Visual Inspection Report: I. General Information

The visual inspection report summarizes the inspection of the Bureau of Jail Management and Penology building. The 2-story reinforced concrete and steel structure is used for jail and office space. Additional restrooms and a light shelter were added without affecting the structure. The inspection found minor ceiling leakage but no other structural defects, damage, cracks, settlement, or termite infestation.

Uploaded by

Erol Vasquez
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
82 views2 pages

Visual Inspection Report: I. General Information

The visual inspection report summarizes the inspection of the Bureau of Jail Management and Penology building. The 2-story reinforced concrete and steel structure is used for jail and office space. Additional restrooms and a light shelter were added without affecting the structure. The inspection found minor ceiling leakage but no other structural defects, damage, cracks, settlement, or termite infestation.

Uploaded by

Erol Vasquez
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

VISUAL INSPECTION REPORT

I. General Information
a) Name of the Building : BUREAU OF JAIL MANAGEMENT AND PENOLOGY
b) Location of the Building : Sitio Balacan, Brooke’s Point, Palawan
c) Building level : 2-storey with accessible roof deck
d) Usage of the Building : Jail & Office

II. Structural System


a) Materials : Reinforced Concrete, Steel, Timber

III. Survey of Loading on the Structure


a) The existing usage and loading condition is compatible with the intended
purpose of the Structure.

IV. Survey of Addition or Alteration Works to Structure


The following facilities were added integrated/added on the originally completed
structure.
a) Two additional comfort rooms, one at the roof deck, the other one is at the rear
side of the structure.
Assessment:
b) Light material shelter at the roof deck.
Assessment:
V. Survey of Signs of Structural Defects, Damages, Distress, Deformation or Deterioration
a) No excessive beam deflections.
b) No visible cracks on the following parts of the structure: floor, walls, beams &
columns.
c) No noticeable floor and foundation settlements.
d) No visible termite infestation.
e) Minor leakage is present along the small portion of the ceiling.
Recommendation:
f) No signs of corrosion.
VI. Sketches, Plans & Photograph

VII. Conclusion