120. Exchangers in cooling water service have the highest corrosion rates where the:
a) velocity is the highest.
b) velocity is the lowest.
c) ph is the highest.
d) water temperature is the highest.
123. List 4 major areas where cracks occur in vessels made of low chromes (i.e. 1-1/4 & 2-1/4 Cr).
a) __________________________________________
b) __________________________________________
c) __________________________________________
d) __________________________________________
127. Often corrosion will occur on the shell of an exchanger at the location of the baffles. An easy way
to find this corrosion is by:
a) spot UT.
b) visual examination.
c) eddy current testing.
d) shining a flashlight beam parallel to the shell.
130. Existing exchanger shells sometimes become out of round making it difficult to reinsert the bundle.
What is the most common cause of exchanger shell out-of-roundness?
a) Over pressure
b) Elevated temperature
c) Metal fatigue
d) Creep
e) Welding repairs to the shell
f) Meteor strike
134. Bulged linings are often the indication of a _______________ in the liner.
135. Whenever there are indications that a metallic liner has leaked, it is important to determine the:
a) thickness of the liner.
b) displacement of the bulged area.
c) condition of the base metal under the liner.
d) the identification of the welder who previously installed the liner.
137. What are the two primary purposes for refractory linings?
1) ____________________________________________
2) ____________________________________________
140. Spark testing is being performed on a coating. What happens if the voltage on a spark tester
exceeds the dielectric strength of the coating?
a) Coating will become magnetic
b) Strength of the coating bond increases
c) A hole is “blown” in the coating
d) Coating will crack
e) Creates a nuclear chain reaction that will destroy the entire universe
143. When a refractory lining cracks, what is a common problem that occurs to the base metal?
a) Dew point corrosion
b) Dealloying
c) Excessive thermal stress
d) Brittle failure
148. What is the most important concern when hydrotesting a large in-service vessel?
a) Rope off an area equal to 1000 sq. ft. for every 1’ of vessel height
b) Provide multiple calibrated pressure gauges
c) Assure the water used has less than 50 ppm of particulates
d) Assure vessel foundation and supports are adequate for the hydrotest weight
150. A pneumatic pressure test is performed on a large vessel. What is one way to determine the
location of remote leaks?
a) Block-in the vessel and see if the pressure drops
b) UT leak detector
c) Binoculars
d) Thermography
151. A vessel is being vacuum tested. What is one negative aspect of a vacuum test?
a) Location of leak is not easily identified
b) There are additional safety precautions as compared to a hydrotest
c) Creating the vacuum requires expensive equipment
d) The vacuum must be held for 24 hours
153. An in-service vessel has a shell thickness of 1.25”. The minimum metal temperature allowed
during a pressure test is:
a) 10oF.
b) 30oF.
c) 60oF.
d) 10oF. above the vessel MDMT.
e) 30oF. above the vessel MDMT.
154. When performing a pneumatic pressure test, the requirements of which code should be followed?
a) ASME B&PV Section I
b) ASME B&PV Section V
c) ASME B&PV Section VIII
d) ASME B31.3
e) API 579
f) API 2201
155. A shell-side pressure test is being performed on an exchanger with a floating head bundle. The
bundle is in the shell and the channel cover is removed. This test will show overall bundle integrity
and can be used to specifically locate which of the following leaks?
a) Stationary tubesheet roll leaks
b) Floating head tubesheet roll leaks
c) Floating head gasket leak.
d) Leaking tubes
e) The exact location of any leak cannot be determined with this test
156. A tube-side pressure test is being performed on an exchanger with a floating head bundle. The
bundle is in the shell and the piping connected to a bottom shell nozzle is removed. This test will
show overall bundle integrity and can be used to specifically locate which of the following leaks?
a) Stationary tubesheet roll leaks
b) Floating head tubesheet roll leaks
c) Floating head gasket leak.
d) Leaking tubes
e) The exact location of any leak cannot be determined with this test
157. A tube-side pressure test is being performed on an exchanger with a floating head bundle. The
bundle is outside the shell and a test head is bolted to the stationary tubesheet. This test will show
overall bundle integrity and can be used to specifically locate which of the following leaks?
a) Stationary tubesheet roll leaks
b) Floating head tubesheet roll leaks
c) Floating head gasket leak.
d) Leaking tubes
e) Roll leaks on both ends, tube leaks, and floating head gasket leaks
f) The exact location of any leak cannot be determined with this test
159. During a bundle pressure test, a tube roll-leak is discovered. The inspection results indicate that the
other tubes are acceptable for a future operational run. The leaking tube is normally:
a) replaced in kind.
b) replaced with improved metallurgy.
c) plugged.
d) removed.
e) rerolled.
160. Before applying a hydrotest to the shell-side of a carbon steel bundle, it is important to:
a) determine whether the tubes are thick enough for the external pressure.
b) determine how far an area should be roped off..
c) assure that all tubes have been seal-welded at the tubesheet.
d) check the chloride content of the water.
162. A shell has a minimum thickness of 0.352” and has a corrosion allowance of 0.125”. The total
thickness needed is 0.477”, so the designer orders 0.500” plate. The extra 0.023” is usually
consider extra corrosion, but often the designer uses the “extra” metal (and the extra is no longer
extra):
a) in the design of vessel stiffening.
b) in the design of nozzle reinforcement.
c) to improve the joint efficiency.
d) to minimize the number of RT’s..
163. Which of the following components usually does NOT have a specified minimum thickness?
a) Top head
b) Nozzle reinforcement
c) Metallic liner
d) Platform handrail
e) Internal baffle
164. If a jurisdiction requires a vessel repair to meet the National Board Inspection Code, what stamp
would have to be used by the Repair Organization?
a) A
b) U
c) UV
d) R
e) VR
MSTS 21 September 2005
API 572 Study Guide
Practice Questions
165. A corroded shell area that has an area of 2.5 ft2 is built-up with weld metal. How should the repair
area normally be inspected?
a) Visual examination
b) Visual examination and either MT or PT
c) Visual examination and spot UT
d) Visual examination and eddy current